# Wave 2D — military direct sites **Window:** exclusive after 2026-09-03 20:09:34 EDT through frozen cutoff 2026-09-11 16:01:37 EDT **Inclusive replay:** 2026-09-03 date-only publishers, then dedupe against Weekly Delta 2026-09-03, especially `waves/WAVE_2D_MILITARY_DIRECT_SITES.md` **Discovery rule:** official service, combatant-command, Guard/Reserve, PEO, personnel, acquisition, and operational surfaces. **Federal Register is not discovery.** **Lane:** Purse-military. Do not recensus classified ops. **Already in 1C/2C — fold, do not duplicate as a new atomic** - NNSA Y-12 B61-13 CSA complete (announced 2026-09-10; stamp 2026-09-01) is a **civilian DOE** production/acceptance object. 2C owns it. No later War / Pantex / service-site clock was retrieved in this sitting. - EO 14427 DPA delegations (Interior/Energy/Commerce) are 1A legal / 1C industrial. No in-window **War DPA instrument** (Title I rated order, Title III award, or allocation) was found on war.gov. Award ≠ obligation ≠ payment ≠ delivery ≠ fielding ≠ combat effect. 403 ≠ missing. Classified/nonpublic is `classified_nonpublic`, not inactivity. ## Promotion-review objects ### 1. War announced a planned Crane microreactor; installation is not yet done **Actor:** Department of War; Army Janus Program; ASN (EI&E); OUSW(R&E); OASW(CT); DIU; State of Indiana; Naval Weapons Station Crane **Clocks:** announced 2026-09-09. Planned installation **no later than September 2028**. Safety, environmental, regulatory, and installation processes remain open. **URL:** [War release](https://www.war.gov/News/Releases/Release/Article/4593065/department-of-war-announces-navys-first-advanced-nuclear-microreactor-deploymen/) **Disposition:** `promotion_review` Commercially owned and operated Micro Modular Reactor at NWS Crane, framed as Indiana’s first advanced nuclear MMR and the Navy’s first shore-based advanced microreactor under Janus. Cross-service: Army is named executive agent for installation nuclear energy. This is an **announced deployment plan**, not a reactor in the ground, not an NRC license, not first megawatt-hour, and not a DPA Title III award. **Claim limit:** Announcement ≠ site work start ≠ licensed operation ≠ grid independence demonstrated. “No later than September 2028” is a target, not a completed installation. ### 2. Air Force exercised an $826 million JASSM/LRASM large-lot production modification **Actor:** Air Force Life Cycle Management Center, Eglin AFB; Lockheed Martin Missiles and Fire Control **Clocks:** announced on the 2026-09-09 War contracts page as modification P00020 to FA8682-24-C-B001. Work expected through 2030-07-31. **URL:** [Contracts for Sept. 9, 2026](https://www.war.gov/News/Contracts/Contract/Article/4594054/contracts-for-sept-9-2026/) **Disposition:** `promotion_review` Modification brings cumulative face value to **$10,480,052,550** from $9,654,077,070. Funds obligated at award mix FY24–FY26 missile/weapons procurement, RDT&E, O&M, and **$11,070,988 FMS**. This is a production-lot option exercise on an existing large-lot contract, not first article, not delivery, not fielding, and not combat use. **Claim limit:** Modification ≠ missiles delivered ≠ inventory increase observed ≠ FMS transfer complete. ### 3. Army awarded a $581 million IDIQ to stand up an IMX-104 manufacturing facility **Actor:** Army Contracting Command, Rock Island; Nitradyn LLC **Clocks:** announced 2026-09-09. Estimated completion 2030-08-09. Work locations and funding determined with each order. **URL:** [Contracts for Sept. 9, 2026](https://www.war.gov/News/Contracts/Contract/Article/4594054/contracts-for-sept-9-2026/) **Disposition:** `promotion_review` Firm-fixed-price IDIQ to **design, construct, and commission** a facility to manufacture Insensitive Munition eXplosive-104. Industrial-base construction vehicle, not explosive produced, not