How it entered the Observatory
The saved starting points
- Earliest file on subject
- Date
- 2026-07-25
- File
- Federal Government Website Sweep 2026-07-25/Accountability Institutions Wave 8/ACCOUNTABILITY_INSTITUTIONS_WAVE_8_PRIMARY_OBJECT_LEDGER.md
- Note
- Records the EAC at three of four commissioners after April 30, 2026 (step 23).
- Earliest thread file
- Date
- 2026-09-16
- File
- Federal Government Weekly Delta 2026-09-16/waves/WAVE_3C_INDEPENDENTS_LABOR_OVERSIGHT.md
- Katie requests
- Date
- 2026-07-25
- Request
- K02-020
- Package
- Federal Government Website Sweep 2026-07-25
- Her words
- I want this to be comprehensive FULL sweep, not a blanket of forced brevity.
- Why
- It had been a while since the last sweep.
- Date
- 2026-09-15
- Request
- K06-058
- Package
- Federal Government Weekly Delta 2026-09-16
- Her words
- I wanted to go through and see if/what the SEC/CFTC/OCC/FINCEN/FDIC/NCUA have updated anything.
- Why
- A queue from her phone chat 'Finance Research Queue'.
- Date
- 2026-09-29
- Request
- K08-025
- Package
- Institutional Signals and Thesis Test 2025-2026
- Her words
- Wow awesome - so now that we actually have all of these mapped out - should we look at what they've been saying/researching to see how they affect the observatory's thesis?
- Why
- Mapping was done; next is content.
- Date
- 2026-09-29
- Request
- K08-026
- Package
- Institutional Signals and Thesis Test 2025-2026
- Her words
- So I think we should look into what these committees have done recently, not just what went through the full cycle - let's see if we can map what's being built currently
- Why
- not stated
- Date
- 2026-10-31
- Request
- K14-036
- Package
- Government Hidden Control Surfaces 2026
- Her words
- I want to make sure we're really keeping up committees and oversight committees and stuff like that - they can get lost in the mix if we don't explicitly go searching for the videos of meetings or transcripts or minutes or followups.
- Why
- They get lost unless searched for.
- Note
- None of her requests names the EAC, voting systems or poll books. The subject came in through government-wide sweeps and the committee work.
The dated steps
2021-02-10 Turning pointThe EAC's commissioners unanimously adopted Voluntary Voting System Guidelines (VVSG) version 2.0, the set of requirements voting systems are tested against.
The EAC's commissioners unanimously adopted Voluntary Voting System Guidelines (VVSG) version 2.0, the set of requirements voting systems are tested against.
Who acted: U.S. Election Assistance Commission (EAC), its commissioners
Stage: approved or adopted
the EAC's Commissioners unanimously adopted the newest VVSG standard, version 2.0.
2022-11-15The EAC accredited the first voting-system test laboratory to test to VVSG 2.0.
The EAC accredited the first voting-system test laboratory to test to VVSG 2.0. The EAC page says both accredited laboratories could test to VVSG 2.0 by November and December 2022.
Who acted: U.S. Election Assistance Commission (EAC)
Stage: approved or adopted
With the accreditation of the first VSTL to test to VVSG 2.0 on November 15, 2022
2023-10-25The EAC released a report on the results of its voluntary electronic poll book pilot program.
The EAC released a report on the results of its voluntary electronic poll book pilot program.
Who acted: U.S. Election Assistance Commission (EAC)
Stage: published
U.S. Election Assistance Commission Report Shows Results of its Voluntary Electronic Poll Book Pilot Program
2023-11-16 Turning pointThe EAC stopped using VVSG 1.0 and 1.1 to certify voting systems.
The EAC stopped using VVSG 1.0 and 1.1 to certify voting systems. From then on every application for a new EAC certification had to be for VVSG 2.0, or a limited maintenance change to a system already certified. The EAC states that systems already certified are not decertified by this move and may stay in use unless a State's law says otherwise.
Who acted: U.S. Election Assistance Commission (EAC)
Stage: took effect
VVSG 1.0 and VVSG 1.1 are now no longer used by the EAC to certify voting systems as of November 16, 2023.
