Skip to content

ELRC Transition Questions and Answers

Evidence through 2026-07-27

Source document and saved text

Read the recorded source on its website

Read the existing saved source text · Read the existing saved source text

Text extracted from all 37 PDF pages, with page markers. Check the original PDF for layout, tables, signatures and exact wording. Official historical transition Q&A; contextual mechanism evidence only. Saved capture verified July 27, 2026; this access repair does not refresh its evidence date.

Official source · · Complete extracted text for AI readers · Return to the study

Useful locations: PDF p. 4

Read all extracted pages
--- PDF page 1 of 37 ---
ELRC Transition Q & A Document 
Updated 11.01.2018 
Last Updated: 11/5/2018     
PROGRAM TOPIC DATE 
RECEIVED 
QUESTION Pending ANSWER 
Both ELRC Signage 10/25/18 Can you please give an update 
on when we should receive our 
signs and window clings? 
10/26/18 Per the Communications Team:  All 
signs and window clings shipped 
during the week of 10/23/2019 with 
the exception of Erie and 
Downingtown which will ship during 
the week of 10/30/2018.   
 
Both Grant signatures 8/15/18 Why do the grants we will 
award/administer for the 
providers need to have an 
original signature?  As an ELRC 
we accept Provider Agreements 
and attendance forms back 
electronically or faxed to make 
payment to providers for 
subsidy payment which can be a 
much larger amount in total.  As 
an ELRC it would be beneficial if 
possible to be consistent with 
the requirements for signatures 
and be able to accept 
electronic/fax signatures for the 
grant documentation.   It would 
help with not only consistency 
as an ELRC, but also with 
convenience and timeliness to 
meet set deadlines. 
UPDATED: 
9/11/2018 
E-signatures are legally sufficient 
for grant and provider agreements. 

--- PDF page 2 of 37 ---
ELRC Transition Q & A Document 
Updated 11.01.2018 
Both PELICAN 
Enhancement 
Calls 
10/19/18 I am currently on the PELICAN 
Enhancement calls and I know 
they are adding many STARS 
items such as grants, Request 
for Designation, and other items 
to Upload through PSS.  Will this 
get confusing with this Uploader 
and PSS?  
11/1/18 Thoughtful consideration is being 
given to making Provider Self 
Service distinct from the SMART 
Document Uploader system.  This 
conversation will continue 
throughout the development 
phases of Provider Self Service with 
the goal of eliminating any possible 
confusion between the two. 
KTQ Merit Awards 10/15/18 What is the maximum number 
of Merit awards that a family 
child care provider can receive? 
10/15/18 A family child care provider who is a 
STAR 2 program can receive a 
maximum of 3 Merit awards.  There 
is no maximum number of Merit 
awards that a family child care 
provider can receive is if they are a 
STAR 3 or 4 program. 
KTQ Head Starts and 
Pre-K Counts 
10/15/18 We were directed to extend all 
Head Start & Pre-K until 
12/31/2018.  What is the 
process to follow? Does this also 
pertain to Pre-K Count 
Standalones? 
Pending  
KTQ PELICAN Reports 10/15/18 How will PELICAN Reports pull 
data for closing providers since 
their STAR level is changed to 
NO STAR at closing?  We have 
had several providers close this 
FY, just do not want this 
movement to hurt our 
percentage.  
Pending  

--- PDF page 3 of 37 ---
ELRC Transition Q & A Document 
Updated 11.01.2018 
KTQ SMART 10/10/18 Currently, the SMART Software 
is functional only through the 
Pre-Designation phase.  Until 
the Designation phase is fully 
functional, should we hold off 
using SMART for consistency in 
the process and continue to use 
the spreadsheets?  Or should 
the QC's start to enter in pre-
designations and print out the 
SMART report for the designator 
to complete the designation? 
10/10/18 The Quality Coaches should start to 
enter the pre-designation 
information into SMART and then 
print out the report for the 
designator to complete the 
designation.  Designators should be 
able to view the uploaded 
documents in SMART within the 
pre-designation window.   
Both RFP for PD and 
TA services 
9/28/18 Is it still OCDEL's plan to issue a 
RFP for PD and TA services for 
fiscal year 2019-2020? If so, 
when will it be released?   
9/30/18 OCDEL anticipates releasing a 
Request for Application (RFA) for 
the implementation of Professional 
Development Service for FY19-
20.  The RFA will be released, and 
announced, per standard DHS 
procurement procedures 
via www.emarketplace.state.pa.us 

--- PDF page 4 of 37 ---
ELRC Transition Q & A Document 
Updated 11.01.2018 
Both Payments to 
ELRC 
9/28/18 Please provide clarification 
regarding payments to ELRCs.  
OCDEL informed the ELRCs that 
payments will be made in equal 
installments of one-twelfth of 
the budget. However, CCW 
service dollars are not being 
paid in this manner. They are 
being paid based upon 
projected costs utilizing the 
previous month's enrollment 
data. 
9/30/18 That is correct.  The amount of 
service dollars anticipated to be 
needed by the ELRC are based on 
the prior month's 
enrollments.  Through PELICAN 
Child Care Works (CCW), the 
Department reconciles prior 
payments and expenses for services 
and factors that reconciliation into 
the next month’s payment 
amount.  For more information, see 
the CCW Procedures Manual 
Chapter 110 "CCIS invoices and 
Payments".  OCDEL acknowledges 
that references in this chapter will 
need to be updated. 
Both STAR 1 Welcome 
Letters 
8/4/18 Do we need to send the official 
OCDEL letter to all programs 
who have been designated a 
STAR 1 from July 1, 2018 
retroactively? 
8/4/18 Yes, ELRCs should send out the 
STAR 1 Welcome Letter that was 
included in ELRC Policy 
Communications KS #18-02 to all 
programs who have received their 
full certificate of compliance 
beginning 7/1/2018. 
KTQ Staff Credentials 8/30/18 Also can you give more 
information about the Admin A 
and B credentials that show up 
in the credential standards for 
2021 – we are already getting 
questions about that. 
8/5/18 The Admin A and B levels are part 
of the Career Pathways work and 
will be released in late Fall 2018 
after workgroup review. 

