Federal Strategic Plans — Dated Source Watchboard
Evidence dates: July 22, 2026 base survey; August 17, 2026 NSSTS row only. All other rows retain their July 22 checks and source dates. This saved watchboard does not certify current status or create a scheduled watch. Scope: publication and status triggers only. This is not the master plan registry.
Watch rules
- A draft, comment close, budget forecast, or “forthcoming” notice does not equal final publication.
- A plan that reaches its printed end year remains a source object, but it is not silently extended.
- A partial rescission or inoperative-content notice does not erase the unaffected remainder.
Not locatedmeans not publicly located in the bounded official-source sweep; it is not a noncompliance finding.- Dates below are stated by official sources or are printed instrument-window endpoints. No forecast date has been added where the source supplied none.
Red — finalization, adoption, or announced-but-unlocated publication
| Entity | Instrument | Status at cutoff | Last official signal | Next trigger | Official link |
|---|---|---|---|---|---|
| President / OSTP / NSC | *National Security Science & Technology Strategy* and 42 U.S.C. § 19221 implementation record | Public August strategy found; exact publication/transmittal clock, separate findings report and follow-on CET plans not located | Public availability verified 2026-08-17; cover supplies only August 2026 | Congressional transmittal/receipt, separate findings report, OSTP/NSC CET plan, agency R&D review, budget crosswalk, owner, metric or milestone | Official strategy · 42 U.S.C. § 19221 |
| U.S. Department of Commerce | *Department of Commerce Strategic Plan 2022–2026* / proposed FY 2026–2030 successor | Old plan formally closed; successor not located | FY 2025 AFR, posted 2026-02, says the old plan closed 2025-01-20 and a successor was being prepared/expected with the FY 2027 President's Budget | Public final FY 2026–2030 plan, or a new AFR/budget statement revising its publication status | FY 2025 AFR |
| Environmental Protection Agency | FY 2026–2030 Strategic Plan; learning agenda; FY 2027 Annual Evaluation Plan | In development; prior FY 2022–2026 plan expressly no longer used | Strategic-plan page updated 2026-03-18 | Final plan, APP/APGs, and stable final learning-agenda/AEP links | Strategic-plan status · Evidence Act |
| Social Security Administration | FY 2026–2030 Agency Strategic Plan | Announced but separate plan not located | FY 2027 Budget Overview said publication was planned for spring 2026 | Public plan PDF/landing page with publication date, goal owners, measures, APP/APG crosswalk | FY 2027 Budget Overview |
| Department of Health and Human Services | Updated HHS Strategic Plan replacing FY 2022–2026 | “Updated Strategic Plan forthcoming”; old plan remains in window | HHS restructuring announcement 2025-03-27; FY 2026 performance materials and current plan page still use/host the old cycle | Final updated plan plus authoritative crosswalk to any operative AHA/function changes | Strategic-plan page · FY 2026 performance |
| U.S. Department of Agriculture | FY 2026–2030 USDA Strategic Plan | Under development; no public draft/final located | FY 2026 explanatory note says successor is being developed and new KPIs/alignment will be reported in FY 2027 explanatory notes | Final plan and FY 2027 explanatory-note KPI crosswalk | FY 2026 explanatory note |
| U.S. Department of the Interior | FY 2026–2030 DOI Strategic Plan | Announced/update work documented; final not located | FY 2027 budget-office document posted 2026-04 still describes coordination, review, and publication work | Final public plan and replacement of the prior-administration plan page | Strategic-planning page · FY 2027 budget-office document |
| Securities and Exchange Commission | Draft Strategic Plan FY 2026–2030 | Draft; FY 2022–2026 final remains current | Draft released 2026-05; comments closed 2026-07-14 | Final plan/adoption notice; compare goal labels, measures, and owners with draft | Draft PDF · comment file |
| Equal Employment Opportunity Commission | Draft Strategic Plan FY 2026–2030 | Draft; FY 2022–2026 final remains current | Public-input period opened 2026-07-01 and closed 2026-07-19 | Final adoption notice and final PDF | Official draft notice |
| National Transportation Safety Board | Draft Strategic Plan FY 2026–2030 | Public-comment draft | Federal Register/public-inspection draft published 2026-06 | Final plan after comment disposition | Federal Register inspection PDF · draft PDF |
