{
  "id": "eac-vvsg-certification",
  "title": "Election Assistance Commission voting-system guidelines and certification: VVSG 2.0, electronic poll books, and the VVSG 2.1 draft",
  "one_line": "The U.S. Election Assistance Commission (EAC) adopted VVSG 2.0 on February 10, 2021, stopped certifying to older versions on November 16, 2023, certified the first electronic poll book on February 20, 2025 and the first VVSG 2.0 voting system on July 10, 2025, and certified VotingWorks VxSuite 4.0 in mid-September 2026; the Technical Guidelines Development Committee reviewed a VVSG 2.1 draft in 2025 that remains a draft in the notes, and the EAC Inspector General left a corrective recommendation open on October 22, 2026.",
  "system": "federal-elections",
  "how_this_machinery_works": [
    {
      "line": "Read the foundation piece 'How a federal election is run, contested and certified', section 5 ('Voting-system guidelines, testing and certification, and the Commission's quorum'). It gives the order: the Technical Guidelines Development Committee (TGDC) drafts guidelines; the Standards Board and Board of Advisors review; the Commission adopts; accredited test laboratories test; the EAC certifies; changes go through an Engineering Change Order or new testing; States certify, buy and deploy.",
      "files": [
        "Obsidian vault: 00 - Index/Operation Inch by Inch/Foundations 2026-11-14/how-a-federal-election-is-run-contested-and-certified.md"
      ]
    },
    {
      "line": "Federal certification is voluntary; many States make it binding by their own law.",
      "files": [
        "Election Integrity/White House Election Integrity Release 2026-07-16/CISA_2026_ELECTION_INFRASTRUCTURE_PLAN_RETURN_2026-10-05.md",
        "Government Hidden Control Surfaces 2026/Meeting Umbrella Catchup 2026-10-31/WAVE_3_READER_CAPTURES_1_7.json"
      ]
    }
  ],
  "how_it_entered": {
    "earliest_file_on_subject": {
      "date": "2026-07-25",
      "file": "Federal Government Website Sweep 2026-07-25/Accountability Institutions Wave 8/ACCOUNTABILITY_INSTITUTIONS_WAVE_8_PRIMARY_OBJECT_LEDGER.md",
      "note": "Records the EAC at three of four commissioners after April 30, 2026 (step 23)."
    },
    "earliest_thread_file": {
      "date": "2026-09-16",
      "file": "Federal Government Weekly Delta 2026-09-16/waves/WAVE_3C_INDEPENDENTS_LABOR_OVERSIGHT.md"
    },
    "katie_requests": [
      {
        "date": "2026-07-25",
        "request": "K02-020",
        "package": "Federal Government Website Sweep 2026-07-25",
        "her_words": "I want this to be comprehensive FULL sweep, not a blanket of forced brevity.",
        "why": "It had been a while since the last sweep."
      },
      {
        "date": "2026-09-15",
        "request": "K06-058",
        "package": "Federal Government Weekly Delta 2026-09-16",
        "her_words": "I wanted to go through and see if/what the SEC/CFTC/OCC/FINCEN/FDIC/NCUA have updated anything.",
        "why": "A queue from her phone chat 'Finance Research Queue'."
      },
      {
        "date": "2026-09-29",
        "request": "K08-025",
        "package": "Institutional Signals and Thesis Test 2025-2026",
        "her_words": "Wow awesome - so now that we actually have all of these mapped out - should we look at what they've been saying/researching to see how they affect the observatory's thesis?",
        "why": "Mapping was done; next is content."
      },
      {
        "date": "2026-09-29",
        "request": "K08-026",
        "package": "Institutional Signals and Thesis Test 2025-2026",
        "her_words": "So I think we should look into what these committees have done recently, not just what went through the full cycle - let's see if we can map what's being built currently",
        "why": "not stated"
      },
      {
        "date": "2026-10-31",
        "request": "K14-036",
        "package": "Government Hidden Control Surfaces 2026",
        "her_words": "I want to make sure we're really keeping up committees and oversight committees and stuff like that - they can get lost in the mix if we don't explicitly go searching for the videos of meetings or transcripts or minutes or followups.",
        "why": "They get lost unless searched for."
      }
    ],
    "note": "None of her requests names the EAC, voting systems or poll books. The subject came in through government-wide sweeps and the committee work."
  },
  "actors": [
    {
      "name": "U.S. Election Assistance Commission (EAC), its commissioners, Testing and Certification Program and Field Services Program",
      "role": "Adopted VVSG 2.0 (2021), accredits test laboratories, set the migration and Lifecycle Policy, runs the Election Supporting Technology Evaluation Program, certified the poll book and voting systems in steps 9, 14 and 26, started the End-of-Life review. Files write 'EAC' for the Commission, its staff and its programs alike."
    },
    {
      "name": "EAC commissioners: Thomas Hicks (Chairman from February 24, 2026), Christy McCormick, Ben Hovland, Donald Palmer (left April 30, 2026)",
      "role": "Three of four seats filled after April 30, 2026; HAVA actions need three approvals (as of July 25, 2026)."
    },
    {
      "name": "Technical Guidelines Development Committee (TGDC)",
      "role": "Chaired by the Director of the National Institute of Standards and Technology (NIST); 14 other members appointed jointly by the EAC and NIST. Reviewed the VVSG 2.1 draft in 2025. Its advice binds no one."
    },
    {
      "name": "National Institute of Standards and Technology (NIST); Craig Burkhardt, Acting Director",
      "role": "Chairs the TGDC and jointly appoints its members."
    },
    {
      "name": "EAC Standards Board",
      "role": "Advisory board of 55 State and 55 local election officials; adopted the April 17, 2026 appointment resolution."
    },
    {
      "name": "EAC Office of Inspector General",
      "role": "Issued the October 22, 2026 interim report on audits behind certifications."
    },
    {
      "name": "The President (Donald Trump)",
      "role": "Signed Executive Order 14248 on March 25, 2025 (step 1 of doj-voter-roll-demands), whose Section 4(b) addresses the EAC's guidelines and certifications."
    },
    {
      "name": "Manufacturers named by the files: Hart InterCivic (Verity Vanguard 1.0), VotingWorks (VxSuite 4.0), KNOWiNK (Poll Pad 3.6, Poll Pad 4.3.2), VR Systems (EViD); products EVS 7.0.0.0, Frontier 1.0, Optio 1.0 without makers named",
      "role": "Submitted products for testing and certification. The files give trade names; they do not give the legal entities."
    },
    {
      "name": "North Carolina",
      "role": "First State to adopt the EAC's poll-book requirements for its own certification program (step 10)."
    }
  ],
  "strands": [
    {
      "strand": "VVSG 2.0: the standard, test laboratories and migration",
      "steps": [
        1,
        2,
        4,
        6
      ]
    },
    {
      "strand": "Electronic poll books (Election Supporting Technology Evaluation Program)",
      "steps": [
        3,
        5,
        7,
        9,
        10,
        25,
        27
      ]
    },
    {
      "strand": "Voting-system certifications and reviews",
      "steps": [
        12,
        14,
        19,
        26,
        28
      ]
    },
    {
      "strand": "VVSG 2.1 draft at the TGDC (folded in from eac-vvsg-2-1)",
      "steps": [
        8,
        13,
        15,
        16,
        17
      ]
    },
    {
      "strand": "TGDC appointments (folded in from tgdc-appointments)",
      "steps": [
        11,
        20,
        21,
        22,
        24
      ]
    },
    {
      "strand": "Commission seats",
      "steps": [
        23
      ]
    },
    {
      "strand": "Executive Order 14248 instruction to the EAC on certifications",
      "steps": [
        18
      ]
    }
  ],
  "steps": [
    {
      "strand": "VVSG 2.0: the standard, test laboratories and migration",
      "date": "2021-02-10",
      "date_exactness": "day given in the link text on the EAC's guidelines page as captured on 2026-10-31",
      "body": "U.S. Election Assistance Commission (EAC), its commissioners",
      "what": "The EAC's commissioners unanimously adopted Voluntary Voting System Guidelines (VVSG) version 2.0, the set of requirements voting systems are tested against.",
      "stage": "approved or adopted",
      "status_word": "unanimously adopted",
      "path": "agency-order-or-decision",
      "rests_on": "the body's own statement, linked",
      "quote": {
        "text": "the EAC's Commissioners unanimously adopted the newest VVSG standard, version 2.0.",
        "file": "Government Hidden Control Surfaces 2026/Meeting Umbrella Catchup 2026-10-31/WAVE_3_READER_CAPTURES_1_7.json"
      },
      "files": [
        "Government Hidden Control Surfaces 2026/Meeting Umbrella Catchup 2026-10-31/WAVE_3_READER_CAPTURES_1_7.json",
        "Government Hidden Control Surfaces 2026/TGDC_MEETINGS_VOTING_STANDARDS_AND_APPOINTMENTS_2026-10-31.md"
      ],
      "register_records": [
        "U3-VVSG-INVENTORY"
      ],
      "disagreement": "none recorded",
      "source_check": "none",
      "from_register": false,
      "weight": "turning point",
      "where_in_the_system": "Commission adopts guidelines",
      "thesis_words": [],
      "what_moves": "rules: a new guideline version adopted",
      "n": 1
    },
    {
      "strand": "VVSG 2.0: the standard, test laboratories and migration",
      "date": "2022-11-15",
      "date_exactness": "day given",
      "body": "U.S. Election Assistance Commission (EAC)",
      "what": "The EAC accredited the first voting-system test laboratory to test to VVSG 2.0. The EAC page says both accredited laboratories could test to VVSG 2.0 by November and December 2022.",