--- PDF page 5 of 37 ---
ELRC Transition Q & A Document 
Updated 11.01.2018 
KTQ Director's 
Credential 
8/30/18 Will the alternative pathway for 
Director Credential still be 
accepted?  If so, will directors 
who previously met the 
standard in this manner be 
“grandfathered” in?  Many of 
those people do not have 
documentation showing they 
were approved (i.e. no 
certificate, email, etc.).  For new 
directors wanting to meet the 
DC standard via alternate 
pathway, will there be a more 
formal process for acceptance of 
their credentials – or will the QC 
approve? 
9/13/18 PA Director Credential Alternative 
Pathway Granted prior to June 30, 
2018 
Directors who met the Director 
Credential Alternative Pathway 
prior to June 30, 2018 will be 
grandfathered in and will receive a 
Director Credential certificate at no 
cost.   
The Director Credential certificate 
will be valid for 5 years.  Ninety (90) 
days prior to the expiration of the 
Director Credential, the director will 
be required to submit a PA Director 
Credential Renewal Application.  
You can find the application at: 
 
http://www.pakeys.org/get-
professional-
development/credentials-
degrees/director-credential/  
Both Encumbrance 8/15/18 Is the expectation that ELRCs 
will be 45% encumbered by 
12/31/18? If so, does this 
include STARS grants? 
8/15/18 For ELRC operations, this is not a 
requirement due to the fact 
financial management is part of 
CCW. 
Both STARS Grants 8/15/18 Has a decision been made about 
how ELRCs will receive payment 
from OCDEL for STARS grants?  If 
it is remaining that it will be 
paid in 1/12, what changes, if 
any, will be made to the time 
frame for paying grants out to 
providers? 
8/15/18 OCDEL does have a mechanism by 
which to update payments for 
STARS grants and awards.  There is 
no change to the 60-day 
requirement for payment to 
providers.  OCDEL will evaluate the 
rate at which funds for grants and 
awards will be made available to 
the ELRCs for draw-down. 

--- PDF page 6 of 37 ---
ELRC Transition Q & A Document 
Updated 11.01.2018 
Both STARS 
Certificates 
8/14/18 Are STAR 1 providers getting a 
certificate with a 10-year 
expiration date or do we put a 
yearly expiration date on the 
certificates? Is the Expiration 
Date on Certificate for a STAR 
2,3,4 a 1-Year or 3-Year date? 
8/15/18 STAR 1 Certificates should have a 
10-year expiration date and STAR 2, 
3 and 4 certificates should have a 3-
year expiration date. 
Both Regional 
Leadership 
Council 
8/2/18 Can you clarify if ELRC’s will be 
required to demonstrate four 
Regional Leadership Council 
Meetings (one per quarter this 
fiscal year) given the transition 
and call for more clarification 
around this requirement?  
8/13/18 As part of Quarter 1 submission to 
OCDEL, ELRCs will need to provide a 
narrative about the collaborative 
group they are using (Regional 
Leadership Council or some other 
group), who comprise the group 
and timing of when meetings will 
occur. 
More information is forth coming. 

--- PDF page 7 of 37 ---
ELRC Transition Q & A Document 
Updated 11.01.2018 
Subsidy Provider 
Agreements 
8/2/18 Scenario -A Certified Provider 
turns in all their new Provider 
Agreement Documentation on 
time and then their rate 
information on say Aug 31st, but 
their Publish Private Rate Sheet 
does not coincide at all with the 
rates they filled out on their 
provider agreement rates page. 
We try to work with them, but 
they fail to provider 
documentation before Sept. 1st 
for us to verify rates.  They do 
not send in their 
accurate/corrective 
documentation of their rates 
until sometime in Sept. 2018 for 
us to verify their private 
rates.  When would the new 
rate increase effective date 
be?  I would think it would be 
the 1st of the month we 
received all the 
required/accurate rate 
information into the ELRC?  So 
for the example above the rate 
effective date would be Sept 
1st?  
8/13/18 Yes. 

--- PDF page 8 of 37 ---
ELRC Transition Q & A Document 
Updated 11.01.2018 
Both ELRC Portal 7/30/18 Is there a method to how the 
forms are being updated in the 
ELRC portal? We check daily but 
it's time consuming to go in and 
open every document to see if it 
has been updated.  Is it possible 
to be alerted to when a form 
has been updated?  Is there a 
timeline for when the forms will 
be updated... Example:  TANF 
forms week of August 6?   
8/13/18 OCDEL continues to identify forms 
that need to be updated. OCDEL is 
waiting for DHS approval on some 
forms that have been updated 
and other forms are with other 
"owning" agencies. To help the 
ELRCs keep up-to-date with the 
latest forms, OCDEL will post a list 
of forms that have been changed 
and links to the new/revised forms 
on the ELRC Portal under ELRC > 
What’s New. The forms will also be 
available under the CCW heading. 
Both STARS Flags 7/30/18 Will there be/ is there currently/ 
a protocol for Keystone STARS 
Flags?  Previously we included 
these in the Award Packets.  
Large Flags for programs moving 
to STAR 3 & 4.  Small flags to 
STAR 2 movements.  Will ELRCs 
receive these moving forward 
for the Award Packets?  Also, 
programs are requesting 
window clings.  Are these on the 
horizon? 
9/6/18 The Communications Team is in the 
process of ordering Keystone STARS 
flags and window clings.  More 
information on these items will be 
forthcoming from the 
Communications Team. 
Both STARS Movement 
Goals 
7/30/18 Will we have Governor Goals for 
STARS Movement this FY? Will 
targets be managed via a similar 
STARS Participation Report?  
The last participation report we 
have is from April?  Is this 
correct?   
8/13/18 Governor goals established in ELS 
17 #02, will not be required in 
18/19.  However, new goals that 
were part of RFP 30-16 and OCDEL's 
5 year targets will be part of the 
ELRC target deliverables.  More 
information on these targets will be 
forthcoming. 

--- PDF page 9 of 37 ---
ELRC Transition Q & A Document 
Updated 11.01.2018 
Both Grants and 
Awards 
7/30/18 As the grants and awards are 
anticipated to be released soon, 
will programs need to renew 
prior to being eligible to apply 
for the grant?  This was the old 
protocol prior to the release of 
the revised STARS system... the 
hold harmless year....  Region 1 
would like to advocate to return 
to the former policy as this will 
assist is spreading the workload 
and funding across the program 
year 
8/13/18    
Yes, grants should be issued in 
accordance with the providers' 
STARS renewal date.   
However, if a provider is in the 
middle of a full designation (not just 
a renewal), the ELRC will wait until 
after the designation is complete.  
Both Performance 
Review 
Instrument 
7/30/18 What is the anticipated release 
of the PRI?  Staff specific 
performance expectations 
cannot be finalized until this 
information is received and we 
have new employees who will 
need introductory performance 
reviews in August / September.  
Do you have PRI 
examples/drafts that could be 
utilized in the interim? 
8/13/18 As part of the September Directors 
meeting, a DRAFT PRI will be shared 
for review and comment.  Many of 
the monitoring goals were 
contained in the RFP and ELRCs 
should review them. To respect 
the implementation of ELRC 
operations Quarter 1, an 
abbreviated listing of deliverables 
will be due from ELRCs by October 
25th.  The first complete PRI 
evaluation will occur in Quarter 2.   