2023-12-06The EAC approved the setting up of the Election Supporting Technology Evaluation Program, a permanent program to evaluate election technologies other than voting systems, after its electronic poll book pilot.
The EAC approved the setting up of the Election Supporting Technology Evaluation Program, a permanent program to evaluate election technologies other than voting systems, after its electronic poll book pilot.
Who acted: U.S. Election Assistance Commission (EAC)
Stage: approved or adopted
U.S. Election Assistance Commission Approves Establishment of Election Supporting Technology Evaluation Program
2024-04-08The EAC approved its VVSG Lifecycle Policy.
The EAC approved its VVSG Lifecycle Policy. The EAC page says the policy covers types of version changes, test-laboratory accreditation, migration from earlier versions, changes allowed to systems certified to earlier versions, and a periodic review timeline.
Who acted: U.S. Election Assistance Commission (EAC)
Stage: approved or adopted
VVSG Lifecycle Policy (approved April 8, 2024)
2024-05-21The EAC launched its voluntary electronic poll book certification program and began registering commercial and in-house manufacturers.
The EAC launched its voluntary electronic poll book certification program and began registering commercial and in-house manufacturers.
Who acted: U.S. Election Assistance Commission (EAC)
Stage: in operation
U.S. Election Assistance Commission Launches Voluntary Electronic Poll Book Certification Program
2025-01-14The TGDC held its annual meeting (labelled the 2024 Annual Meeting) without a quorum.
The TGDC held its annual meeting (labelled the 2024 Annual Meeting) without a quorum. Speakers called it an information session and put off approving minutes. The meeting heard updates on the EAC Testing and Certification Program and the NIST Voting Program.
Who acted: Technical Guidelines Development Committee (TGDC), meeting at the National Cybersecurity Center of Excellence, Rockville, Maryland
Stage: discussed
The annual meeting occurred, but no quorum was present.
TGDC_MEETINGS_VOTING_STANDARDS_AND_APPOINTMENTS_2026-10-31.md
2025-02-20 Turning pointThe EAC certified KNOWiNK Poll Pad 3.6 as the first electronic poll book under its voluntary Election Supporting Technology Evaluation Program.
The EAC certified KNOWiNK Poll Pad 3.6 as the first electronic poll book under its voluntary Election Supporting Technology Evaluation Program. The release also described a Field Services route for checking EAC-certified systems already in use.
Who acted: U.S. Election Assistance Commission (EAC)
Stage: approved or adopted
Where the files differ: The release title differs between files. The signal ledger gives 'EAC Announces First Federally Certified Electronic Poll Book During Election Security Technology Evaluation Program'; the EAC news index saved in the October 30 package gives 'The EAC Announces First Federally Certified Electronic Poll Book During Election Technology Hearing'. Date and product are the same in both.
The EAC certified KNOWiNK Poll Pad 3.6 as the first electronic poll book under its voluntary Election Supporting Technology Evaluation Program
2025-03-18The EAC commissioners issued a joint statement on North Carolina becoming the first State to adopt the EAC's voluntary electronic poll book certification requirements for its own certification program.
The EAC commissioners issued a joint statement on North Carolina becoming the first State to adopt the EAC's voluntary electronic poll book certification requirements for its own certification program.
Who acted: EAC commissioners (joint statement); North Carolina (State certification program)
Stage: stated by the body
EAC Commissioners Issue Joint Statement on North Carolina Becoming First State to Adopt Federal Electronic Poll Book Requirements
2025-04-11The TGDC charter was renewed.
The TGDC charter was renewed. The FY2025 committee census gives the same current charter date for the EAC Standards Board, Board of Advisors and Local Leadership Council. The TGDC file says the renewed charter keeps the joint EAC and NIST appointment structure.
Who acted: U.S. Election Assistance Commission (EAC)
Stage: signed or enacted
Charter (renewed April 11. 2025)
2025-05-28The EAC commissioners issued a policy supporting paper-based, auditable voting systems.
The EAC commissioners issued a policy supporting paper-based, auditable voting systems. It restated that VVSG 2.0 certification requires a paper ballot and that States and localities choose and deploy their systems. The EAC's headline says over 98% of jurisdictions already use systems with a paper record of every vote.