loaded warheads, not a plant in operation. **Claim limit:** Facility IDIQ ≠ commissioned plant ≠ IMX-104 output ≠ ammunition in inventory. Orders, not the ceiling, will move money. ### 4. Navy awarded NGEAU full-rate production IDIQ ($184.25 million) **Actor:** Naval Surface Warfare Center Crane; General Dynamics Mission Systems **Clocks:** announced 2026-09-10. Completion expected September 2032. Sole-source under 10 U.S.C. 3204(a)(1). **URL:** [Contracts for Sept. 10, 2026](https://www.war.gov/News/Contracts/Contract/Article/4596373/contracts-for-sept-10-2026/) **Disposition:** `promotion_review` FFP/CPFF IDIQ for **manufacture of Full Rate Production** of Next Generation Electronics Attack Units, NGEAU sustainment, and Advanced Capability Mission Computer future sustainment. Obligated at award: FY26 APN $29,691,536 (74.1%) and FY25 APN $10,365,451 (25.9%). FRP award is not units delivered or EA aircraft modified. **Claim limit:** FRP IDIQ ≠ first production lot shipped ≠ fielded NGEAU ≠ combat EA effect. ### 5. Navy exercised MK 48 MOD 7 All-Up-Round production options ($257.3 million) **Actor:** NAVSEA; Lockheed Martin, Liverpool **Clocks:** **awarded 2026-09-03**; announced on the 2026-09-09 contracts page. Completion expected September 2029. **URL:** [Contracts for Sept. 9, 2026](https://www.war.gov/News/Contracts/Contract/Article/4594054/contracts-for-sept-9-2026/) **Disposition:** `promotion_review` as an in-window **publication clock** of a Sept. 3 award. Date-only 09-03 replay then keep because 09-03 WAVE_2D did not carry this object. Option exercise for production, spares, production-support material, engineering, and hardware repair of MK 48 Heavyweight Torpedo AUR / MOD 7. Mix: Navy (FY24–FY26 WPN) plus **foreign-partner funds $74,799,495 (30%)**, including Royal Australian Navy. Option exercise is not torpedoes delivered. **Claim limit:** Option exercise ≠ AUR accepted ≠ loaded on a submarine ≠ FMS delivery complete. $1,216,670 FY24 WPN expires at FYE. ### 6. Space Force selected Lake Kickapoo, Texas, as preferred DARC Site 3 **Actor:** USSF; Space Systems Command / Mission Delta 2; 20th Space Surveillance Squadron; UK and Australia as MOU partners **Clocks:** announced 2026-09-09. Construction expected to begin **2027** after contract award and approvals; civil construction complete **2029**; operational acceptance planned **2030**. Site 1 (Western Australia) completed Dec 2024 / early-use 2025. UK Pembrokeshire still pending planning approval. **URL:** [Space Force](https://www.spaceforce.mil/News/Article-Display/Article/4592096/us-space-force-selects-texas-as-preferred-location-for-third-darc-site/) **Disposition:** `promotion_review` Preferred-location / project-planning approval for the third and final Deep Space Advanced Radar Capability site. Completes the planned U.S.–UK–Australia trilateral GEO-coverage architecture. Not a construction start, not a radar radiating, not operational acceptance. **Claim limit:** Preferred location ≠ contract award ≠ construction start ≠ 24/7 GEO coverage. UK site remains unapproved. ### 7. Hawaii Guard remained on state active duty for Lala recovery and staged for Hurricane Lowell **Actor:** Hawaii National Guard; Hawaii Emergency Management Agency **Clocks:** article 2026-09-08. As of **2026-09-07**, **194** personnel on state active duty. Task Force Kauai staging 47 personnel for Lowell; Chinook resupply photographed 2026-09-09. Lala recovery still running on Hawaii Island/Maui. **URL:** [National Guard](https://www.nationalguard.mil/News/Article-View/Article/4591941/hawaii-guard-sustains-recovery-efforts-mobilizes-for-hurricane-lowell/) **Disposition:** `promotion_review` as a **later operating clock** on the 09-03 Lala/Moke object, plus a new Lowell posture. 