Federal agencies' FY 2026-2030 strategic plans

The statutory cycle in which each covered federal agency publishes a new four-year strategic plan after a presidential term begins, and what each body has published, adopted, drafted, withdrawn or not yet replaced.

Where it sits: Remaking the Institutions › Federal agencies and the workforce › Agencies reorganized, and how they plan and report

How it entered the Observatory

The saved starting points
Earliest file date
2026-07-22 (cutoff of the legal framework, watchboard base and lane files)
Katie requests
  • Id
    K02-007
    When
    2026-07-22 17:33 UTC
    Her words
    I think something were missing in the observatory is the different governmental agencies ‘strategic plans’ that they have - they literally lay out what they’re doing, what they’re going to do, and how they’re going to reach their goals.
    Why
    She saw it as a gap: the plans state what agencies intend to do.
  • Id
    K07-004
    When
    2026-09-16 23:27 UTC
    Her words
    We should go through the federal entity tree and read their CORE missions to understand what they are heading towards.
    Why
    Prompted by the chairman's opening words at the Treasury Secretary's House hearing.
  • Id
    K07-026
    When
    2026-09-18 13:21 UTC
    Her words
    Can we look into the process of core missions being created?
    Why
    Her governmental accounting background: missions matter for how funds are segregated.
  • Id
    K07-027
    When
    2026-09-18 13:37 UTC
    Her words
    I think you should go through and check what other strategic missions we're missing and let's grab those and review!!
    Why
    They matter to the Observatory.
Source
~/Documents/Obsidian/Freedom 250 Chronicle/00 - Index/Operation Inch by Inch/Katie's Words 2026-11-13/ORIGINS_BY_PACKAGE.json

The dated steps

2024-07 (July 2024 edition of the circular; the register gives July 25, 2024 for Transmittal Memorandum 98)OMB's budget circular told agencies to publish new FY 2026-2030 strategic plans in February 2026 and set a May 30, 2025 date for first draft parts to go to OMB.

OMB's budget circular told agencies to publish new FY 2026-2030 strategic plans in February 2026 and set a May 30, 2025 date for first draft parts to go to OMB.

Who acted: Office of Management and Budget (OMB), Circular A-11 (2024 edition), section 230

Stage: published

Where the files differ: The strategic-plans files cite the August 29, 2025 edition of Circular A-11 for the whole production calendar, including the May 30, 2025 date. The May 30, 2025 date appears in this 2024 edition, which came before it; the files do not say whether the 2025 edition repeats it.

Adds guidance identifying the timeline and milestones for agencies in developing new Agency Strategic Plans covering FYs 2026-2030.

a11-2024-archived.pdf

2024-12-23The Federal Agency Performance Act of 2024 became law.

The Federal Agency Performance Act of 2024 became law. It adds to the yearly strategic review each agency must do of its plan's goals: progress, risks, and what to do about goals most at risk.

Who acted: Congress; the President (Public Law 118-190, Federal Agency Performance Act of 2024)

Stage: signed or enacted

approved 2024-12-23, strengthened the annual strategic-review layer

FEDERAL_STRATEGIC_PLANNING_LEGAL_FRAMEWORK.md

2025-01-20 (closure date; reported in the Commerce FY 2025 Agency Financial Report, posted February 2026)Commerce's FY 2025 Agency Financial Report says its FY 2022-2026 strategic plan closed on January 20, 2025, and that a FY 2026-2030 plan was being prepared for publication with the FY 2027 President's Budget.

Commerce's FY 2025 Agency Financial Report says its FY 2022-2026 strategic plan closed on January 20, 2025, and that a FY 2026-2030 plan was being prepared for publication with the FY 2027 President's Budget.

Who acted: U.S. Department of Commerce

Stage: ended or withdrawn

Where the files differ: The November 6 file says the AFR 'expressly says the successor plan had not yet published'; the September 18 refresh says a successor 'was being prepared'. Both describe the same AFR. Two different AFR links are given (DOCFY2025AFR_508.pdf and DOC FY 2025 AFR.pdf).

FY 2025 AFR says the old plan closed January 20, 2025 and a FY 2026–2030 plan was being prepared for publication with the FY 2027 budget.

STRATEGIC_INSTRUMENT_REFRESH_2026-09-18.md

2025-01-20 (the date the statements stopped applying; the date of ARC's notice is not given)ARC's plan page says specified statements in its 2022-2026 plan stopped applying as of January 20, 2025.

ARC's plan page says specified statements in its 2022-2026 plan stopped applying as of January 20, 2025. The rest of the plan stays posted.

Who acted: Appalachian Regional Commission (ARC)

Stage: ended or withdrawn

Specified plan statements ceased to apply

FEDERAL_STRATEGIC_PLANS_WATCHBOARD.md

after 2025-01-20 (the page names that date as the boundary; the date of the notice is not given)PCLOB's plan page labels its plans historical and says the parts that conflict with directives issued after January 20, 2025 are inoperative.

PCLOB's plan page labels its plans historical and says the parts that conflict with directives issued after January 20, 2025 are inoperative. The files do not name the directives.