Who acted: EAC commissioners
Stage: approved or adopted
The commissioners adopted a policy supporting paper-based, auditable voting systems and restated that VVSG 2.0 certification requires a paper ballot
2025-07-02The TGDC met online.
The TGDC met online. The EAC's notice said EAC staff and members would discuss the draft VVSG 2.1 and 'the Executive Order to Protect the Integrity of American Elections'; written public comments were due June 27, 2025. A quorum was declared; pending nominees could take part in discussion but not vote. A motion for further discussion by the end of the month passed.
Who acted: Technical Guidelines Development Committee (TGDC), with EAC staff
Stage: discussed
During the meeting, EAC staff and TGDC members will discuss the draft of the Voluntary Voting System Guidelines (VVSG) 2.1 and the Executive Order to Protect the Integrity of American Elections.
2025-07-10 Turning pointThe EAC certified Hart InterCivic's Verity Vanguard 1.0, the first voting system certified to VVSG 2.0.
The EAC certified Hart InterCivic's Verity Vanguard 1.0, the first voting system certified to VVSG 2.0.
Who acted: U.S. Election Assistance Commission (EAC)
Stage: approved or adopted
The EAC announced the first voting system certified to VVSG 2.0. Hart InterCivic's Verity Vanguard 1.0 is the first voting system to complete certification to the latest standards.
2025-07-30The TGDC held its first working session on the draft VVSG 2.1.
The TGDC held its first working session on the draft VVSG 2.1. Members discussed accessibility representation and whether the document could say it was prepared at the TGDC's direction. The next session was set for August 8.
Who acted: Technical Guidelines Development Committee (TGDC)
Stage: discussed
Members continued the draft discussion, including accessibility representation and whether the document could properly say it was prepared at TGDC's direction.
TGDC_MEETINGS_VOTING_STANDARDS_AND_APPOINTMENTS_2026-10-31.md
2025-08-08At its second working session the TGDC adopted a further review sequence: members' notes, an EAC written and redline response, and another review period before a further meeting.
At its second working session the TGDC adopted a further review sequence: members' notes, an EAC written and redline response, and another review period before a further meeting.
Who acted: Technical Guidelines Development Committee (TGDC)
Stage: discussed
Members adopted a further review sequence: member notes, EAC written/redline response and another review period before a further meeting.
TGDC_MEETINGS_VOTING_STANDARDS_AND_APPOINTMENTS_2026-10-31.md
2025-09-17At the third working session the EAC reported that it had put members' submissions into a revised draft (VVSG 2.1, TGDC Feedback Rev. 2, 314 pages).
At the third working session the EAC reported that it had put members' submissions into a revised draft (VVSG 2.1, TGDC Feedback Rev. 2, 314 pages). Members asked for more technical discussion, appointments and public access to the draft and letters. Counsel separated posting drafts early from the later formal public-comment process.
Who acted: Technical Guidelines Development Committee (TGDC); EAC staff
Stage: studied or staff paper
EAC reported incorporating member submissions into a revised draft.
TGDC_MEETINGS_VOTING_STANDARDS_AND_APPOINTMENTS_2026-10-31.md
2025-09-21Deadline: Executive Order 14248 (signed March 25, 2025) told the EAC to review and, if appropriate, re-certify voting systems within 180 days under new standards from Section 4(b)(i), and to rescind all earlier certifications based on prior standards.
Deadline: Executive Order 14248 (signed March 25, 2025) told the EAC to review and, if appropriate, re-certify voting systems within 180 days under new standards from Section 4(b)(i), and to rescind all earlier certifications based on prior standards. Section 4(b)(i) told the EAC to start amending VVSG 2.0, with no date set. Deadline; no result recorded in the notes. The notes record no amended VVSG 2.0 as of 2026-11-03.
Who acted: U.S. Election Assistance Commission (EAC) (the body addressed)
Stage: scheduled
Date note: Worked out by counting 180 days from 2025-03-25, the signing of Executive Order 14248; no file states this date.