09-03 WAVE_2D owned Kauai/Oahu end-of-response with continuation on Hawaii Island and Maui (up to 250 activated). This window’s state is dual-mission: Lala debris/wellness (72,000+ lb debris; 421 safety checks as of Sep 4; Maui 80 damage assessments / 2,295 ft roadway) **and** Lowell staging. Volunteers on SAD; ~5,500 available. Statement of sister-state pledges is not a Title 32 or Title 10 order. **Claim limit:** SAD count ≠ Title 10 mobilization. Staging ≠ storm impact. Debris pounds ≠ recovery complete. ### 8. Washington Guard closed a 44-day wildfire aviation/hand-crew activation **Actor:** Washington National Guard; Washington DNR **Clocks:** mission ended **2026-09-04**; article 2026-09-08. Mobilized from 2026-07-18. **URL:** [National Guard](https://www.nationalguard.mil/News/Article-View/Article/4592397/washington-guard-concludes-extended-wildfire-response/) **Disposition:** `promotion_review` Agency-reported output: 474.7 flight hours, 2,044 water-bucket drops, 1,943,269 gallons. First operational use of a WAARNG UH-72 Lakota as a helicopter command platform (Sinlahekin Fire). Hand crews on Little Giant Fire; traffic-control support after Spokane Complex. This is an operational self-report of **mission end**, not acres saved or fires contained. **Claim limit:** Gallons dropped ≠ containment. First Lakota C2 use ≠ fleet conversion. Conclusion ≠ no further 2026 fire tasking. ### 9. Super Garuda Shield executed combined joint land-strike live fire **Actor:** U.S. Army (HIMARS, AH-64); U.S. Marine Rotational Force–Darwin; Indonesian Army/Marines/Air Force **Clocks:** live-fire **2026-09-04 and 2026-09-07**; article 2026-09-08. Airborne jump opening field training **2026-09-04** (article 2026-09-05). Exercise window still Aug 31–Sep 11 as owned in 09-03. **URLs:** [joint land strike](https://www.army.mil/article/295141/us_and_indonesia_execute_joint_combined_strike_at_super_garuda_shield); [airborne jump](https://www.army.mil/article/295127/multinational_paratroopers_open_super_garuda_shield_field_training_with_airborne_jump) **Disposition:** `promotion_review` as **in-window exercise events** on an already-owned Super Garuda Shield 26 object. Do not recensus the Aug 31 kickoff. Ground: U.S. M142 HIMARS, Indonesian ASTROS II Mk6, Indonesian Marine RM-70. Air: Indonesian F-16s; U.S. and Indonesian AH-64s. Jump: 200+ U.S./partner paratroopers into Baturaja. Exercise ≠ deployment commitment, treaty, or combat engagement. **Claim limit:** Live fire in an exercise ≠ combat strike. HIMARS presence ≠ permanent basing. ### 10. Yama Sakura 91 closed as a trilateral CPX **Actor:** U.S. Army; Japan; Australia **Clocks:** held 2026-09-02 through **2026-09-10** close at Camp Asaka. Article 2026-09-10. **URL:** [Army](https://www.army.mil/article/295234/yama_sakura_91_comes_to_a_close_demonstrating_cohesive_commitment_to_pacific_allies) **Disposition:** `promotion_review` 46th iteration; command-post exercise across Japan plus JBLM, Washington. Start sits before exclusive start; **close** is in-window. CPX completion is not a new basing, contingency plan executed, or combat readiness independently measured. **Claim limit:** Exercise close ≠ operational plan executed. ### 11. Phoenix Express 2026 began in Tunisia **Actor:** U.S. 6th Fleet / Naval Forces Africa; AFRICOM-sponsored; Tunisian Navy host **Clocks:** began **2026-09-07** at La Goulette; 12-day / 21st iteration. Navy story 2026-09-08. **URL:** [Navy](https://www.navy.mil/Press-Office/News-Stories/display-news/Article/4591979/exercise-phoenix-express-2026-begins-in-tunisia/) **Disposition:** `promotion_review` Participants named: Algeria, Belgium, Egypt, France, Georgia, Italy, Libya, Morocco, Tunisia, Türkiye, Saudi Arabia, Spain, United States. Maritime-security exercise, not a new basing or engagement. **Claim limit:** Exercise start ≠ interdiction totals ≠ EEZ enforcement outcome. ### 12. Keel laid for future USS John