When a private company runs a public system: ORNL and VA's electronic health record

Research date: November 21, 2026. Dated background component of government-hidden-control-surfaces-2026; cross-reference congressional-committee-control-plane. Sources, exact versions and reading limits. The broader owner cutoff is unchanged.

Public responsibility, ownership of records, the right to inspect, the ability to verify performance, and payment are different things. The ORNL contract specifies substantial government records and oversight rights. The VA case shows why an enforceable metric also needs usable evidence and an independent verification process. Neither arrangement makes the contractor a government agency.

This extends our DOE contractor-assurance audit reading, the November committee review, and the congressional-access background. The earlier GAO assurance findings concerned three Environmental Management contracts. They are not findings against ORNL. Our retained FAR overhaul map explains why a current regulation, agency deviation and clause actually included in a contract must not be treated as interchangeable.

The two arrangements and the versions actually examined

CaseLegal instrument and identityEvidence used here
Oak Ridge National LaboratoryDOE M&O prime DE-AC05-00OR22725, UT-Battelle, LLC. Section B identifies ORNL as an FFRDC; section F extends the term through March 31, 2030.Operator's public conformed-contract repository, through modification 1411, September 30, 2026. Actual selected sections have their own modification numbers; see below. This is a posted conformed copy, not a claim that every signed modification was separately audited.
VA electronic health record modernizationSingle-award IDIQ 36C10B18D5000, originally Cerner Government Services, Inc.; the September 2025 OIG memorandum identifies the contractor as Oracle Health Government Services Inc. Parent-brand references to Oracle do not replace the contracting entity.Named contract/PWS versions described in official VA testimony and OIG examinations; September 2026 GAO testimony. A complete current signed conformed IDIQ and every task-order attachment were not obtained. Rights not established by these sources remain explicitly open.

The ORNL index lists B/mod1362, June 18, 2025; E/F/G/mod1359, March 7, 2025; H/mod1404, July 21, 2026; and I/mod1404. The index prints July 21, 2025 for section I, while its file path is July 2026 and H lists July 2026. The payload is identified by mod1404 and its recorded hash; the discrepant index date is not silently repaired. FY2026 PEMP, appendix G/mod1392, is dated February 6, 2026 in the index and covers October 2025–September 2026.

For VA, OIG 22-03591-231 cites P00002, May 16, 2023 for revised service metrics. OIG 24-00682-187 separately cites the PWS, P00002, April 17, 2023, plus task order 36C10B20N0028 / TO46, Joint EHRM Master Test Plan, February 15, 2024, and testing guidelines version 8.0, December 2023. These are reported document dates and locators, not proof the signed modification was executed on both dates. Obtaining the actual modification and dated attachments is the way to settle their relationship.

ORNL: follow the rights through the contract

Responsibility and direction. UT-Battelle manages and operates the laboratory under B-1. G-1 reserves changes to work, terms, price, waivers and acceptance of nonconforming work to the contracting officer. G-2 gives the COR technical direction within the delegated scope. An operator's management authority is therefore different from authority to change the government's bargain. B, pp.3–6, G, p.3.

Records. I.127 incorporates DEAR 970.5204-3, October 2014, deviation PF2015-23. It makes performance records government property subject to specified exceptions for contractor-owned employment/medical, corporate, procurement, legal and technology-transfer records. Paragraph (d) grants government/designee inspection, copying and audit access, including paragraph (b) categories. Ownership and access are thus separate. Its retention, lawful-use and transfer provisions still matter; the contractual text is not a ruling that attorney-client privilege has been waived in a particular dispute. On completion or termination, government-owned records go where the contracting officer directs; specified contractor-owned originals or copies can also be required. Flow-down under (g) is conditional, particularly for the listed on-site hazardous-work subcontracts, not a statement that this exact clause applies to every supplier. I, printed pp.171–174 / PDF178–181.

I.152 incorporates 970.5232-3, October 2021, deviation PF2022-23. It requires separate supporting accounts, permits inspection/audit, provides records disposition, specifies applicable subcontract cost-audit arrangements and gives the Comptroller General access to directly pertinent transaction records and employee interviews. That is a separate audit route; it does not by itself answer a contested congressional subpoena. I, printed pp.252–253 / PDF259–260.

Verification. H-15, September 2009, requires a board-executed assurance system, risk-based self-assessment, verification methods, correction of trends and information access for the contracting officer. DOE can change its oversight mix depending on effectiveness. H-35 retains DOE appraisals and the contracting officer's annual assessment. The FY2026 PEMP combines contractor assurance, demonstration that the information is valid, and DOE's own independent assessment. Self-assessment is part of the design; independent verification is not automatically demonstrated by the design. H, pp.9–10,15–17, PEMP, pp.5–11.

