.md · 3 sections · 27244 characters
workbench: Research Packages/Federal Government Weekly Delta 2026-09-11/waves/WAVE_2D_MILITARY_DIRECT_SITES.md
Canonical source SHA-256: da328624cc1f8ea673a711b0e5f224e18a76caa072c05058b7b9b75ac99de7e9
Served copy SHA-256: da328624cc1f8ea673a711b0e5f224e18a76caa072c05058b7b9b75ac99de7e9
Owner evidence cutoffs: {"federal-government-weekly-delta-2026-09-11": "2026-09-11T16:01:37-04:00"}
These are package-level cutoffs, not a claim that this source was rechecked on those dates. Use its own publication and capture dates.
Owners: federal-government-weekly-delta-2026-09-11
Section 1 of 3
# Wave 2D — military direct sites
Window: exclusive after 2026-09-03 20:09:34 EDT through frozen cutoff 2026-09-11 16:01:37 EDT
Inclusive replay: 2026-09-03 date-only publishers, then dedupe against Weekly Delta 2026-09-03, especially waves/WAVE_2D_MILITARY_DIRECT_SITES.md
Discovery rule: official service, combatant-command, Guard/Reserve, PEO, personnel, acquisition, and operational surfaces. Federal Register is not discovery.
Lane: Purse-military. Do not recensus classified ops.
Already in 1C/2C — fold, do not duplicate as a new atomic
Award ≠ obligation ≠ payment ≠ delivery ≠ fielding ≠ combat effect. 403 ≠ missing. Classified/nonpublic is classified_nonpublic, not inactivity.
### 1. War announced a planned Crane microreactor; installation is not yet done
Actor: Department of War; Army Janus Program; ASN (EI&E); OUSW(R&E); OASW(CT); DIU; State of Indiana; Naval Weapons Station Crane
Clocks: announced 2026-09-09. Planned installation no later than September 2028. Safety, environmental, regulatory, and installation processes remain open.
URL: War release
Disposition: promotion_review
Commercially owned and operated Micro Modular Reactor at NWS Crane, framed as Indiana’s first advanced nuclear MMR and the Navy’s first shore-based advanced microreactor under Janus. Cross-service: Army is named executive agent for installation nuclear energy. This is an announced deployment plan, not a reactor in the ground, not an NRC license, not first megawatt-hour, and not a DPA Title III award.
Claim limit: Announcement ≠ site work start ≠ licensed operation ≠ grid independence demonstrated. “No later than September 2028” is a target, not a completed installation.
### 2. Air Force exercised an $826 million JASSM/LRASM large-lot production modification
Actor: Air Force Life Cycle Management Center, Eglin AFB; Lockheed Martin Missiles and Fire Control
Clocks: announced on the 2026-09-09 War contracts page as modification P00020 to FA8682-24-C-B001. Work expected through 2030-07-31.
URL: Contracts for Sept. 9, 2026
Disposition: promotion_review
Modification brings cumulative face value to $10,480,052,550 from $9,654,077,070. Funds obligated at award mix FY24–FY26 missile/weapons procurement, RDT&E, O&M, and $11,070,988 FMS. This is a production-lot option exercise on an existing large-lot contract, not first article, not delivery, not fielding, and not combat use.
Claim limit: Modification ≠ missiles delivered ≠ inventory increase observed ≠ FMS transfer complete.
### 3. Army awarded a $581 million IDIQ to stand up an IMX-104 manufacturing facility
Actor: Army Contracting Command, Rock Island; Nitradyn LLC
Clocks: announced 2026-09-09. Estimated completion 2030-08-09. Work locations and funding determined with each order.
URL: Contracts for Sept. 9, 2026
Disposition: promotion_review
Firm-fixed-price IDIQ to design, construct, and commission a facility to manufacture Insensitive Munition eXplosive-104. Industrial-base construction vehicle, not explosive produced, not loaded warheads, not a plant in operation.