E. Kilmer (DDG 134) **Actor:** Navy; General Dynamics Bath Iron Works **Clocks:** ceremony **2026-09-10** at Bath, Maine. Navy press-release index same day. **URL:** [Navy press-release index (10 September 2026 item)](https://www.navy.mil/Press-Office/Press-Releases/) **Disposition:** `promotion_review` Keel laying is a construction-milestone ceremony, not launch, not delivery, not commissioning, not a Flight III combatant in the fleet. **Claim limit:** Keel ≠ hull complete ≠ acceptance trials ≠ in commission. ## Folded or clock-only (do not recensus as new actions) | Object | Owner | This delta | |---|---|---| | NNSA Y-12 B61-13 CSA complete (stamp 2026-09-01; announced 2026-09-10) | 2C civilian DOE | **Fold.** No War, Pantex, or service-site later clock retrieved. CSA ≠ Pantex assembly ≠ War acceptance ≠ deployed B61-13. | | EO 14427 DPA delegations | 1A legal / 1C industrial | **No War DPA instrument** in this window. Last retrieved War DPA Title III on war.gov was out of window (BAE RH45 July 7; germanium Jan 29). Aug 31 Camden Copper foil is **IBAS**, not DPA, and is before exclusive start. | | Gen. Schiess CSO installation; Day-One message | 09-03 WAVE_2D | Fold. Leadership transition, not force-structure change. | | Navy Millington / Project THETIS migration | 09-03 WAVE_2D | Fold. Migration ≠ THETIS complete. | | DAF shaving-profile / CBRN / chaplain guidance | 09-03 WAVE_2D | Fold. No new in-window implementing MARADMIN/DAFI retrieved. | | MARADMIN 405/26 FY2027 enlistment bonuses | 09-03 WAVE_2D | Fold. | | M18 handgun supplemental inspection final report | 09-03 WAVE_2D | Fold. | | NGB FORGE hybrid-microgrid APFIT | 09-03 WAVE_2D | Fold. Award ≠ fielding. | | GTRI CAML prototype OTA (Aug 21) | 09-03 WAVE_2D | Fold. Prototype ≠ production. | | SC Guard first HH-60M (Aug 27 arrival) | 09-03 WAVE_2D | Fold. One of three. | | Northern Viking 26 concluded Sep 3 | 09-03 WAVE_2D | Navy/6th Fleet **Sep 4 wrap** is the same close. Fold. | | Super Garuda Shield 26 kickoff Aug 31 / through Sep 11 | 09-03 WAVE_2D | **Keep only in-window events** (objects 9). Do not recensus kickoff. | | PACAF Nepal C-130J (Sep 2) | 09-03 WAVE_2D | Fold. | | Abraham Lincoln CSG Thailand arrival Sep 2 | 09-03 WAVE_2D | **Later clock:** CSG **departed Thailand Sep 6**. Port departure ≠ CENTCOM re-entry. [Pacific Fleet](https://www.cpf.navy.mil/Newsroom/News) | | USS Delaware Tromsø arrival Sep 1 | 09-03 WAVE_2D | **Later clock:** concluded routine port visit Grøtsund **Sep 7**. Presence ≠ new basing. | | MAFFS 1,070,017 gallons through Aug 31 | 09-03 WAVE_2D | Fold. | | Atlas Angel II start Aug 31 | 09-03 WAVE_2D | Montana/Sri Lanka **Sep 4 close article** is the same five-day SME exchange. Fold. | | Guam–Nebraska–RMI partnership (signed Aug 25) | 09-03 WAVE_2D | Fold. | | Guard leadership statements (435k; MAVEN; NGRF 22k; IBCT conversions) | 09-03 WAVE_2D | Fold. Statement ≠ appropriation. | | Heaviside MOTH $99M (awarded Aug 27) | 09-03 contracts / WAVE_2C industrial line | **Fold the award.** Sep 10 CPE-ISW REWSI article is a later wrapping (below). | | TITAN initial production; HEL production; Anniston FORGE OTA | 09-03 WAVE_2C | Fold. No in-window delivery receipt. | | Copper-foil IBAS $37.2M (announced Aug 31; award Apr 27) | pre-window War industrial | Fold. Not DPA; not this window. | ## Additional in-window objects (lower rank or grouped) ### REWSI first production contracts — PEO wrapping, mixed clocks **Actor:** Army CPE Intelligence and Spectrum Warfare; PM EW&C; ACC-APG **Clocks:** PEO article **2026-09-10**. Heaviside $99M awarded **Aug 27** (fold). RII $96.9M Dragonfly/Intrepid 1200 awarded **Sep 3** (date-only; not in 09-03 2D). Five-year ordering periods. **URL:** [CPE-ISW](https://cpeisw.army.mil/2026/09/10/army-awards-the-first-two-production-contracts-using-the-rapid-electromagnetic-warfare-signals-intelligence-rewsi-call-for-solutions/) **Disposition:** `admit_lower_rank` / later-clock