Within 180 days of the date of this order, the Election Assistance Commission shall take appropriate action to review and, if appropriate, re- certify voting systems under the new standards established under subsection
2025-09-30The EAC met with registered voting-system manufacturers to start a formal End-of-Life review of certified systems that are no longer supported or active, for possible decommissioning or withdrawal from service.
The EAC met with registered voting-system manufacturers to start a formal End-of-Life review of certified systems that are no longer supported or active, for possible decommissioning or withdrawal from service.
Who acted: U.S. Election Assistance Commission (EAC)
Stage: studied or staff paper
The EAC met with registered voting system manufacturers to initiate a formal End-of-Life (EoL) review of certified systems that are no longer supported or active for potential decommissioning or withdrawal from service.
2026-01-31 to 2026-04-17In its 2025 Annual Report the EAC recommended to Congress (Recommendation 7) removing the joint appointment language so the EAC can appoint TGDC members.
In its 2025 Annual Report the EAC recommended to Congress (Recommendation 7) removing the joint appointment language so the EAC can appoint TGDC members. It reported five pending nominations for the 14-member committee as of January 31, 2026.
Who acted: U.S. Election Assistance Commission (EAC), unanimously
Stage: recommended by an advisory body
As such, the EAC recommends removing the joint appointment language allowing the EAC to appoint members.
2026-03-09The EAC posted a notice of two TGDC vacancies for people with technical and scientific expertise in voting systems and equipment.
The EAC posted a notice of two TGDC vacancies for people with technical and scientific expertise in voting systems and equipment. The vacancies are to be filled jointly by the EAC and the Director of the National Institute of Standards and Technology (NIST).
Who acted: U.S. Election Assistance Commission (EAC), notice signed by General Counsel Camden Kelliher
Stage: request for information or comment
the EAC is posting this notice of vacancy for two vacancies for individuals with technical and scientific expertise relating to voting systems and voting equipment.
2026-04-17At its annual meeting in Chicago (April 16-17) the Standards Board adopted a resolution strongly supporting that the EAC commissioners fix the TGDC appointment problems named in Recommendation 7, or speed appointments in other ways, leaving out other members specified by Section 221(c)(1)(E) of the Help America Vote Act (the TGDC file reads these as the statutory technical-expert category).
At its annual meeting in Chicago (April 16-17) the Standards Board adopted a resolution strongly supporting that the EAC commissioners fix the TGDC appointment problems named in Recommendation 7, or speed appointments in other ways, leaving out other members specified by Section 221(c)(1)(E) of the Help America Vote Act (the TGDC file reads these as the statutory technical-expert category).
Who acted: EAC Standards Board
Stage: recommended by an advisory body
Where the files differ: The resolution PDF's web title reads 'Resolution as adopted by the EAC Board of Advisors on May 6, 2025'; the document itself is headed Standards Board, April 17, 2026, and says 'Adopted April 17, 2026.' The TGDC file follows the document body.
IT IS THEREFORE RESOLVED, by the Standards Board, that the Membership strongly supports that the Commissioners of the bipartisan Election Assistance Commission correct the issues regarding the Technical Guidelines Development Committee appointment process identified in Recommendation 7 of its 2025 Annual Report
2026-04-30Commissioner Donald Palmer left the EAC.
Commissioner Donald Palmer left the EAC. Three of the four commissioner seats remained filled, and actions under the Help America Vote Act (HAVA) need three approvals.
Who acted: U.S. Election Assistance Commission (EAC); Commissioner Donald Palmer
Stage: other
three of four commissioners remain after Donald Palmer's Apr 30 departure; HAVA actions require three approvals.
2026-05-26The TGDC roster named eleven members besides the chair (Craig Burkhardt, Acting Director of NIST), with EAC Chairman Thomas Hicks as Designated Federal Officer.
The TGDC roster named eleven members besides the chair (Craig Burkhardt, Acting Director of NIST), with EAC Chairman Thomas Hicks as Designated Federal Officer. It showed one appointment pending approval and two technical-expert seats vacant.
Who acted: U.S. Election Assistance Commission (EAC) (TGDC roster)
Stage: published
names eleven non-chair members, shows one appointment pending approval and two technical-expert vacancies.
