International Monetary Next Phase — Transition Timeline
Original comparison cutoff: 2026-07-13
Purpose: selected occurred/effective spine plus scheduled clocks across captured liquidity, fiscal programmability, failure/finality and international risk transfer
Reading route: Next Phase maintained answer and field definitions. September 7 consolidation reconciles selected later saved sources; it is not a new review of every scheduled date.
Status rule
Event state, object operating state and duration are separate fields. Each row records one clock event using the controlled vocabularies in the field registry. A historical object may be marked superseded without erasing the fact that its earlier event occurred.
Original occurred / effective spine — July 13 record
| Date | Track | Jurisdiction | Entity / object | Event | Event state | Object operating state | Primary source |
|---|---|---|---|---|---|---|---|
| 2021-07 | Fiscal programmability | China | PBOC / e-CNY 1.0 | PBOC published the historical R&D design describing e-CNY as a central-bank liability and its smart-contract capability. That wallet-claim classification was superseded from 2026-01-01. | OCCURRED | SUPERSEDED | PBOC |
| 2022-11-30 | Fiscal programmability | Indonesia | Bank Indonesia / Project Garuda | BI published the high-level Digital Rupiah design, beginning with wholesale work. | OCCURRED | DESIGN | Bank Indonesia |
| 2023-04 | Fiscal programmability | Japan | BOJ retail-CBDC pilot | BOJ began the current simulated pilot with central, intermediary and endpoint systems. | OCCURRED | PILOT-SIMULATED | BOJ |
| 2023-07 | Fiscal programmability | Brazil | BCB / Drex Phase I | Restricted testing of tokenized federal-bond DvP began using fictitious clients and assets. | OCCURRED | PILOT-SIMULATED | BCB |
| 2023-08-15 | Fiscal programmability | Russia | Bank of Russia / digital ruble | Real-transaction pilot began with limited banks and customers. | OCCURRED | PILOT-REAL-VALUE | Bank of Russia |
| 2024-03-15 | Risk transfer | Japan | NEXI | Swap-transaction and letter-of-credit-confirmation insurance reforms became operative. | EFFECTIVE | PRODUCTION-GENERAL | NEXI |
| 2024 | Fiscal programmability | Russia | Bank of Russia / Federal Treasury | Federal-budget student allowances and fine payments were tested in experimental digital rubles. | OCCURRED | PILOT-REAL-VALUE | Bank of Russia status paper |
| 2024-09-30 | Cross-border adapter | Korea / Indonesia | BOK, BI and appointed banks | Direct KRW/IDR local-currency transaction framework entered production. | EFFECTIVE | PRODUCTION-LIMITED | Bank Indonesia |
| 2024-10 | Fiscal programmability | Brazil | BCB / Drex Phase I | Phase I closed after simulated DvP and privacy/programming work. | OCCURRED | PILOT-SIMULATED | BCB |
| 2024-12 | Risk transfer | China / Africa | SINOSURE barter cover | SINOSURE wrote its first cross-border barter-trade cover, protecting a mineral-equipment/fluorite exchange against non-payment. | COMPLETED-TRANSACTION | PRODUCTION-GENERAL | SINOSURE |
| 2024-12-13 | Fiscal programmability | Indonesia | Bank Indonesia / wholesale Digital Rupiah | Immediate-state PoC for issuance, redemption and transfer completed. | OCCURRED | POC | Bank Indonesia |
| 2025-04 to 2025-06 | Fiscal programmability | South Korea | BOK and seven banks / Hangang I | Real users transacted in bank deposit tokens; digital-voucher flows were tested over BOK institutional settlement. | OCCURRED | PILOT-REAL-VALUE | BOK |
| 2025-06 | Risk transfer | BRICS / NDB | Proposed BRICS Multilateral Guarantees | BRICS published guidelines for an NDB-incubated guarantee pilot. | ANNOUNCED | PROPOSED | BRICS |