wrapping. First REWSI production **framing** is in-window; the Heaviside obligation is not. **Claim limit:** Production IDIQ ≠ sensors fielded ≠ EMSO CoN satisfied. Award under AOS/CSO is not a program-of-record IOC. ### Other War contracts clustered (not each a new atomic) From retrieved **Sept. 9 and Sept. 10** pages only (see coverage receipt for missing days): - **DFAS / EY** labor-hour, max $989,996,050, DoW agency-wide and DWCF audits FY27–31. Face value this action $388,273,413; $62.6M FY26 WCF obligated now. Audit contract ≠ clean opinion. - **Accenture** $480,365,950 JETMS to replace legacy task/correspondence systems. IT vehicle; funds obligated later. Not C2 fielding. - **Harper Construction** $223,577,265 programmed depot-maintenance hangar, Oklahoma City; $106.4M FY26 MILCON obligated. Construction award ≠ hangar in service (ECD 2030-09-09). - **Charles Reed Knight Jr.** $49,997,842 IDIQ for M110 semi-automatic sniper systems, variants, accessories, tools, training through 2031-09-10. IDIQ ≠ weapons issued. - **American Ordnance** $15,500,977 IDIQ equipment for a new Advanced Multi-Purpose isostatic/warhead pressing facility at Iowa AAP. Equipment IDIQ ≠ press running. - **Griffon Aerospace Outlaw** $17,515,469 IDIQ for communication subcomponents and training: announced Sep 4, **actually awarded Sep 8** (correction on Sep 10 page). Award ≠ UAS fielded. - **BAE Ship Repair** $115,659,256 (options to $527.5M) LPD-30/31 fitting-out and post-shakedown availabilities. - **Huntington Ingalls** $13,217,537 LCS planning-yard (options to $742.8M). Planning yard ≠ hull modernization complete. - **BAE Land & Armaments** $38,199,786 for two MK 45 Mod 4 overhauls. - **Boeing / DLA** $23,175,320 ICBM cable assemblies (sole-source; complete 2030-10-31). Cables ≠ Sentinel fielding. - **KestrelX** $9,987,285 COCO low-observable threat-replication aircraft (SBIR Phase III). Training support ≠ operational UAV. - **LPD FO/PSA, SONAR spares (Lockheed $17.4M, awarded Sep 3), VOLARE AFRL dual $85M ceilings, Rolls-Royce EPA on Tinker engine contract, DLA jackets/ACH pads** — sustainment/research/commodity. Grouped. Sept. 3 awards that only surfaced later: MK 48 (object 5), SONAR spares. Inclusive 09-03 replay kept them because 09-03 2D did not list them. ### Force posture / movement (statement ≠ movement ≠ engagement) - **USS Ross (DDG 71)** arrived Mombasa, Kenya, scheduled port visit **Sep 5**. Port call ≠ new mission. - **13th MEU** simultaneous EAB sensing/C2/fueling training underway in 3rd Fleet (Camp Pendleton article in-window). Training ≠ deployed EAB. - **Vermont ANG 158th FW** returned **Sep 6** from an overseas deployment. Return ≠ mission-effect finding. - **Pacific Partnership 2026** Malaysia stop opened Sep 3 (date-only; ~250 personnel). HA/DR preparedness ≠ disaster operation. - **Multilateral ASWEX** (JMSDF/ROKN/RAN/RAAF/USN) completed **Aug 25–27**; Pacific Fleet **Sep 9** story is later publication of an earlier event. Enrichment only. - **Saber Junction 26** “passing of a torch” Sep 9: leadership/ceremony inside an ongoing Europe exercise, not a new deployment. - **U.S.–Mongolia Bilateral Defense Framework** Sep 8: DASW Alvaro Smith / MG Gankhuyag roadmap talk (spending, exercises, DIB). Dialogue ≠ assistance agreement executed. [War release](https://www.war.gov/News/Releases/Release/Article/4593737/united-states-department-of-war-and-mongolias-ministry-of-defense-conduct-bilat/) - **Big Rescue Kanagawa** Sep 1 event, War.gov story Sep 9: disaster-medical exercise in Japan. Exercise ≠ real-world response. ### Personnel / recruiting / civilian workforce No in-window **RIF instrument**, civilian-workforce cut order, or recruiting-mission-change MARADMIN/DAFI was retrieved. - **MARADMIN 408/26** (signed 