TGDC_MEETINGS_VOTING_STANDARDS_AND_APPOINTMENTS_2026-10-31.md
2026-09-15The EAC published two Federal Register notices seeking public comment on information collections for the Election Supporting Technology Evaluation Program: the Application for Testing (2026-18797) and the Manufacturer Registration Form (2026-18798).
The EAC published two Federal Register notices seeking public comment on information collections for the Election Supporting Technology Evaluation Program: the Application for Testing (2026-18797) and the Manufacturer Registration Form (2026-18798).
Who acted: U.S. Election Assistance Commission (EAC)
Stage: request for information or comment
In-window FR objects 2026-18797 / 2026-18798 (Sep 15) are ESTEP Application for Testing and Manufacturer Registration PRA collections
2026-09-15The EAC certified VotingWorks VxSuite 4.0 to VVSG 2.0.
The EAC certified VotingWorks VxSuite 4.0 to VVSG 2.0. EVS 7.0.0.0, Frontier 1.0 and Optio 1.0 were in test-plan stages; the Weekly Delta file (to September 16) lists Frontier 1.0 as 'Systems Under Test / Test Plan Approved'.
Who acted: U.S. Election Assistance Commission (EAC)
Stage: approved or adopted
Where the files differ: Date: the active-buildout register says 'VotingWorks VxSuite 4.0 was certified September 15, 2026'; the findings file says 'By September 16', and the EAC product page it cites is dated 2026-09-16.
By September 16, VotingWorks VxSuite 4.0 had joined the certified systems while three additional VVSG 2.0 products remained in testing.
2026-09-16The EAC's table of certified and under-test electronic poll books, dated September 16, listed its newest certifications as April 20 and July 9 (the file gives no year).
The EAC's table of certified and under-test electronic poll books, dated September 16, listed its newest certifications as April 20 and July 9 (the file gives no year). KNOWiNK Poll Pad 4.3.2 and VR Systems EViD were under test.
Who acted: U.S. Election Assistance Commission (EAC)
Stage: published
EPB certified-and-under-test table page is dated Sep 16; newest certified systems on that table remain Apr 20 / Jul 9
2026-10-22The EAC Inspector General issued an interim report on the physical-configuration audits that support EAC voting-system certifications.
The EAC Inspector General issued an interim report on the physical-configuration audits that support EAC voting-system certifications. It found one limited documentation discrepancy in a certified configuration and left a corrective recommendation open.
Who acted: EAC Office of Inspector General
Stage: published
It identified one limited certified-configuration documentation discrepancy and an open corrective recommendation.
Where it stands
As of 2026-11-14 (latest file on the story dated 2026-11-03): VVSG 2.0 is the EAC's adopted guideline; the VVSG 2.1 files are drafts (revised draft reported September 17, 2025). The files name two voting systems certified to VVSG 2.0 (Hart Verity Vanguard 1.0, July 10, 2025; VotingWorks VxSuite 4.0, September 15 or 16, 2026), with EVS 7.0.0.0, Frontier 1.0 and Optio 1.0 in test-plan stages as of September 16, 2026. KNOWiNK Poll Pad 3.6 is the first certified electronic poll book (February 20, 2025); KNOWiNK Poll Pad 4.3.2 and VR Systems EViD were under test on September 16, 2026. The Commission had three of four commissioners after April 30, 2026. The TGDC roster of May 26, 2026 showed one appointment pending and two technical-expert seats vacant. The EAC Inspector General's October 22, 2026 interim report left a corrective recommendation open. For Executive Order 14248 Section 4(b), the notes record no result as of 2026-11-03.
What comes next
- When
- not given
- What
- EAC certification decisions for EVS 7.0.0.0, Frontier 1.0 and Optio 1.0, in test-plan stages as of September 16, 2026.
- Stage
- under test
- Files
- Institutional Signals and Thesis Test 2025-2026/ACTIVE_BUILDOUT_REGISTER_2026-09-28.json
- Institutional Signals and Thesis Test 2025-2026/ACTIVE_BUILDOUT_DELIVERY_TRADE_INPUT_FINDINGS_2026-09-28.md
- When
- not given
- What
- A formal public-comment process on the VVSG 2.1 draft, which EAC notices say will come 'as feedback from the EAC's Advisory Boards is compiled'.