      "stage": "approved or adopted",
      "status_word": "accreditation",
      "path": "agency-order-or-decision",
      "rests_on": "the body's own statement, linked",
      "quote": {
        "text": "With the accreditation of the first VSTL to test to VVSG 2.0 on November 15, 2022",
        "file": "Government Hidden Control Surfaces 2026/Meeting Umbrella Catchup 2026-10-31/WAVE_3_READER_CAPTURES_1_7.json"
      },
      "files": [
        "Government Hidden Control Surfaces 2026/Meeting Umbrella Catchup 2026-10-31/WAVE_3_READER_CAPTURES_1_7.json"
      ],
      "register_records": [],
      "disagreement": "none recorded",
      "source_check": "none",
      "from_register": false,
      "weight": "step",
      "where_in_the_system": "Test laboratory accreditation",
      "thesis_words": [],
      "what_moves": "systems: test laboratories able to test to the new version",
      "n": 2
    },
    {
      "strand": "Electronic poll books (Election Supporting Technology Evaluation Program)",
      "date": "2023-10-25",
      "date_exactness": "day given",
      "body": "U.S. Election Assistance Commission (EAC)",
      "what": "The EAC released a report on the results of its voluntary electronic poll book pilot program.",
      "stage": "published",
      "status_word": "report released",
      "path": "agency-plan-or-report",
      "rests_on": "the body's own statement (EAC news index, in the package)",
      "quote": {
        "text": "U.S. Election Assistance Commission Report Shows Results of its Voluntary Electronic Poll Book Pilot Program",
        "file": "Federal Government Refresh 2026-10-30/Phase 2/Source Documents/eac.txt"
      },
      "files": [
        "Federal Government Refresh 2026-10-30/Phase 2/Source Documents/eac.txt"
      ],
      "register_records": [],
      "disagreement": "none recorded",
      "source_check": "none",
      "from_register": false,
      "weight": "detail",
      "where_in_the_system": "Poll-book program (Election Supporting Technology Evaluation Program)",
      "thesis_words": [],
      "what_moves": "nothing recorded",
      "n": 3
    },
    {
      "strand": "VVSG 2.0: the standard, test laboratories and migration",
      "date": "2023-11-16",
      "date_exactness": "day given; applications for VVSG 1.0 and 1.1 were accepted to November 15, 2023; the EAC's release is dated November 29, 2023",
      "body": "U.S. Election Assistance Commission (EAC)",
      "what": "The EAC stopped using VVSG 1.0 and 1.1 to certify voting systems. From then on every application for a new EAC certification had to be for VVSG 2.0, or a limited maintenance change to a system already certified. The EAC states that systems already certified are not decertified by this move and may stay in use unless a State's law says otherwise.",
      "stage": "took effect",
      "status_word": "no longer used to certify",
      "path": "agency-order-or-decision",
      "rests_on": "the body's own statement, linked",
      "quote": {
        "text": "VVSG 1.0 and VVSG 1.1 are now no longer used by the EAC to certify voting systems as of November 16, 2023.",
        "file": "Government Hidden Control Surfaces 2026/Meeting Umbrella Catchup 2026-10-31/WAVE_3_READER_CAPTURES_1_7.json"
      },
      "files": [
        "Government Hidden Control Surfaces 2026/Meeting Umbrella Catchup 2026-10-31/WAVE_3_READER_CAPTURES_1_7.json",
        "Federal Government Refresh 2026-10-30/Phase 2/Source Documents/eac.txt",
        "Government Hidden Control Surfaces 2026/TGDC_MEETINGS_VOTING_STANDARDS_AND_APPOINTMENTS_2026-10-31.md"
      ],
      "register_records": [
        "U3-VVSG-INVENTORY"
      ],
      "disagreement": "none recorded",
      "source_check": "none",
      "from_register": false,
      "weight": "turning point",
      "where_in_the_system": "Move to a new guideline version (migration)",
      "thesis_words": [],
      "what_moves": "rules: which version new certifications must meet",
      "n": 4
    },
    {
      "strand": "Electronic poll books (Election Supporting Technology Evaluation Program)",
      "date": "2023-12-06",
      "date_exactness": "day given",
      "body": "U.S. Election Assistance Commission (EAC)",
      "what": "The EAC approved the setting up of the Election Supporting Technology Evaluation Program, a permanent program to evaluate election technologies other than voting systems, after its electronic poll book pilot.",
      "stage": "approved or adopted",
      "status_word": "approves establishment",
      "path": "agency-operation-or-program",
      "rests_on": "the body's own statement (EAC news index, in the package)",
      "quote": {
        "text": "U.S. Election Assistance Commission Approves Establishment of Election Supporting Technology Evaluation Program",
        "file": "Federal Government Refresh 2026-10-30/Phase 2/Source Documents/eac.txt"
      },
      "files": [
        "Federal Government Refresh 2026-10-30/Phase 2/Source Documents/eac.txt"
      ],
      "register_records": [],
      "disagreement": "none recorded",
      "source_check": "none",
      "from_register": false,
      "weight": "step",
      "where_in_the_system": "Poll-book program (Election Supporting Technology Evaluation Program)",
      "thesis_words": [],
      "what_moves": "functions: a new federal evaluation program",
      "n": 5
    },
    {
      "strand": "VVSG 2.0: the standard, test laboratories and migration",
      "date": "2024-04-08",
      "date_exactness": "day given",
      "body": "U.S. Election Assistance Commission (EAC)",
      "what": "The EAC approved its VVSG Lifecycle Policy. The EAC page says the policy covers types of version changes, test-laboratory accreditation, migration from earlier versions, changes allowed to systems certified to earlier versions, and a periodic review timeline.",
      "stage": "approved or adopted",
      "status_word": "approved",
      "path": "agency-order-or-decision",
      "rests_on": "the body's own statement, linked",
      "quote": {
        "text": "VVSG Lifecycle Policy (approved April 8, 2024)",
        "file": "Government Hidden Control Surfaces 2026/Meeting Umbrella Catchup 2026-10-31/WAVE_3_READER_CAPTURES_1_7.json"
      },
      "files": [
        "Government Hidden Control Surfaces 2026/Meeting Umbrella Catchup 2026-10-31/WAVE_3_READER_CAPTURES_1_7.json"
      ],
      "register_records": [],
      "disagreement": "none recorded",
      "source_check": "none",
      "from_register": false,
      "weight": "step",
      "where_in_the_system": "Move to a new guideline version (migration)",
      "thesis_words": [],
      "what_moves": "rules: how versions change and migrate",
      "n": 6
    },
    {
      "strand": "Electronic poll books (Election Supporting Technology Evaluation Program)",
      "date": "2024-05-21",
      "date_exactness": "day given",
      "body": "U.S. Election Assistance Commission (EAC)",
      "what": "The EAC launched its voluntary electronic poll book certification program and began registering commercial and in-house manufacturers.",
      "stage": "in operation",
      "status_word": "launches",
      "path": "agency-operation-or-program",
      "rests_on": "the body's own statement (EAC news index, in the package)",
      "quote": {
        "text": "U.S. Election Assistance Commission Launches Voluntary Electronic Poll Book Certification Program",
        "file": "Federal Government Refresh 2026-10-30/Phase 2/Source Documents/eac.txt"
      },
      "files": [
        "Federal Government Refresh 2026-10-30/Phase 2/Source Documents/eac.txt"
      ],
      "register_records": [],
      "disagreement": "none recorded",
      "source_check": "none",
      "from_register": false,
      "weight": "step",
      "where_in_the_system": "Poll-book program (Election Supporting Technology Evaluation Program)",
      "thesis_words": [],
      "what_moves": "functions: poll-book certification opened",
      "n": 7
    },
    {
      "strand": "VVSG 2.1 draft at the TGDC (folded in from eac-vvsg-2-1)",
      "date": "2025-01-14",
      "date_exactness": "day given",
      "body": "Technical Guidelines Development Committee (TGDC), meeting at the National Cybersecurity Center of Excellence, Rockville, Maryland",
      "what": "The TGDC held its annual meeting (labelled the 2024 Annual Meeting) without a quorum. Speakers called it an information session and put off approving minutes. The meeting heard updates on the EAC Testing and Certification Program and the NIST Voting Program.",
      "stage": "discussed",
      "status_word": "held; no quorum",
      "path": "advisory-committee",
      "rests_on": "official record (formal transcript), linked",
      "quote": {
        "text": "The annual meeting occurred, but no quorum was present.",
        "file": "Government Hidden Control Surfaces 2026/TGDC_MEETINGS_VOTING_STANDARDS_AND_APPOINTMENTS_2026-10-31.md"
      },
      "files": [
        "Government Hidden Control Surfaces 2026/TGDC_MEETINGS_VOTING_STANDARDS_AND_APPOINTMENTS_2026-10-31.md",
        "Government Hidden Control Surfaces 2026/Meeting Umbrella Catchup 2026-10-31/WAVE_3_READER_CAPTURES_8_13.json"
      ],
      "register_records": [
        "U3-TGDC-JAN-TRANSCRIPT"
      ],
      "disagreement": "none recorded",
      "source_check": "none",
      "from_register": false,
      "weight": "step",
      "where_in_the_system": "TGDC drafts guidelines",
      "thesis_words": [],
      "what_moves": "nothing recorded",
      "n": 8
    },
    {
      "strand": "Electronic poll books (Election Supporting Technology Evaluation Program)",
      "date": "2025-02-20",
      "date_exactness": "day given",
      "body": "U.S. Election Assistance Commission (EAC)",
