.md · 1 sections · 1692 characters
workbench:Research Packages/Institutional Signals and Thesis Test 2025-2026/SURFACE_COVERAGE_STATUS_2026-09-28.md
Source SHA-256: 544ebe797a407c79e5f67ecc5cf9623ab694ed8d027caa492362f2ee077bb8e0
Evidence cutoffs by research owner: {"artifact:ea5cf60e803b05db": ""}
Saved source text, not a new finding. Markdown notation and table delimiters are retained.
Lines 1–36 · Section 1 of 1
Program state: complete through the fixed cutoff; this is a coverage receipt, not the thesis verdict Window: January 1, 2025 through September 28, 2026 Denominator: 114 governed surfaces
| Lane | Total | Terminal | In progress | Preflighted | With signal records |
|---|---|---|---|---|---|
| Financial and digital | 24 | 24 | 0 | 0 | 16 |
| Science and industrial | 11 | 11 | 0 | 0 | 11 |
| Management operating system | 23 | 23 | 0 | 0 | 16 |
| Cyber and critical infrastructure | 12 | 12 | 0 | 0 | 6 |
| Public delivery | 20 | 20 | 0 | 0 | 17 |
| Trade, logistics and infrastructure | 18 | 18 | 0 | 0 | 15 |
| Public input | 6 | 6 | 0 | 0 | 6 |
A surface is not complete merely because it has a signal. Terminal status requires a source-surface review, an explicit disposition, a claim limit and any necessary access hold.
None. Every denominator row has a governed terminal disposition.
Satisfied for the fixed window: every row is terminal as a material signal, a bounded null, an access hold or a denominator-only route, and the package validator confirms that every directional finding remains traceable to a primary official object.