- Stage
- scheduled, date not stated
- Files
- Government Hidden Control Surfaces 2026/Meeting Umbrella Catchup 2026-10-31/WAVE_3_READER_CAPTURES_8_13.json
- Government Hidden Control Surfaces 2026/TGDC_MEETINGS_VOTING_STANDARDS_AND_APPOINTMENTS_2026-10-31.md
- When
- not given
- What
- Action on the EAC Inspector General's open corrective recommendation (October 22, 2026).
- Stage
- recommendation open
- Files
- Election Integrity/2026_MIDTERM_POST_COUNT_REVIEW_ARCHITECTURE_2026-11-03.md
What the notes do not record
- The notes do not record an amended VVSG 2.0 or other guidance under Executive Order 14248 Section 4(b)(i), or any re-certification or rescission of certifications under Section 4(b)(ii), as of 2026-11-03.
- The notes do not record a Commission vote adopting VVSG 2.1, or a Standards Board or Board of Advisors review of the draft.
- The notes do not record any TGDC meeting after September 17, 2025, or any appointment after the May 26, 2026 roster.
- The notes do not record the result of the End-of-Life review begun on September 30, 2025: which systems, if any, were decommissioned or withdrawn.
- The notes do not record which electronic poll books were certified on April 20 and July 9, or the year.
- The notes do not record the date of the EAC's 2025 Annual Report, or any action by Congress on its Recommendation 7.
- The notes do not record which system or configuration the Inspector General's documentation discrepancy concerns, or the EAC's response.
- The notes do not record the EAC's commissioners after July 25, 2026, or a nomination for the vacant seat.
- The notes do not record any State certifying, buying or using a VVSG 2.0 system.
- The notes do not record the legal entities of the manufacturers named by trade name.
What it touches
- Department of Justice demands for State voter-registration lists, and their sharing with the Department of Homeland Security
Its step 1 is the President's signing of Executive Order 14248 on March 25, 2025. Section 4(b) of that order is addressed to the EAC; this story's step 18 is the 180-day date in Section 4(b)(ii).
- EAC Voluntary Voting System Guidelines 2.1: TGDC draft review toward Commission adoption
Folded in: the TGDC's 2025 review of the VVSG 2.1 draft.
- TGDC appointment delays and the Standards Board's call to speed appointments
Folded in: TGDC charter, vacancies, the EAC's Recommendation 7, the Standards Board resolution and the May 26, 2026 roster.
- Voting-system security patches versus EAC and State certification rules
Page 6 of the Cybersecurity and Infrastructure Security Agency (CISA) 2026 Election Infrastructure Security Plan recommends harmonizing patch-management and certification requirements so security updates can move in real time. The CISA file records no EAC rule or change-order process changed as of October 5, 2026.
- Cybersecurity and Infrastructure Security Agency (CISA)'s 2026 Election Infrastructure Security Plan ('Securing the Next 250'): announced July 17, published September 24, 2026
The same CISA plan; published September 24, 2026.
- Cybersecurity and Infrastructure Security Agency (CISA)'s 2026 Election Report on voting-system and SLTT network vulnerabilities
CISA's July 13, 2026 report on voting-system vulnerabilities; the evidence lane lists mapping patched versions to EAC and State recertification as further work.
- DHS/Federal Emergency Management Agency (FEMA) FY2026 Homeland Security Grant Program election conditions (voter-list verification, manual audit, SAVE run, 20% holdback) and their vacatur in Metropolitan Government of Nashville v. DHS
Executive Order 14248 Section 4(d) tells the Secretary of Homeland Security and the FEMA Administrator to heavily prioritize VVSG 2.0 compliance and test-laboratory testing in Homeland Security Grant Program funding for election offices. This story's files do not connect the FY2026 grant conditions of July 10, 2026 to Section 4(d).
- Federal post-count review of the 2026 midterms (Department of Justice (DOJ) monitoring, voter-roll requests, audits)
The Inspector General's October 22, 2026 interim report is recorded in the post-count review file.
Graphics and studies
- What changed in the federal government, September 12–16
- Federal advisory committees and other public decision forums
- What the government is building around crypto and the dollar