2026-09-03): FY27 solicitation for lateral move into Marine acquisitions officer MOS 8059/8061. Solicitation ≠ accessions. - **MARADMIN 411/26** (R 111400Z SEP 26): second-round USMC Innovation Challenge kickoff. Challenge ≠ fielded kit. - **MARADMIN 410/26** (Sep 11): FY27 Congressional Fellowship selection results. Personnel assignment, not end-strength. - **Florida ANG student flight** (Sep 10): claimed BMT honor-graduate surge from restructured curriculum. Training-pipeline anecdote, not accession quota change. - **Navy CNO/MCPON** visits NPTU Charleston (Sep 8) and Mayport/Kings Bay (Sep 9): leader travel, not manning action. - **STARCOM 320th Recruiting Squadron** activation is **Aug 19** (pre-window). Fold. ### Industrial-base finance on service sites No **new** Serra Verde / Trilogy / Atalco / Alcoa instrument. No in-window War DPA Title III. Crane MMR (object 1) and Nitradyn/Iowa AAP facility vehicles (object 3 and grouped American Ordnance) are the industrial objects. DLA newsroom did not surface a distinct in-window production/finance object beyond the War contracts commodity lines. ## 2026-09-03 date-only replay (then dedupe) Reached: Navy THETIS (fold); Space Force Schiess (fold); DAF implementing guidance still on spaceforce.mil dated Aug 31 (fold); Super Garuda wildfire-safeguard article Sep 3 (pre-live-fire; owned as kickoff context); Army Reserve Catalyst Forge article dated Sep 2 describing **July 12–25** event (09-03 already treated as evaluation, not PoR); MARADMIN 408/26 Sep 3 (personnel solicitation, kept as lower-rank); MK 48 and SONAR options awarded Sep 3 and published later (kept as objects/grouped). 09-03 WAVE_2D already owned Northern Viking close, Super Garuda kickoff, Lincoln Thailand arrival, Delaware Norway arrival, Hawaii Lala/Moke posture, MAFFS gallons, SC HH-60M, Atlas Angel II start. Those are not new atomics. ## Bounded negatives - No public **War DPA** Title I/III instrument after exclusive start. - No public **B61-13** Pantex assembly-complete or War-acceptance receipt on service/War pages. - No public **IOC / fielding** claim that is not an exercise, experiment, or preferred-siting (DARC Site 3 is preferred location; EA-37B Compass Call Sep 3 formation photo is not a new IOC — 09-03 already had Grey Wolf IOC as an earlier-event enrichment). - No **Title 10 Guard/Reserve call-up** instrument. Hawaii is **state active duty**; Washington wildfire close is a state/DNR support mission end. - No census of SAM.gov, FPDS, USAspending, classified OTAs, or every PEO. ## Surfaces | Surface | Status | Note | |---|---|---| | war.gov Contracts Sept. 9 | **reached** | Full text retrieved | | war.gov Contracts Sept. 10 | **reached** | Full text retrieved; includes Sep 4/8 Griffon correction | | war.gov Contracts Sept. 3, 4, 8 | **unread as dedicated pages** | Awards from those days appear as later-page annotations (MK 48, SONAR, Griffon). Index is a JS shell (“simulated response” / Load More). Not treated as empty. | | war.gov Contracts Sept. 11 | **out of window if posted at 5 p.m.** | Standing rule: contracts announced each business day at 5 p.m. Frozen cutoff is **16:01:37 EDT**. Do not take a post-cutoff Sept. 11 dump as this wave. | | war.gov Contracts Sept. 1–2 | **reached via search; pre-window** | Fold (GE F414 PBL $2.87B; Pacific CE IDIQ $400M ceiling; Fort Meade cyber facility $122M). | | war.gov Releases | **reached** | Crane MMR; Mongolia BDF; 9/11 memorial closure (ceremonial) | | war.gov News Stories | **reached (selected)** | Big Rescue Kanagawa; not a full COCOM census | | army.mil news | **reached** | Super Garuda, Yama Sakura, 1st Cavalry TyrOS experiment (ranked down: experiment ≠ fielding) | | cpeisw.army.mil | **reached** | REWSI wrapping | | navy.mil Press Releases | **reached (index)** | Kilmer keel; CNO visits; THETIS fold. Individual Kilmer article