Claim limit: Facility IDIQ ≠ commissioned plant ≠ IMX-104 output ≠ ammunition in inventory. Orders, not the ceiling, will move money.
### 4. Navy awarded NGEAU full-rate production IDIQ ($184.25 million)
Actor: Naval Surface Warfare Center Crane; General Dynamics Mission Systems
Clocks: announced 2026-09-10. Completion expected September 2032. Sole-source under 10 U.S.C. 3204(a)(1).
URL: Contracts for Sept. 10, 2026
Disposition: promotion_review
FFP/CPFF IDIQ for manufacture of Full Rate Production of Next Generation Electronics Attack Units, NGEAU sustainment, and Advanced Capability Mission Computer future sustainment. Obligated at award: FY26 APN $29,691,536 (74.1%) and FY25 APN $10,365,451 (25.9%). FRP award is not units delivered or EA aircraft modified.
Claim limit: FRP IDIQ ≠ first production lot shipped ≠ fielded NGEAU ≠ combat EA effect.
### 5. Navy exercised MK 48 MOD 7 All-Up-Round production options ($257.3 million)
Actor: NAVSEA; Lockheed Martin, Liverpool
Clocks: awarded 2026-09-03; announced on the 2026-09-09 contracts page. Completion expected September 2029.
URL: Contracts for Sept. 9, 2026
Disposition: promotion_review as an in-window publication clock of a Sept. 3 award. Date-only 09-03 replay then keep because 09-03 WAVE_2D did not carry this object.
Option exercise for production, spares, production-support material, engineering, and hardware repair of MK 48 Heavyweight Torpedo AUR / MOD 7. Mix: Navy (FY24–FY26 WPN) plus foreign-partner funds $74,799,495 (30%), including Royal Australian Navy. Option exercise is not torpedoes delivered.
Claim limit: Option exercise ≠ AUR accepted ≠ loaded on a submarine ≠ FMS delivery complete. $1,216,670 FY24 WPN expires at FYE.
### 6. Space Force selected Lake Kickapoo, Texas, as preferred DARC Site 3
Actor: USSF; Space Systems Command / Mission Delta 2; 20th Space Surveillance Squadron; UK and Australia as MOU partners
Clocks: announced 2026-09-09. Construction expected to begin 2027 after contract award and approvals; civil construction complete 2029; operational acceptance planned 2030. Site 1 (Western Australia) completed Dec 2024 / early-use 2025. UK Pembrokeshire still pending planning approval.
URL: Space Force
Disposition: promotion_review
Preferred-location / project-planning approval for the third and final Deep Space Advanced Radar Capability site. Completes the planned U.S.–UK–Australia trilateral GEO-coverage architecture. Not a construction start, not a radar radiating, not operational acceptance.
Claim limit: Preferred location ≠ contract award ≠ construction start ≠ 24/7 GEO coverage. UK site remains unapproved.
### 7. Hawaii Guard remained on state active duty for Lala recovery and staged for Hurricane Lowell
Actor: Hawaii National Guard; Hawaii Emergency Management Agency
Clocks: article 2026-09-08. As of 2026-09-07, 194 personnel on state active duty. Task Force Kauai staging 47 personnel for Lowell; Chinook resupply photographed 2026-09-09. Lala recovery still running on Hawaii Island/Maui.
URL: National Guard
Disposition: promotion_review as a later operating clock on the 09-03 Lala/Moke object, plus a new Lowell posture.
09-03 WAVE_2D owned Kauai/Oahu end-of-response with continuation on Hawaii Island and Maui (up to 250 activated). This window’s state is dual-mission: Lala debris/wellness (72,000+ lb debris; 421 safety checks as of Sep 4; Maui 80 damage assessments / 2,295 ft roadway) and Lowell staging. Volunteers on SAD; ~5,500 available. Statement of sister-state pledges is not a Title 32 or Title 10 order.
