Federal Strategic Plans
Status: landed in the vault as an imported source package (DR-059). Not an Observatory tab. Feeds Entity Theory / the Federal Group via the entity crosswalk. Import-style filenames and frontmatter are acceptable.
Evidence dates: July 22, 2026 general plan survey and entity-chart snapshot;
August 17, 2026 NSSTS addition. The later addition does not refresh the other
plans or lane findings.
Research custody: this is the maintained package under DR-059. The matching
Workbench files remain dated research history; their Research readers resolve here.
This package maps federal strategic plans and related performance instruments back to the Observatory's entity chart.
Read first
- FEDERAL_STRATEGIC_PLANNING_LEGAL_FRAMEWORK — what the plan system is and which clocks and entity boundaries matter.
- FEDERAL_STRATEGIC_PLANS_MASTER_REGISTRY — the federated source-first coverage register and lane router.
FEDERAL_STRATEGIC_PLANS_ENTITY_CROSSWALK.csv— the 379 Entity Chart nodes in the July 22 snapshot and their initial plan-unit calls.- FEDERAL_STRATEGIC_PLANS_WATCHBOARD — drafts, announced plans, revision states, and next dated triggers.
- FEDERAL_STRATEGIC_PLANS_CLAIM_AUDIT — wording controls that keep intent, authority, money, implementation, and results separate.
- FEDERAL_STRATEGIC_PLANS_SYNTHESIS — the cross-entity findings and Observatory uses.
- NATIONAL_SECURITY_SCIENCE_AND_TECHNOLOGY_STRATEGY_2026 — the August national functional strategy linking the 2025 NSS to later OSTP/NSC CET plans and agency implementation; strategy is not an agency GPRA plan, appropriation or operating result.
Detailed research registers
The package-level master registry routes to the dated lane files copied into Evidence/. Those registers preserve goal labels, measures, owners, dependencies, official links, archive links, confidence calls, and source gaps without overloading the package router. The imported package retains these detailed registers in the Chronicle.
- Lane 1: State, Treasury, Justice, HHS, DHS, VA and their assigned components.
- Lane 2: defense, economy, land, infrastructure, labor, education and assigned components.
- Lane 3: government-wide framework, independent agencies, corporations, legislative/judicial bodies, and intelligence architecture.
- Lane 4: specialized agencies, regional commissions, drafts, prior-cycle surfaces, and second-pass gaps.
Read the two planning layers together
The July survey explains how an issuing agency connects its stated goals to annual plans, budgets, evidence work and reported results. The August NSSTS addition contributes a national functional strategy across agencies. Keep that instrument distinct from each agency plan: technology priority does not supply an agency owner, appropriation, award or operating result. Follow the existing NSSTS reading for that strategy and its source evidence.
Package rule
Strategic plans are evidence of stated direction and management design. They are not proof of enactment, funding, completed reorganization, or achieved results.
Update rule
Update the watchboard first when a draft becomes final, an announced plan appears, a plan is amended or partly discontinued, or a new APP/APR/AEP changes the evidence state. Then update the relevant lane record and the master coverage call; never silently overwrite the earlier clock.
Package roster (all files — added at 2026-07-25 promotion)
- LANE_1_GAPS *(Evidence/)*
- LANE_1_STATE_SECURITY *(Evidence/)*
- LANE_2_ECONOMY_INFRA *(Evidence/)*
- LANE_2_GAPS *(Evidence/)*
- LANE_3_GAPS *(Evidence/)*
- LANE_3_INDEPENDENT_FRAMEWORK *(Evidence/)*
- LANE_4_SMALL_AGENCIES *(Evidence/)*
- TEAM_SCHEMA *(Evidence/)*
- FEDERAL_STRATEGIC_PLANNING_LEGAL_FRAMEWORK
- FEDERAL_STRATEGIC_PLANS_CLAIM_AUDIT
- FEDERAL_STRATEGIC_PLANS_MASTER_REGISTRY
- FEDERAL_STRATEGIC_PLANS_SYNTHESIS
- FEDERAL_STRATEGIC_PLANS_WATCHBOARD
- NATIONAL_SECURITY_SCIENCE_AND_TECHNOLOGY_STRATEGY_2026
Sources
Full saved reading
View the saved source references. This record has no direct external citation in its source-link list.
Document details and formats
About the dates and filing language
- Evidence date
- When this document or named claim was checked. A newer collection, export or website date does not update it.
- Current, private, Workbench or promotion
- These can describe the saved document’s original filing or custody. This public reading preserves that history; publication does not turn its findings into government approval, binding law or newly verified evidence.
- Master data and projection
- The maintained factual record and a page generated from it. Repeated views are not additional independent evidence.
- Provenance and source join
- Where a record came from, and the exact reference connecting a claim to its source.
- Gate, receipt and operating evidence
- A required decision or condition, its documentary record, and evidence that the named activity actually occurred. Permission, delivery and operation stay separate.
Saved research reading. Its original dates and claim limits control; the export date does not refresh the evidence.