      "what": "The EAC certified KNOWiNK Poll Pad 3.6 as the first electronic poll book under its voluntary Election Supporting Technology Evaluation Program. The release also described a Field Services route for checking EAC-certified systems already in use.",
      "stage": "approved or adopted",
      "status_word": "certified",
      "path": "agency-order-or-decision",
      "rests_on": "the body's own statement, linked",
      "quote": {
        "text": "The EAC certified KNOWiNK Poll Pad 3.6 as the first electronic poll book under its voluntary Election Supporting Technology Evaluation Program",
        "file": "Institutional Signals and Thesis Test 2025-2026/PUBLIC_DELIVERY_FULL_SWEEP_SIGNAL_LEDGER_2025-2026.json"
      },
      "files": [
        "Institutional Signals and Thesis Test 2025-2026/PUBLIC_DELIVERY_FULL_SWEEP_SIGNAL_LEDGER_2025-2026.json",
        "Federal Government Refresh 2026-10-30/Phase 2/Source Documents/eac.txt",
        "Institutional Signals and Thesis Test 2025-2026/PUBLIC_DELIVERY_FULL_SWEEP_FINDINGS_2026-09-28.md"
      ],
      "register_records": [
        "eac-first-electronic-poll-book-certification-2025-02-20"
      ],
      "disagreement": "The release title differs between files. The signal ledger gives 'EAC Announces First Federally Certified Electronic Poll Book During Election Security Technology Evaluation Program'; the EAC news index saved in the October 30 package gives 'The EAC Announces First Federally Certified Electronic Poll Book During Election Technology Hearing'. Date and product are the same in both.",
      "source_check": "none",
      "from_register": false,
      "weight": "turning point",
      "where_in_the_system": "EAC certifies (poll books)",
      "thesis_words": [],
      "what_moves": "a named product certified",
      "n": 9
    },
    {
      "strand": "Electronic poll books (Election Supporting Technology Evaluation Program)",
      "date": "2025-03-18",
      "date_exactness": "day given",
      "body": "EAC commissioners (joint statement); North Carolina (State certification program)",
      "what": "The EAC commissioners issued a joint statement on North Carolina becoming the first State to adopt the EAC's voluntary electronic poll book certification requirements for its own certification program.",
      "stage": "stated by the body",
      "status_word": "joint statement",
      "path": "state-or-tribal-government-action",
      "rests_on": "the body's own statement (EAC news index, in the package)",
      "quote": {
        "text": "EAC Commissioners Issue Joint Statement on North Carolina Becoming First State to Adopt Federal Electronic Poll Book Requirements",
        "file": "Federal Government Refresh 2026-10-30/Phase 2/Source Documents/eac.txt"
      },
      "files": [
        "Federal Government Refresh 2026-10-30/Phase 2/Source Documents/eac.txt"
      ],
      "register_records": [],
      "disagreement": "none recorded",
      "source_check": "none",
      "from_register": false,
      "weight": "detail",
      "where_in_the_system": "State certification, purchase and deployment",
      "thesis_words": [],
      "what_moves": "nothing recorded",
      "n": 10
    },
    {
      "strand": "TGDC appointments (folded in from tgdc-appointments)",
      "date": "2025-04-11",
      "date_exactness": "day given",
      "body": "U.S. Election Assistance Commission (EAC)",
      "what": "The TGDC charter was renewed. The FY2025 committee census gives the same current charter date for the EAC Standards Board, Board of Advisors and Local Leadership Council. The TGDC file says the renewed charter keeps the joint EAC and NIST appointment structure.",
      "stage": "signed or enacted",
      "status_word": "charter renewed",
      "path": "advisory-committee",
      "rests_on": "official record, linked",
      "quote": {
        "text": "Charter (renewed April 11. 2025)",
        "file": "Government Hidden Control Surfaces 2026/Meeting Umbrella Catchup 2026-10-31/WAVE_3_READER_CAPTURES_1_7.json"
      },
      "files": [
        "Government Hidden Control Surfaces 2026/Meeting Umbrella Catchup 2026-10-31/WAVE_3_READER_CAPTURES_1_7.json",
        "Government Hidden Control Surfaces 2026/TGDC_MEETINGS_VOTING_STANDARDS_AND_APPOINTMENTS_2026-10-31.md",
        "Government Hidden Control Surfaces 2026/FACA_FY2025_COMMITTEE_CENSUS.json"
      ],
      "register_records": [
        "COM-047436",
        "COM-047442",
        "COM-047437",
        "COM-047446",
        "U3-TGDC-CHARTER"
      ],
      "disagreement": "none recorded",
      "source_check": "none",
      "from_register": false,
      "weight": "detail",
      "where_in_the_system": "TGDC drafts guidelines",
      "thesis_words": [],
      "what_moves": "legal existence: committee charters continued",
      "n": 11
    },
    {
      "strand": "Voting-system certifications and reviews",
      "date": "2025-05-28",
      "date_exactness": "day given",
      "body": "EAC commissioners",
      "what": "The EAC commissioners issued a policy supporting paper-based, auditable voting systems. It restated that VVSG 2.0 certification requires a paper ballot and that States and localities choose and deploy their systems. The EAC's headline says over 98% of jurisdictions already use systems with a paper record of every vote.",
      "stage": "approved or adopted",
      "status_word": "policy",
      "path": "staff-position",
      "rests_on": "the body's own statement, linked",
      "quote": {
        "text": "The commissioners adopted a policy supporting paper-based, auditable voting systems and restated that VVSG 2.0 certification requires a paper ballot",
        "file": "Institutional Signals and Thesis Test 2025-2026/PUBLIC_DELIVERY_FULL_SWEEP_SIGNAL_LEDGER_2025-2026.json"
      },
      "files": [
        "Institutional Signals and Thesis Test 2025-2026/PUBLIC_DELIVERY_FULL_SWEEP_SIGNAL_LEDGER_2025-2026.json",
        "Federal Government Refresh 2026-10-30/Phase 2/Source Documents/eac.txt"
      ],
      "register_records": [
        "eac-paper-based-auditable-systems-policy-2025-05-28"
      ],
      "disagreement": "none recorded",
      "source_check": "none",
      "from_register": false,
      "weight": "step",
      "where_in_the_system": "Commission adopts guidelines",
      "thesis_words": [],
      "what_moves": "nothing recorded",
      "n": 12
    },
    {
      "strand": "VVSG 2.1 draft at the TGDC (folded in from eac-vvsg-2-1)",
      "date": "2025-07-02",
      "date_exactness": "day given",
      "body": "Technical Guidelines Development Committee (TGDC), with EAC staff",
      "what": "The TGDC met online. The EAC's notice said EAC staff and members would discuss the draft VVSG 2.1 and 'the Executive Order to Protect the Integrity of American Elections'; written public comments were due June 27, 2025. A quorum was declared; pending nominees could take part in discussion but not vote. A motion for further discussion by the end of the month passed.",
      "stage": "discussed",
      "status_word": "meeting; motion passed",
      "path": "advisory-committee",
      "rests_on": "the body's own statement and spoken (meeting recording), linked",
      "quote": {
        "text": "During the meeting, EAC staff and TGDC members will discuss the draft of the Voluntary Voting System Guidelines (VVSG) 2.1 and the Executive Order to Protect the Integrity of American Elections.",
        "file": "Government Hidden Control Surfaces 2026/Meeting Umbrella Catchup 2026-10-31/WAVE_3_READER_CAPTURES_1_7.json"
      },
      "files": [
        "Government Hidden Control Surfaces 2026/Meeting Umbrella Catchup 2026-10-31/WAVE_3_READER_CAPTURES_1_7.json",
        "Government Hidden Control Surfaces 2026/TGDC_MEETINGS_VOTING_STANDARDS_AND_APPOINTMENTS_2026-10-31.md",
        "Government Hidden Control Surfaces 2026/Meeting Umbrella Catchup 2026-10-31/WAVE_3_SOURCE_LEDGER.json"
      ],
      "register_records": [
        "U3-TGDC-JUL-AGENDA",
        "U3-TGDC-CAPTIONS-2025-07-02"
      ],
      "disagreement": "none recorded",
      "source_check": "none",
      "from_register": false,
      "weight": "step",
      "where_in_the_system": "TGDC drafts guidelines",
      "thesis_words": [],
      "what_moves": "nothing recorded",
      "n": 13
    },
    {
      "strand": "Voting-system certifications and reviews",
      "date": "2025-07-10",
      "date_exactness": "day given",
      "body": "U.S. Election Assistance Commission (EAC)",
      "what": "The EAC certified Hart InterCivic's Verity Vanguard 1.0, the first voting system certified to VVSG 2.0.",
      "stage": "approved or adopted",
      "status_word": "certified",
      "path": "agency-order-or-decision",
      "rests_on": "the body's own statement, linked",
      "quote": {
        "text": "The EAC announced the first voting system certified to VVSG 2.0. Hart InterCivic's Verity Vanguard 1.0 is the first voting system to complete certification to the latest standards.",
        "file": "Federal Government Refresh 2026-10-30/Phase 2/Source Documents/eac.txt"
      },
      "files": [
        "Federal Government Refresh 2026-10-30/Phase 2/Source Documents/eac.txt",
        "Institutional Signals and Thesis Test 2025-2026/PUBLIC_DELIVERY_FULL_SWEEP_SIGNAL_LEDGER_2025-2026.json",
        "Institutional Signals and Thesis Test 2025-2026/PUBLIC_DELIVERY_FULL_SWEEP_FINDINGS_2026-09-28.md"
      ],
      "register_records": [
        "eac-first-vvsg-2-system-certification-2025-07-10"
      ],
      "disagreement": "none recorded",
      "source_check": "none",
      "from_register": false,
      "weight": "turning point",
      "where_in_the_system": "EAC certifies (voting systems)",
      "thesis_words": [],
      "what_moves": "a named product certified",
      "n": 14,
      "note": "The files do not tie this certification to Executive Order 14248."
