| The count | Verified program site | - Value
- 3
| For this row’s sourcing, see the saved details, section context and linked research. |
|---|
| The count | Verified company site; program work there not shown | - Value
- 3
| For this row’s sourcing, see the saved details, section context and linked research. |
|---|
| The count | Planned or being built | - Value
- 2
| For this row’s sourcing, see the saved details, section context and linked research. |
|---|
| The count | Not publicly disclosed or not decided | - Value
- 5
| For this row’s sourcing, see the saved details, section context and linked research. |
|---|
| Site by site · Verified program site | Eaton FITT project location | - Sub
- Menomonee Falls, Wisconsin · Eaton Corporation
- Badge
- Text
- Verified program site
- Location
- Menomonee Falls, Wisconsin
- Operator
- Eaton Corporation
- State in the registry
- selected rd and test project
- Capability
- Compact and reliable voltage-regulating hybrid transformer research and test
- Program
- Flexible Innovative Transformer Technologies portfolio
- What the record does not prove
- The selected project location is public; field acceptance, utility installation and production capacity are not established.
- The orientation page's words (masters/nssts_program_rulings.json)
- FITT: Menomonee Falls · Schenectady (Named project locations / field acceptance pending)
- Registry as of
- August 19, 2026
| |
|---|
| Site by site · Verified program site | GE Vernova FITT project location | - Sub
- Schenectady, New York · GE Vernova Operations LLC
- Badge
- Text
- Verified program site
- Location
- Schenectady, New York
- Operator
- GE Vernova Operations LLC
- State in the registry
- selected demonstration projects
- Capability
- Solid-state transformer and universal spare power-transformer demonstrations
- Program
- Flexible Innovative Transformer Technologies portfolio
- What the record does not prove
- Selection identifies the company and location but not a completed substation demonstration or qualified production line.
- The orientation page's words (masters/nssts_program_rulings.json)
- FITT: Menomonee Falls · Schenectady (Named project locations / field acceptance pending)
- Registry as of
- August 19, 2026
| |
|---|
| Site by site · Verified program site | Lockheed Martin GPS IIIF production facility | - Sub
- Denver / Littleton, Colorado · Lockheed Martin Corporation
- Badge
- Text
- Verified program site
- Location
- Denver / Littleton, Colorado
- Operator
- Lockheed Martin Corporation
- State in the registry
- active production
- Capability
- GPS IIIF spacecraft assembly, integration and production
- Program
- GPS IIIF spacecraft production and transition
- What the record does not prove
- Company-reported production progress does not establish government delivery acceptance, launch or on-orbit checkout.
- The orientation page's words (masters/nssts_program_rulings.json)
- GPS IIIF: Denver / Littleton, Colorado (Verified production site)
- Registry as of
- August 19, 2026
| |
|---|
| Site by site · Verified company site; program work there not shown | Argonne Leadership Computing Facility / Building 240 | - Sub
- Lemont, Illinois · UChicago Argonne, LLC for the U.S. Department of Energy
- Badge
- Text
- Verified company site; program work there not shown
- Location
- Lemont, Illinois
- Operator
- UChicago Argonne, LLC for the U.S. Department of Energy
- State in the registry
- operating user facility
- Capability
- Leadership-class scientific computing and data-center operations
- Program
- National Genesis Mission Supercomputing Center of Innovation
- What the record does not prove
- The proposed Genesis center is an Argonne object, but the RFI does not identify its final building, energized capacity or accepted system configuration.
- The orientation page's words (masters/nssts_program_rulings.json)
- Argonne: Argonne ALCF, Lemont (Operating capability site; final center configuration unresolved)
- Registry as of
- August 19, 2026
| |
|---|
| Site by site · Verified company site; program work there not shown | nLIGHT beam-combined HEL manufacturing expansion | - Sub
- Longmont, Colorado · nLIGHT DEFENSE Systems, Inc. / nLIGHT, Inc.
- Badge
- Text
- Verified company site; program work there not shown
- Location
- Longmont, Colorado
- Operator
- nLIGHT DEFENSE Systems, Inc. / nLIGHT, Inc.
- State in the registry
- capacity expansion
- Capability
- High-energy-laser source and beam-control manufacturing
- Program
- Joint Laser Weapon System
- What the record does not prove
- The facility supports HEL capacity generally; JLWS workshare and accepted output are not public.
- The orientation page's words (masters/nssts_program_rulings.json)
- JLWS: Longmont · Bothell (Capability sites / JLWS workshare not public)
- Registry as of
- August 19, 2026
| |
|---|
| Site by site · Verified company site; program work there not shown | Lockheed Martin Aculight high-energy-laser operations | - Sub
- Bothell, Washington · Lockheed Martin Aculight Corp.