URL 404’d once via guessed slug; index text is the controlling source. | | navy.mil News Stories / c6f / cpf | **reached** | Phoenix Express; Ross Kenya; Delaware close; Lincoln departure; ASWEX later publication | | marines.mil News | **reached** | 13th MEU EAB training; Super Garuda kickoff fold | | marines.mil MARADMINS | **reached** | 408/26, 409/26, 410/26, 411/26 in-window; 405/26 fold | | af.mil News | **blocked 403** from this host (Akamai); **reached via search/open_page** for Week-in-Photos and selected tags | EA-37B photo Sep 3 is not a new IOC. No in-window recruiting/RIF instrument retrieved. | | spaceforce.mil News | **reached** (open_page); curl 403 | DARC Site 3; Schiess fold; DASH experiment (ranked down: experiment ≠ kill-chain fielding) | | nationalguard.mil News | **reached** | Hawaii Lowell/Lala; Washington wildfire close; Vermont return; Florida student flight; Patriot 26 / Nebraska FTX grouped as training | | darpa.mil/news | **reached; empty in-window as dated news** | Index is a filter shell. Dated items retrieved by search are **Aug 11 Lift Challenge** (out of window) and **Aug 6 “It’s About Time”** manufacturing pipeline (out of window). SBIR topics closing Sep 23 are open solicitations, not awards. | | dla.mil News | **blocked 403** from this host; **search reached** older items only | No distinct in-window DLA newsroom production object. Commodity awards taken from War contracts pages. | | dpaa.mil ID Announcements | **reached via search** | **Sep 2** Aguirre WWII ID is date-only / pre-exclusive-start. No later ID in-window. POW/MIA Recognition Day is third Friday **Sep 18** (after cutoff). | | SAM.gov / FPDS / USAspending | **not recensus’d** | Bounded negative | | Classified / nonpublic ops | **classified_nonpublic** | Not inactivity | ## Coverage receipt | Publisher family | Status | Missed (new) | Enrichment / clock | Routine/reject | |---|---|---:|---:|---:| | War contracts (business-day $7.5M+) | mixed: Sep 9–10 reached; Sep 3/4/8 pages unread; Sep 11 after 5 p.m. out of window | 5 promoted production/industrial | 1 (Griffon date correction) | ~15 grouped | | War releases / news | reached | 1 (Crane MMR) | 1 (Mongolia BDF) | ceremonial 9/11 | | Army flagship + CPE-ISW | reached | 2 (SGS live fire; YS91 close) | 1 (REWSI wrap) | 1st Cav TyrOS experiment; 9/11 museum | | Navy press + 6th/Pacific Fleet | reached | 2 (Phoenix Express; Kilmer keel) | 2 (Lincoln departure; Delaware close) | CNO travel; ASWEX later pub | | Marines news + MARADMINS | reached | 0 | 1 (13th MEU EAB training) | fellowship/challenge MARADMINs | | Air Force flagship | blocked 403 here; partial via search | 0 | 0 | Week-in-Photos; no new IOC | | Space Force flagship | reached | 1 (DARC Site 3) | 0 | DASH experiment; Schiess fold | | National Guard | reached | 2 (HI Lowell/Lala SAD; WA wildfire close) | 1 (VT return) | Patriot 26, Nebraska FTX, Egypt airshow | | DARPA news | reached; empty dated in-window | 0 | 0 | open SBIR clocks | | DLA news | blocked / no in-window newsroom object | 0 | 0 | contracts commodity only | | DPAA | ID index reached | 0 | 0 | Sep 2 ID fold; Sep 18 Recognition Day later | | Award systems | not enumerated | — | — | bounded | **Closed:** **no** for a complete business-day contracts series (unread dedicated pages: Sept. 3, 4, 8; Sept. 11 5 p.m. is after cutoff). **Yes** for the named service newsrooms actually retrieved (Army, Navy press index, Marines, Space Force, Guard, War releases, CPE-ISW, DARPA news index). Named unread or blocked publishers: **Air Force flagship af.mil (403 from this host)**, **DLA newsroom (403)**, **dedicated War contract pages for Sept. 3/4/8**, **SAM/FPDS**. Those are tool-path or scope bounds, not inactivity findings. This is public-surface research, not a census of every contract, PEO, COCOM action, field outcome, or classified operation.