    },
    {
      "strand": "VVSG 2.1 draft at the TGDC (folded in from eac-vvsg-2-1)",
      "date": "2025-07-30",
      "date_exactness": "day given",
      "body": "Technical Guidelines Development Committee (TGDC)",
      "what": "The TGDC held its first working session on the draft VVSG 2.1. Members discussed accessibility representation and whether the document could say it was prepared at the TGDC's direction. The next session was set for August 8.",
      "stage": "discussed",
      "status_word": "working session",
      "path": "advisory-committee",
      "rests_on": "spoken (meeting recording), linked",
      "quote": {
        "text": "Members continued the draft discussion, including accessibility representation and whether the document could properly say it was prepared at TGDC's direction.",
        "file": "Government Hidden Control Surfaces 2026/TGDC_MEETINGS_VOTING_STANDARDS_AND_APPOINTMENTS_2026-10-31.md"
      },
      "files": [
        "Government Hidden Control Surfaces 2026/TGDC_MEETINGS_VOTING_STANDARDS_AND_APPOINTMENTS_2026-10-31.md",
        "Government Hidden Control Surfaces 2026/Meeting Umbrella Catchup 2026-10-31/WAVE_3_READER_CAPTURES_8_13.json"
      ],
      "register_records": [
        "U3-TGDC-CAPTIONS-2025-07-30"
      ],
      "disagreement": "none recorded",
      "source_check": "none",
      "from_register": false,
      "weight": "step",
      "where_in_the_system": "TGDC drafts guidelines",
      "thesis_words": [],
      "what_moves": "nothing recorded",
      "n": 15
    },
    {
      "strand": "VVSG 2.1 draft at the TGDC (folded in from eac-vvsg-2-1)",
      "date": "2025-08-08",
      "date_exactness": "day given",
      "body": "Technical Guidelines Development Committee (TGDC)",
      "what": "At its second working session the TGDC adopted a further review sequence: members' notes, an EAC written and redline response, and another review period before a further meeting.",
      "stage": "discussed",
      "status_word": "review sequence adopted",
      "path": "advisory-committee",
      "rests_on": "spoken (meeting recording), linked",
      "quote": {
        "text": "Members adopted a further review sequence: member notes, EAC written/redline response and another review period before a further meeting.",
        "file": "Government Hidden Control Surfaces 2026/TGDC_MEETINGS_VOTING_STANDARDS_AND_APPOINTMENTS_2026-10-31.md"
      },
      "files": [
        "Government Hidden Control Surfaces 2026/TGDC_MEETINGS_VOTING_STANDARDS_AND_APPOINTMENTS_2026-10-31.md",
        "Government Hidden Control Surfaces 2026/Meeting Umbrella Catchup 2026-10-31/WAVE_3_READER_CAPTURES_8_13.json"
      ],
      "register_records": [
        "U3-TGDC-CAPTIONS-2025-08-08"
      ],
      "disagreement": "none recorded",
      "source_check": "none",
      "from_register": false,
      "weight": "step",
      "where_in_the_system": "TGDC drafts guidelines",
      "thesis_words": [],
      "what_moves": "nothing recorded",
      "n": 16
    },
    {
      "strand": "VVSG 2.1 draft at the TGDC (folded in from eac-vvsg-2-1)",
      "date": "2025-09-17",
      "date_exactness": "day given",
      "body": "Technical Guidelines Development Committee (TGDC); EAC staff",
      "what": "At the third working session the EAC reported that it had put members' submissions into a revised draft (VVSG 2.1, TGDC Feedback Rev. 2, 314 pages). Members asked for more technical discussion, appointments and public access to the draft and letters. Counsel separated posting drafts early from the later formal public-comment process.",
      "stage": "studied or staff paper",
      "status_word": "revised draft",
      "path": "advisory-committee",
      "rests_on": "spoken (meeting recording) and the body's own statement, linked",
      "quote": {
        "text": "EAC reported incorporating member submissions into a revised draft.",
        "file": "Government Hidden Control Surfaces 2026/TGDC_MEETINGS_VOTING_STANDARDS_AND_APPOINTMENTS_2026-10-31.md"
      },
      "files": [
        "Government Hidden Control Surfaces 2026/TGDC_MEETINGS_VOTING_STANDARDS_AND_APPOINTMENTS_2026-10-31.md",
        "Government Hidden Control Surfaces 2026/Meeting Umbrella Catchup 2026-10-31/WAVE_3_READER_CAPTURES_8_13.json"
      ],
      "register_records": [
        "U3-TGDC-CAPTIONS-2025-09-17",
        "U3-TGDC-REV2"
      ],
      "disagreement": "none recorded",
      "source_check": "none",
      "from_register": false,
      "weight": "step",
      "where_in_the_system": "TGDC drafts guidelines",
      "thesis_words": [],
      "what_moves": "nothing recorded",
      "n": 17
    },
    {
      "strand": "Executive Order 14248 instruction to the EAC on certifications",
      "date": "2025-09-21",
      "date_exactness": "day given",
      "body": "U.S. Election Assistance Commission (EAC) (the body addressed)",
      "what": "Deadline: Executive Order 14248 (signed March 25, 2025) told the EAC to review and, if appropriate, re-certify voting systems within 180 days under new standards from Section 4(b)(i), and to rescind all earlier certifications based on prior standards. Section 4(b)(i) told the EAC to start amending VVSG 2.0, with no date set. Deadline; no result recorded in the notes. The notes record no amended VVSG 2.0 as of 2026-11-03.",
      "stage": "scheduled",
      "status_word": "deadline; no result recorded in the notes",
      "path": "presidential-instrument",
      "rests_on": "official record (Federal Register text), linked",
      "quote": {
        "text": "Within 180 days of the date of this order, the Election Assistance Commission shall take appropriate action to review and, if appropriate, re- certify voting systems under the new standards established under subsection",
        "file": "Executive Order Source Library/Source Text Editions/eo-43e41ca872fa27bea788.md"
      },
      "files": [
        "Executive Order Source Library/Source Text Editions/eo-43e41ca872fa27bea788.md"
      ],
      "register_records": [],
      "disagreement": "none recorded",
      "source_check": "none",
      "from_register": false,
      "weight": "step",
      "where_in_the_system": "EAC certifies (voting systems)",
      "thesis_words": [],
      "what_moves": "nothing recorded",
      "date_note": "Worked out by counting 180 days from 2025-03-25, the signing of Executive Order 14248; no file states this date.",
      "n": 18,
      "note": "The files tie no EAC step in this story to Executive Order 14248 by number or in plain words. The EAC's notice for the July 2, 2025 TGDC meeting (step 13) lists 'the Executive Order to Protect the Integrity of American Elections' as a discussion topic. The order came first (March 25, 2025); the VVSG 2.1 drafting (steps 8, 13, 15-17) and the End-of-Life review (step 19) followed. The signing is step 1 of the story doj-voter-roll-demands."
    },
    {
      "strand": "Voting-system certifications and reviews",
      "date": "2025-09-30",
      "date_exactness": "day given",
      "body": "U.S. Election Assistance Commission (EAC)",
      "what": "The EAC met with registered voting-system manufacturers to start a formal End-of-Life review of certified systems that are no longer supported or active, for possible decommissioning or withdrawal from service.",
      "stage": "studied or staff paper",
      "status_word": "review initiated",
      "path": "agency-order-or-decision",
      "rests_on": "the body's own statement (EAC news index, in the package)",
      "quote": {
        "text": "The EAC met with registered voting system manufacturers to initiate a formal End-of-Life (EoL) review of certified systems that are no longer supported or active for potential decommissioning or withdrawal from service.",
        "file": "Federal Government Refresh 2026-10-30/Phase 2/Source Documents/eac.txt"
      },
      "files": [
        "Federal Government Refresh 2026-10-30/Phase 2/Source Documents/eac.txt"
      ],
      "register_records": [],
      "disagreement": "none recorded",
      "source_check": "none",
      "from_register": false,
      "weight": "step",
      "where_in_the_system": "EAC certifies (voting systems)",
      "thesis_words": [],
      "what_moves": "nothing recorded",
      "n": 19
    },
    {
      "strand": "TGDC appointments (folded in from tgdc-appointments)",
      "date": "2026-01-31 to 2026-04-17",
      "date_exactness": "no day given; the report gives its count 'as of January 31, 2026', and the Standards Board quoted it on April 17, 2026",
      "body": "U.S. Election Assistance Commission (EAC), unanimously",
      "what": "In its 2025 Annual Report the EAC recommended to Congress (Recommendation 7) removing the joint appointment language so the EAC can appoint TGDC members. It reported five pending nominations for the 14-member committee as of January 31, 2026.",
      "stage": "recommended by an advisory body",
      "status_word": "recommendation to Congress",
      "path": "agency-plan-or-report",
      "rests_on": "the body's own statement, as quoted in the Standards Board resolution, linked",
      "quote": {
        "text": "As such, the EAC recommends removing the joint appointment language allowing the EAC to appoint members.",
        "file": "Government Hidden Control Surfaces 2026/Meeting Umbrella Catchup 2026-10-31/WAVE_3_READER_CAPTURES_8_13.json"
      },
      "files": [
        "Government Hidden Control Surfaces 2026/Meeting Umbrella Catchup 2026-10-31/WAVE_3_READER_CAPTURES_8_13.json",
        "Government Hidden Control Surfaces 2026/TGDC_MEETINGS_VOTING_STANDARDS_AND_APPOINTMENTS_2026-10-31.md"
      ],
      "register_records": [],
      "disagreement": "none recorded",
      "source_check": "none",
      "from_register": false,
      "weight": "step",
      "where_in_the_system": "TGDC drafts guidelines",
      "thesis_words": [],
      "what_moves": "nothing recorded",
      "n": 20
    },
    {
      "strand": "TGDC appointments (folded in from tgdc-appointments)",
      "date": "2026-03-09",
      "date_exactness": "day given",
      "body": "U.S. Election Assistance Commission (EAC), notice signed by General Counsel Camden Kelliher",
      "what": "The EAC posted a notice of two TGDC vacancies for people with technical and scientific expertise in voting systems and equipment. The vacancies are to be filled jointly by the EAC and the Director of the National Institute of Standards and Technology (NIST).",
      "stage": "request for information or comment",
      "status_word": "notice of vacancy",
      "path": "advisory-committee",
      "rests_on": "official record, linked",
      "quote": {
        "text": "the EAC is posting this notice of vacancy for two vacancies for individuals with technical and scientific expertise relating to voting systems and voting equipment.",
        "file": "Government Hidden Control Surfaces 2026/Meeting Umbrella Catchup 2026-10-31/WAVE_3_READER_CAPTURES_14_18.json"
      },
      "files": [
        "Government Hidden Control Surfaces 2026/Meeting Umbrella Catchup 2026-10-31/WAVE_3_READER_CAPTURES_14_18.json",
        "Government Hidden Control Surfaces 2026/TGDC_MEETINGS_VOTING_STANDARDS_AND_APPOINTMENTS_2026-10-31.md"
      ],
      "register_records": [
        "U3-TGDC-VACANCY"
      ],
      "disagreement": "none recorded",
      "source_check": "none",
      "from_register": false,
      "weight": "step",
      "where_in_the_system": "TGDC drafts guidelines",
      "thesis_words": [],
      "what_moves": "staff: two committee seats open",
      "n": 21
    },
    {
      "strand": "TGDC appointments (folded in from tgdc-appointments)",
      "date": "2026-04-17",
      "date_exactness": "day given; the meeting ran April 16-17, 2026 in Chicago",
      "body": "EAC Standards Board",
