Skip to content

International Monetary Next Phase — Field Registry

Created: 2026-07-13
Status: maintained field definitions for the four-track comparative package
Tracks: captured liquidity; programmable fiscal money; failure/finality; commodity–currency–insurance

Reading route: The Next Phase answer owns the shared explanation; this file owns field meanings and evidence thresholds. The definitions were reconciled on September 7 without refreshing the dated country records.

Governing rule

One announcement may name several entities and several money objects. Record them separately. Do not promote a comparison until the legal holder, claim, settlement asset and operating status are known.

Four-track record

FieldRequired value
TrackCAPTURED-LIQUIDITY, FISCAL-PROGRAMMABILITY, FAILURE-FINALITY, RISK-TRANSFER
JurisdictionState or legal regime, not a political bloc unless the bloc owns the object
Named entityExact legal entity
Entity roleSee role register below
Money/credit objectExact legal claim or instrument
Source of fundsHousehold deposit, corporate deposit, export proceeds, tax receipt, treasury appropriation, stablecoin inflow, policy premium, bond proceeds or other named source
Legal holderEntity with the recognized balance-sheet claim
DenominationUnit of account of the object
Permitted asset/useWhat the holder may legally do with the funds
Settlement assetCentral-bank reserve, bank deposit, trust claim, EMT/stablecoin, cash, security, other
Finality locusLaw/system/rule that makes the transfer final
Collateral stateIneligible, eligible, pledged, mobilized, haircut unknown, or not applicable
Guarantee/insuranceNamed carrier, ECA, fund, reinsurer or none located
Failure ruleRedemption, insolvency, outage, freeze, reversal and loss-allocation rule
Cross-border adapterNamed payment, messaging, FX, clearing, custody or reinsurance connection
Operating statusControlled lifecycle vocabulary below
Event/clock statusControlled event vocabulary below
Duration modifierNONE, TEMPORARY, STAGED or CONDITIONAL
Evidence-gap fieldsName the specific unknown field and distinguish a missing disclosure from a document not located or not accessed in the dated review; no gap label is an object status
Clock dateAnnouncement, filing, approval, effective, pilot, production, trigger, payment or resolution date
Evidence gradeA-OPERATIVE, B-OFFICIAL-DESCRIPTIVE, C-ENTITY-CLAIM, D-SECONDARY, UNVERIFIED
Open documentExact missing rule, agreement, schedule, ledger or transaction record

Entity-role register

RoleBoundary
Fiscal authorityAppropriates, allocates or directs public spending; does not necessarily issue money
Central bankIssues reserve/CBDC liability or operates final settlement; do not collapse with ministries or commercial banks
Commercial/policy bankHolds deposits, creates bank claims or extends credit
Trust / EMI / stablecoin issuerIssues the named private digital-money claim under its own legal regime
Wallet/PSPProvides access or instructions; may not own customer funds
Securities issuerOwes the bond or security obligation
CSD / registryMaintains the authoritative securities record or connects it to settlement
CCPNovates or guarantees qualifying transactions under a loss waterfall
Export-credit agencyInsures or guarantees defined trade/project risks; may be state-owned without being the sovereign itself
Primary insurerWrites the policy obligation
Reinsurer / retrocessionaireAccepts ceded risk behind the writing carrier
Guarantee fundSupplies a defined statutory or contractual loss-bearing pool
FX / swap providerTransforms or hedges currency exposure; does not erase the original denomination
Cross-border operatorConnects national stacks through payment, messaging, FX, custody or settlement rules

Money- and credit-object register

Keep these objects separate even when one app displays them together:

Status vocabularies

Do not compress lifecycle, event, duration and missing evidence into one label.

Operating status

StatusMeaning
DESIGNArchitecture or policy design without an operating instrument
PROPOSEDPolitical or policy concept without adopted authority
CONSULTATIONDraft rule or design open for response
SANDBOXRestricted regulatory environment, not general operation
POCTechnical proof using experimental or simulated objects
PILOT-SIMULATEDPilot without real customer funds/assets
PILOT-REAL-VALUEControlled pilot using real value but not general availability
PRODUCTION-LIMITEDLive under operating service terms for defined participants, corridors or use cases beyond a bounded experiment; real value alone may still be a pilot
PRODUCTION-GENERALGenerally operative within the named legal scope
ACTIVE-RULERule is legally effective
NOT-ISSUEDAnnounced instrument has no verified issuance
PAUSEDPreviously active work has been formally halted
SUPERSEDEDReplaced by a named later object or rule
NOT-APPLICABLEThe recorded event is analysis or another publication that does not itself create an operating object