Claim limit: SAD count ≠ Title 10 mobilization. Staging ≠ storm impact. Debris pounds ≠ recovery complete.
### 8. Washington Guard closed a 44-day wildfire aviation/hand-crew activation
Actor: Washington National Guard; Washington DNR
Clocks: mission ended 2026-09-04; article 2026-09-08. Mobilized from 2026-07-18.
URL: National Guard
Disposition: promotion_review
Agency-reported output: 474.7 flight hours, 2,044 water-bucket drops, 1,943,269 gallons. First operational use of a WAARNG UH-72 Lakota as a helicopter command platform (Sinlahekin Fire). Hand crews on Little Giant Fire; traffic-control support after Spokane Complex. This is an operational self-report of mission end, not acres saved or fires contained.
Claim limit: Gallons dropped ≠ containment. First Lakota C2 use ≠ fleet conversion. Conclusion ≠ no further 2026 fire tasking.
### 9. Super Garuda Shield executed combined joint land-strike live fire
Actor: U.S. Army (HIMARS, AH-64); U.S. Marine Rotational Force–Darwin; Indonesian Army/Marines/Air Force
Clocks: live-fire 2026-09-04 and 2026-09-07; article 2026-09-08. Airborne jump opening field training 2026-09-04 (article 2026-09-05). Exercise window still Aug 31–Sep 11 as owned in 09-03.
URLs: joint land strike; airborne jump
Disposition: promotion_review as in-window exercise events on an already-owned Super Garuda Shield 26 object. Do not recensus the Aug 31 kickoff.
Ground: U.S. M142 HIMARS, Indonesian ASTROS II Mk6, Indonesian Marine RM-70. Air: Indonesian F-16s; U.S. and Indonesian AH-64s. Jump: 200+ U.S./partner paratroopers into Baturaja. Exercise ≠ deployment commitment, treaty, or combat engagement.
Claim limit: Live fire in an exercise ≠ combat strike. HIMARS presence ≠ permanent basing.
### 10. Yama Sakura 91 closed as a trilateral CPX
Actor: U.S. Army; Japan; Australia
Clocks: held 2026-09-02 through 2026-09-10 close at Camp Asaka. Article 2026-09-10.
URL: Army
Disposition: promotion_review
46th iteration; command-post exercise across Japan plus JBLM, Washington. Start sits before exclusive start; close is in-window. CPX completion is not a new basing, contingency plan executed, or combat readiness independently measured.
Claim limit: Exercise close ≠ operational plan executed.
### 11. Phoenix Express 2026 began in Tunisia
Actor: U.S. 6th Fleet / Naval Forces Africa; AFRICOM-sponsored; Tunisian Navy host
Clocks: began 2026-09-07 at La Goulette; 12-day / 21st iteration. Navy story 2026-09-08.
URL: Navy
Disposition: promotion_review
Participants named: Algeria, Belgium, Egypt, France, Georgia, Italy, Libya, Morocco, Tunisia, Türkiye, Saudi Arabia, Spain, United States. Maritime-security exercise, not a new basing or engagement.
Claim limit: Exercise start ≠ interdiction totals ≠ EEZ enforcement outcome.
### 12. Keel laid for future USS John E. Kilmer (DDG 134)
Actor: Navy; General Dynamics Bath Iron Works
Clocks: ceremony 2026-09-10 at Bath, Maine. Navy press-release index same day.
URL: Navy press-release index (10 September 2026 item)
Disposition: promotion_review
Keel laying is a construction-milestone ceremony, not launch, not delivery, not commissioning, not a Flight III combatant in the fleet.
Claim limit: Keel ≠ hull complete ≠ acceptance trials ≠ in commission.