      "what": "At its annual meeting in Chicago (April 16-17) the Standards Board adopted a resolution strongly supporting that the EAC commissioners fix the TGDC appointment problems named in Recommendation 7, or speed appointments in other ways, leaving out other members specified by Section 221(c)(1)(E) of the Help America Vote Act (the TGDC file reads these as the statutory technical-expert category).",
      "stage": "recommended by an advisory body",
      "status_word": "resolution adopted",
      "path": "advisory-committee",
      "rests_on": "official record, linked",
      "quote": {
        "text": "IT IS THEREFORE RESOLVED, by the Standards Board, that the Membership strongly supports that the Commissioners of the bipartisan Election Assistance Commission correct the issues regarding the Technical Guidelines Development Committee appointment process identified in Recommendation 7 of its 2025 Annual Report",
        "file": "Government Hidden Control Surfaces 2026/Meeting Umbrella Catchup 2026-10-31/WAVE_3_READER_CAPTURES_8_13.json"
      },
      "files": [
        "Government Hidden Control Surfaces 2026/Meeting Umbrella Catchup 2026-10-31/WAVE_3_READER_CAPTURES_8_13.json",
        "Government Hidden Control Surfaces 2026/TGDC_MEETINGS_VOTING_STANDARDS_AND_APPOINTMENTS_2026-10-31.md",
        "Government Hidden Control Surfaces 2026/Meeting Umbrella Catchup 2026-10-31/WAVE_3_SOURCE_LEDGER.json"
      ],
      "register_records": [
        "U3-SB-EVENT",
        "U3-SB-ROUGH",
        "U3-SB-RESOLUTION"
      ],
      "disagreement": "The resolution PDF's web title reads 'Resolution as adopted by the EAC Board of Advisors on May 6, 2025'; the document itself is headed Standards Board, April 17, 2026, and says 'Adopted April 17, 2026.' The TGDC file follows the document body.",
      "source_check": "none",
      "from_register": false,
      "weight": "step",
      "where_in_the_system": "Standards Board and Board of Advisors review",
      "thesis_words": [],
      "what_moves": "nothing recorded",
      "n": 22
    },
    {
      "strand": "Commission seats",
      "date": "2026-04-30",
      "date_exactness": "day given; the EAC announced the departure on April 29, 2026",
      "body": "U.S. Election Assistance Commission (EAC); Commissioner Donald Palmer",
      "what": "Commissioner Donald Palmer left the EAC. Three of the four commissioner seats remained filled, and actions under the Help America Vote Act (HAVA) need three approvals.",
      "stage": "other",
      "status_word": "departing",
      "path": "nomination",
      "rests_on": "the body's own statement, linked",
      "quote": {
        "text": "three of four commissioners remain after Donald Palmer's Apr 30 departure; HAVA actions require three approvals.",
        "file": "Federal Government Website Sweep 2026-07-25/Accountability Institutions Wave 8/ACCOUNTABILITY_INSTITUTIONS_WAVE_8_PRIMARY_OBJECT_LEDGER.md"
      },
      "files": [
        "Federal Government Website Sweep 2026-07-25/Accountability Institutions Wave 8/ACCOUNTABILITY_INSTITUTIONS_WAVE_8_PRIMARY_OBJECT_LEDGER.md",
        "Federal Government Refresh 2026-10-30/Phase 2/Source Documents/eac.txt"
      ],
      "register_records": [],
      "disagreement": "none recorded",
      "source_check": "none",
      "from_register": false,
      "weight": "step",
      "where_in_the_system": "Commission quorum",
      "thesis_words": [],
      "what_moves": "final decision authority: three sitting commissioners, three approvals needed",
      "n": 23
    },
    {
      "strand": "TGDC appointments (folded in from tgdc-appointments)",
      "date": "2026-05-26",
      "date_exactness": "day given",
      "body": "U.S. Election Assistance Commission (EAC) (TGDC roster)",
      "what": "The TGDC roster named eleven members besides the chair (Craig Burkhardt, Acting Director of NIST), with EAC Chairman Thomas Hicks as Designated Federal Officer. It showed one appointment pending approval and two technical-expert seats vacant.",
      "stage": "published",
      "status_word": "roster",
      "path": "advisory-committee",
      "rests_on": "official record, linked",
      "quote": {
        "text": "names eleven non-chair members, shows one appointment pending approval and two technical-expert vacancies.",
        "file": "Government Hidden Control Surfaces 2026/TGDC_MEETINGS_VOTING_STANDARDS_AND_APPOINTMENTS_2026-10-31.md"
      },
      "files": [
        "Government Hidden Control Surfaces 2026/TGDC_MEETINGS_VOTING_STANDARDS_AND_APPOINTMENTS_2026-10-31.md",
        "Government Hidden Control Surfaces 2026/Meeting Umbrella Catchup 2026-10-31/WAVE_3_READER_CAPTURES_14_18.json"
      ],
      "register_records": [
        "U3-TGDC-ROSTER"
      ],
      "disagreement": "none recorded",
      "source_check": "none",
      "from_register": false,
      "weight": "step",
      "where_in_the_system": "TGDC drafts guidelines",
      "thesis_words": [],
      "what_moves": "nothing recorded",
      "n": 24
    },
    {
      "strand": "Electronic poll books (Election Supporting Technology Evaluation Program)",
      "date": "2026-09-15",
      "date_exactness": "day given",
      "body": "U.S. Election Assistance Commission (EAC)",
      "what": "The EAC published two Federal Register notices seeking public comment on information collections for the Election Supporting Technology Evaluation Program: the Application for Testing (2026-18797) and the Manufacturer Registration Form (2026-18798).",
      "stage": "request for information or comment",
      "status_word": "Paperwork Reduction Act notice",
      "path": "agency-operation-or-program",
      "rests_on": "official record, linked",
      "quote": {
        "text": "In-window FR objects 2026-18797 / 2026-18798 (Sep 15) are ESTEP Application for Testing and Manufacturer Registration PRA collections",
        "file": "Federal Government Weekly Delta 2026-09-16/waves/WAVE_3C_INDEPENDENTS_LABOR_OVERSIGHT.md"
      },
      "files": [
        "Federal Government Weekly Delta 2026-09-16/waves/WAVE_3C_INDEPENDENTS_LABOR_OVERSIGHT.md",
        "Federal Government Weekly Delta 2026-09-16/generated/FR_PUBLICATION_CENSUS_2026-09-11_TO_2026-09-16.json"
      ],
      "register_records": [],
      "disagreement": "none recorded",
      "source_check": "none",
      "from_register": false,
      "weight": "detail",
      "where_in_the_system": "Poll-book program (Election Supporting Technology Evaluation Program)",
      "thesis_words": [],
      "what_moves": "nothing recorded",
      "n": 25
    },
    {
      "strand": "Voting-system certifications and reviews",
      "date": "2026-09-15",
      "date_exactness": "the files differ: September 15 (register) or by September 16 (findings file; EAC product page dated 2026-09-16)",
      "body": "U.S. Election Assistance Commission (EAC)",
      "what": "The EAC certified VotingWorks VxSuite 4.0 to VVSG 2.0. EVS 7.0.0.0, Frontier 1.0 and Optio 1.0 were in test-plan stages; the Weekly Delta file (to September 16) lists Frontier 1.0 as 'Systems Under Test / Test Plan Approved'.",
      "stage": "approved or adopted",
      "status_word": "certified; others under test",
      "path": "agency-order-or-decision",
      "rests_on": "the body's own statement, linked",
      "quote": {
        "text": "By September 16, VotingWorks VxSuite 4.0 had joined the certified systems while three additional VVSG 2.0 products remained in testing.",
        "file": "Institutional Signals and Thesis Test 2025-2026/ACTIVE_BUILDOUT_DELIVERY_TRADE_INPUT_FINDINGS_2026-09-28.md"
      },
      "files": [
        "Institutional Signals and Thesis Test 2025-2026/ACTIVE_BUILDOUT_DELIVERY_TRADE_INPUT_FINDINGS_2026-09-28.md",
        "Institutional Signals and Thesis Test 2025-2026/ACTIVE_BUILDOUT_REGISTER_2026-09-28.json",
        "Institutional Signals and Thesis Test 2025-2026/ACTIVE_BUILDOUT_DELIVERY_TRADE_INPUT_CANDIDATES_2026-09-28.json",
        "Federal Government Weekly Delta 2026-09-16/waves/WAVE_3C_INDEPENDENTS_LABOR_OVERSIGHT.md"
      ],
      "register_records": [
        "delivery-eac-vvsg20-certification-and-fielding-pipeline"
      ],
      "disagreement": "Date: the active-buildout register says 'VotingWorks VxSuite 4.0 was certified September 15, 2026'; the findings file says 'By September 16', and the EAC product page it cites is dated 2026-09-16.",
      "source_check": "none",
      "from_register": false,
      "weight": "step",
      "where_in_the_system": "EAC certifies (voting systems)",
      "thesis_words": [],
      "what_moves": "a named product certified",
      "n": 26
    },
    {
      "strand": "Electronic poll books (Election Supporting Technology Evaluation Program)",
      "date": "2026-09-16",
      "date_exactness": "date of the EAC table page",
      "body": "U.S. Election Assistance Commission (EAC)",
      "what": "The EAC's table of certified and under-test electronic poll books, dated September 16, listed its newest certifications as April 20 and July 9 (the file gives no year). KNOWiNK Poll Pad 4.3.2 and VR Systems EViD were under test.",
      "stage": "published",
      "status_word": "table; under test",
      "path": "agency-operation-or-program",
      "rests_on": "the body's own statement, linked",
      "quote": {
        "text": "EPB certified-and-under-test table page is dated Sep 16; newest certified systems on that table remain Apr 20 / Jul 9",
        "file": "Federal Government Weekly Delta 2026-09-16/waves/WAVE_3C_INDEPENDENTS_LABOR_OVERSIGHT.md"
      },
      "files": [
        "Federal Government Weekly Delta 2026-09-16/waves/WAVE_3C_INDEPENDENTS_LABOR_OVERSIGHT.md"
      ],
      "register_records": [],
      "disagreement": "none recorded",
      "source_check": "none",
      "from_register": false,
      "weight": "detail",
      "where_in_the_system": "EAC certifies (poll books)",
      "thesis_words": [],
      "what_moves": "nothing recorded",
      "n": 27
    },
    {
      "strand": "Voting-system certifications and reviews",
      "date": "2026-10-22",
      "date_exactness": "day given in the text before the quoted sentence",
      "body": "EAC Office of Inspector General",
      "what": "The EAC Inspector General issued an interim report on the physical-configuration audits that support EAC voting-system certifications. It found one limited documentation discrepancy in a certified configuration and left a corrective recommendation open.",
      "stage": "published",
      "status_word": "interim report; recommendation open",
      "path": "oversight",
      "rests_on": "official record, linked",
      "quote": {
        "text": "It identified one limited certified-configuration documentation discrepancy and an open corrective recommendation.",
        "file": "Election Integrity/2026_MIDTERM_POST_COUNT_REVIEW_ARCHITECTURE_2026-11-03.md"
      },
      "files": [
        "Election Integrity/2026_MIDTERM_POST_COUNT_REVIEW_ARCHITECTURE_2026-11-03.md"
      ],
      "register_records": [],
      "disagreement": "none recorded",
      "source_check": "none",
      "from_register": false,
      "weight": "step",
      "where_in_the_system": "Inspector General review",
      "thesis_words": [],
      "what_moves": "nothing recorded",
      "n": 28
    }
  ],
  "where_in_the_system": [
    {
      "stage": "Foundation section 5 — TGDC drafts guidelines",
      "steps": [
        8,
        11,
        13,
        15,
        16,
        17,
        20,
        21,
        24
      ],
      "note": ""
    },
    {
      "stage": "Foundation section 5 — Standards Board and Board of Advisors review",
      "steps": [
        22
      ],
      "note": "The notes record no Standards Board or Board of Advisors review of the VVSG 2.1 draft as of 2026-11-03; step 22 is about TGDC appointments."