--- PDF page 10 of 37 ---
ELRC Transition Q & A Document 
Updated 11.01.2018 
Both Provider 
Agreements 
7/30/18 What is expected to be in each 
Provider Agreement File?  
Copies of everything or just the 
signature pages and verification 
of published rates?  Could we 
have a list of what should be in 
each provider file?  All 
documents were issued to the 
providers. Do we need all copies 
in every file as well? 
7/31/18 For CCW Provider Agreement files, 
the ELRC is required to maintain "all 
documentation from the provider 
and correspondence not generated 
through PELICAN CCW".  For more 
information about ELRC 
Responsibilities for Provider 
Management, go to the ELRC Portal, 
Child Care Works, Policy and 
Procedures, Chapter 300 Regulated 
Provider Management and Chapter 
301 Relative/Neighbor Provider 
Management.  
See below list: 
Regulated Provider 
• Provider Agreement, Page 1 
• Signature Page, Page 6 
• Appendix B: Provider’s Closed 
Days  
• Appendix C1: CCIS Subsidized 
Child Care Provider’s Reported 
Rates  
• Appendix C2 Regulated Rates 
• Appendix E: Multiple Locations (if 
applicable) 
• Appendix G: Provider Service 
Schedule 
• Appendix H: new capacity 
compliance document 
• W-9: Request for Taxpayer 
Identification Number and 
Certification (IRS form) 
• Complete Child Care Provider 
Survey 
• A signed and dated copy of your 
parent handbook or written 
information that is given to a parent 
explaining your policies and 
includes your published child care 

--- PDF page 11 of 37 ---
ELRC Transition Q & A Document 
Updated 11.01.2018 
rates 
• Photo ID (for FCCH only) 
 
Relative Provider (includes in-home 
provider) – In-State and Out-of-
State 
• Provider Agreement, Page 1 
• Signature Page, Page 5 
• Appendix B Relative  
• Appendix C – Rules for Payment in 
the Subsidized Child Care Program 
• Appendix D – Parent/Caretaker 
and Relative Provider Attestation of 
Relationship to Child 
• Appendix E – Disclosure 
Statement (if applicable 
• Proof of identity (Photo 
identification) with a signature.  
• Proof of address.  
• Proof of working telephone with 
“call-out” capability at the physical 
location.  
• Social Security card or other proof 
of SSN.  
• Tax information on a W-9 Form.  
• Copy of Original Federal Criminal 
History Clearance Results Letter.  
• Mandated Reporter 
Training  Certificate of Completion 
• Copy of State Child Abuse and 
Criminal Background clearances 
(optional) 
 
Out-of-State Provider (Regulated an 
Out-of-State relative is really the 
same as an In-state with just 
different proof of address. 
• Regulated Out-of-State Facility 
Information (Regulated Only) 

--- PDF page 12 of 37 ---
ELRC Transition Q & A Document 
Updated 11.01.2018 
• Facility Tax Information-Out-of-
State Child Care Facility (Regulated 
Only) 
• Provider Agreement information 
above for Regulated or Relative 
Provider 
• Proof of identity (Photo 
identification) with a signature. 
(Relative) 
• Proof of address. (Relative) 
• Proof of working telephone with 
“call-out” capability at the physical 
location. (Relative) 
• Social Security card or other proof 
of SSN. (Relative) 
• Tax information on a W-9 Form.  
• Copy of Original Federal Criminal 
History Clearance Results Letter.  
• Mandated Reporter Training 
Certificate of Completion 
• Copy of License or Certificate 
(Regulated) 

--- PDF page 13 of 37 ---
ELRC Transition Q & A Document 
Updated 11.01.2018 
Both Monthly 
Operations 
Report 
7/30/18 Is there a template for the 
Monthly Operations Report 
which is due the 5th of the 
month? Is this due for July? 
8/13/18 Please refer to Operations 
Communication CCW #18-02 Early 
Learning Resource Center 
Performance Standards Operational 
Objectives Monitoring for CCW 
Program Year 2018-2019.  The 
"ELRC CCW Monthly Operations 
Report for Self-Monitoring" has 
been made available to the ELRCs 
to use on a voluntary basis.  The 
elements outlined in the self-
monitoring tool are those reviewed 
internally by OCDEL Program 
Representatives.  ELRCs are not 
obligated to use the report.  
However, ELRCS should be 
prepared to address any issues 
identified by the Program 
Representative. 
Both Report 
Submission Dates 
7/30/18 Would it be possible to have a 
calendar of important report 
submission dates?  For example, 
the calendar would highlight 
exact due dates.... so if the 5th 
of the month falls on a Sunday 
as it does in August... when is 
the NVRA report due?  Friday or 
Monday.... a calendar 
highlighting all important 
submissions dates would be 
extremely helpful 
7/31/18 Yes, the Bureau of Operations and 
Monitoring will compile this 
calendar and make it available on 
the ELRC portal as soon as possible. 
 
The NVRA report is due to Jesse 
Farley, OCDEL’s NVRA coordinator, 
by the 5th of every month.  If the 
5th falls on a weekend, the report is 
due the first work day following the 
5th.  

--- PDF page 14 of 37 ---
ELRC Transition Q & A Document 
Updated 11.01.2018 
Subsidy Enrollment 
Summary vs. 
Rates 
7/26/18 My understanding is that the 
provider has the option of 
charging the client the 
difference between the MCCA 
and her published rates and that 
the STARS Add-on dollars are to 
go directly to the facility. Since 
PELICAN is generating the 
enrollment summaries using 
both the MCCA including the 
STARS Add-on dollars, the 
parent/client is seeing the 
estimated payment including 
the add-on.  When the provider 
tells the parent the additional 
amount owed (to charge the 
difference between MCCA and 
rates, which they are allowed), 
the parent doesn’t agree 
because the enrollment 
summary is showing a different 
amount and feels like the 
provider is cheating them 
because the provider received 
additional payment from their 
CCIS/ELRC.    What I’m looking 
for is consistent messaging that 
we can pass along to our staff 
and in turn the provider and 
families so that they understand 
the enrollment summary 
includes the STARS add-on:  1)1. 
We don’t want providers 
thinking they can charge the 
parent the difference between 
MCCA + Add on. (double dip the 
system) 2)2. We want families 
to understand why a provider is 
receiving STARS Tiered add on 
8/13/18 Tiered reimbursement is part of the 
subsidy payment.  Providers who 
charge parents the difference 
between the subsidy payment, 
minus the co-payment, and their 
private rate must count the amount 
of tiered reimbursement when 
asking the parent to cover the 
difference.  ELRCs should explain 
this to providers and parents if 
asked. 