Who acted: Privacy and Civil Liberties Oversight Board (PCLOB)

Stage: ended or withdrawn

official page labels its plans historical and says portions inconsistent with post-2025-01-20 directives are inoperative

LANE_4_SMALL_AGENCIES.md

2025-01-24Specified sections of FMC's FY 2022-2026 plan stopped being in effect.

Specified sections of FMC's FY 2022-2026 plan stopped being in effect. FMC said a revised plan would issue as soon as practicable; its FY 2025 annual report says it will finalize the new plan.

Who acted: Federal Maritime Commission (FMC)

Stage: ended or withdrawn

specified sections ceased to be in effect 2025-01-24; revised plan promised as soon as practicable

LANE_4_SMALL_AGENCIES.md

2025-01-27USTDA amended its FY 2022-2026 strategic plan.

USTDA amended its FY 2022-2026 strategic plan. Its page calls the amended version the current plan.

Who acted: U.S. Trade and Development Agency (USTDA)

Stage: amended

official page calls this the current plan; PDF was amended 2025-01-27

LANE_4_SMALL_AGENCIES.md

2025-02-18 (signed); 2025-02-24 (published, 90 FR 10447) Turning pointThe President signed an order that, among other things, tells the chairmen of independent regulatory agencies to send their strategic plans to the OMB Director for clearance before finalizing them.

The President signed an order that, among other things, tells the chairmen of independent regulatory agencies to send their strategic plans to the OMB Director for clearance before finalizing them. The order sets no date for this.

Who acted: The President (Executive Order 14215, 'Ensuring Accountability for All Agencies', Sec. 6(c))

Stage: signed or enacted

Where the files differ: The executive order map (ORDER_MAP_MERGED.json) marks Sec. 6(c) 'not-found-in-library'. One research file states, without a date, 'OMB also clears SEC strategic plans', in a row headed 'Under Executive Order 14215 and OMB M-25-24'. The library holds no dated record of any chairman sending a plan to OMB under Sec. 6(c) as of 2026-11-06.

Independent regulatory agency chairmen shall submit agency strategic plans developed pursuant to the Government Performance and Results Act of 1993 to the Director of OMB for clearance prior to finalization.

2025-02-18 - EO 14215 - Ensuring Accountability for All Agencies.md

2025-05-30Date set by OMB's circular for agencies to send OMB a status update and draft mission, goals, objective areas and first FY 2026-2027 priority-goal statements.

Date set by OMB's circular for agencies to send OMB a status update and draft mission, goals, objective areas and first FY 2026-2027 priority-goal statements. The library holds no record of which agencies sent them as of 2026-11-06.

Who acted: Covered executive agencies, to OMB (deadline set by OMB Circular A-11, not by statute or executive order)

Stage: scheduled

Status update plus draft mission, strategic goals, strategic-objective areas, Capacity Assessment status, and an initial FY 2026–2027 Agency Priority Goal impact statement to OMB

CORE_MISSION_CREATION_AND_ACCOUNTING_PROCESS_2026-09-18.md

2025-06NASA published its FY 2026 Annual Performance and Evaluation Plan, which says a 2026 plan and set of performance goals is forthcoming.

NASA published its FY 2026 Annual Performance and Evaluation Plan, which says a 2026 plan and set of performance goals is forthcoming. NASA's FY 2025 financial report (posted January 2026) says the same.

Who acted: National Aeronautics and Space Administration (NASA)

Stage: stated by the body

FY 2026 APP/AEP published 2025-06 and says a 2026 plan/performance-goal set is forthcoming.

LANE_3_INDEPENDENT_FRAMEWORK.md

2025-07 (revised file; landing updated 2025-07-18)FERC posted a revised file of its FY 2022-2026 strategic plan (first issued March 31, 2022).

FERC posted a revised file of its FY 2022-2026 strategic plan (first issued March 31, 2022).

Who acted: Federal Energy Regulatory Commission (FERC)

Stage: amended

Original 2022-03-31; revised file dated 2025-07

FEDERAL_STRATEGIC_PLANS_WATCHBOARD.md

2025-08-29 Turning pointOMB issued the current edition of its budget circular.

OMB issued the current edition of its budget circular. Section 230 says the plan published in February 2026 must cover at least FY 2026 through FY 2030; Part 6 sets the planning, review and reporting cycle, and says federal employees, not contractors, must prepare the plans.

Who acted: Office of Management and Budget (OMB), Circular A-11 (2025 edition), Part 6

Stage: published

The current edition at cutoff is dated 2025-08-29.

LANE_3_INDEPENDENT_FRAMEWORK.md

2025-09 (with the FY 2027 budget submission)Date set by OMB's circular for a full draft strategic plan, draft FY 2026-2027 priority goals and draft evidence questions to go to OMB with the FY 2027 budget submission.

Date set by OMB's circular for a full draft strategic plan, draft FY 2026-2027 priority goals and draft evidence questions to go to OMB with the FY 2027 budget submission. The library holds no record of which agencies sent them as of 2026-11-06.

Who acted: Covered executive agencies, to OMB (deadline set by OMB Circular A-11)

Stage: scheduled

Full draft strategic plan, draft FY 2026–2027 priority goals, and draft FY 2027 priority evidence questions

CORE_MISSION_CREATION_AND_ACCOUNTING_PROCESS_2026-09-18.md

2025-11-05Public input on FHFA's draft FY 2026-2030 plan closed.

