Contested Logistics
Start with the Contested Logistics research package
for prepared commercial lift, ports, rail, fuel, production, sustainment and payment. Its July 15 baseline and September 30 FORTRESS-focused update keep authority, activation and operating clocks separate.
The October 2026 industrial and transport capacity delta
adds the $2.3 billion CRISI rail selections, $426 million INFRA selections, $128.2 million PHMSA safety-grant package, the enacted critical-infrastructure manufacturing study, updated USGS deposit map and helium designation. It keeps selection, agreement, obligation, construction, commissioning and measured capacity separate.
The October 23 Hampton Roads barracks financial-close answer
records a private-capital transaction-stage receipt for 8,098 planned beds over five years. It keeps financial close, construction, delivery, occupancy, sustainment funding and projected savings on separate clocks.
For the installation-power question, follow the child
FORTRESS America research package.
It owns the September 30 program, covered-site and critical-load questions, financing, project registry, source gaps and proof of tested resilience. The
program-to-proved-resilience graphic
is one view of that source package, not another research owner.
For command, data and acquisition architecture, return to the separate
Military Modernization package.
An award, activation agreement, installed system and accepted operating capability remain different receipts.
Sources
Full saved reading
View the saved source references. This record has no direct external citation in its source-link list.
Document details and formats
Saved research reading. Its original dates and claim limits control; the export date does not refresh the evidence.