--- PDF page 15 of 37 ---
ELRC Transition Q & A Document 
Updated 11.01.2018 
dollars 3) 3. We want to be sure 
all of our staff (both CCW & 
STARS) understand and are 
providing the same messaging. 

--- PDF page 16 of 37 ---
ELRC Transition Q & A Document 
Updated 11.01.2018 
KTQ STARS Grants 7/26/18 Our budget has line items for 
Keystone STARS Grants and 
Awards (Other Care Levels) and 
Keystone STARS Grants and 
Awards (Infant/Toddlers).  Can 
you please explain how I/T 
dollars will be tracked and 
calculated?  Will the grant 
paperwork be the same or will 
there be separate grant 
requests for those caring for 
Infants/Toddlers?  Will PELICAN 
be pulling these amounts? 
8/13/18 At this time PELICAN KTQ and CCW 
do not possess the functionality to 
share this type of data. 
Accordingly, OCDEL (and ELRC) 
will monitor Infant Toddler (and all 
other care levels) expenditures via 
KQRPT114 - Grants Type Detail 
Report.  OCDEL will use the report 
to adjust grant care level amounts 
in CCW. 
Subsidy Provider 
Agreements 
7/26/18 Regarding collecting rates 
information, if the provider only 
gives us their private rates, do 
we still need their published 
rates? 
7/1/18 Yes 
Both Meeting Calendar 7/26/18 Can we add more details to the 
meeting schedule; e.g. topics 
and who should attend? 
7/31/18 Yes.  OCDEL is enhancing the 
meeting schedule to include topics 
and recommended 
participants.  And, as a reminder, 
agendas are sent out about one 
week in advance of the meeting for 
ELRC information. 
Subsidy Provider 
Agreements 
7/26/18 Can the subsidy provider 
agreement be built into PELICAN 
so the document can be 
associated with the providers’ 
information? 
7/31/18 Yes, OCDEL will have to scope this 
under future system work. 
Both Zoom Platform 7/26/18 Can we get a test link for the 
Zoom meetings in advance? 
7/31/18  Yes 
Both Quality Grants 7/26/18 When will the Quality Grants be 
available to the ELRC's? 
7/31/18 Mid-August 2018 

--- PDF page 17 of 37 ---
ELRC Transition Q & A Document 
Updated 11.01.2018 
Both Head Start 7/26/18 We have been contacted by the 
local Head Start agency about 
placement of children and 
related issues.  Where should 
these questions be directed? 
7/31/18 Direct all Head Start questions to 
Tracy Duarte at the Head Start 
Collaboration Office.  Her 
information can be found on the 
ELRC Portal under, "Contact Lists", 
"PA Key Contact List".  *NOTE:  
Currently this list does not include 
Tracey's contact information. 
Both Communications 7/26/16 May we distribute 
communications materials with 
our local partners ourselves 
versus OCDEL distributing 
these? 
7/31/18 Yes 
Both Signage 7/26/18 When will we receive ELRC 
signage and brochures? 
7/31/18 Our communications director, Liz 
Knouse will be addressing your 
questions during the August 2nd 
touchpoint phone call. 
Both August Resource 
and Referral 
Training 
7/23/18 What are the dates and times 
slated for August Resource and 
Referral Training?  How many 
staff will be allowed to attend 
per ELRC? 
7/25/18 This training will occur August 22nd 
and 23rd at Harrisburg 
PaTTAN.  ELRC trainers (one per 
region, two if there are multiple 
regions managed by the lead 
agency) are expected to attend this 
training, which will be a 
combination of Resource and 
Referral and Relationship-Based 
competencies.  ELRCs should give 
the names and email addresses of 
their trainers who will be attending 
to the assigned Program 
Representative so details can be 
sent to them, including timeframes 
and information on local 
accommodations.  Please note that 
ELRCs must cover the cost of travel 
expenses for this training.  

--- PDF page 18 of 37 ---
ELRC Transition Q & A Document 
Updated 11.01.2018 
Both August Directors' 
Meeting 
7/23/18 What are the agenda items for 
the 8/9/2018 Directors' 
Meeting?  If completing meeting 
using Zoom platform, is there a 
software link so we are able to 
test capability before the 
meeting? 
7/24/18 OCDEL will provide the agenda and 
the link as soon as possible. 
Both October 
Director's 
Meeting 
7/23/18 Is the Directors' Meeting 
scheduled for 10/11/2018 going 
to be moved to the ECE 
Summit? 
7/24/18 OCDEL is evaluating utilizing the 
summit venue to convene the ELRC 
directors.  We will let you know as 
soon as possible. 
Both ELRC Summit 7/23/18 What days are required for ELRC 
attendance at the ECE Summit 
on Oct 15-17, 2018? 
7/24/18 Generally, grantees may make their 
own decisions about attending the 
summit.  However, OCDEL is 
evaluating utilizing the summit 
venue to convene the ELRC 
directors.  We will let you know as 
soon as possible. 
Both ELRC TANF 7/20/18 Would you be able to advise 
where the ELRC TANF forms 
are?  I have clicked on forms and 
nothing is there.  I am looking 
for the updated ELRC TANF 
rights and responsibilities.  
7/23/18 From the home page of the ELRC 
portal, click "Child Care Works" 
then "Forms".  Once on the "Forms" 
page, look to the right for "Related 
Topics".  "TANF & FS/SNAP Child 
Care" is a link available under 
"Related Topics".  Click it and it will 
take you to the TANF Rights and 
Responsibilities forms in both 
English and Spanish. 

--- PDF page 19 of 37 ---
ELRC Transition Q & A Document 
Updated 11.01.2018 
KTQ Three Year Cycle 6/8/18 Can you explain how the three-
year cycle will work? 
7/10/18 The Three Year Cycle, or Three Year 
Activity Cycle, refers to a program's 
Designation and Program Quality 
Assessment Cycle.  OCDEL, along 
with the Program Quality 
Assessment Team, is striving to 
reach full implementation of this 
cycle.  When fully implemented, a 
Keystone STARS program would 
receive their STARS designation in 
Year 1; their Program Quality 
Assessment in Year 2; and work on 
their Continuous Quality 
Improvement plan in Year 3 before 
the cycle would begin again.   
Both COMPASS 
Community 
Partner 
6/6/18 Will there be a training for ELRC 
Staff selected to be a COMPASS 
Community Partner and CHIP 
Navigator? 
6/8/18 Yes.  OCDEL is developing a brief 
training for ELRC staff who will be 
doing this work.  We expect to have 
that training available early in the 
new fiscal year, most likely August.  
We will set up a webinar for this 
training. 
Both Resource and 
Referrals 
6/4/18 It has been a long time wish of 
the Resource and Referrals to 
add a place on client cases in 
PELICAN to capture R & R 
Referral data.  Can this be 
revisited in future releases? 
6/8/18 We can scope this for future 
PELICAN work.  If we are able to do 
that, we will need to engage ELRC 
staff regarding the requirements. 