Public input on FHFA's draft FY 2026-2030 plan closed.

Who acted: Federal Housing Finance Agency (FHFA)

Stage: comment period closed

Public input closed November 5, 2025.

WAVE_1_FHFA_CORE_MISSION.md

2025-12-03Date set by OMB's circular for final-draft strategic plans and priority goals to go to OMB for clearance.

Date set by OMB's circular for final-draft strategic plans and priority goals to go to OMB for clearance. The library holds one record of a plan sent to OMB around this time (ACHP, December 9, 2025); it holds no record of the others as of 2026-11-06.

Who acted: Covered executive agencies, to OMB (deadline set by OMB Circular A-11)

Stage: scheduled

Final-draft strategic plan and priority goals for OMB clearance; initial APP/APR, Evidence Plan, and Capacity Assessment

CORE_MISSION_CREATION_AND_ACCOUNTING_PROCESS_2026-09-18.md

2025-12-08 Turning pointOMB issued the President's Management Agenda, the government-wide management goals that agency plans tie to.

OMB issued the President's Management Agenda, the government-wide management goals that agency plans tie to. It uses the words 'deliver and maintain operational control of the Government'.

Who acted: Office of Management and Budget (OMB), Memorandum M-26-03

Stage: published

Where the files differ: The files give the three headings two ways. The legal framework (cutoff 2026-07-22) and the November 6 file: shrink the government and eliminate waste; ensure accountability for Americans; deliver results and buy American. Lane 3 (cutoff 2026-07-22): 'Eliminate Waste and Ensure Accountability'; 'Rebuild American Industry'; 'Deliver Results', which it calls 'labels compacted from PMA'.

on 2025-12-08, groups its goals under three headings

FEDERAL_STRATEGIC_PLANNING_LEGAL_FRAMEWORK.md

2025-12-09; 2026-02ACHP sent its draft FY 2026-2030 plan to OMB on December 9, 2025 and took in OMB's edits; members reviewed final adjustments in February 2026.

ACHP sent its draft FY 2026-2030 plan to OMB on December 9, 2025 and took in OMB's edits; members reviewed final adjustments in February 2026. ACHP's own production calendar gave February 2026 for publication. The library holds no record of formal adoption or a public final as of 2026-09-18.

Who acted: Advisory Council on Historic Preservation (ACHP)

Stage: received or under consideration by the deciding body

draft sent to OMB 2025-12-09; OMB edits incorporated; members reviewed final adjustments in February 2026

LANE_4_SMALL_AGENCIES.md

2025-12-16The FDIC Board approved the FDIC 2026-2030 strategic plan.

The FDIC Board approved the FDIC 2026-2030 strategic plan. The plan page was updated February 6, 2026.

Who acted: Federal Deposit Insurance Corporation (FDIC) Board of Directors

Stage: approved or adopted

Board approval on December 16, 2025

CORE_MISSION_CREATION_AND_ACCOUNTING_PROCESS_2026-09-18.md

2026-01-29 (date on the PDF)Selective Service's FY 2026-2030 plan PDF is dated January 29, 2026.

Selective Service's FY 2026-2030 plan PDF is dated January 29, 2026.

Who acted: Selective Service System

Stage: published

PDF dated 2026-01-29

LANE_4_SMALL_AGENCIES.md

not given (FY 2025 Agency Financial Report); forecast date: February 2026Education's FY 2025 Agency Financial Report said a FY 2026-2030 plan would be released with the February 2026 President's Budget.

Education's FY 2025 Agency Financial Report said a FY 2026-2030 plan would be released with the February 2026 President's Budget. The library holds no record of that plan on Education's plan page as of 2026-09-18; the page still lists FY 2022-2026.

Who acted: U.S. Department of Education

Stage: stated by the body

FY 2025 AFR forecast a FY 2026–2030 plan with the February 2026 President's Budget, but the current plan page still lists only 2022–2026.

STRATEGIC_INSTRUMENT_REFRESH_2026-09-18.md

2026-02-02 Turning pointStatutory date for each covered agency head to publish a strategic plan: the first Monday in February of the year after a presidential term begins.

Statutory date for each covered agency head to publish a strategic plan: the first Monday in February of the year after a presidential term begins. Covered agencies are the 5 U.S.C. § 105 Executive agencies except CIA, GAO, the Postal Service and the Postal Regulatory Commission. The files give no list of plans published on this day; the library's later checks record each agency's plan by its own date.

Who acted: Head of each covered executive agency (5 U.S.C. § 306; set by statute, not by an executive order)

Stage: scheduled

For the present cycle, that date was 2026-02-02.

FEDERAL_STRATEGIC_PLANNING_LEGAL_FRAMEWORK.md

2026-02 (with the President's FY 2027 Budget)OMB's circular set February 2026, with the President's FY 2027 Budget, for public strategic plans, performance plans and reports, priority goals, evidence plans and capacity assessments.

OMB's circular set February 2026, with the President's FY 2027 Budget, for public strategic plans, performance plans and reports, priority goals, evidence plans and capacity assessments.