    },
    {
      "stage": "Foundation section 5 — Commission adopts guidelines",
      "steps": [
        1,
        12
      ],
      "note": "VVSG 2.0 adopted (step 1). The notes record no Commission adoption of VVSG 2.1 as of 2026-11-03."
    },
    {
      "stage": "Foundation section 5 — Test laboratory accreditation",
      "steps": [
        2
      ],
      "note": ""
    },
    {
      "stage": "Foundation section 5 — Move to a new guideline version (migration)",
      "steps": [
        4,
        6
      ],
      "note": ""
    },
    {
      "stage": "Foundation section 5 — EAC certifies (voting systems)",
      "steps": [
        14,
        18,
        19,
        26
      ],
      "note": ""
    },
    {
      "stage": "Foundation section 5 — Poll-book program (Election Supporting Technology Evaluation Program)",
      "steps": [
        3,
        5,
        7,
        25
      ],
      "note": ""
    },
    {
      "stage": "Foundation section 5 — EAC certifies (poll books)",
      "steps": [
        9,
        27
      ],
      "note": ""
    },
    {
      "stage": "Foundation section 5 — Engineering Change Order or modification",
      "steps": [],
      "note": "The CISA file describes the process; the notes record no dated change order as of 2026-11-03."
    },
    {
      "stage": "Foundation section 5 — State certification, purchase and deployment",
      "steps": [
        10
      ],
      "note": "Only North Carolina's poll-book adoption (step 10). The notes record no State purchase or use of a VVSG 2.0 system as of 2026-11-03."
    },
    {
      "stage": "Foundation section 5 — Field Services verification",
      "steps": [],
      "note": "Named in the February 20, 2025 release (step 9); the notes record no Field Services result as of 2026-11-03."
    },
    {
      "stage": "Foundation section 5 — Inspector General review",
      "steps": [
        28
      ],
      "note": ""
    },
    {
      "stage": "Foundation section 5 — Commission quorum",
      "steps": [
        23
      ],
      "note": ""
    }
  ],
  "quiet_stretch": [
    {
      "from": "2025-07-10",
      "to": "2026-09-15",
      "what": "No voting-system certification step in the files between Hart Verity Vanguard 1.0 and VotingWorks VxSuite 4.0. Pending: systems on the EAC's 'Voting Systems Under Test' page (dated 2026-01-07)."
    },
    {
      "from": "2025-09-17",
      "to": "2026-03-09",
      "what": "No TGDC step in the files after the third working session. Pending: further review of the VVSG 2.1 revised draft and the formal public-comment process."
    }
  ],
  "same_days": {
    "2021-02-10 (VVSG 2.0 adopted, step 1)": [
      {
        "date": "2021-02-10",
        "body": "The President (Joseph Biden)",
        "line": "Signed Executive Order 14014, Blocking Property With Respect to the Situation in Burma.",
        "file": "Executive Order Source Library/Biden Backfill 2026-10-30/FINAL_ORDER_SOURCE_RECEIPTS.json"
      }
    ],
    "2023-11-16 (VVSG 1.0 and 1.1 no longer used to certify, step 4)": [
      {
        "date": "2023-11-14",
        "body": "Department of Justice Office of Privacy and Civil Liberties (agency report)",
        "line": "Reported the investiture of six of eight Data Protection Review Court judges.",
        "file": "Federal Government Movement Atlas/MOVEMENT_REGISTRY.json"
      }
    ],
    "2025-02-20 (first electronic poll book certified, step 9)": [
      {
        "date": "2025-02-18",
        "body": "The President; Office of Management and Budget and Office of Information and Regulatory Affairs",
        "line": "Executive Order 14215 put independent agencies' rules and management under presidential coordination and OIRA review.",
        "file": "Federal Government Movement Atlas/MOVEMENT_REGISTRY.json"
      },
      {
        "date": "2025-02-19",
        "body": "The President",
        "line": "Signed Executive Order 14217, Commencing the Reduction of the Federal Bureaucracy.",
        "file": "Federal Government Entity Library Harvest 2026-08-22/generated/WAVE_1A_KEEPERS.csv"
      },
      {
        "date": "2025-02-19",
        "body": "The President",
        "line": "Issued 'Ensuring Lawful Governance and Implementing the President's Department of Government Efficiency Deregulatory Initiative'.",
        "file": "Federal Government Full Freshness Sweep 2026-08-22/waves/wave_2_executive/PRIMARY_OBJECT_DISPOSITION_LEDGER.csv"
      }
    ],
    "2025-07-10 (first VVSG 2.0 voting system certified, step 14)": [
      {
        "date": "2025-07-10",
        "body": "U.S. Department of War, Office of Strategic Capital",
        "line": "Loan agreement with MP Materials.",
        "file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_2_ENERGY_MANUFACTURING_CRITICAL_MATERIALS_REGISTRY_2026-08-18.json"
      },
      {
        "date": "2025-07-11",
        "body": "Senate Armed Services Committee",
        "line": "Voted 26-1 to advance its FY2026 National Defense Authorization Act.",
        "file": "Congressional Committee Control Plane/isolated_lanes/sasc_ndaa_markup/sasc_ndaa_markup_committee_action_inventory.json"
      }
    ]
  },
  "where_it_stands": "As of 2026-11-14 (latest file on the story dated 2026-11-03): VVSG 2.0 is the EAC's adopted guideline; the VVSG 2.1 files are drafts (revised draft reported September 17, 2025). The files name two voting systems certified to VVSG 2.0 (Hart Verity Vanguard 1.0, July 10, 2025; VotingWorks VxSuite 4.0, September 15 or 16, 2026), with EVS 7.0.0.0, Frontier 1.0 and Optio 1.0 in test-plan stages as of September 16, 2026. KNOWiNK Poll Pad 3.6 is the first certified electronic poll book (February 20, 2025); KNOWiNK Poll Pad 4.3.2 and VR Systems EViD were under test on September 16, 2026. The Commission had three of four commissioners after April 30, 2026. The TGDC roster of May 26, 2026 showed one appointment pending and two technical-expert seats vacant. The EAC Inspector General's October 22, 2026 interim report left a corrective recommendation open. For Executive Order 14248 Section 4(b), the notes record no result as of 2026-11-03.",
  "next_dated": [
    {
      "when": "not given",
      "what": "EAC certification decisions for EVS 7.0.0.0, Frontier 1.0 and Optio 1.0, in test-plan stages as of September 16, 2026.",
      "stage": "under test",
      "files": [
        "Institutional Signals and Thesis Test 2025-2026/ACTIVE_BUILDOUT_REGISTER_2026-09-28.json",
        "Institutional Signals and Thesis Test 2025-2026/ACTIVE_BUILDOUT_DELIVERY_TRADE_INPUT_FINDINGS_2026-09-28.md"
      ]
    },
    {
      "when": "not given",
      "what": "A formal public-comment process on the VVSG 2.1 draft, which EAC notices say will come 'as feedback from the EAC's Advisory Boards is compiled'.",
      "stage": "scheduled, date not stated",
      "files": [
        "Government Hidden Control Surfaces 2026/Meeting Umbrella Catchup 2026-10-31/WAVE_3_READER_CAPTURES_8_13.json",
        "Government Hidden Control Surfaces 2026/TGDC_MEETINGS_VOTING_STANDARDS_AND_APPOINTMENTS_2026-10-31.md"
      ]
    },
    {
      "when": "not given",
      "what": "Action on the EAC Inspector General's open corrective recommendation (October 22, 2026).",
      "stage": "recommendation open",
      "files": [
        "Election Integrity/2026_MIDTERM_POST_COUNT_REVIEW_ARCHITECTURE_2026-11-03.md"
      ]
    }
  ],
  "not_shown": [
    "The notes do not record an amended VVSG 2.0 or other guidance under Executive Order 14248 Section 4(b)(i), or any re-certification or rescission of certifications under Section 4(b)(ii), as of 2026-11-03.",
    "The notes do not record a Commission vote adopting VVSG 2.1, or a Standards Board or Board of Advisors review of the draft.",
    "The notes do not record any TGDC meeting after September 17, 2025, or any appointment after the May 26, 2026 roster.",
    "The notes do not record the result of the End-of-Life review begun on September 30, 2025: which systems, if any, were decommissioned or withdrawn.",
    "The notes do not record which electronic poll books were certified on April 20 and July 9, or the year.",
    "The notes do not record the date of the EAC's 2025 Annual Report, or any action by Congress on its Recommendation 7.",
    "The notes do not record which system or configuration the Inspector General's documentation discrepancy concerns, or the EAC's response.",
    "The notes do not record the EAC's commissioners after July 25, 2026, or a nomination for the vacant seat.",
    "The notes do not record any State certifying, buying or using a VVSG 2.0 system.",
    "The notes do not record the legal entities of the manufacturers named by trade name."