--- PDF page 20 of 37 ---
ELRC Transition Q & A Document 
Updated 11.01.2018 
Both ELRC Portal - .swf 
Files 
5/30/18 Many of the CCW and K2Q 
training materials on the ELRC 
portal are .swf files, which I am 
unable to open.  When I click on 
these .swf files, first they take a 
long time to download and 
finally when they have finished 
downloading and I try to open 
them, then I get a pop up error 
message that says: 
• “This file does not have a 
program associated with it for 
performing this action.  Please 
install a program, or if one is 
already installed, create an 
association in the Default 
Programs control panel.” 
 
I have Flash installed but the 
files still do not open.  Do we 
need to have a specific program 
installed to open these training 
files? 
6/12/18 The format "swf" refers to 
"Shockwave Flash" file format.  This 
is managed by Adobe.  Although 
OCDEL is not completely sure, we 
believe that newer versions of 
Adobe do not support this format.  
We suggest the user try opening the 
files with Adobe 9.  
Subsidy Overpayments 5/25/18 How is the collection of client 
overpayments going to work 
when transitioning to the 
ELRC’s? We have clients paying 
our office directly toward 
overpayments they have. 
Approximately $100,000 is 
currently owed to us. Will the 
current process continue and 
will the money go to the ELRC’s 
even though it is CCIS grant 
money that’s owed? 
6/12/18 Any overpayments being collected 
should be logged by the exiting CCIS 
and given to the ELRC at transition.  
The ELRC should send a letter to the 
parent to tell the parent to begin 
sending payments to them.  Any 
overpayments collected by the ELRC 
outside of the system should be 
added to the 2018-19 recap as 
revenue.  

--- PDF page 21 of 37 ---
ELRC Transition Q & A Document 
Updated 11.01.2018 
Both Promotional 
Materials and 
Other 
Information for 
Communications 
5/23/18 Will the ELRCs receive 
promotional materials?  Will 
these include pens, bags and 
similar items they can share 
with families and providers?  
And can OCDEL provide verbiage 
grantees may use for posting on 
public facing websites? 
5/30/18 ELRCs will receive a mailing in late 
June which will include a variety of 
promotional and marketing 
materials.  A full list of what the box 
will contain can be found on the 
ELRC portal. 
Subsidy Fiscal Records 5/17/18 I’m confused about the note on 
page 1 of the transition 
communique #18-04.  It says 
that Fiscal records do not need 
to be transferred.  Attendance 
invoices may be transferred 
based on what is agreed upon 
by the CCIS and ELRC.  
Attendance invoices and 
payment summaries are a vital 
part of the audit.  When the 
State completes their audit 
review, won’t they need this 
information?  Why would we 
only send client and provider 
files and not the payment part 
of the process?  How would 
payments be verified by the 
State?  Does this note refer to 
all 5 years of the contract or just 
the final year?  Also, there are 
often invoice questions from 
providers after the summer is 
over when they are closing out 
their fiscal year for their own 
audits.  How is the ELRC going to 
answer the provider’s auditor’s 
questions or verify payments if 
they do not have the invoices 
and payment summaries? 
5/18/18 The above holds true for provider 
overpayments being collected 
outside of the system as well.  

--- PDF page 22 of 37 ---
ELRC Transition Q & A Document 
Updated 11.01.2018 
Both Computers and 
Hard Drives 
Moving to New 
ELRCs 
5/11/18 If a CCIS/RK has offered their 
computers to the new ELRC to 
continue serving the same 
families, clients, and providers 
in the exact same counties, do 
they need to be wiped? Or can 
we maintain the computers as 
they are since we will need 
access to all the same 
information/files/etc.  If we 
don't have to wipe them they 
we can save time and money on 
re-installing software, programs, 
records, files, etc. 
5/18/18 The hard drives of computers being 
transferred to the ELRC do not need 
to be wiped. 
Subsidy Grant Extensions 4/26/18 Is there a problem if Indirect 
costs for FY 17-18 go over the 
10% amount due to pre-
payment of expenses that are 
needed for the Grant Extension 
for July & August?   If the 
answer is yes, then should 
expenses go on the July and 
August budget and add the 
indirect cost there? 
5/7/18 No it will not be a problem if 
indirect costs for FY 17-18 go over 
the 10% due to pre-payment of 
expenses.  However, the CCIS 
should be prepared to justify this 
during an audit.  Otherwise, the 
expenses that would cause the 
indirect to exceed the threshold 
should be added to the grant 
extension budget. 
Both Direct Deposit 4/26/18 Will new ELRCs be responsible 
for obtaining direct deposit 
information from providers or 
would CCIS be expected to share 
that information? 
4/26/18 The CCIS may share the information 
with the new ELRC but, as the 
payer, the new ELRC will want to 
verify direct deposit information 
with providers. 

--- PDF page 23 of 37 ---
ELRC Transition Q & A Document 
Updated 11.01.2018 
Both Funds Used to 
Prepare for ELRC 
Implementation 
4/26/18 Since funds will not be made 
available before July 1, 2018, 
what funds can ELRCs use to 
prepare for implementation? 
4/26/18 ELRC grantees or sub-grantees that 
are current CCIS grantees may use 
excess administrative funds from 
fiscal year 2017-2018.  Regional Key 
grantees may use revenues from 
providing professional 
development.  Beyond those 
sources, ELRCs will need to access 
lines of credit. 
Subsidy Indirect Cost 
Expense 
4/26/18 How will the Outgoing CCIS 
establish Indirect Cost Expenses 
for the two (2) month extension 
period?  In the past, Indirect 
Costs were determined by a 
formula that consisted of a pre-
determined FSS budget minus 
equipment times 10%.   There 
isn’t a predetermined FSS 
budget for the Outgoing CCIS to 
use in this calculation. 
4/26/18 Per the Office of Management and 
Budget Uniform Administrative 
Requirements, Cost Principles and 
Audit Requirements for Federal 
Awards (2 CFR 200), agencies can 
charge a de Minimis indirect rate of 
10% of the modified total direct 
costs. The modified total direct cost 
is Family Support Service 
(FSS)/Administrative budget 
excluding equipment. If the agency 
has a current document showing a 
different federally negotiated rate 
for indirect costs, this rate must be 
used and a copy of the document 
must be included with the budget. 
Any agency that requests more 
than the de Minimis indirect rate 
must provide justification for the 
indirect amount and get approval 
from OCDEL.   