Who acted: Covered executive agencies (target set by OMB Circular A-11)

Stage: scheduled

Public Strategic Plan, APP/APR, priority goals, Evidence Plan, and Capacity Assessment

CORE_MISSION_CREATION_AND_ACCOUNTING_PROCESS_2026-09-18.md

2026-02-24 (page update)NRC's strategic-planning page says its FY 2026-2030 plan is in development and the FY 2022-2026 plan remains current.

NRC's strategic-planning page says its FY 2026-2030 plan is in development and the FY 2022-2026 plan remains current.

Who acted: Nuclear Regulatory Commission (NRC)

Stage: stated by the body

official page updated 2026-02-24 says successor is in development.

LANE_3_INDEPENDENT_FRAMEWORK.md

2026-03 (date on the draft's cover)CFPB posted a draft FY 2026-2030 plan marked 'DRAFT—FOR PUBLIC COMMENT'.

CFPB posted a draft FY 2026-2030 plan marked 'DRAFT—FOR PUBLIC COMMENT'.

Who acted: Consumer Financial Protection Bureau (CFPB)

Stage: request for information or comment

DRAFT—FOR PUBLIC COMMENT

CFPB_Draft_Strategic_Plan_FY2026-2030.pdf

2026-03-04FMSHRC announced it was developing its FY 2026-2030 plan.

FMSHRC announced it was developing its FY 2026-2030 plan.

Who acted: Federal Mine Safety and Health Review Commission (FMSHRC)

Stage: announced

agency announced development on 2026-03-04

LANE_4_SMALL_AGENCIES.md

2026-03-05 (adopted); 2026-09-11 (public reports page updated)The FCA Board adopted its FY 2026-2030 plan.

The FCA Board adopted its FY 2026-2030 plan. It appeared on FCA's public reports page updated September 11, 2026.

Who acted: Farm Credit Administration (FCA) Board

Stage: approved or adopted

Where the files differ: The September 18 refresh gives 'March 5' without a year; the watchboard and Lane 4 give 2026-03-05.

Board adopted 2026-03-05; public reports page updated 2026-09-11

FEDERAL_STRATEGIC_PLANS_WATCHBOARD.md

2026-03-16FHFA published its final FY 2026-2030 plan.

FHFA published its final FY 2026-2030 plan. The PDF's metadata title reads 'U.S. Federal Housing Strategic Plan for OMB 1_30_2026'.

Who acted: Federal Housing Finance Agency (FHFA), publishing as 'U.S. Federal Housing'

Stage: published

labeled Final on the reports landing and dated March 16, 2026

WAVE_1_FHFA_CORE_MISSION.md

2026-03-18 (page update)EPA's plan page says its FY 2026-2030 plan is being developed, aligned to the Administrator's five pillars, and that EPA no longer uses its FY 2022-2026 plan.

EPA's plan page says its FY 2026-2030 plan is being developed, aligned to the Administrator's five pillars, and that EPA no longer uses its FY 2022-2026 plan.

Who acted: Environmental Protection Agency (EPA)

Stage: stated by the body

Official plan page, updated 2026-03-18, says EPA is developing FY 2026–2030 and no longer uses FY 2022–2026.

LANE_3_INDEPENDENT_FRAMEWORK.md

2026-03-20 (approved); 2026-03-24 (announced); 2026-04-03 (report posted)The Commission approved its FY 2026-2030 plan, announced it four days later, and posted it on April 3.

The Commission approved its FY 2026-2030 plan, announced it four days later, and posted it on April 3.

Who acted: U.S. Commission on Civil Rights

Stage: approved or adopted

approved 2026-03-20; announced 2026-03-24; report posted 2026-04-03

LANE_4_SMALL_AGENCIES.md

2026-04 (date on the document)FMSHRC's final FY 2026-2030 plan is dated April 2026.

FMSHRC's final FY 2026-2030 plan is dated April 2026.

Who acted: Federal Mine Safety and Health Review Commission (FMSHRC)

Stage: published

final dated 2026-04

LANE_4_SMALL_AGENCIES.md

2026-04CFPB released its FY 2026-2030 plan, dated April 2026, without the draft marking.

CFPB released its FY 2026-2030 plan, dated April 2026, without the draft marking. Its May 2026 performance plan calls it the plan 'the agency released in April 2026'.

Who acted: Consumer Financial Protection Bureau (CFPB)

Stage: published

Where the files differ: The watchboard and Lane 3 (rows checked at the July 22, 2026 base) say the landing page treats the plan as current while the linked document is labeled draft. The CFPB census file (recheck 2026-09-16) and the April 2026 PDF (cover 'APRIL 2026', no 'DRAFT' text) give a non-draft April 2026 version; the March 2026 draft carries 'DRAFT—FOR PUBLIC COMMENT'.

a non-draft filename exists (cfpb_strategic-plan_fy2026-fy2030.pdf), cover dated April 2026, no DRAFT watermark.

WAVE_1_CFPB_CORE_MISSION.md

2026-04 (PDF posted)DNFSB posted its FY 2026-2030 plan.

DNFSB posted its FY 2026-2030 plan.

