<!-- GENERATED by render_surface_coverage_summary.py; edit the coverage overrides, not this file. -->
# Surface coverage status — September 28, 2026

**Program state:** complete through the fixed cutoff; this is a coverage receipt, not the thesis verdict
**Window:** January 1, 2025 through September 28, 2026
**Denominator:** 114 governed surfaces

## Coverage table

| Lane | Total | Terminal | In progress | Preflighted | With signal records |
|---|---:|---:|---:|---:|---:|
| Financial and digital | 24 | 24 | 0 | 0 | 16 |
| Science and industrial | 11 | 11 | 0 | 0 | 11 |
| Management operating system | 23 | 23 | 0 | 0 | 16 |
| Cyber and critical infrastructure | 12 | 12 | 0 | 0 | 6 |
| Public delivery | 20 | 20 | 0 | 0 | 17 |
| Trade, logistics and infrastructure | 18 | 18 | 0 | 0 | 15 |
| Public input | 6 | 6 | 0 | 0 | 6 |

## What the counts mean

- **114 terminal rows**: 81 signal, 4 bounded null, 23 access hold and 6 cohort-denominator-only.
- **0 surfaces** have official-source work in progress.
- **0 surfaces** remain open: 0 preflighted and 0 in progress.
- **87 surfaces** currently have one or more normalized signal records.

A surface is not complete merely because it has a signal. Terminal status requires a source-surface review, an explicit disposition, a claim limit and any necessary access hold.

## Open surfaces by lane

None. Every denominator row has a governed terminal disposition.

## Completion rule

Satisfied for the fixed window: every row is terminal as a material signal, a bounded null, an access hold or a denominator-only route, and the package validator confirms that every directional finding remains traceable to a primary official object.
