Declares the policy of grid reliability, resilience and security and that, to address the national energy emergency declared in EO 14156, the grid must use all available generation resources, particularly secure, redundant fuel supplies. No separate result assessment recorded
Declares the policy of grid reliability, resilience and security and that, to address the national energy emergency declared in EO 14156, the grid must use all available generation resources, particularly secure, redundant fuel supplies.
Addressed to
- the President
Order text
It is the policy of the United States to ensure the reliability, resilience, and security of the electric power grid.
The Energy Secretary is to streamline and expedite DOE's process for issuing section 202(c) Federal Power Act orders when a grid operator forecasts a temporary supply interruption is needed to prevent grid failure, including approving applications by generators to run at maximum capacity. Not found in the notes
The Energy Secretary is to streamline and expedite DOE's process for issuing section 202(c) Federal Power Act orders when a grid operator forecasts a temporary supply interruption is needed to prevent grid failure, including approving applications by generators to run at maximum capacity.
Addressed to
- the Secretary of Energy
What the notes record
- Searched
- 1. stories (batch 3, batch 4, upgraded): order number
- 2. thread register: order number and words: grid reliab, 202(c), resource adequacy
- 3. research files: grep EO/Executive Order/E.O. 14262 (md, json, csv), passages read; also words: Resource Adequacy, reserve margin
- Pass
- 2
- Deadline passed
- False
Order text
shall, to the maximum extent permitted by law, streamline, systemize, and expedite the Department of Energy's processes for issuing orders under section 202(c) of the Federal Power Act during the periods of grid operations described above
The Energy Secretary is to develop a uniform methodology for current and anticipated reserve margins in all FERC-regulated regions of the bulk power system and use it to identify regions below acceptable thresholds. Found in part
The Energy Secretary is to develop a uniform methodology for current and anticipated reserve margins in all FERC-regulated regions of the bulk power system and use it to identify regions below acceptable thresholds.
Addressed to
- the Secretary of Energy
Deadline
- Words
- Within 30 days of the date of this order
- Date
- 2025-05-08
- Counted
- Within 30 days of the date of this order counted from signing 2025-04-08
- Type
- deadline
What the notes record
- What it shows
- published: the DOE July 2025 Resource Adequacy Report is recorded as made to implement the order; the file does not date the 30-day methodology itself
- Pass
- 2
- Evidence kind
- formal step toward the result
- Date
- 2025-05-08
- Kind of date
- deadline on an officer or body
- Deadline passed
- True
DOE forward-looking empirical/modeling analysis, created to implement EO 14262REFERENCE_COVERAGE.json
Order text
Within 30 days of the date of this order, the Secretary of Energy shall develop a uniform methodology for analyzing current and anticipated reserve margins for all regions of the bulk power system regulated by the Federal Energy Regulatory Commission and shall utilize this methodology to identify current and anticipated regions with reserve margins below acceptable thresholds as identified by the Secretary of Energy.
The methodology and any analysis it produces are to be published on DOE's website. Found
The methodology and any analysis it produces are to be published on DOE's website.
Addressed to
- the Secretary of Energy
Deadline
- Words
- within 90 days of the date of this order
- Date
- 2025-07-07
- Counted
- within 90 days of the date of this order counted from signing 2025-04-08
- Type
- deadline
What the notes record
- What it shows
- published: DOE July 2025 Resource Adequacy Report on energy.gov (file URL reads FINAL JULY 7); the full report was not read in the file
- Pass
- 2
- Date
- 2025-07-07
- Kind of date
- deadline on an officer or body
- Deadline passed
- True
DOE forward-looking empirical/modeling analysis, created to implement EO 14262REFERENCE_COVERAGE.json
Order text
be published, along with any analysis it produces, on the Department of Energy's website within 90 days of the date of this order.
The Energy Secretary is to set up a process for regular assessment of the methodology and its results and a protocol to identify generation resources critical to reliability in a region. Not found in the notes
The Energy Secretary is to set up a process for regular assessment of the methodology and its results and a protocol to identify generation resources critical to reliability in a region.
Addressed to
- The Secretary of Energy
What the notes record
- Searched
- 1. stories (batch 3, batch 4, upgraded): order number
- 2. thread register: order number and words: grid reliab, 202(c), resource adequacy
- 3. research files: grep EO/Executive Order/E.O. 14262 (md, json, csv), passages read; also words: Resource Adequacy, reserve margin
- Pass
- 2
- Deadline passed
- False
Order text
The Secretary of Energy shall establish a process by which the methodology described in subsection (b) of this section, and any analysis and results it produces, are assessed on a regular basis, and a protocol to identify which generation resources within a region are critical to system reliability.
The protocol is to use all lawful mechanisms, including section 202(c), to retain critical resources in at-risk regions and to prevent an identified resource over 50 MW from leaving the bulk-power system or converting fuel where that would cut accredited capacity. Found in part
The protocol is to use all lawful mechanisms, including section 202(c), to retain critical resources in at-risk regions and to prevent an identified resource over 50 MW from leaving the bulk-power system or converting fuel where that would cut accredited capacity.
Addressed to
- the Secretary of Energy
What the notes record
- What it shows
- issued: 2026 section 202(c) orders keeping named plants available; the story does not tie them to an EO 14262 protocol and records no protocol
- Pass
- 2
- Evidence kind
- formal step toward the result
- Deadline passed
- False
roughly 90-day orders keeping named plants that were due to retire availabledoe-202c-orders.json
Order text
prevent, as the Secretary of Energy deems appropriate and consistent with applicable law, including section 202 of the Federal Power Act, an identified generation resource in excess of 50 megawatts of nameplate capacity from leaving the bulk-power system