--- PDF page 24 of 37 ---
ELRC Transition Q & A Document 
Updated 11.01.2018 
Both Clearances 4/19/18 For staff who will continue to be 
employed after July 1, 2018 and 
clearances are now due, should 
the current CCIS pay for 
clearance or should the 
individual wait and have the 
ELRC pay for the clearance? 
4/20/18 No, CCIS grantees that will not 
continue as part of an ELRC should 
not incur this expense. 
Subsidy Extension 
Agreements 
4/19/18 How will the agreement work 
with dates that run from April 
2018 to April 2020?  Will there 
be an extension for the period 
of May through June of 2020? 
4/20/18 OCDEL will be amending the 
grants to reflect a June 30, 2020 
end date for the first period of the 
grant cycle. 
Both Direct Deposit 4/19/18 Can the ELRC mandate direct 
deposit for all provider 
payments? 
4/19/18 The ELRC may strongly encourage 
direct deposit but cannot require 
providers to have direct deposit. 
KTQ STARS movement 4/18/18 STARS designations will be 
renewed for 90 days to allow for 
ELRCs to get their footing.  For 
programs who are requesting to 
move up, how will this message 
be communicated?  There is 
money tied to moving up in 
STARS. 
5/11/18 Provider movement is continuing to 
be supported throughout the 
transition.  Program quality 
assessments are continuing  
Both Agenda for June 
Training 
4/18/18 Will we have agenda for June 
training week before we 
register? 
4/27/18 Yes.  The registration link and 
agenda will be sent via email prior 
to the actual training days in June.   
Both Check in Calls 4/18/18 When will daily check in calls 
begin? 
4/20/18 Daily check in calls will begin on 
Monday, July 2, 2018 and continue 
for as long as necessary. 

--- PDF page 25 of 37 ---
ELRC Transition Q & A Document 
Updated 11.01.2018 
Both Communication 
Team  
4/18/18 If an ELRC is located in a strip 
mall, how will the signage look? 
4/20/18 The signage produced by the State 
Department of General Services will 
meet the needs of most ELRC’s, 
however, there may be 
circumstances whereby the need to 
contract with a specific vendor in 
order to meet lease 
agreements.  We will work with 
each of the ELRC’s individually to 
meet the needs of your facility.   
Both Communication 
Team  
4/18/18 How long will weekly 
communication team calls 
continue?  Just during launch or 
ongoing? 
4/20/18 Weekly during launch and monthly 
ongoing following launch. 
Both Communication 
Team  
4/18/18 It was said that the ELRC would 
be sent business cards.  Will 
these contain staff names, and if 
so, which staff members will 
receive business cards? 
4/20/18 ELRC grantees will receive a supply 
of generic business cards that will 
contain region-specific and satellite 
office-specific, not employee-
specific, information.  There is also 
information in the ELRC Style Guide 
including business card templates.  

--- PDF page 26 of 37 ---
ELRC Transition Q & A Document 
Updated 11.01.2018 
Both Communication 
Team  
4/18/18 Can signage include the name of 
the ELRC agency with ELRC logo 
as long as there are no other 
agency logos? 
4/20/18 Yes, The ELRC Logo must be present 
at the top of the page.  It is 
understood there will be other 
agency brands as part of the 
communications with families 
either web based or in writing.  It is 
acceptable for both written and 
digital communication to place the 
name of your agency and contact 
information with the ELRC 
Logo/Brand.  There is community 
recognition of your agency among 
families.  We want to ensure the 
ELRC brand is easily identifiable for 
families but are pleased to do so in 
conjunction with your agency.   
General Cost savings from 
integration 
4/18/18 How will the millions of dollars 
being saved through integration 
be redirected? 
4/20/18 OCDEL is still evaluating this.  At 
minimum, funds will need to be 
redirected to continue to come into 
full compliance with the CCDBG. 
Both ELRC Naming 
Convention 
4/18/18 Please clarify how the counties 
and ELRC regions will be named. 
4/20/18 Early Learning Resource Centers will 
be associated/identified by their 
region's number. 
Both Email Accounts 4/18/18 Will we be receiving generic 
ELRC email addresses? 
4/20/18 Yes. 

--- PDF page 27 of 37 ---
ELRC Transition Q & A Document 
Updated 11.01.2018 
Both Funds for Start 
Up 
4/18/18 What funds will be available for 
startup? 
4/20/18 Funds may not be drawn down, nor 
expenses incurred, during the 
transition period April 2018 through 
June 2018.  ELRC funding will not be 
available until July 2018.  ELRC 
grantees that are current CCIS or 
Regional Key grantees may use 
excess administrative funds, lines of 
credit and revenues from 
professional development, if 
available, to purchase furniture and 
equipment in advance of July.  ELRC 
grantees should also consider 
utilizing furniture and equipment 
that may be available from an 
exiting grantee. 
Both Initial Purchases 4/18/18 During the transitional period of 
the ELRC contract period, are we 
able to draw down any 
additional fund to cover our 
initial purchases for furniture 
and equipment? 
4/20/18 Funds may not be drawn down, nor 
expenses incurred, during the 
transition period April 2018 through 
June 2018.  ELRC funding will not be 
available until July 2018.  ELRC 
grantees that are current CCIS or 
Regional Key grantees may use 
excess administrative funds, lines of 
credit and revenues from 
professional development, if 
available, to purchase furniture and 
equipment in advance of July.  ELRC 
grantees should also consider 
utilizing furniture and equipment 
that may be available from an 
exiting grantee. 

--- PDF page 28 of 37 ---
ELRC Transition Q & A Document 
Updated 11.01.2018 
Both Interpreter 
Services 
4/18/18 Does OCDEL prescribe which 
Interpreter Service ELRCs can 
use?  Are there specific 
requirements for Interpreter 
Services that must be followed? 
4/20/18 OCDEL does not prescribe this. 
Both Logo 4/18/18 Can centrally printed envelopes 
and documents display the ELRC 
logo? 
4/20/18 OCDEL will take this into 
consideration. 
Both PELICAN Access 4/18/18 Example:  Region A is 
subcontracting with Region B; 
ELRC Director for Region B is 
part of Region A's subcontract.  
What PELICAN access will ELRC 
Director B have to Region A? 
4/20/18 Access to PELICAN is specific to the 
ELRC region, regardless of sub-
contracted relationships.  Access 
within the ELRC region may be 
limited based on user role.  More 
information will be provided during 
the application process for system 
access. 
Both Program Review 
Instrument 
4/18/18 When will the Program Review 
Instrument (PRI) be made 
available to grantees for FY 
18/19? 
4/20/18  Specific communication outlining 
the schedule of monitoring and 
reporting, including how the 
monitoring tools that OCDEL will 
use will be made available, will be 
issued.  