Who acted: Defense Nuclear Facilities Safety Board (DNFSB)

Stage: published

PDF posted 2026-04

LANE_4_SMALL_AGENCIES.md

2026-04FEC published its FY 2026-2030 plan.

FEC published its FY 2026-2030 plan.

Who acted: Federal Election Commission (FEC)

Stage: published

FY 2026–2030; published 2026-04; current.

LANE_3_INDEPENDENT_FRAMEWORK.md

2026-04 (FY 2027 budget-office document); forecast October 2025An Interior FY 2027 budget-office document posted in April 2026 still describes coordination, review and publication work on the FY 2026-2030 plan.

An Interior FY 2027 budget-office document posted in April 2026 still describes coordination, review and publication work on the FY 2026-2030 plan. Earlier Bureau of Indian Affairs consultation material had forecast an October 2025 release. The library holds no record of a department-wide final as of 2026-09-18.

Who acted: U.S. Department of the Interior

Stage: stated by the body

BIA consultation material forecast an October 2025 release, while an April 2026 budget document still described publication work.

LANE_2_GAPS.md

not given (FY 2027 Agency Performance Plan and Report); forecast: spring 2026HHS's FY 2027 performance plan and report said its FY 2026-2030 plan 'will be published Spring 2026' and used an interim four-goal framework (healthcare, public health, human services, research).

HHS's FY 2027 performance plan and report said its FY 2026-2030 plan 'will be published Spring 2026' and used an interim four-goal framework (healthcare, public health, human services, research). HHS's plan page said an updated plan was 'forthcoming'. The library holds no record of a published HHS FY 2026-2030 plan as of 2026-11-06.

Who acted: U.S. Department of Health and Human Services (HHS)

Stage: stated by the body

FY 2027 performance materials say publication “will be” in spring 2026 and use an interim four-goal framework: healthcare, public health, human services, research.

STRATEGIC_INSTRUMENT_REFRESH_2026-09-18.md

2026-04-03 (official release); index updated 2026-04-20DOT released its FY 2026-2030 strategic plan with four goals: safety, infrastructure, innovation, efficiency.

DOT released its FY 2026-2030 strategic plan with four goals: safety, infrastructure, innovation, efficiency.

Who acted: U.S. Department of Transportation (DOT)

Stage: published

FY 2026–2030 / official release 2026-04-03; index updated 2026-04-20

LANE_2_ECONOMY_INFRA.md

2026-04-03MSPB published its FY 2026-2030 plan.

MSPB published its FY 2026-2030 plan.

Who acted: Merit Systems Protection Board (MSPB)

Stage: published

FY 2026–2030; published 2026-04-03; current.

LANE_3_INDEPENDENT_FRAMEWORK.md

2026-04-03 (released); PDF dated 2026-01-30OSC released its FY 2026-2030 plan; the PDF is dated January 30, 2026.

OSC released its FY 2026-2030 plan; the PDF is dated January 30, 2026.

Who acted: U.S. Office of Special Counsel (OSC)

Stage: published

dated 2026-01-30; released 2026-04-03

LANE_4_SMALL_AGENCIES.md

2026-04-03 (congressional justification published; register); 2026-04-27 (annual-reports page updated)GSA published its congressional justification package, which includes its strategic plan; GSA's annual-reports page treats the FY 2026-2030 plan as current.

GSA published its congressional justification package, which includes its strategic plan; GSA's annual-reports page treats the FY 2026-2030 plan as current. The PDF's filename reads 'Revised Final Draft OMB Submission'.

Who acted: General Services Administration (GSA)

Stage: published

Where the files differ: The register record calls the item in the package 'the FY2026–2027 Strategic Plan'; the research files call it the FY 2026–2030 plan. Lane 3 calls the plan 'final/current'; the watchboard lists it among plans needing 'Stable final filename/document metadata or adoption notice'. The November 6 file lists GSA among bodies with final plans.

Public landing treats as current; filename says “Revised Final Draft OMB Submission”

FEDERAL_STRATEGIC_PLANS_WATCHBOARD.md

2026-04-06 (from the official filename; the title page gives no date)The department posted its Strategic Plan FY 2026-2030 'In Support of the President's Management Agenda', with five business goals including an unmodified audit opinion by December 31, 2028.

The department posted its Strategic Plan FY 2026-2030 'In Support of the President's Management Agenda', with five business goals including an unmodified audit opinion by December 31, 2028.

Who acted: Department of Defense, publishing as the Department of War

Stage: published

Where the files differ: Lane 4 lists it as 'final dated 2026-04-06'; Lane 2 says the date comes from the filename alone. The November 6 file presents the War plan among finals that advance the September 18 baseline; Lane 2 and Lane 4 already list it at the July 22 base.

final dated 2026-04-06

LANE_4_SMALL_AGENCIES.md

2026-04-06STB posted its final FY 2026-2030 plan.

STB posted its final FY 2026-2030 plan.

Who acted: Surface Transportation Board (STB)

Stage: published

final posted 2026-04-06

LANE_4_SMALL_AGENCIES.md

2026-04-09NCUA published its 2026-2030 plan with a new mission sentence, and its 2026 performance plan the same day.

