NARA cloud and ERA procurement continuity
Full saved reading
View cited sources (8)
These are the sources cited by this reading. Each source keeps its own date and scope.
Saved research reading. Its original dates and claim limits control; the export date does not refresh the evidence.
Saved source details
---
title: NARA cloud and ERA procurement continuity - later contracts and remaining joins
research_id: nara-ai-records-compute-transition
artifact_role: answer
status: current
evidence_cutoff: 2026-11-18
evidence_scope: Exact public award endpoints and four bounded NARA keyword searches; not a complete contract, workload or service-acceptance audit.
---
NARA cloud and ERA procurement continuity
The August supplier map distinguishes the cloud broker, underlying provider, application integrators and local infrastructure. This return investigates its September contract dates and adds later ERA implementation orders. The structured observations preserve the native fields, exact endpoint URLs, query criteria and public-evidence limits.
Two later ERA service orders are located
USAspending reports two Skylight Inc. orders under the NEEMO vehicle 88310326D00009. Both descriptions cover lifecycle digital services for ERA's production and non-production cloud environments. Both have a September 8, 2026 signature date and a September 2 performance start. The dates are not interchangeable.
| Order | Reported obligation | Performance end | State established |
|---|---|---|---|
88310326F00198 | $5,374,527.45 | August 7, 2027 | Public procurement record for ERA services |
88310326F00199 | $788,143.76 | May 7, 2027 | Public procurement record for ERA services |
Sources: first order, second order, and each linked official API endpoint in the observation file. These records establish a later implementation route, beyond the August map's discovery task. They do not state that every Fearless responsibility transferred, identify the underlying cloud for every environment, allocate spending to AI, or provide accepted deliverables, availability or performance results.
The parent record names NEEMO, was signed June 29 with a June 25 performance start, and carries a $90 million all-options value. That ceiling is separate from the orders' obligations. Parent vehicle.
Earlier award dates do not prove service stopped
The exact PICARD parent and AWS call still show September 29, 2026 end dates in the records retrieved November 18. The Fearless ERA task shows September 28 as its current end and September 29, 2027 as a potential end. A potential end is not an exercised extension; a passed current end is not an observed shutdown. The records do not resolve the post-September PICARD/AWS service rail or the complete Fearless-to-Skylight relationship.
The AWS endpoint reports $7,974,250 in obligations, compared with $7,872,100 in the August answer. Its last-modified field is August 21, 2026. The difference is preserved as a later observation of the public record, without inventing a November funding action or a new AI purchase. PICARD, AWS call, Fearless task.
What users can do has a separate evidence trail
The November 11 public-search check already records a real query, contextual excerpt, page cue and reachable document link on NARA's special-topic JFK search. It does not measure a general improvement in archival research. That observed behavior is stronger than an inventory entry, while narrower than a tested relevance benchmark or site-wide launch.
NARA's inventory page, reviewed by the agency October 28 and inspected here November 18, still lists general Archives.gov semantic search as a future pilot and Catalog semantic search as a pilot. Its privacy page attributes the special search to Google Vertex and describes anonymous query storage and source-validation/accuracy limits. These statements do not identify either Skylight order as the contract for that search. Inventory, search privacy controls.
Search and reading limits
Four official spending-by-award searches used the awarding agency NARA, contract types A–D, an August 1–November 18, 2026 window and the separate keywords PICARD, AWS, ERA 2.0 and CLOUD. Each returned a complete first page within those filters. The CLOUD result exposed the two Skylight orders, which were then checked at exact award endpoints. Other returned awards were not adopted as AI findings. Keyword search is not a complete NARA vendor/vehicle census and cannot establish that no successor exists under a different description or instrument.
The earlier October search/records return and November public-query observation retain their own dates. No new test query, model evaluation, source-PDF accuracy check, system inspection, current general-launch claim or service-shutdown finding is made here. The new question is the exact post-September cloud-service instrument and its workload/acceptance crosswalk, not whether a historical contract date elapsed.