--- PDF page 29 of 37 ---
ELRC Transition Q & A Document 
Updated 11.01.2018 
Both Readiness On-site 
Review and visits 
4/18/18 What will the readiness on-site 
requirement visit look like?  
What is the timing of such 
visits? 
4/20/18 Each ELRC grantee received the 
"readiness review tool" at the April 
orientation in Gettysburg.  The on-
site review will include an 
inspection of the physical office 
location as well as any satellite 
locations, a review of file 
documentation for training plans, 
limited English proficiency, 
employee compliance with criminal 
history background checks and 
mandated child abuse reporting, 
emergency plans and other 
requirements listed on the 
tool.  The timing of the visits will be 
coordinated with the grantee by the 
operations team assigned to it. 
Both Reporting 
Requirements 
4/18/18 What are the reporting and on-
site monitoring requirements? 
4/20/18 They will vary depending upon what 
is being reviewed.  At minimum, 
ELRCs will receive one on-site 
monitoring visit per year with 
interim reporting requirements 
occurring on a more frequent 
basis.  Also, during years one and 
two of implementation, ELRCs can 
expect more frequent visits from 
OCDEL staff to provide support, 
training and technical assistance as 
needed.  Specific communication 
outlining the schedule of 
monitoring and reporting, including 
how the monitoring tools that 
OCDEL will use will be made 
available, will be issued.  

--- PDF page 30 of 37 ---
ELRC Transition Q & A Document 
Updated 11.01.2018 
Both Resource and 
Referrals 
4/18/18 What will the expectations for 
Resource and Referral include?  
How do these pertain to CHIP 
and Medicaid? 
4/20/18 Resource and Referral is deeply 
embedded in the work of the 
ELRC.  The R&R work is connective 
thread that runs across both the 
family and provider facing work and 
ELRC staff are expected to be able 
to knowledgably engage any 
community member in a discussion 
of the work.  Each ELRC will be 
expected to designate staff to serve 
in the role of a Compass 
Community Partner.  Staff in that 
role will be able to actively help 
families use COMPASS to apply for 
CHIP and Medicaid on the family's 
behalf. ELRCs will provide this 
assistance if the family requests it. 
Both Secure Email 4/18/18 On Readiness Review document, 
it speaks of secure email 
addresses for ELRC Staff.  What 
does this mean? 
4/20/18 ELRC grantees will need to provide 
secure email addresses for their 
staff to enable them to 
receive/send confidential 
information about families and 
providers participating in the Child 
Care Works and Keystone STARS 
programs. 

--- PDF page 31 of 37 ---
ELRC Transition Q & A Document 
Updated 11.01.2018 
Subsidy TANF Regulations 4/18/18 Will there be revisions to TANF 
CC regs?  Chapter 3042 works to 
stabilize children.  Children 
receiving TANF-funded care 
continue to fall through the 
cracks.  Will there be any 
continuity of care for TANF 
funded children? 
4/20/18 No revisions to TANF Child Care 
regulations are planned at 
present.  OCDEL works 
collaboratively with the 
Department's Office of Income 
Maintenance (OIM) to support the 
child care needs of TANF 
families.  As the eligibility agent for 
TANF child care, OIM must take into 
consideration requirements 
imposed by the federal TANF block 
grant, including meeting the work 
requirement and re-
determining eligibility on the 
frequency required by that block 
grant and in Pennsylvania statute.  
Subsidy Attendance 
Invoices for FY 
17/18 
4/13/18 The CCIS business timeline 
shows 7/31/18 as the date that 
FY17/18 books close. Will 
providers be expected to submit 
attendance invoices for FY 
17/18 earlier than 7/31/18? If 
so, by what date, and when and 
who will be providing 
notification to providers.     
5/10/18 Please see Transition 
Communication #18-05 Change to 
Attendance Invoice Deadline for 
May and June issued May 9, 2018. 

--- PDF page 32 of 37 ---
ELRC Transition Q & A Document 
Updated 11.01.2018 
Both Lines of Credit 4/12/18 If an ELRC needs to use their line 
of credit, will OCDEL pay the 
interest on the line of credit? 
4/12/18 No OCDEL will not make an 
additional payment for interest 
expended due to use of the line of 
credit. This is factored into the fixed 
cost model and the receipt of 
1/12th of all Administrative/Family 
Support Service funds throughout 
the fiscal year.  
Both Hard Drives 4/6/18 What about the hard drives 
from our computers and the 
information they contain? 
5/25/18 OCDEL has coordinated with the 
Bureau of Information Systems (BIS) 
for the collection of hard drives 
from any CCIS grantee that is 
permanently closing down or 
downsizing.   Hard drives will 
continue to be available to the 
CCISs to carry out grant extension 
activities.  However, CCISs should 
let their subsidy coordinator know 
as soon as possible how many hard 
drives they will have for collection.  
OCDEL will compile that 
information per CCIS location for 
BIS.  Using that information, BIS will 
provide addresses for local 
Department of Human Services 
(DHS) offices where the hard drives 
can be returned.  If needed, subsidy 
coordinators will assist CCISs with 
the return of hard drives to those 
local offices.  CCISs returning hard 
drives may want to “wipe” the hard 
drives before returning them.  
There is one exception to the return 
of hard drives.  Computers that are 
being acquired by Early Learning 
Resource Center (ELRC) grantees do 
not have to have their hard drives 
removed.  However, the CCIS 

--- PDF page 33 of 37 ---
ELRC Transition Q & A Document 
Updated 11.01.2018 
transferring the computer may 
want to “wipe” the hard drive. 
Subsidy Assets acquired 
using CCIS Funds 
4/6/18 What will we need to do with 
our furniture, equipment, 
supplies and other assets we 
acquired using CCIS funds? 
5/10/18 See Transition Communication #18–
03 Child Care Information Services 
and Regional Key Property and 
Supplies Inventory and Liquidation 
Issued April 30, 2018 