| Public Company Accounting Oversight Board | Draft Strategic Plan 2026–2030 | Public-comment draft | Comment process opened 2026-07-20 | Comment close, Board adoption, and final plan | Strategy and budget page |
| Consumer Financial Protection Bureau | Strategic Plan FY 2026–2030 | Landing page treats it as current; linked file/document remains labeled draft | Landing modified 2026-04-27 | Replacement final PDF, formal adoption notice, or explicit statement that draft-labeled document is operative | Plan landing · draft-labeled PDF |
| General Services Administration | GSA Strategic Plan FY 2026–2030 | Public landing treats as current; filename says “Revised Final Draft OMB Submission” | Annual-report page updated 2026-04-27 | Stable final filename/document metadata or adoption notice | Annual reports · plan PDF |
| National Aeronautics and Space Administration | Successor to *NASA Strategic Plan 2022* | Prior plan runs through FY 2026; successor goals/plan described as forthcoming | FY 2026 APP/AEP published 2025-06; FY 2025 AFR posted 2026-01 repeats successor transition | FY 2026–2030 plan and new performance-goal crosswalk | Strategic-plan landing · FY 2026 APP/AEP |
| Nuclear Regulatory Commission | FY 2026–2030 Strategic Plan and agency priority questions | Under development; FY 2022–2026 plan remains current through its window | Strategic-planning page updated 2026-02-24 | Final NUREG plan edition, publication date, APP and APGs | Strategic-planning page |
| Federal Mine Safety and Health Review Commission | Strategic Plan FY 2026–2030 | Development announced; final not located | Agency notice 2026-03-04 | Final plan publication | Development notice |
| National Archives and Records Administration | FY 2026–2030 strategic-plan framework | Under development; prior page remains | Current official page says new plan is being developed; exact notice date not stated | Final plan and replacement/update of FY 2022–2026 page | Strategic-plan page |
| Farm Credit Administration | Strategic Plan FY 2026–2030 | Final anticipated but not located | FY 2027 proposed budget says FCA anticipates publishing the final plan | Final plan URL and publication date | FY 2027 proposed budget |
| Advisory Council on Historic Preservation | Strategic Plan FY 2026–2030 | Draft completed through OMB review; formal public adoption not located | Draft sent to OMB 2025-12-09; members reviewed final adjustments in 2026-02 | Formal adoption record and public final PDF | February 2026 meeting book |
| National Institutes of Health | NIH-Wide Strategic Plan FYs 2027–2031 | Framework/input stage; FY 2021–2025 plan expired | NIH request for information published 2026-03 | Final FY 2027–2031 plan and revision/publication date | NIH-wide plan page · RFI notice |
| Bureau of Alcohol, Tobacco, Firearms and Explosives | ATF Strategic Plan FY 2023–2028 | Official budget says approved; public plan/target attachment not located | FY 2025 Congressional Budget Submission says plan approved and targets under review | Public plan plus finalized performance-target attachment, or later budget exhibit reproducing them | FY 2025 budget submission |
| Community Development Financial Institutions Fund | Announced FY 2023–2028 component plan | Announced in development; final/version history not located; Treasury parent now covers 2026–2030 | Director message in 2022 announced plan development | Final plan or authoritative confirmation/version history from CDFI Fund | Development message · publications |
| Peace Corps | Successor to FY 2022–2026 plan | Prior-cycle plan remains on reports surface; other official material refers to a draft successor | Prior plan still returned at 2026-07-22 cutoff | Public final successor and adoption/publication date | Reports and documents |
| Tennessee Valley Authority | 2026 Integrated Resource Plan | “Preliminary final”; separate from current TVA Strategic Planning Report | Public-comment deadline 2026-07-22; Board consideration expected 2026-08 | Board-approved final IRP and decision record; do not alter enterprise-plan status | 2026 IRP |
Amber — prior-cycle plans reaching the stated FY/CY 2026 endpoint
For these rows, the next trigger is issuer publication, formal extension, replacement, or archive/status change after the printed 2026 endpoint. The endpoint alone does not prove that a successor exists.
