# Contested Logistics

Start with the [Contested Logistics research package](CONTESTED_LOGISTICS_RESEARCH_PACKAGE.md)
for prepared commercial lift, ports, rail, fuel, production, sustainment and
payment. Its July 15 baseline and September 30 FORTRESS-focused update keep
authority, activation and operating clocks separate.

The [October 2026 industrial and transport capacity delta](OCTOBER_2026_INDUSTRIAL_AND_TRANSPORT_CAPACITY_DELTA.md)
adds the $2.3 billion CRISI rail selections, $426 million INFRA selections,
$128.2 million PHMSA safety-grant package, the enacted critical-infrastructure
manufacturing study, updated USGS deposit map and helium designation. It keeps
selection, agreement, obligation, construction, commissioning and measured
capacity separate.

The October 23 [Hampton Roads barracks financial-close answer](HAMPTON_ROADS_BARRACKS_FINANCIAL_CLOSE_2026-10-23.md)
records a private-capital transaction-stage receipt for 8,098 planned beds over
five years. It keeps financial close, construction, delivery, occupancy,
sustainment funding and projected savings on separate clocks.

For the installation-power question, follow the child
[FORTRESS America research package](../FORTRESS%20America%20and%20Military%20Installation%20Energy%20Independence%202026-09-30/README.md).
It owns the September 30 program, covered-site and critical-load questions,
financing, project registry, source gaps and proof of tested resilience. The
[program-to-proved-resilience graphic](../FORTRESS%20America%20and%20Military%20Installation%20Energy%20Independence%202026-09-30/FORTRESS_AMERICA_PROGRAM_TO_PROVED_RESILIENCE_INFOGRAPHIC.html)
is one view of that source package, not another research owner.

For command, data and acquisition architecture, return to the separate
[Military Modernization package](../Military%20Modernization/README.md).
An award, activation agreement, installed system and accepted operating
capability remain different receipts.