--- PDF page 34 of 37 ---
ELRC Transition Q & A Document 
Updated 11.01.2018 
Subsidy Audits 4/6/18 We normally have an audit 
completed before the end of 
each grant year.  Will this audit 
serve as the “close-out” final 
CCIS audit or will we need to 
have an additional audit 
conducted in July/August after 
conclusion of grant extension 
activities? 
4/12/18 A separate, unique audit will not be 
needed for grant extension dollars. 
Subsidy Cases pending 
with OIG and 
BHA 
4/6/18 What about cases pending with 
OIG and BHA? 
4/10/18 OCDEL will be meeting with these 
entities to discuss the transfer of 
responsibility for these cases from 
the CCIS to the ELRC. 
Both Communications 
to families and 
providers 
4/6/18 When will families and 
providers be notified about the 
changes? 
4/10/18 OCDEL will be issuing notifications 
to all families and providers 
soon.  CCISs and Regional Keys will 
be notified when these notices start 
going out.  Please see Transition 
Communication #18-07 Letter to 
Families and Providers Announcing 
the Creation of Early Learning 
Resource Centers. 
Both Cost of 
transferring files, 
equipment 
4/6/18 Which entity must cover the 
cost of transferring files and any 
furniture, equipment, supplies 
or other assets to the ELRC? 
4/10/18 The ELRC grantee.   There will be a 
transition communication being 
issued by OCDEL to both CCIS's and 
Regional Keys. 
Subsidy Date to stop 
taking 
applications, new 
enrollments 
4/6/18 When should we stop taking 
applications, issuing adverse 
actions, enrolling children, 
processing other case actions, 
and referring cases to OIG? 
4/10/18 Please see Transition 
Communication #18-06A Blackout 
Period for Transition to Early 
Learning Resource Centers: 
Instructions for Current CCIS 
Partners. 

--- PDF page 35 of 37 ---
ELRC Transition Q & A Document 
Updated 11.01.2018 
Both Dates for Go-Live 
transition 
4/6/18 What is the date by which 
PELICAN system work must be 
prepared in order to be ready 
for the June 16 Go Live 
transition date? 
4/10/18 The PELICAN CCW and KTQ systems 
will transition from CCIS and 
Regional Key 
operations/assignments starting on 
June 15, 2018 at 4:30 pm.  CCIS will 
receive detailed communications on 
what they will need to do in CCW to 
prepare for this transition.  Regional 
Keys must have all of their data 
enter/close-out in KTQ completed 
by the close of business on June 14, 
2018. 
Subsidy Fiscal Activities 4/6/18 What about books closing, fiscal 
lock, re-cap, 1099’s, final audits 
and other fiscal activities? 
4/10/18 CCIS agencies who will not become 
ELRC lead agencies will have 2-
month grant extensions to cover 
this work.  OCDEL will be hosting 
phone calls with the CCISs to 
provide full instructions, including 
timelines, for these activities.  A 2-
month grant extension will be 
negotiated as a result of the calls. 
Subsidy Grant Extensions 4/6/18 Can the CCIS keep furniture, 
equipment, supplies and other 
assets needed to carry out grant 
extension activities until 
completed? 
4/10/18 Yes.  If a CCIS is permanently closing 
down, they must plan on disposing 
of the items using the information 
outlined in the communication 
when grant extension activities 
have concluded. 
Subsidy Grant Extensions 4/6/18 Will there be money to cover 
the cost of rent, phones, copy 
machines, salaries and benefits 
during the grant extension 
period? 
4/10/18 OCDEL will negotiate a budget with 
each CCIS that is not moving 
forward as a lead agency.  This 
budget will include costs needed to 
cover staff, equipment and 
overhead needed to complete grant 
extension activities. 

--- PDF page 36 of 37 ---
ELRC Transition Q & A Document 
Updated 11.01.2018 
Both Pass-off of Files 4/6/18 Can the CCIS approach the ELRC 
grantee to discuss operational 
issues, such as the pass-off of 
files and other transition 
activities? 
4/10/18 OCDEL requests that contact occur 
after April 18, 2018, after which 
CCIS's and Regional Keys can 
contact the ELRC grantee for 
discussion and planning. OCDEL will 
reinforce this with the ELRC 
grantees. 
Both System 
Requirements 
4/6/18 What are the system 
requirements agencies should 
be mindful of when purchasing 
computer equipment?  Can we 
use Apple equipment? 
4/10/18 ELRC will be required to use the 
PELICAN Child Care Works and Keys 
to Quality systems.  This system 
requires Microsoft Office or 
Microsoft compatible software, 
Windows 7 or higher, and Internet 
access.  ELRC's will receive 
additional systems specifications 
pertaining to other non-PELICAN 
databases that support Keystone 
STARS. 
Both Conflict of 
Interest 
3/30/18 Will there be any restrictions 
concerning an individual 
working for an ELRC if they own 
or are affiliated with a Child 
Care Program? 
4/10/18 There will be restrictions on this 
activity.  The restrictions are 
addressed in RFP 30 -16 under Part 
III - Technical Submittal; section 
D labeled "conflict of interest" and 
section E “conflict free 
requirements".   

--- PDF page 37 of 37 ---
ELRC Transition Q & A Document 
Updated 11.01.2018 
Both Communication 
Team  
4/18/08 For those ELRCs that are run by 
other government offices such 
as County, how will the two 
combine branding both in 
written communication and 
web-based forms? 
4/20/18 The ELRC Logo must be present at 
the top of the page for branding 
purposes.  It is understood there 
will be other agency brands as part 
of the communications with family 
either web based or in writing.  It is 
acceptable for both written and 
digital communication to place the 
name of your agency and contact 
information with the ELRC 
Logo/Brand.  There is community 
recognition of your agency among 
families.  We want to ensure the 
ELRC brand is easily identifiable for 
families but are pleased to do so in 
conjunction with your agency.   
 

Sources

Full saved reading

Read source: Official source: ELRC Transition Questions and Answers

View cited sources (1)

These are the sources cited by this reading. Each source keeps its own date and scope.

Document details and formats
Optional file downloads
For AI readers: complete text and record details
About the dates and filing language
Evidence date
When this document or named claim was checked. A newer collection, export or website date does not update it.
Current, private, Workbench or promotion
These can describe the saved document’s original filing or custody. This public reading preserves that history; publication does not turn its findings into government approval, binding law or newly verified evidence.
Master data and projection
The maintained factual record and a page generated from it. Repeated views are not additional independent evidence.
Provenance and source join
Where a record came from, and the exact reference connecting a claim to its source.
Gate, receipt and operating evidence
A required decision or condition, its documentary record, and evidence that the named activity actually occurred. Permission, delivery and operation stay separate.