| 2025 | Risk transfer | Indonesia | Ministry of Finance / LPEI | Finance Ministry special assignment expanded LPEI guarantee and insurance support for priority exports. | AUTHORIZED | PRODUCTION-LIMITED | Indonesia Eximbank |
| 2026-01-01 | Captured liquidity / fiscal programmability | China | PBOC e-CNY 2.0 framework | Commercial-bank wallet balances became bank deposit liabilities with interest, reserve-base treatment and deposit insurance; nonbank-provider balances became provider liabilities backed by 100% guarantee funds. PBOC retained top-layer rules, infrastructure and regulation. | EFFECTIVE | ACTIVE-RULE | State Council/Xinhua |
| 2026-01-13 | Insurance capital | South Korea | FSC / K-ICS | FSC adopted the future core-capital K-ICS framework and transition path. | AUTHORIZED | DESIGN | Korea FSC |
| 2026-03-06 | Risk transfer | Indonesia | LPEI | LPEI reported implementation of special export financing, guarantee and insurance support and its state/financial-sector risk-sharing role. | OCCURRED | PRODUCTION-LIMITED | Indonesia Eximbank |
| 2026-03-13 | Risk transfer | Japan / Australia | NEXI / Export Finance Australia | ECAs signed a renewed one-stop-shop reinsurance agreement for joint projects. | OCCURRED | PRODUCTION-GENERAL | NEXI |
| 2026-03-18 | Fiscal programmability | South Korea | BOK / participating banks and service institutions under Hangang II | BOK formally initiated Phase II; this launch record does not itself establish Phase II real-value transactions. | OCCURRED | DESIGN | BOK |
| 2026-03 (announcement) | Fiscal programmability | South Korea | Ministries, BOK, Korea Environment Corporation | BOK announced an EV-charging subsidy deposit-token MOU scheduled for signature on 2026-03-24; no completed subsidy payment is proved by this source. | ANNOUNCED | DESIGN | BOK |
| 2026-03-30 | Captured liquidity / collateral | Europe | Eurosystem collateral framework | Eligible DLT-issued marketable assets became capable of entry through qualifying CSD/T2S paths. | EFFECTIVE | ACTIVE-RULE | ECB |
| 2026-03-30 | Finality | South Korea | BOK-Wire+ | BOK extended conventional reserve-settlement operating hours. | EFFECTIVE | PRODUCTION-GENERAL | BOK |
| 2026-05-21 | Insurance capital | Japan | Bank of Japan | BOJ published its international life-insurer review, highlighting asset-intensive reinsurance and private-fund connections. | OCCURRED | NOT-APPLICABLE | BOJ |
| 2026-05-29 | Risk transfer | Brazil | ABGF / FGCE | ABGF announced financial-institution accreditation to begin June 1; the announcement does not prove actual bank onboarding or a first guarantee. | ANNOUNCED | NOT-ISSUED | ABGF |
| 2026-06-01 | Captured liquidity | Indonesia | BI / state-owned banks / DHE SDA | Revised natural-resource export-proceeds entry, retention and permitted-placement rules became effective. | EFFECTIVE | ACTIVE-RULE | Bank Indonesia |
| 2026-06-24 | Private digital money | Japan | SBI Shinsei Trust Bank / SBI VC Trade / JPYSC | SBI Shinsei Trust Bank launched JPYSC as issuer/trustee; SBI VC Trade is distributor and electronic-payment-instrument exchange provider. | OCCURRED | PRODUCTION-LIMITED | SBI |
| 2026-06-29 | Collateral / finality | Europe | EIB, Clearstream, DekaBank, Eurex Clearing, Bundesbank/ECMS | DLT-native EIB paper was mobilized through triparty services and ECMS for Bundesbank financing. | COMPLETED-TRANSACTION | PRODUCTION-LIMITED | Clearstream |
Original scheduled / conditional spine — July 13 record
These rows preserve official schedules known at the original cutoff. A passed date does not prove implementation. Russia’s digital-ruble row separates the projected access stage from the July real-value pilot; September 1 implementation has not been verified here. The occurred pilot row above retains its real-value-pilot status.