  ],
  "where_the_files_stop_top5": [
    "Any EAC action under Executive Order 14248 Section 4(b), or a statement by the EAC on the September 21, 2025 deadline.",
    "The Commission's disposition of the VVSG 2.1 draft and the date of a public-comment notice.",
    "The result of the End-of-Life review of certified systems (September 30, 2025).",
    "Certification decisions for EVS 7.0.0.0, Frontier 1.0 and Optio 1.0.",
    "The EAC's commissioners and quorum after July 25, 2026."
  ],
  "touches": [
    {
      "thread": "doj-voter-roll-demands",
      "at_step": "step 18 (deadline counted from its step 1)",
      "how": "Its step 1 is the President's signing of Executive Order 14248 on March 25, 2025. Section 4(b) of that order is addressed to the EAC; this story's step 18 is the 180-day date in Section 4(b)(ii).",
      "file": "Obsidian vault: 00 - Index/Operation Inch by Inch/Stories 2026-11-14/batch 4/doj-voter-roll-demands.json"
    },
    {
      "thread": "eac-vvsg-2-1",
      "at_step": "steps 8, 13, 15, 16, 17",
      "how": "Folded in: the TGDC's 2025 review of the VVSG 2.1 draft."
    },
    {
      "thread": "tgdc-appointments",
      "at_step": "steps 11, 20, 21, 22, 24",
      "how": "Folded in: TGDC charter, vacancies, the EAC's Recommendation 7, the Standards Board resolution and the May 26, 2026 roster."
    },
    {
      "thread": "voting-system-patches",
      "at_step": "none (dated 2026-09-24)",
      "how": "Page 6 of the Cybersecurity and Infrastructure Security Agency (CISA) 2026 Election Infrastructure Security Plan recommends harmonizing patch-management and certification requirements so security updates can move in real time. The CISA file records no EAC rule or change-order process changed as of October 5, 2026.",
      "file": "Election Integrity/White House Election Integrity Release 2026-07-16/CISA_2026_ELECTION_INFRASTRUCTURE_PLAN_RETURN_2026-10-05.md"
    },
    {
      "thread": "cisa-election-security-plan-2026",
      "at_step": "none (dated 2026-09-24)",
      "how": "The same CISA plan; published September 24, 2026."
    },
    {
      "thread": "cisa-election-report-2026",
      "at_step": "none (dated 2026-07-13)",
      "how": "CISA's July 13, 2026 report on voting-system vulnerabilities; the evidence lane lists mapping patched versions to EAC and State recertification as further work.",
      "file": "Election Integrity/White House Election Integrity Release 2026-07-16/Evidence Lanes/VOTING_SYSTEMS_EVIDENCE_LANE.md"
    },
    {
      "thread": "dhs-hsgp-election-conditions",
      "at_step": "none",
      "how": "Executive Order 14248 Section 4(d) tells the Secretary of Homeland Security and the FEMA Administrator to heavily prioritize VVSG 2.0 compliance and test-laboratory testing in Homeland Security Grant Program funding for election offices. This story's files do not connect the FY2026 grant conditions of July 10, 2026 to Section 4(d).",
      "file": "Executive Order Source Library/Source Text Editions/eo-43e41ca872fa27bea788.md"
    },
    {
      "thread": "midterm-post-count-review",
      "at_step": "step 28",
      "how": "The Inspector General's October 22, 2026 interim report is recorded in the post-count review file."
    }
  ],
  "foundation": [
    {
      "file": "Government Hidden Control Surfaces 2026/TGDC_MEETINGS_VOTING_STANDARDS_AND_APPOINTMENTS_2026-10-31.md",
      "why": "Short file on how guidelines move from the TGDC to the Commission, the 2025 VVSG 2.1 sessions and the 2026 appointment records."
    },
    {
      "file": "Institutional Signals and Thesis Test 2025-2026/ACTIVE_BUILDOUT_DELIVERY_TRADE_INPUT_FINDINGS_2026-09-28.md",
      "why": "Section 1 gives the VxSuite 4.0 certification and the three systems in testing in one paragraph."
    },
    {
      "file": "Obsidian vault: 00 - Index/Operation Inch by Inch/Foundations 2026-11-14/how-a-federal-election-is-run-contested-and-certified.md",
      "why": "Section 5 lays out each stage and who does it."
    }
  ],
  "interpretation": [
    {
      "claim": "Codex's reading of the certifications",
      "quote": "This is a genuine standard-to-product admission chain, but the last mile remains with state and local election authorities.",
      "file": "Institutional Signals and Thesis Test 2025-2026/PUBLIC_DELIVERY_FULL_SWEEP_FINDINGS_2026-09-28.md"
    },
    {
      "claim": "Codex's ranking of the pipeline",
      "quote": "The clearest active build is the EAC's VVSG 2.0 pipeline.",
      "file": "Institutional Signals and Thesis Test 2025-2026/ACTIVE_BUILDOUT_DELIVERY_TRADE_INPUT_FINDINGS_2026-09-28.md"
    },
    {
      "claim": "Codex writes Katie's thesis term 'inch-by-inch' into its test of the July 10, 2025 certification",
      "quote": "A revised federal standard reached a named certification without changing the state and local legal shell for running elections.",
      "file": "Institutional Signals and Thesis Test 2025-2026/PUBLIC_DELIVERY_FULL_SWEEP_SIGNAL_LEDGER_2025-2026.json"
    },
    {
      "claim": "Codex's pattern reading",
      "quote": "Public authority sets the acceptance or safety boundary; expert or private operators build and test; the agency retains fielding, inspection, withdrawal and remedy authority.",
      "file": "Institutional Signals and Thesis Test 2025-2026/ACTIVE_INSTITUTIONAL_BUILDOUT_MAP_2026-09-28.md"
    },
    {
      "claim": "Codex's reading of the TGDC",
      "quote": "The Technical Guidelines Development Committee (TGDC) supplies a concrete example of a small committee affecting a larger government process.",
      "file": "Government Hidden Control Surfaces 2026/TGDC_MEETINGS_VOTING_STANDARDS_AND_APPOINTMENTS_2026-10-31.md"
    },
    {
      "claim": "Codex's reading of the Inspector General report",
      "quote": "That is a certification-control review, not evidence of election exploitation or an incorrect 2026 result.",
      "file": "Election Integrity/2026_MIDTERM_POST_COUNT_REVIEW_ARCHITECTURE_2026-11-03.md"
    }
  ],
  "left_out": [
    "TGDC 2016 and 2017 meetings that named and scoped VVSG 2.0 (EAC guidelines page as captured): earlier than the 2021 adoption and undated to the day.",
    "EAC chair rotations (Palmer, February 24, 2025; Hicks, February 24, 2026) and routine EAC releases in the news index (Clearinghouse Awards, poll-worker days, training): not steps in guidelines or certification. Hicks's chairmanship is given under actors.",
    "EAC board meetings of May 2025 and the Board of Advisors meeting of April 28-29, 2026: the files do not say they took up the VVSG or certification.",
    "FACA census counts for the four EAC committees (Wave 7 legal reconciliation; five TGDC meetings in FY2025): counts, matched to steps 8, 13 and 15-17.",
    "Wave 7 legal reconciliation, Wave 9 promotion audit and the Movement Atlas founding record (EAC created 2002-10-29): structure, not dated steps.",
    "Executive Order 14248 Sections 2(a)(i), 4(a), 4(c), 7(b) and 9 (registration form, funding and reporting instructions to the EAC): not about guidelines or certification; they belong with doj-voter-roll-demands and the order map.",
    "Deep Website Review (September 22, 2026) note that the latest visible EAC release was July 1: an index view, not a step."
  ],
  "open_points": [
    {
      "kind": "disagreement",
      "what": "VotingWorks VxSuite 4.0 certification date: September 15, 2026 in the active-buildout register; 'By September 16' in the findings file, citing an EAC page dated 2026-09-16. The foundation piece follows the register.",
      "where": "Institutional Signals and Thesis Test 2025-2026/ACTIVE_BUILDOUT_REGISTER_2026-09-28.json (current_build); Institutional Signals and Thesis Test 2025-2026/ACTIVE_BUILDOUT_DELIVERY_TRADE_INPUT_FINDINGS_2026-09-28.md (section 1)",
      "settled": "no",
      "fix": ""
    },
    {
      "kind": "disagreement",
      "what": "Title of the EAC's February 20, 2025 release: 'During Election Security Technology Evaluation Program' (signal ledger source title) against 'During Election Technology Hearing' (EAC news index saved in the October 30 package).",
      "where": "Institutional Signals and Thesis Test 2025-2026/PUBLIC_DELIVERY_FULL_SWEEP_SIGNAL_LEDGER_2025-2026.json (record eac-first-electronic-poll-book-certification-2025-02-20); Federal Government Refresh 2026-10-30/Phase 2/Source Documents/eac.txt",
      "settled": "no",
      "fix": ""
    },
    {
      "kind": "disagreement",
      "what": "The Standards Board resolution PDF's web title names the Board of Advisors and May 6, 2025; the document is the Standards Board's, adopted April 17, 2026.",
      "where": "Government Hidden Control Surfaces 2026/TGDC_MEETINGS_VOTING_STANDARDS_AND_APPOINTMENTS_2026-10-31.md (Standards Board section); Government Hidden Control Surfaces 2026/Meeting Umbrella Catchup 2026-10-31/WAVE_3_READER_CAPTURES_8_13.json",
      "settled": "yes, by the document body (Standards_Board_Resolution_April_2026_508.pdf as captured)",
      "fix": "Standards Board resolution adopted April 17, 2026."
    },
    {
      "kind": "register error",
      "what": "The thread register's main_bodies for eac-vvsg-certification lists 'Federal Reserve and bank regulators', 'Federal Council on the Arts and the Humanities', 'Federal Salary Council' and 'Federal Prevailing Rate Advisory Committee (OPM)'. None acts in this story; they come from other rows of the multi-body sweep file.",
      "where": "Thread Register (whole library)/THREAD_REGISTER_whole_workbench.json, thread eac-vvsg-certification, main_bodies",
      "settled": "yes, by the four thread files",
      "fix": "main_bodies: U.S. Election Assistance Commission; Technical Guidelines Development Committee; EAC Standards Board; EAC Office of Inspector General."