| Entity | Instrument | Status at cutoff | Last official signal | Next trigger | Official link |
|---|---|---|---|---|---|
| Department of State / USAID | Joint Strategic Plan FY 2022–2026 | Current-in-window; entity/operating structure changed after publication | Plan released 2022-03-30; State transition announcement 2025-03-28 | Successor plan plus authoritative function-by-function State/USAID ownership map | Plan PDF · State transition statement |
| Bureau of the Fiscal Service | Strategic Plan FY 2022–2026 and FY 2024 addendum | Current-in-window; end-of-window flag | FY 2024 addendum is latest located revision | Successor plan or formal continuation after FY 2026 | Plan · addendum |
| Department of Justice | DOJ Strategic Plan FY 2022–2026 | Current-in-window | Released 2022-07-01; current budget/performance and evidence pages continue annual reporting | Successor plan and new KPI/evidence crosswalk | Plan · budget/performance |
| Federal Emergency Management Agency | FEMA Strategic Plan 2022–2026 | Current-in-window; current-policy-fit caveat | Official plan remains posted at cutoff | Successor/extension and replacement learning agenda | Plan PDF |
| U.S. Customs and Border Protection | CBP Strategy 2021–2026 | Current-in-window | Published 2020-12; DHS OIG implementation audit published 2024-09 | Successor enterprise strategy or formal extension | Plan PDF |
| U.S. Citizenship and Immigration Services | USCIS Strategic Plan FYs 2023–2026 and Learning Agenda | Current-in-window; archived announcement creates administrative ambiguity | Official plan/download and learning agenda remained available at cutoff | Current-administration affirmation, revision, or successor plus evidence-plan crosswalk | Plan PDF · Learning Agenda |
| Transportation Security Administration | TSA Strategy 2018–2026 | Current-in-window | Current TSA strategy hub still hosts it at cutoff | Successor enterprise strategy or explicit continuation | Strategy hub |
| Cybersecurity and Infrastructure Security Agency | Cybersecurity Strategic Plan FY 2024–2026; International Strategic Plan FY 2025–2026 | Current mission strategies; enterprise plan FY 2023–2025 already expired | Cyber plan released 2023-08-04; international plan posted 2024-10 | Successor enterprise plan and/or successor mission strategies; keep types separate | Cyber plan · international plan |
| U.S. Census Bureau | Strategic Plan FY 2022 Through FY 2026 | Current by printed window | Released 2022-01-31; no successor located | FY 2026–2030 successor or status update | Plan PDF |
| National Oceanic and Atmospheric Administration | *Building a Climate Ready Nation: NOAA FY22–26 Strategic Plan* | Current by printed window; Commerce parent was separately closed | Published 2022-06; no NOAA-specific rescission located | NOAA successor, rescission, or formal continuation | Plan PDF |
| U.S. Patent and Trademark Office | USPTO 2022–2026 Strategic Plan | Current by printed window | Released 2023-06-07 | Successor plan or current-administration revision | Release and plan |
| Federal Energy Regulatory Commission | FERC FY 2022–2026 Strategic Plan | Current; revised official file | Original 2022-03-31; revised file dated 2025-07 | Successor plan, further revision, or explicit continuation | Plan PDF |
| Maritime Administration | MARAD Strategic Plan FY 2022–2026 | Current by printed window; workforce strategy separately runs through FY 2027 | Agency plan current at cutoff; workforce plan revised 2025-03 | Successor agency plan; keep workforce-plan clock separate | Agency plan |
| Department of Education | Strategic Plan FY 2022–2026 | Current by printed window; administration-alignment caveat | Released 2022-07-08; landing reviewed 2025-01-14 | Successor, rescission, or explicit continuation plus APP/evidence crosswalk | Strategic-plans landing |
| Federal Communications Commission | Strategic Plan FY 2022–2026 | Current through printed window; no successor located | Official PDF remained current source at cutoff | FY 2026–2030 plan or FY 2027 budget/performance framework | Plan PDF |
| Commodity Futures Trading Commission | Strategic Plan 2022–2026 | Current through printed window; no successor located | Plan archive identifies 2022-03 publication | FY 2026–2030 plan and related APP/APGs | Reports and plans |
| Federal Labor Relations Authority | Strategic Plan FY 2022–2026 | Prior-cycle final remains posted | Official PDF still posted at cutoff | Successor or archive/status change | Plan PDF |
| Federal Mediation and Conciliation Service | Strategic Plan 2022–2026 | Prior-cycle final remains posted | Official plan page still current at cutoff | Successor or archive/status change | Plan page |