Section 2 of 3
## Folded or clock-only (do not recensus as new actions)
| Object | Owner | This delta |
|---|---|---|
| NNSA Y-12 B61-13 CSA complete (stamp 2026-09-01; announced 2026-09-10) | 2C civilian DOE | Fold. No War, Pantex, or service-site later clock retrieved. CSA ≠ Pantex assembly ≠ War acceptance ≠ deployed B61-13. |
| EO 14427 DPA delegations | 1A legal / 1C industrial | No War DPA instrument in this window. Last retrieved War DPA Title III on war.gov was out of window (BAE RH45 July 7; germanium Jan 29). Aug 31 Camden Copper foil is IBAS, not DPA, and is before exclusive start. |
| Gen. Schiess CSO installation; Day-One message | 09-03 WAVE_2D | Fold. Leadership transition, not force-structure change. |
| Navy Millington / Project THETIS migration | 09-03 WAVE_2D | Fold. Migration ≠ THETIS complete. |
| DAF shaving-profile / CBRN / chaplain guidance | 09-03 WAVE_2D | Fold. No new in-window implementing MARADMIN/DAFI retrieved. |
| MARADMIN 405/26 FY2027 enlistment bonuses | 09-03 WAVE_2D | Fold. |
| M18 handgun supplemental inspection final report | 09-03 WAVE_2D | Fold. |
| NGB FORGE hybrid-microgrid APFIT | 09-03 WAVE_2D | Fold. Award ≠ fielding. |
| GTRI CAML prototype OTA (Aug 21) | 09-03 WAVE_2D | Fold. Prototype ≠ production. |
| SC Guard first HH-60M (Aug 27 arrival) | 09-03 WAVE_2D | Fold. One of three. |
| Northern Viking 26 concluded Sep 3 | 09-03 WAVE_2D | Navy/6th Fleet Sep 4 wrap is the same close. Fold. |
| Super Garuda Shield 26 kickoff Aug 31 / through Sep 11 | 09-03 WAVE_2D | Keep only in-window events (objects 9). Do not recensus kickoff. |
| PACAF Nepal C-130J (Sep 2) | 09-03 WAVE_2D | Fold. |
| Abraham Lincoln CSG Thailand arrival Sep 2 | 09-03 WAVE_2D | Later clock: CSG departed Thailand Sep 6. Port departure ≠ CENTCOM re-entry. Pacific Fleet |
| USS Delaware Tromsø arrival Sep 1 | 09-03 WAVE_2D | Later clock: concluded routine port visit Grøtsund Sep 7. Presence ≠ new basing. |
| MAFFS 1,070,017 gallons through Aug 31 | 09-03 WAVE_2D | Fold. |
| Atlas Angel II start Aug 31 | 09-03 WAVE_2D | Montana/Sri Lanka Sep 4 close article is the same five-day SME exchange. Fold. |
| Guam–Nebraska–RMI partnership (signed Aug 25) | 09-03 WAVE_2D | Fold. |
| Guard leadership statements (435k; MAVEN; NGRF 22k; IBCT conversions) | 09-03 WAVE_2D | Fold. Statement ≠ appropriation. |
| Heaviside MOTH $99M (awarded Aug 27) | 09-03 contracts / WAVE_2C industrial line | Fold the award. Sep 10 CPE-ISW REWSI article is a later wrapping (below). |
| TITAN initial production; HEL production; Anniston FORGE OTA | 09-03 WAVE_2C | Fold. No in-window delivery receipt. |
| Copper-foil IBAS $37.2M (announced Aug 31; award Apr 27) | pre-window War industrial | Fold. Not DPA; not this window. |
## Additional in-window objects (lower rank or grouped)
### REWSI first production contracts — PEO wrapping, mixed clocks
Actor: Army CPE Intelligence and Spectrum Warfare; PM EW&C; ACC-APG
Clocks: PEO article 2026-09-10. Heaviside $99M awarded Aug 27 (fold). RII $96.9M Dragonfly/Intrepid 1200 awarded Sep 3 (date-only; not in 09-03 2D). Five-year ordering periods.