    },
    {
      "kind": "register error",
      "what": "The register's where_it_stands for this thread says no reader wrote a summary.",
      "where": "Thread Register, eac-vvsg-certification, where_it_stands",
      "settled": "no",
      "fix": "Point story_file to Stories 2026-11-14/batch 7/eac-vvsg-certification.json."
    },
    {
      "kind": "missing fact",
      "what": "The notes record no EAC action under Executive Order 14248 Section 4(b)(i) or 4(b)(ii) as of 2026-11-03; the 180-day date (September 21, 2025) is counted, not stated.",
      "where": "Executive Order Source Library/Source Text Editions/eo-43e41ca872fa27bea788.md",
      "settled": "no",
      "fix": ""
    },
    {
      "kind": "missing fact",
      "what": "The result of the End-of-Life review begun September 30, 2025 is not recorded.",
      "where": "Federal Government Refresh 2026-10-30/Phase 2/Source Documents/eac.txt",
      "settled": "no",
      "fix": ""
    },
    {
      "kind": "missing fact",
      "what": "The poll books certified on April 20 and July 9, and the year, are not named.",
      "where": "Federal Government Weekly Delta 2026-09-16/waves/WAVE_3C_INDEPENDENTS_LABOR_OVERSIGHT.md (EAC paragraph)",
      "settled": "no",
      "fix": ""
    },
    {
      "kind": "missing fact",
      "what": "The date of the EAC's 2025 Annual Report (Recommendation 7) is not given.",
      "where": "Government Hidden Control Surfaces 2026/Meeting Umbrella Catchup 2026-10-31/WAVE_3_READER_CAPTURES_8_13.json (Standards Board resolution)",
      "settled": "no",
      "fix": ""
    },
    {
      "kind": "missing fact",
      "what": "The EAC's commissioners after July 25, 2026 are not recorded. The membership ledger (roster as of August 17, 2026) says 'No sitting chair or commissioner verified' and that no Commission action or quorum should be inferred after July 9, 2026; the files do not say what happened on July 9, 2026.",
      "where": "Government Hidden Control Surfaces 2026/CONTROL_SURFACE_MEMBERSHIP_LEDGER_2025-2026.json (election-assistance-commission)",
      "settled": "no",
      "fix": ""
    },
    {
      "kind": "missing fact",
      "what": "The system and configuration behind the Inspector General's documentation discrepancy, and the EAC's response, are not recorded.",
      "where": "Election Integrity/2026_MIDTERM_POST_COUNT_REVIEW_ARCHITECTURE_2026-11-03.md",
      "settled": "no",
      "fix": ""
    },
    {
      "kind": "missing fact",
      "what": "The notes record no Commission disposition of VVSG 2.1 and no public-comment notice for it as of 2026-11-03.",
      "where": "Government Hidden Control Surfaces 2026/TGDC_MEETINGS_VOTING_STANDARDS_AND_APPOINTMENTS_2026-10-31.md",
      "settled": "no",
      "fix": ""
    },
    {
      "kind": "lead",
      "what": "The EAC 'Voting Systems Under Test' page (dated 2026-01-07) and the VxSuite 4.0 product page are linked in the active-buildout register and would give test-plan and certification dates.",
      "where": "Institutional Signals and Thesis Test 2025-2026/ACTIVE_BUILDOUT_REGISTER_2026-09-28.json",
      "settled": "no",
      "fix": ""
    },
    {
      "kind": "lead",
      "what": "The EAC Inspector General interim report is linked in the post-count file (oig.eac.gov) and would name the system and recommendation.",
      "where": "Election Integrity/2026_MIDTERM_POST_COUNT_REVIEW_ARCHITECTURE_2026-11-03.md",
      "settled": "no",
      "fix": ""
    }
  ],
  "files_used": {
    "thread_files": [
      "Federal Government Weekly Delta 2026-09-16/waves/WAVE_3C_INDEPENDENTS_LABOR_OVERSIGHT.md",
      "Institutional Signals and Thesis Test 2025-2026/ACTIVE_BUILDOUT_DELIVERY_TRADE_INPUT_FINDINGS_2026-09-28.md",
      "Institutional Signals and Thesis Test 2025-2026/PUBLIC_DELIVERY_FULL_SWEEP_FINDINGS_2026-09-28.md",
      "Government Hidden Control Surfaces 2026/TGDC_MEETINGS_VOTING_STANDARDS_AND_APPOINTMENTS_2026-10-31.md"
    ],
    "folded_thread_files": [
      "Government Hidden Control Surfaces 2026/TGDC_MEETINGS_VOTING_STANDARDS_AND_APPOINTMENTS_2026-10-31.md"
    ],
    "related_files": [
      "Election Integrity/2026_MIDTERM_POST_COUNT_REVIEW_ARCHITECTURE_2026-11-03.md",
      "Executive Order Source Library/Source Text Editions/eo-43e41ca872fa27bea788.md",
      "Federal Government Refresh 2026-10-30/Phase 2/Source Documents/eac.txt",
      "Federal Government Website Sweep 2026-07-25/Accountability Institutions Wave 8/ACCOUNTABILITY_INSTITUTIONS_WAVE_8_PRIMARY_OBJECT_LEDGER.md",
      "Federal Government Weekly Delta 2026-09-16/generated/FR_PUBLICATION_CENSUS_2026-09-11_TO_2026-09-16.json",
      "Government Hidden Control Surfaces 2026/FACA_FY2025_COMMITTEE_CENSUS.json",
      "Government Hidden Control Surfaces 2026/Meeting Umbrella Catchup 2026-10-31/WAVE_3_READER_CAPTURES_14_18.json",
      "Government Hidden Control Surfaces 2026/Meeting Umbrella Catchup 2026-10-31/WAVE_3_READER_CAPTURES_1_7.json",
      "Government Hidden Control Surfaces 2026/Meeting Umbrella Catchup 2026-10-31/WAVE_3_READER_CAPTURES_8_13.json",
      "Government Hidden Control Surfaces 2026/Meeting Umbrella Catchup 2026-10-31/WAVE_3_SOURCE_LEDGER.json",
      "Institutional Signals and Thesis Test 2025-2026/ACTIVE_BUILDOUT_DELIVERY_TRADE_INPUT_CANDIDATES_2026-09-28.json",
      "Institutional Signals and Thesis Test 2025-2026/ACTIVE_BUILDOUT_REGISTER_2026-09-28.json",
      "Institutional Signals and Thesis Test 2025-2026/PUBLIC_DELIVERY_FULL_SWEEP_SIGNAL_LEDGER_2025-2026.json",
      "Government Hidden Control Surfaces 2026/CONTROL_SURFACE_MEMBERSHIP_LEDGER_2025-2026.json",
      "Election Integrity/White House Election Integrity Release 2026-07-16/CISA_2026_ELECTION_INFRASTRUCTURE_PLAN_RETURN_2026-10-05.md",
      "Institutional Signals and Thesis Test 2025-2026/ACTIVE_INSTITUTIONAL_BUILDOUT_MAP_2026-09-28.md",
      "Government Hidden Control Surfaces 2026/WAVE_7_MISSING_FEDERAL_ANCHORS_LEGAL_RECONCILIATION_2026-09-28.md"
    ]
  },
  "register_records_used": [
    "U3-VVSG-INVENTORY",
    "U3-TGDC-JAN-TRANSCRIPT",
    "eac-first-electronic-poll-book-certification-2025-02-20",
    "COM-047436",
    "COM-047442",
    "COM-047437",
    "COM-047446",
    "U3-TGDC-CHARTER",
    "eac-paper-based-auditable-systems-policy-2025-05-28",
    "U3-TGDC-JUL-AGENDA",
    "U3-TGDC-CAPTIONS-2025-07-02",
    "eac-first-vvsg-2-system-certification-2025-07-10",
    "U3-TGDC-CAPTIONS-2025-07-30",
    "U3-TGDC-CAPTIONS-2025-08-08",
    "U3-TGDC-CAPTIONS-2025-09-17",
    "U3-TGDC-REV2",
    "U3-TGDC-VACANCY",
    "U3-SB-EVENT",
    "U3-SB-ROUGH",
    "U3-SB-RESOLUTION",
    "U3-TGDC-ROSTER",
    "delivery-eac-vvsg20-certification-and-fielding-pipeline"
  ],
  "counts": {
    "thread_files": 4,
    "folded_thread_files": 1,
    "raw_happenings_in_thread_files": 66,
    "raw_happenings_in_folded_thread_files": 8,
    "happenings_kept": 13,
    "steps": 28,
    "turning_points": 4,
    "steps_with_disagreement": 3,
    "steps_with_saved_original": 23,
    "steps_from_register_only": 0,
    "open_points": 14,
    "open_points_missing_fact": 7,
    "open_points_error_under_four_tests": 0,
    "happenings_note": "Raw happenings are the reader records for the four thread files (12+25+21+8; the TGDC file's 8 count for both threads folded in). Most steps come from EAC pages captured or saved in the packages, which the readers did not record as happenings."
  },
  "builder_notes": "Scope. The register gives 4 thread files. Folded in: eac-vvsg-2-1 and tgdc-appointments (same file; both list this thread as possible_same_as). voting-system-patches, the CISA threads and dhs-hsgp-election-conditions are kept as touches. A search of all research files for VVSG, TGDC, Poll Pad, VxSuite, Vanguard and ESTEP found 28 files; EAC pages captured by the Meeting Umbrella Catchup (WAVE_3_READER_CAPTURES_*.json) and the EAC news index saved as Federal Government Refresh 2026-10-30/Phase 2/Source Documents/eac.txt supplied steps 1-7, 10, 11, 19-22 and 24. Executive Order 14248: the signing is step 1 of doj-voter-roll-demands and is not repeated; only the Section 4(b)(ii) date is a step here (counted, with date_note). The order map lists 4(b)(i) and 4(b)(ii) as not found in the library. No file ties an EAC step to the order except that the July 2, 2025 TGDC notice lists it as a topic. Hard parts: the VxSuite date (15 or 16 September); the year of the April 20 and July 9 poll-book certifications; what happened on July 9, 2026 to the Commission. Quote check (script, whitespace-normalised substring, markdown and capture markup removed, JSON files read as their string values): 28 of 28 step quotes found word for word; 0 interpretation quotes not found. Every step lists at least one file.",
  "set_aside_2026-11-14": []
}