NCUA published its 2026-2030 plan with a new mission sentence, and its 2026 performance plan the same day.

Who acted: National Credit Union Administration (NCUA) Board

Stage: published

The 2026–2030 plan, published April 9, 2026, sets three goals:

WAVE_1_NCUA_CORE_MISSION.md

2026-04-09 (effective); landing updated 2026-04-14SBA's FY 2026-2030 plan took effect.

SBA's FY 2026-2030 plan took effect.

Who acted: U.S. Small Business Administration (SBA)

Stage: took effect

FY 2026–2030; effective 2026-04-09; landing updated 2026-04-14; current.

LANE_3_INDEPENDENT_FRAMEWORK.md

2026-04-14 (date on the PDF)AmeriCorps' final FY 2026-2030 plan is dated April 14, 2026; its filename includes 'OMBFinal'.

AmeriCorps' final FY 2026-2030 plan is dated April 14, 2026; its filename includes 'OMBFinal'.

Who acted: AmeriCorps (Corporation for National and Community Service)

Stage: published

final dated 2026-04-14

LANE_4_SMALL_AGENCIES.md

by 2026-05 (publication date not stated)Treasury posted its Strategic Plan 2026-2030 with five goals; most Treasury bureaus have no plan of their own and are covered through this plan's crosswalk.

Treasury posted its Strategic Plan 2026-2030 with five goals; most Treasury bureaus have no plan of their own and are covered through this plan's crosswalk. The plan PDF prints no mission statement.

Who acted: Department of the Treasury

Stage: published

publicly posted by May 2026

LANE_1_STATE_SECURITY.md

2026-05 (approximate)FTC published its FY 2026-2030 plan.

FTC published its FY 2026-2030 plan.

Who acted: Federal Trade Commission (FTC)

Stage: published

FY 2026–2030; final/current; published approximately 2026-05.

LANE_3_INDEPENDENT_FRAMEWORK.md

2026-05 (approximate)NLRB published its FY 2026-2030 plan.

NLRB published its FY 2026-2030 plan.

Who acted: National Labor Relations Board (NLRB)

Stage: published

FY 2026–2030; published approximately 2026-05; current.

LANE_3_INDEPENDENT_FRAMEWORK.md

2026-05DFC published a combined FY 2026-2030 strategic plan and FY 2026 performance plan.

DFC published a combined FY 2026-2030 strategic plan and FY 2026 performance plan.

Who acted: U.S. International Development Finance Corporation (DFC)

Stage: published

FY 2026–2030; published 2026-05; current.

LANE_3_INDEPENDENT_FRAMEWORK.md

2026-06 (GAO-26-108516 released)GAO reported that OMB's August 2025 guidance and four sampled agencies had not yet fully put in place all the new strategic-review requirements of the 2024 Act.

GAO reported that OMB's August 2025 guidance and four sampled agencies had not yet fully put in place all the new strategic-review requirements of the 2024 Act. DHS, Treasury and GSA planned 2026 strategic reviews; State had not confirmed one at the time of GAO's work.

Who acted: Government Accountability Office (GAO)

Stage: other

found that OMB's August 2025 guidance and the four sampled agencies had not yet fully implemented all new requirements

FEDERAL_STRATEGIC_PLANNING_LEGAL_FRAMEWORK.md

2026-06-02 (draft released); comments through 2026-07-02 — see disagreementSEC released a draft FY 2026-2030 plan for public comment.

SEC released a draft FY 2026-2030 plan for public comment.

Who acted: Securities and Exchange Commission (SEC)

Stage: request for information or comment

Where the files differ: Two files give June 2 (released) and July 2 (comments closed). The roster and the July 22 Chronicle copy of Lane 3 give comments closed July 14, 2026, and Lane 3 gives the draft as released in May 2026.

The SEC released the draft on June 2, 2026, invited comments through July 2, and posted the final on September 2.

WAVE_1_SEC_CORE_MISSION.md

2026-06 (Federal Register public-inspection document 2026-11627)NTSB put out a draft FY 2026-2030 plan for public comment through the Federal Register.

NTSB put out a draft FY 2026-2030 plan for public comment through the Federal Register.

Who acted: National Transportation Safety Board (NTSB)

Stage: request for information or comment

June 2026 public-comment draft

LANE_4_SMALL_AGENCIES.md

2026-07-01 (draft opened); 2026-07-19 (comments closed)EEOC opened public comment on a draft FY 2026-2030 plan; comments closed July 19.

EEOC opened public comment on a draft FY 2026-2030 plan; comments closed July 19.

Who acted: Equal Employment Opportunity Commission (EEOC)

Stage: request for information or comment

Successor draft opened 2026-07-01, comments closed 2026-07-19; not final at cutoff.

LANE_3_INDEPENDENT_FRAMEWORK.md

not given (posted by 2026-07-22)Office of Personnel Management's FY 2026-2030 plan is posted; the files give no publication date.

Office of Personnel Management's FY 2026-2030 plan is posted; the files give no publication date. The November 6 file also lists OPM's final plan.

Who acted: Office of Personnel Management (OPM)

Stage: published

FY 2026–2030; current; publication date not stated on landing.