URL: CPE-ISW
Disposition: admit_lower_rank / later-clock wrapping. First REWSI production framing is in-window; the Heaviside obligation is not.
Claim limit: Production IDIQ ≠ sensors fielded ≠ EMSO CoN satisfied. Award under AOS/CSO is not a program-of-record IOC.
### Other War contracts clustered (not each a new atomic)
From retrieved Sept. 9 and Sept. 10 pages only (see coverage receipt for missing days):
Sept. 3 awards that only surfaced later: MK 48 (object 5), SONAR spares. Inclusive 09-03 replay kept them because 09-03 2D did not list them.
### Force posture / movement (statement ≠ movement ≠ engagement)
### Personnel / recruiting / civilian workforce
No in-window RIF instrument, civilian-workforce cut order, or recruiting-mission-change MARADMIN/DAFI was retrieved.
### Industrial-base finance on service sites
No new Serra Verde / Trilogy / Atalco / Alcoa instrument. No in-window War DPA Title III. Crane MMR (object 1) and Nitradyn/Iowa AAP facility vehicles (object 3 and grouped American Ordnance) are the industrial objects. DLA newsroom did not surface a distinct in-window production/finance object beyond the War contracts commodity lines.
## 2026-09-03 date-only replay (then dedupe)
Reached: Navy THETIS (fold); Space Force Schiess (fold); DAF implementing guidance still on spaceforce.mil dated Aug 31 (fold); Super Garuda wildfire-safeguard article Sep 3 (pre-live-fire; owned as kickoff context); Army Reserve Catalyst Forge article dated Sep 2 describing July 12–25 event (09-03 already treated as evaluation, not PoR); MARADMIN 408/26 Sep 3 (personnel solicitation, kept as lower-rank); MK 48 and SONAR options awarded Sep 3 and published later (kept as objects/grouped).
09-03 WAVE_2D already owned Northern Viking close, Super Garuda kickoff, Lincoln Thailand arrival, Delaware Norway arrival, Hawaii Lala/Moke posture, MAFFS gallons, SC HH-60M, Atlas Angel II start. Those are not new atomics.
| Surface | Status | Note |
|---|---|---|
| war.gov Contracts Sept. 9 | reached | Full text retrieved |
| war.gov Contracts Sept. 10 | reached | Full text retrieved; includes Sep 4/8 Griffon correction |
| war.gov Contracts Sept. 3, 4, 8 | unread as dedicated pages | Awards from those days appear as later-page annotations (MK 48, SONAR, Griffon). Index is a JS shell (“simulated response” / Load More). Not treated as empty. |
| war.gov Contracts Sept. 11 | out of window if posted at 5 p.m. | Standing rule: contracts announced each business day at 5 p.m. Frozen cutoff is 16:01:37 EDT. Do not take a post-cutoff Sept. 11 dump as this wave. |
| war.gov Contracts Sept. 1–2 | reached via search; pre-window | Fold (GE F414 PBL $2.87B; Pacific CE IDIQ $400M ceiling; Fort Meade cyber facility $122M). |
| war.gov Releases | reached | Crane MMR; Mongolia BDF; 9/11 memorial closure (ceremonial) |
| war.gov News Stories | reached (selected) | Big Rescue Kanagawa; not a full COCOM census |
| army.mil news | reached | Super Garuda, Yama Sakura, 1st Cavalry TyrOS experiment (ranked down: experiment ≠ fielding) |
| cpeisw.army.mil | reached | REWSI wrapping |
| navy.mil Press Releases | reached (index) | Kilmer keel; CNO visits; THETIS fold. Individual Kilmer article URL 404’d once via guessed slug; index text is the controlling source. |
| navy.mil News Stories / c6f / cpf | reached | Phoenix Express; Ross Kenya; Delaware close; Lincoln departure; ASWEX later publication |
| marines.mil News | reached | 13th MEU EAB training; Super Garuda kickoff fold |
