Where are the national-security tech programs physically built, and which sites are still secret or undecided?

Data table · Detailed sources

The program registry places 13 sites. 3 are verified program sites (Eaton FITT project location, Menomonee Falls, Wisconsin; GE Vernova FITT project location, Schenectady, New York; Lockheed Martin GPS IIIF production facility, Denver / Littleton, Colorado). 3 are verified company sites where the program's own work is not shown (Argonne Leadership Computing Facility / Building 240, Lemont, Illinois; nLIGHT beam-combined HEL manufacturing expansion, Longmont, Colorado; Lockheed Martin Aculight high-energy-laser operations, Bothell, Washington). 2 are planned or being built (Natcast Advanced Packaging Piloting Facility, ASU Research Park, Tempe, Arizona (planned); Amkor advanced packaging and test facility, Peoria, Arizona). 5 are not publicly disclosed or not yet decided: NNSA Secret/Restricted Data Enterprise Cloud physical hosting environment; Distributed Bioindustrial Production Capability prototype site; QTIME performer and transition-user test locations; Space Data Network satellite, gateway and integration sites; Protected Tactical SATCOM spacecraft integration and checkout sites.

Evidence through September 9, 2026

What's still uncertain

Sources and data

Detailed evidence records

Read the chart data

17 saved rows. Read every row with its sources and dates · Download the complete data.

The first 8 rows appear below. Follow the complete table for all remaining rows.

SectionRecordSaved detailsSources and dates
The countVerified program site
Value
3
For this row’s sourcing, see the saved details, section context and linked research.
The countVerified company site; program work there not shown
Value
3
For this row’s sourcing, see the saved details, section context and linked research.
The countPlanned or being built
Value
2
For this row’s sourcing, see the saved details, section context and linked research.
The countNot publicly disclosed or not decided
Value
5
For this row’s sourcing, see the saved details, section context and linked research.
Site by site · Verified program siteEaton FITT project location
Sub
Menomonee Falls, Wisconsin · Eaton Corporation
Badge
Text
Verified program site
Location
Menomonee Falls, Wisconsin
Operator
Eaton Corporation
State in the registry
selected rd and test project
Capability
Compact and reliable voltage-regulating hybrid transformer research and test
Program
Flexible Innovative Transformer Technologies portfolio
What the record does not prove
The selected project location is public; field acceptance, utility installation and production capacity are not established.
The orientation page's words (masters/nssts_program_rulings.json)
FITT: Menomonee Falls · Schenectady (Named project locations / field acceptance pending)
Registry as of
August 19, 2026
Site by site · Verified program siteGE Vernova FITT project location
Sub
Schenectady, New York · GE Vernova Operations LLC
Badge
Text
Verified program site
Location
Schenectady, New York
Operator
GE Vernova Operations LLC
State in the registry
selected demonstration projects
Capability
Solid-state transformer and universal spare power-transformer demonstrations
Program
Flexible Innovative Transformer Technologies portfolio
What the record does not prove
Selection identifies the company and location but not a completed substation demonstration or qualified production line.
The orientation page's words (masters/nssts_program_rulings.json)
FITT: Menomonee Falls · Schenectady (Named project locations / field acceptance pending)
Registry as of
August 19, 2026
Site by site · Verified program siteLockheed Martin GPS IIIF production facility
Sub
Denver / Littleton, Colorado · Lockheed Martin Corporation
Badge
Text
Verified program site
Location
Denver / Littleton, Colorado
Operator
Lockheed Martin Corporation
State in the registry
active production
Capability
GPS IIIF spacecraft assembly, integration and production
Program
GPS IIIF spacecraft production and transition
What the record does not prove
Company-reported production progress does not establish government delivery acceptance, launch or on-orbit checkout.
The orientation page's words (masters/nssts_program_rulings.json)
GPS IIIF: Denver / Littleton, Colorado (Verified production site)
Registry as of
August 19, 2026
Site by site · Verified company site; program work there not shownArgonne Leadership Computing Facility / Building 240
Sub
Lemont, Illinois · UChicago Argonne, LLC for the U.S. Department of Energy
Badge
Text
Verified company site; program work there not shown
Location
Lemont, Illinois
Operator
UChicago Argonne, LLC for the U.S. Department of Energy
State in the registry
operating user facility
Capability
Leadership-class scientific computing and data-center operations
Program
National Genesis Mission Supercomputing Center of Innovation
What the record does not prove
The proposed Genesis center is an Argonne object, but the RFI does not identify its final building, energized capacity or accepted system configuration.
The orientation page's words (masters/nssts_program_rulings.json)
Argonne: Argonne ALCF, Lemont (Operating capability site; final center configuration unresolved)
Registry as of
August 19, 2026

Complete evidence table and continuation pages →