.md · 1 sections · 8578 characters
workbench:Research Packages/Monetary Cross-Cuts/Authority Through the Adapter 2025-2026/AUTHORITY_CONTROL_POINT_EVIDENCE_MATRIX_2025-2026.md
Source SHA-256: f1f2b59c313cf320c78156f4d54d55f0d4f6aca7bb8a1ce7959229dbd944c7cf
Evidence cutoffs by research owner: {"artifact:393355d0d8114cc0": ""}
Saved source text, not a new finding. Markdown notation and table delimiters are retained.
Lines 1–71 · Section 1 of 1
# Authority Through the Adapter — Control-Point Evidence Matrix
Cutoff: 2026-08-31T10:42:24-04:00 America/New_York
Use: factual comparison beneath the interpretive deep dive
Stage vocabulary: F0 narrative, F1 authority, F2 constitution,
F3 readiness, F4 consequence, F5 stress/exit
## Monetary and securities cases
| Case | New machinery | Legal claim / issuer | Authoritative record | Finality / cash | Eligibility / collateral | Correction / failure power | Evidence state | Authority movement |
|---|---|---|---|---|---|---|---|---|
| Japan / Project Agorá | multi-currency shared programmable platform | tokenised reserves issued by central banks; tokenised deposits issued by commercial banks | jurisdictional and unifying ledgers inside controlled prototype; external core/RTGS records remain required | atomic inside prototype; issuance/redemption connect to external RTGS/core systems | participant and scenario scope set by testing agreement | maker-checker, manual approvals, operational facilitator, runbook and fallback | F4 for 30 controlled real-value transactions; not production |
execution migrated into prototype; issuer, external money and fallback authority retained |
| Japan / Canton JGB repo-DvP PoC | synchronized blockchain workflow | statutory book-entry JGB and undecided cash leg | legal JGB remains in Book-Entry Transfer Act account system; chain state synchronized | cash architecture and completed DvP unresolved | test participants and instruments selected by consortium | production error/default rule unpublished | F2-F3 |
workflow state moves; legal security record does not |
| Japan / DCP | competing tokenised-deposit and stablecoin link designs | bank deposits and/or regulated token claim depending on selected design | architecture still under validation | possible existing-settlement-system link; final form unresolved | 43-company controlled validation | failure and reversal terms unpublished | F3 |
design contest inside bank/regulatory perimeter |
| SWIFT shared ledger | Besu/EVM-compatible shared orchestration ledger | bank-issued tokenised deposits | banks' own ledgers and the SWIFT commitment layer perform different roles | existing RTGS, correspondent or agreed mechanisms remain final route | SWIFT and participating-bank rules; public constitution incomplete | banks retain keys, assets and funding; loss/fallback terms still incomplete publicly | F3; ready for controlled initial use, 17 banks preparing pilots |
orchestration moves; balance-sheet and settlement authority retained |
| DTC tokenization service | tokens on approved L1/L2 networks plus off-chain LedgerScan | DTC security entitlement under Article 8; registered owner remains Cede & Co. | LedgerScan constitutes DTC's official books and records for tokenised entitlements | initial service does not settle in digitised form; traditional settlement requires detokenization | DTC selects eligible securities, networks, protocols and registered wallets; no initial DTC risk-management collateral value | protocols must support distribution control and reversibility; DTC addresses error, loss and malfeasance | F1-F3; authorized limited production service, broader operation pending |
participant transfer instruction moves on-chain; legal framework, official record and reversal remain DTC-governed |
| Eurosystem / Pontes | bridge plus Eurosystem DLT platform | central-bank money and regulated private settlement assets | market ledgers plus T2 / Eurosystem DLT according to leg and phase | initial cash-leg legal finality in T2; later native Eurosystem-DLT finality planned | Eurosystem defines eligible participants, operators and assets | TARGET/Eurosystem rulebook and central-bank liquidity perimeter | F3; September 2026 launch pending at cutoff |
state operational perimeter expands into DLT; private market ledgers remain plural |
| UK / GBTD | tokenised sterling deposits and programmable payments | participating commercial-bank deposit | bank and pilot records; general-production constitution not yet published | BoE Synchronisation Lab explores atomic settlement in central-bank money | seven participating banks and selected use cases | conventional deposit protections stated; production failure terms pending | F3; pilot underway, completion and recurring production not established |
programmability moves; bank liability and public settlement anchor remain |
| Case | Portable / programmable object | Native authority retained | Private or distributed role | Stress / loss boundary | Evidence state | Comparison limit |
|---|---|---|---|---|---|---|
| JBIC/NEXI U.S. gas-power finance | signed loans, insurance cover and project milestones | Japanese public lenders/insurers define eligible project and covered risk | sponsors, commercial lenders, EPC and operators build and run assets | policy/loan terms assign ordinary loss; systemic or political support remains public-policy-facing | F2 signed instruments; no draw/operation proof |
capital adapter, not a digital-ledger case |
| Insurance and reinsurance | models, policies, capital and claims data | regulators define admissible capital; statutes and public pools define residual loss | carriers, reinsurers, brokers, models and ILS distribute risk | claim, insolvency, assessment and public-backstop waterfall | mixed F3-F5 by program |
shows failure constitution, not monetary finality |
| Federal Scientific Trust Stack | identity, provenance, attestations, agent delegation and execution logs | award, export, FOCI, data, facility and security authorities keep separate legal effects | interoperable credentials, analytics, platforms and agents carry evidence and execute bounded tasks | suspension, termination, correction, appeal and retraction remain authority-specific | production components; joined stack missing | administrative analogy, not proof about money |
### Europe and the United Kingdom