Payment and acceptance. B-8 sets annual total available performance fee at $22,306,748 for October 2025–September 2029; it is available fee, not verified earnings or the cost of operating the laboratory. The PEMP applies its science/technology fee percentage and M&O multiplier. I.151, 970.5232-2, October 2021, Alternate II/deviation PF2022-23, separately governs allowable-cost advances, provisional fees, return of excess provisional fee and final financial settlement. E-1 incorporates 52.246-9, April 1984, allowing inspection/evaluation of work and premises at reasonable times. An advance, inspection, fee determination and final acceptance are distinct acts. B p.6, PEMP pp.8–11, I printed249–253, E p.3.

Correction and transition. H-14 permits withdrawal of work under its stated conditions and requires cooperation with the replacement performer. F-3 incorporates 52.242-15, August 1989, Alternate I April 1984, with a contract-specific stop-work period of up to 30 days, extension/cancellation/termination and adjustment provisions. F-4 distinguishes ordinary contracting-officer authority from imminent-danger intervention. The records-transfer right above is a transition mechanism, not evidence that a successor can immediately operate every facility or replace every licensed technology. No termination or exercised sanction at ORNL is established here. H pp.8–9, F pp.3–4.

H-33 also conditions allowance of NDA enforcement costs on language preserving existing classified-information, congressional-communication and whistleblower duties and rights. This actual contract provision is more specific evidence than assuming all vendors use identical confidentiality terms. H pp.14–15.

VA: distinguish the stronger bargain from proof it works

VA's November 15, 2023 testimony reports 22 SLAs and six service-level obligations after renegotiation. It distinguishes core system availability from incident-free time: the core could be available while partial failures still disrupted users. It also describes the deployment reset and VA's decision to evaluate readiness. These are dated agency accounts, not independent acceptance findings or the 2026 contract text. DelBene testimony, complete four pages.

The September 2024 OIG audit found reliance on contractor incident reporting without a formal process to verify metrics and associated credits. It identifies the May 2023 change from 99.9% to 99.95% outage-free time, added incident-free measures and ticket-related invoice credits. It did not evaluate the effectiveness of all those changes. Its recommendations call for real-time data sharing and verification of credits. A contractual remedy and the evidence needed to calculate it are separate controls. OIG22-03591-231, printediii–viii,31–32 / PDF5–10,44–45.

The September 2025 Lovell memorandum supplies a different evidence test. OIG confirmed testing and applicable retesting for its sample of 24 of 100 interfaces, while documenting repository deficiencies. One interface's localized testing occurred after go-live and its evidence was held elsewhere; other entries mixed passed status with “no run.” The review did not assess hands-on user functionality or experience. This supports a documentation finding with a defined denominator, rather than “the interfaces were never tested” or “the whole system passed operational acceptance.” OIG24-00682-187, printed1–3,5–7.

GAO's September 2, 2026 testimony separately tracks the independent lifecycle-cost estimate, integrated schedule, user readiness and operational assessment. Its recommendation statuses are as of August 2026. The program includes infrastructure, management and VA costs beyond the EHR contract. The later November committee question about underlying lifecycle-cost documentation belongs to this same existing chain; an IDIQ ceiling, obligations, invoice payment and whole-life estimate remain different numbers. GAO26-109393, planning/operational-assessment sections and appendix, November committee record.

Comparison and the next receipts

Control to checkWhat this study establishesWhat still requires a document or observed outcome
Public decision authorityORNL separates CO and COR powers; VA retained program decisions and changed its service requirements.Actual delegated authority and the signed current VA order/modification controlling the particular work.
Records and accessORNL's exact ownership, audit and transfer text is available. VA audits identify specific reporting/test repositories and information gaps.VA's full current records-ownership, access, software/data-license, retention and exit provisions. ORNL terms cannot be imported into VA.
VerificationBoth cases identify a difference between contractor-produced information and government assessment.Logs, independent checks, reconciliation exceptions and closed recommendations for the exact period under review.
Money and acceptanceORNL advances and earned fee are distinct; VA's cited remedies include invoice credits.Actual earned-fee decisions, assessed/applied credits, accepted deliverables and paid invoices. No such payment audit was done here.
Correction and continuityORNL has specified work-withdrawal, stop-work and records-transition mechanisms. VA exercised a reset and renegotiation in the dated record.Full current VA termination/transition rights, export formats and a tested continuity/exit plan; actual exercise is a separate receipt.

What changes our reading of the week: the DOE assurance inquiry and VA cost/rollout hearings are asking whether government can see and judge the work well enough to govern it. The new contractor order concerns a further route—Congress obtaining evidence from the private holder. These are materially connected questions, with different legal bases and different proof requirements.

Return conditions: obtain VA's signed P00002 and its dated attachments, later current modifications and the applicable task-order acceptance/exit provisions; check actual credit verification and recommendation closure. For ORNL, seek the period-specific written evaluation/earned-fee determination before claiming the contractual oversight design worked. This background comparison is complete for the identified public evidence; those operational and full-text gaps remain open.

Sources

Document details and formats

Saved research reading. Its original dates and claim limits control; the export date does not refresh the evidence.