Event / clock status

StatusMeaning
ANNOUNCEDAn authorized entity publicly described a planned action
FILEDApplication, filing or request submitted but not approved
AUTHORIZEDLegal permission exists; operation is a separate clock
SCHEDULEDOfficial future date/window stated; event has not occurred
OCCURREDThe dated event took place
EFFECTIVEA law, rule or operating term entered legal effect
COMPLETED-TRANSACTIONOne or more transactions concluded; recurring scale is not implied
RESOLVEDA failure, claim, dispute or temporary state reached an authoritative disposition

Duration modifier

ModifierMeaning
NONENo special duration condition
TEMPORARYOperative only for a defined emergency or period
STAGEDParticipants or functions enter across multiple dates
CONDITIONALAuthority or operation depends on named unmet conditions

Evidence-gap token

Name the particular unknown field, such as redemption cutoff, governing law or claim currency. Use not publicly stated only when the reviewed disclosure supports that description. Use not located in the dated review for a retrieval gap, and describe an access failure when a known document could not be read. A missing public record does not establish that the rule or transaction does not exist. Never use a gap label as the operating status of the whole object.

Separate clocks

Every record may carry more than one clock, but each row gets one clock event:

  1. political announcement;
  2. legislative adoption;
  3. regulator filing/application;
  4. authorization/approval;
  5. effective date;
  6. technical PoC;
  7. real-value pilot;
  8. first production transaction;
  9. recurring operation;
  10. first collateral mobilization;
  11. first insured/guaranteed transaction;
  12. loss trigger;
  13. claim payment or guarantee call;
  14. insolvency/resolution;
  15. cross-border connection.

Currency stack

For trade, insurance and cross-border fiscal records, capture separately:

Same is not a default. Write the unit or the specific, dated evidence-gap description.

Fiscal-programmability minimum fields

FieldRequired question
Appropriation authorityWho legally authorizes the expenditure?
Disbursement authorityWho sends the payment instruction?
IssuerWhose liability reaches the recipient?
Access providerWhich bank/PSP/wallet gives access?
Restriction authorWho defines eligible merchant, product, place, time or recipient?
Enforcement locusLedger, wallet, smart contract, bank core or ex-post audit?
Data readerWhich entities may see identity, balance and transaction purpose?
OverrideWho can freeze, reverse, expire, claw back or manually release funds?
SettlementWhat asset discharges the inter-entity obligation?
Unused-fund ruleReturn, expiry, rollover, conversion or not publicly stated?

Failure/finality minimum fields

ScenarioEvidence required
Issuer failureStatute, safeguarding rule, insolvency priority or resolution plan
Bank failureDeposit-insurance treatment and access/transfer rule
Stablecoin runReserve liquidation, redemption queue and suspension authority
Sovereign-price shockHaircut, margin, valuation and liquidity-response rule
OutageOffline/fallback ledger and reconciliation rule
Atomic settlement failureTimeout, rollback, partial-completion and dispute rule
Freeze/sanctionsNamed authority and legal basis
Key/wallet compromiseLiability allocation and recovery process
Cross-border disputeGoverning law, venue and operator loss allocation
Insurance/ECA callTrigger, waiting period, claim currency and subrogation

Promotion tests

A new fact changes the Observatory story only if it moves at least one control point:

Do not promote participant counts, consortium membership, memorandum language or token branding without one of these changes.

Sources

Full saved reading

View the saved source references. This record has no direct external citation in its source-link list.

Document details and formats
Optional file downloads
For AI readers: complete text and record details
About the dates and filing language
Evidence date
When this document or named claim was checked. A newer collection, export or website date does not update it.
Current, private, Workbench or promotion
These can describe the saved document’s original filing or custody. This public reading preserves that history; publication does not turn its findings into government approval, binding law or newly verified evidence.
Master data and projection
The maintained factual record and a page generated from it. Repeated views are not additional independent evidence.
Provenance and source join
Where a record came from, and the exact reference connecting a claim to its source.
Gate, receipt and operating evidence
A required decision or condition, its documentary record, and evidence that the named activity actually occurred. Permission, delivery and operation stay separate.

Saved research reading. Its original dates and claim limits control; the export date does not refresh the evidence.