| Federal Retirement Thrift Investment Board | Strategic Plan FY 2022–2026 | Official page calls it the most recent plan | Still identified as most recent at cutoff | Successor/publication-date signal | Plan page |
| Institute of Museum and Library Services | Strategic Plan FY 2022–2026 | Prior-cycle plan remains posted; replacement not located | Official plan page at cutoff | Successor or status change | Plan page |
| U.S. Agency for Global Media | Strategic Priorities FY 2022–2026 | Prior-cycle priorities remain posted; 2026 national-security policy is a different instrument | Separate national-security policy announced 2026-01-02 | Successor strategic priorities; do not substitute national-security policy | Strategic priorities · 2026 policy |
| U.S. Access Board | Strategic Plan FY 2022–2026 | Prior-cycle plan still cited by FY 2027 budget justification | FY 2027 justification current at cutoff | Successor plan or explicit FY 2027 continuation | Budget/performance · FY 2027 justification |
| Marine Mammal Commission | Strategic Plan FY 2022–2026 | Official priority page continues to identify it | Official page at cutoff | Successor or priority-page status change | Priority page |
| Chemical Safety and Hazard Investigation Board | Strategic Plan FY 2022–2026 | Mission page still links it; successor not located | Official mission page at cutoff | Successor or archive/status change | Mission page |
| National Capital Planning Commission | Strategic Plan 2022–2026 | Prior-cycle plan remains listed; 2026 Comprehensive Plan revision is separate | Strategic reports page at cutoff | Successor agency plan; do not substitute Comprehensive Plan | Strategic reports |
| Administrative Conference of the United States | Strategic Plan FY 2024–2026 | Short-cycle plan reaches FY 2026; successor not located | Official PDF at cutoff | Successor or formal continuation | Plan PDF |
| ODNI | ODNI Science and Technology Strategic Plan FY 2022–2026 | Current functional strategy through FY 2026; no ODNI corporate plan located | Official PDF remained available at cutoff | Successor S&T strategy and any public ODNI corporate plan | S&T plan PDF |
| Intelligence Community / CIA and ODNI | IC Open Source Intelligence Strategy 2024–2026 | Current IC-wide functional strategy; not CIA/ODNI corporate plan | Released 2024 | Successor IC OSINT strategy or formal extension; preserve IC/component boundary | OSINT strategy |
| Export-Import Bank of the United States | EXIM FY 2026 Strategic Plan | Current annual-window plan | Current plan page at cutoff | FY 2027 plan or explicit continuation/update | Strategic plans |
| Congressional Budget Office | Strategic Goals for 2025 and 2026 in FY 2026 appropriation request | Current budget-performance goals; no longer-horizon institutional plan located | Appropriation request published 2025; 2026 transparency plan now current | Next appropriation request/director plan that replaces or extends goal window | FY 2026 request · 2026 transparency plan |
Red/amber — partial rescission, amendment, or inoperative-content controls
| Entity | Instrument | Status at cutoff | Last official signal | Next trigger | Official link |
|---|---|---|---|---|---|
| Federal Maritime Commission | FY 2022–2026 Strategic Plan / promised revised plan | Specified sections ceased to be in effect; remainder remains posted; revision pending | Sections ceased 2025-01-24; agency says revised plan will issue as soon as practicable | Revised/final plan and explicit surviving/replaced-section map | Strategic plans |
| Appalachian Regional Commission | Strategic Plan 2022–2026 | Specified plan statements ceased to apply; no complete replacement located | Non-application date 2025-01-20 | Replacement plan or official redline identifying surviving content | Strategic-plan page |
| Privacy and Civil Liberties Oversight Board | Strategic Plan FY 2022–2026 | Page labels plans historical; portions inconsistent with post-2025-01-20 directives are inoperative | Directive boundary 2025-01-20; no successor located | Successor or official content-level redline/status notice | Strategic plans |
| U.S. Trade and Development Agency | Strategic Plan FYs 2022–2026 | Official page calls it current; amended version controls | Amended 2025-01-27 | Successor after FY 2026 or further amendment; preserve original/amended clocks | Plan page · amended PDF |
Blue — annual performance and evidence release clocks
These are statutory/event clocks, not promises that every Observatory chart node will publish on the same schedule.