| marines.mil MARADMINS | reached | 408/26, 409/26, 410/26, 411/26 in-window; 405/26 fold |
| af.mil News | blocked 403 from this host (Akamai); reached via search/open_page for Week-in-Photos and selected tags | EA-37B photo Sep 3 is not a new IOC. No in-window recruiting/RIF instrument retrieved. |
| spaceforce.mil News | reached (open_page); curl 403 | DARC Site 3; Schiess fold; DASH experiment (ranked down: experiment ≠ kill-chain fielding) |
| nationalguard.mil News | reached | Hawaii Lowell/Lala; Washington wildfire close; Vermont return; Florida student flight; Patriot 26 / Nebraska FTX grouped as training |
| darpa.mil/news | reached; empty in-window as dated news | Index is a filter shell. Dated items retrieved by search are Aug 11 Lift Challenge (out of window) and Aug 6 “It’s About Time” manufacturing pipeline (out of window). SBIR topics closing Sep 23 are open solicitations, not awards. |
| dla.mil News | blocked 403 from this host; search reached older items only | No distinct in-window DLA newsroom production object. Commodity awards taken from War contracts pages. |
| dpaa.mil ID Announcements | reached via search | Sep 2 Aguirre WWII ID is date-only / pre-exclusive-start. No later ID in-window. POW/MIA Recognition Day is third Friday Sep 18 (after cutoff). |
| SAM.gov / FPDS / USAspending | not recensus’d | Bounded negative |
| Classified / nonpublic ops | classified_nonpublic | Not inactivity |
Section 3 of 3
| Publisher family | Status | Missed (new) | Enrichment / clock | Routine/reject |
|---|---|---|---|---|
| War contracts (business-day $7.5M+) | mixed: Sep 9–10 reached; Sep 3/4/8 pages unread; Sep 11 after 5 p.m. out of window | 5 promoted production/industrial | 1 (Griffon date correction) | ~15 grouped |
| War releases / news | reached | 1 (Crane MMR) | 1 (Mongolia BDF) | ceremonial 9/11 |
| Army flagship + CPE-ISW | reached | 2 (SGS live fire; YS91 close) | 1 (REWSI wrap) | 1st Cav TyrOS experiment; 9/11 museum |
| Navy press + 6th/Pacific Fleet | reached | 2 (Phoenix Express; Kilmer keel) | 2 (Lincoln departure; Delaware close) | CNO travel; ASWEX later pub |
| Marines news + MARADMINS | reached | 0 | 1 (13th MEU EAB training) | fellowship/challenge MARADMINs |
| Air Force flagship | blocked 403 here; partial via search | 0 | 0 | Week-in-Photos; no new IOC |
| Space Force flagship | reached | 1 (DARC Site 3) | 0 | DASH experiment; Schiess fold |
| National Guard | reached | 2 (HI Lowell/Lala SAD; WA wildfire close) | 1 (VT return) | Patriot 26, Nebraska FTX, Egypt airshow |
| DARPA news | reached; empty dated in-window | 0 | 0 | open SBIR clocks |
| DLA news | blocked / no in-window newsroom object | 0 | 0 | contracts commodity only |
| DPAA | ID index reached | 0 | 0 | Sep 2 ID fold; Sep 18 Recognition Day later |
| Award systems | not enumerated | — | — | bounded |
Closed: no for a complete business-day contracts series (unread dedicated pages: Sept. 3, 4, 8; Sept. 11 5 p.m. is after cutoff). Yes for the named service newsrooms actually retrieved (Army, Navy press index, Marines, Space Force, Guard, War releases, CPE-ISW, DARPA news index). Named unread or blocked publishers: Air Force flagship af.mil (403 from this host), DLA newsroom (403), dedicated War contract pages for Sept. 3/4/8, SAM/FPDS. Those are tool-path or scope bounds, not inactivity findings.
This is public-surface research, not a census of every contract, PEO, COCOM action, field outcome, or classified operation.