| Date/window | Track | Jurisdiction | Entity / object | Future event | Event state | Recorded state or projected stage (as specified) | Duration modifier | Primary source |
|---|---|---|---|---|---|---|---|---|
| 2026-H2 | Fiscal programmability | South Korea | Hangang II / Treasury subsidy | Public transactions and first EV-subsidy disbursement targeted; no completed payment located. | SCHEDULED | PILOT-REAL-VALUE | STAGED | BOK |
| 2026-H2 | Private digital money | Europe | Qivalis dedicated Amsterdam entity | Consortium targets euro EMT issuance subject to authorization. | SCHEDULED | NOT-ISSUED | CONDITIONAL | ING |
| 2026-Q3 | Finality / collateral | Europe | Eurosystem Pontes | Initial launch of the wholesale DLT-to-TARGET bridge is planned, with user testing before launch. | SCHEDULED | DESIGN | STAGED | ECB Pontes |
| 2026-09-01 | Fiscal programmability | Russia | Digital ruble | Largest banks and qualifying large merchants enter the statutory access/acceptance stage. | SCHEDULED | Projected access stage; July record remains PILOT-REAL-VALUE | STAGED | Bank of Russia |
| 2027-01-01 | Insurance capital | South Korea | Core-capital K-ICS | New standard begins, subject to transition rules. | SCHEDULED | DESIGN | STAGED | Korea FSC |
| 2027-01-30 | Insurance capital | Europe | Amended Solvency II | Amended framework takes effect. | SCHEDULED | DESIGN | STAGED | EIOPA |
| 2027-02-04 | Securities / finality | South Korea | DLT securities-registration law | Amendments recognizing qualifying DLT securities records become effective. | SCHEDULED | DESIGN | NONE | Korea FSC |
| 2027-H2 | Fiscal programmability | Euro area | Digital-euro beta | Twelve-month operational pilot planned; no issuance decision has been made. | SCHEDULED | DESIGN | CONDITIONAL | ECB |
| 2028 | Finality / collateral | Europe | Appia | Eurosystem blueprint for longer-term tokenized wholesale architecture targeted. | SCHEDULED | DESIGN | NONE | ECB |
Later saved observations — dates remain separate
| Observation or event | Release / retrieval clock | What changes | Limit and saved source owner |
|---|---|---|---|
| JPYSC reserve snapshot June 30, 2026, 19:00 JST | Issuer/service pages reached in the August 31 review | Issued amount and trust cash deposit snapshot plus contractual direct-redemption route located | Not current attestation, routine redemption or external circulation; Japan ledger JPN-AUG-018 |
| Hangang operating-scope designation July 15 | Captured in the Korea study’s July 31 update | More banks, larger wallet population and holding/transfer limits, transfers and government-treasury project scope | Authorization/pilot scope, not an appropriation, executed Treasury instruction or completed subsidy payment; Korea digital study and FSC designation |
| Agorá controlled tests in July | Official BOK result July 30 | Real-value prototype transactions completed; original future-test gap is superseded | Not production availability, integrated RTGS/core operation or final legal opinions; Japan ledger JPN-AUG-014 |
| DCP validation began August 20; Canton JGB implementation PoC announced August 13 | DCP release August 26; Canton release August 13 | Named experiments progressed | No selected DCP architecture or Canton cash leg, completed production DvP or blockchain-native legal JGB; Japan ledger JPN-AUG-015/016 |
| JBIC loan agreements signed August 7 for Pennsylvania and Texas projects | Published August 14; saved August Japan review | Signed financing and NEXI insurance decisions for private portions | Not drawdown, construction, operation or a proven digital/commodity loop; Japan ledger JPN-AUG-020 |
The Japan specialist owns the dated bank-accounting and reserve figures. The source index separates partial resolutions from remaining documentary gaps. Unamended regional states retain their stated cutoffs.
Original first-event tests — retained research questions
The following July 13 questions retain the investigation’s scope. They are not new watches or claims that every field remains wholly unknown. Use the dated amendments and source index before treating an earlier gap as open. For each mechanism, seek the first documented:
- insured Indonesian export linked through DHE into an identified BI or sovereign instrument;
- Korean Treasury deposit-token payment with reversal and accounting rules;
- Pontes production settlement with published failure/fallback treatment;
- FGCE or BMG executed guarantee with named currency and loss allocation;
- stablecoin/deposit-token insolvency, safeguarding or resolution opinion in Japan, Korea or Europe;
- insurer holding of a tokenized sovereign asset under a disclosed prudential classification;
- cross-border local-currency trade in which payment, policy, claim and reinsurance currencies are all public.
Sources
Full saved reading
View cited sources (33)
These are the sources cited by this reading. Each source keeps its own date and scope.
Document details and formats
Saved research reading. Its original dates and claim limits control; the export date does not refresh the evidence.