| Entity / issuer set | Instrument | Status at cutoff | Last official signal | Next trigger | Official link |
|---|---|---|---|---|---|
| Executive agencies covered by 31 U.S.C. § 1115 | Agency Annual Performance Plans and Agency Priority Goals | Annual cycle | Statute requires APP submission by the first Monday in February each year, covering current and next fiscal years | First Monday in February 2027 APP/budget wave; capture FY 2027/FY 2028 plans, APGs, owners, indicators, and late strategic-plan releases | 31 U.S.C. § 1115 |
| Executive agencies covered by 31 U.S.C. § 1116 | Annual Performance Reports | Annual results cycle | Statute requires public release/submission no later than 150 days after fiscal-year end | FY 2026 APR wave; record actuals, unmet-goal explanations, and prior-year trend data rather than treating plan targets as results | 31 U.S.C. § 1116 |
| Agencies covered by 5 U.S.C. § 312 | Annual Evaluation Plans; learning agendas/evidence-building plans | AEP annual; learning agenda multi-year | AEP is issued with the APP for the next fiscal year; learning agenda is tied to the strategic-plan cycle | FY 2027/2028 AEP release wave with the next APP; capture final evaluation activities and any revised learning agenda | 5 U.S.C. § 312 · Evidence.gov comparison |
| GSA, OPM, FTC, CFPB, FDIC, NCUA, FHFA, SEC, NLRB, MSPB | APP/APR/APG suites | Current plan pages show annual instruments; normalization incomplete | Current FY 2026/FY 2027 materials were located in the sweep | Next issuer update or statutory annual wave: capture exact indicator, baseline, target, goal leader, actual, and missed-goal explanation | Performance.gov agency directory |
| OPM, GSA, NSF, EPA, NASA | Learning agendas, capacity assessments, and AEPs | Current evidence objects exist or are being finalized; detailed crosswalk incomplete | Current official evidence/plan pages located by 2026-07-22 | Next final/revised evidence release; map each question/activity to strategic objective without calling it a finding | Evidence.gov |
Close / reopen rule
Close a row only when the issuing entity posts a final instrument or an authoritative status notice. Reopen it if the issuer later changes the document, restores/withdraws a prior plan, publishes a redline, or moves the official URL. Preserve the old URL and all distinct clocks in the package registry.
Sources
Full saved reading
View cited sources (84)
These are the sources cited by this reading. Each source keeps its own date and scope.
- Official strategy
- 42 U.S.C. § 19221
- FY 2025 AFR
- Strategic-plan status
- Evidence Act
- FY 2027 Budget Overview
- Strategic-plan page
- FY 2026 performance
- FY 2026 explanatory note
- Strategic-planning page
- FY 2027 budget-office document
- Draft PDF
- comment file
- Official draft notice
- Federal Register inspection PDF
- draft PDF
- Strategy and budget page
- Plan landing
- draft-labeled PDF
- Annual reports
- plan PDF
- Strategic-plan landing
- FY 2026 APP/AEP
- Strategic-planning page
- Development notice
- Strategic-plan page
- FY 2027 proposed budget
- February 2026 meeting book
- NIH-wide plan page
- RFI notice
- FY 2025 budget submission
- Development message
- publications
- Reports and documents
- 2026 IRP
- Plan PDF
- State transition statement
- Plan
- addendum
- Plan
- budget/performance
- Plan PDF
- Plan PDF
- Plan PDF
- Learning Agenda
- Strategy hub
- Cyber plan
- international plan
- Plan PDF
- Plan PDF
- Release and plan
- Plan PDF
- Agency plan
- Strategic-plans landing
- Plan PDF
- Reports and plans
- Plan PDF
- Plan page
- Plan page
- Plan page
- Strategic priorities
- 2026 policy
- Budget/performance
- FY 2027 justification
- Priority page
- Mission page
- Strategic reports
- Plan PDF
- S&T plan PDF
- OSINT strategy
- Strategic plans
- FY 2026 request
- 2026 transparency plan
- Strategic plans
- Strategic-plan page
- Strategic plans
- Plan page
- amended PDF
- 31 U.S.C. § 1115
- 31 U.S.C. § 1116
- 5 U.S.C. § 312
- Evidence.gov comparison
- Performance.gov agency directory
- Evidence.gov
Document details and formats
About the dates and filing language
- Evidence date
- When this document or named claim was checked. A newer collection, export or website date does not update it.
- Current, private, Workbench or promotion
- These can describe the saved document’s original filing or custody. This public reading preserves that history; publication does not turn its findings into government approval, binding law or newly verified evidence.
- Master data and projection
- The maintained factual record and a page generated from it. Repeated views are not additional independent evidence.
- Provenance and source join
- Where a record came from, and the exact reference connecting a claim to its source.
- Gate, receipt and operating evidence
- A required decision or condition, its documentary record, and evidence that the named activity actually occurred. Permission, delivery and operation stay separate.
Saved research reading. Its original dates and claim limits control; the export date does not refresh the evidence.