LANE_3_INDEPENDENT_FRAMEWORK.md

not given (posted by 2026-07-22)National Science Foundation's FY 2026-2030 plan is posted; the files give no publication date.

National Science Foundation's FY 2026-2030 plan is posted; the files give no publication date.

Who acted: National Science Foundation (NSF)

Stage: published

FY 2026–2030; final/current; publication date not stated on landing.

LANE_3_INDEPENDENT_FRAMEWORK.md

not given (posted by 2026-07-22)U.S. Department of Labor's FY 2026-2030 plan is posted; the files give no publication date.

U.S. Department of Labor's FY 2026-2030 plan is posted; the files give no publication date.

Who acted: U.S. Department of Labor (DOL)

Stage: published

FY 2026–2030 / publication date not stated; available on official current landing by cutoff

LANE_2_ECONOMY_INFRA.md

not given (posted by 2026-07-22)Pension Benefit Guaranty Corporation's FY 2026-2030 plan is posted; the files give no publication date.

Pension Benefit Guaranty Corporation's FY 2026-2030 plan is posted; the files give no publication date.

Who acted: Pension Benefit Guaranty Corporation (PBGC)

Stage: published

PBGC Strategic Plan Fiscal Years 2026–2030

LANE_3_INDEPENDENT_FRAMEWORK.md

not given (posted by 2026-07-22)Occupational Safety and Health Review Commission's FY 2026-2030 plan is posted; the files give no publication date.

Occupational Safety and Health Review Commission's FY 2026-2030 plan is posted; the files give no publication date.

Who acted: Occupational Safety and Health Review Commission

Stage: published

Occupational Safety and Health Review Commission | current plan published | Strategic Plan, FY 2026–2030

LANE_4_SMALL_AGENCIES.md

not given (posted by 2026-07-22)Consumer Product Safety Commission's FY 2026-2030 plan is posted; the files give no publication date.

Consumer Product Safety Commission's FY 2026-2030 plan is posted; the files give no publication date.

Who acted: Consumer Product Safety Commission

Stage: published

consumer-product injury prevention, compliance, communication, and operational capability

LANE_4_SMALL_AGENCIES.md

not given (posted by 2026-07-22)Railroad Retirement Board's FY 2026-2030 plan is posted; the files give no publication date.

Railroad Retirement Board's FY 2026-2030 plan is posted; the files give no publication date.

Who acted: Railroad Retirement Board

Stage: published

retirement/survivor and unemployment/sickness benefit administration plus program stewardship

LANE_4_SMALL_AGENCIES.md

not given (posted by 2026-07-22)National Endowment for the Arts's FY 2026-2030 plan is posted; the files give no publication date.

National Endowment for the Arts's FY 2026-2030 plan is posted; the files give no publication date.

Who acted: National Endowment for the Arts

Stage: published

National Endowment for the Arts | current plan published | Strategic Plan, FY 2026–2030

LANE_4_SMALL_AGENCIES.md

not given (posted by 2026-07-22)Office of Government Ethics's FY 2026-2030 plan is posted; the files give no publication date.

Office of Government Ethics's FY 2026-2030 plan is posted; the files give no publication date.

Who acted: Office of Government Ethics

Stage: published

final plan posted after public-input process

LANE_4_SMALL_AGENCIES.md

not given (posted by 2026-07-22)Tennessee Valley Authority's FY 2026-2030 plan is posted; the files give no publication date.

Tennessee Valley Authority's FY 2026-2030 plan is posted; the files give no publication date.

Who acted: Tennessee Valley Authority

Stage: published

Strategic Planning Report Fiscal Years 2026–2030

LANE_3_INDEPENDENT_FRAMEWORK.md

not given (posted by 2026-07-22)Department of Energy, Office of Cybersecurity, Energy Security, and Emergency Response's FY 2026-2030 plan is posted; the files give no publication date.

Department of Energy, Office of Cybersecurity, Energy Security, and Emergency Response's FY 2026-2030 plan is posted; the files give no publication date.

Who acted: Department of Energy, Office of Cybersecurity, Energy Security, and Emergency Response (CESER)

Stage: published

CESER FY 2026–2030

LANE_2_ECONOMY_INFRA.md

2026-08-07SSA released its Agency Strategic Plan 2026-2030 with three goals.

SSA released its Agency Strategic Plan 2026-2030 with three goals. Its FY 2027 Budget Overview had said the plan would publish in spring 2026.

Who acted: Social Security Administration (SSA)

Stage: published

Final FY 2026–2030 plan is public; release dated 2026-08-07.

LANE_3_INDEPENDENT_FRAMEWORK.md

2026-08-26EEOC adopted its final FY 2026-2030 plan, effective immediately.

EEOC adopted its final FY 2026-2030 plan, effective immediately.

Who acted: Equal Employment Opportunity Commission (EEOC)

Stage: approved or adopted

Final adopted 2026-08-26 and effective immediately.

LANE_3_INDEPENDENT_FRAMEWORK.md

2026-09-02SEC posted its final FY 2026-2030 plan, replacing FY 2022-2026 as its current plan.

SEC posted its final FY 2026-2030 plan, replacing FY 2022-2026 as its current plan.

Who acted: Securities and Exchange Commission (SEC)

Stage: published

Where the files differ: The roster's September 16 recheck says the SEC landing 'still hosts FY 2022–2026' and the successor 'remains draft-labeled'. The SEC census file records that Codex later found the final landing and corrected its call.

Final posted 2026-09-02, superseding the draft state.

LANE_3_INDEPENDENT_FRAMEWORK.md

by 2026-09-08NTSB's final FY 2026-2030 plan was posted after public comment.

NTSB's final FY 2026-2030 plan was posted after public comment.

Who acted: National Transportation Safety Board (NTSB)

Stage: published

final posted by 2026-09-08 after public comment

LANE_4_SMALL_AGENCIES.md

not given (located by 2026-09-18)Chemical Safety and Hazard Investigation Board's FY 2026-2030 plan is posted; the files give no publication date.

Chemical Safety and Hazard Investigation Board's FY 2026-2030 plan is posted; the files give no publication date.

Who acted: Chemical Safety and Hazard Investigation Board (CSB)

Stage: published

final FY 2026–2030 plan now located

STRATEGIC_INSTRUMENT_REFRESH_2026-09-18.md

not given (located by 2026-09-18)Department of Energy, Office of Energy Dominance Financing's FY 2026-2030 plan is posted; the files give no publication date.

Department of Energy, Office of Energy Dominance Financing's FY 2026-2030 plan is posted; the files give no publication date.

Who acted: Department of Energy, Office of Energy Dominance Financing

Stage: published

Directs use and stewardship of federal loan authority

STRATEGIC_INSTRUMENT_REFRESH_2026-09-18.md

not given (located by 2026-09-18)Department of Energy, Office of Inspector General's FY 2026-2030 plan is posted; the files give no publication date.

Department of Energy, Office of Inspector General's FY 2026-2030 plan is posted; the files give no publication date.

Who acted: Department of Energy, Office of Inspector General

Stage: published

Defines independent audit, inspection, investigation, and organizational-capability priorities for the oversight office.

STRATEGIC_INSTRUMENT_REFRESH_2026-09-18.md

not given (located by 2026-09-18)Department of the Interior, Orphaned Wells Program Office's FY 2026-2030 plan is posted; the files give no publication date.

Department of the Interior, Orphaned Wells Program Office's FY 2026-2030 plan is posted; the files give no publication date.

Who acted: Department of the Interior, Orphaned Wells Program Office

Stage: published

Organizes the office's orphaned-well grant, technical, data, environmental, and program-stewardship work.

STRATEGIC_INSTRUMENT_REFRESH_2026-09-18.md

not given (FY 2025 Agency Financial Report, reviewed 2026-09-18)Peace Corps' FY 2025 Agency Financial Report says it retired its FY 2022-2026 plan while developing the FY 2026-2030 plan and adopted an interim FY 2025-2026 performance plan.

Peace Corps' FY 2025 Agency Financial Report says it retired its FY 2022-2026 plan while developing the FY 2026-2030 plan and adopted an interim FY 2025-2026 performance plan. The library holds no record of a public final as of 2026-09-18.

Who acted: Peace Corps

Stage: ended or withdrawn

FY 2025 AFR says the prior plan was retired during development of the FY 2026–2030 plan

LANE_4_SMALL_AGENCIES.md

by 2026-11-06 (exact date not given)Justice's final FY 2026-2030 plan replaced the publication hold described in its FY 2027 budget.

Justice's final FY 2026-2030 plan replaced the publication hold described in its FY 2027 budget. It has three goals and names the National Fraud Enforcement Division as a component.

Who acted: Department of Justice

Stage: published

Where the files differ: The September 18 refresh says revision and publication were 'still open'; the November 6 file says the final is published. The register records this as a later update, not an error.

Justice's final FY 2026–2030 plan now replaces the earlier publication hold.

FEDERAL_OPERATING_CONTROL_PLANE_PRIMARY_SOURCE_RETURN_2026-11-06.md

Where it stands

As of the latest file (November 6, 2026), the files record final FY 2026-2030 plans for the Departments of War (Defense), Justice, Transportation, Labor and the Treasury, and for OPM, GSA, SSA, SEC, EEOC, FDIC, NCUA, FHFA, CFPB, SBA, NSF, FTC, NLRB, MSPB, FEC, DFC, PBGC, NTSB, FCA, FMSHRC, CSB and a list of small agencies. The library holds no record of a final department-wide FY 2026-2030 plan for HHS, Commerce, Agriculture, Energy, Interior, Education, HUD, Homeland Security or State/USAID as of their latest checks (November 6 for HHS, Commerce and DHS; September 18 for the rest), nor for EPA, NASA, NRC, NARA, FCC or CFTC as of September 18, 2026. HHS's own performance plan gave spring 2026; Commerce's financial report gave the FY 2027 President's Budget; Education's gave February 2026. FMC, ARC, PCLOB and USTDA keep older plans posted with parts ceased, inoperative or amended. ACHP's draft went through OMB review in December 2025 and February 2026; the library holds no record of its adoption as of September 18, 2026.

What comes next

What the notes do not record

What it touches

Graphics and studies

Entities in this story