- Badge
- Text
- Verified company site; program work there not shown
- Location
- Bothell, Washington
- Operator
- Lockheed Martin Aculight Corp.
- State in the registry
- active prototype performer
- Capability
- Integrated high-energy-laser prototype development
- Program
- Joint Laser Weapon System
- What the record does not prove
- The federal record ties Aculight to HEL prototype work and Bothell; it does not publish the JLWS build site, workshare or acceptance result.
- The orientation page's words (masters/nssts_program_rulings.json)
- JLWS: Longmont · Bothell (Capability sites / JLWS workshare not public)
- Registry as of
- August 19, 2026
| |
|---|
| Site by site · Planned or being built | Natcast Advanced Packaging Piloting Facility | - Sub
- ASU Research Park, Tempe, Arizona (planned) · Natcast, Inc.
- Badge
- Text
- Planned or being built
- Location
- ASU Research Park, Tempe, Arizona (planned)
- Operator
- Natcast, Inc.
- State in the registry
- final operator award and planned tempe colocation preconstruction
- Capability
- Advanced packaging prototyping, piloting and qualification
- Program
- National Advanced Packaging Manufacturing Program
- What the record does not prove
- Natcast's final $1.1 billion operator award and the planned Tempe co-location are confirmed. The ASU announcement described a nonbinding site LOI subject to due diligence and final contracting; construction, tool installation, operating readiness and qualified package flows remain future gates.
- The orientation page's words (masters/nssts_program_rulings.json)
- NAPMP: ASU Research Park, Tempe, Arizona (planned) (Planned Tempe co-location under a nonbinding LOI; final site contracting, construction, tool installation and qualified package flows remain separate gates.)
- Registry as of
- August 19, 2026
| |
|---|
| Site by site · Planned or being built | Amkor advanced packaging and test facility | - Sub
- Peoria, Arizona · Amkor Technology Arizona, Inc.
- Badge
- Text
- Planned or being built
- Location
- Peoria, Arizona
- Operator
- Amkor Technology Arizona, Inc.
- State in the registry
- awarded future capacity
- Capability
- High-volume advanced packaging and test
- Program
- National Advanced Packaging Manufacturing Program
- What the record does not prove
- The CHIPS manufacturing award and NAPMP are separate instruments; no public source makes Peoria the NAPMP piloting facility.
- The orientation page's words (masters/nssts_program_rulings.json)
- NAPMP: ASU Research Park, Tempe, Arizona (planned) (Planned Tempe co-location under a nonbinding LOI; final site contracting, construction, tool installation and qualified package flows remain separate gates.)
- Registry as of
- August 19, 2026
| |
|---|
| Site by site · Not publicly disclosed or not decided | NNSA Secret/Restricted Data Enterprise Cloud physical hosting environment | - Sub
- Not publicly disclosed · Amazon Web Services, Inc. with NNSA
- Badge
- Text
- Not publicly disclosed or not decided
- Location
- Not publicly disclosed
- Operator
- Amazon Web Services, Inc. with NNSA
- State in the registry
- operating environment location withheld
- Capability
- Classified scientific cloud and Restricted Data workloads
- Program
- NNSA Secret/Restricted Data Enterprise Cloud
- What the record does not prove
- The operating relationship is public; the physical data-center topology, contract ledger and security architecture are not.
- The orientation page's words (masters/nssts_program_rulings.json)
- NNSA cloud: Physical hosting environment withheld (Operating relationship / site topology undisclosed)
- Registry as of
- August 19, 2026
- Correction
- Correction checked 2026-09-09: NNSA June 30 notice establishes an enterprise-authorized AWS environment but describes inaugural Genesis workloads prospectively. Original evidence cutoff is retained; this is a bounded wording correction, not a full refresh.
| |
|---|
| Site by site · Not publicly disclosed or not decided | Distributed Bioindustrial Production Capability prototype site | - Sub
- Hawaii — exact site and operator not publicly identified · Team not publicly selected
- Badge
- Text
- Not publicly disclosed or not decided
- Location
- Hawaii — exact site and operator not publicly identified
- Operator
- Team not publicly selected
- State in the registry
- closed call preselection hawaii required
- Capability
- Integrated pilot-scale, production-representative biomanufacturing
- Program
- Distributed Bioindustrial Production Capability prototype
- What the record does not prove
- The public prototype call requires implementation in Hawaii in an INDOPACOM-representative environment. Existing BioMADE and DBIMP facilities are capability references, not proof of an application, selection, exact Hawaii site or site operator.
- The orientation page's words (masters/nssts_program_rulings.json)
- DBPC: Prototype site not public (Existing BioMADE sites do not prove an application)
- Registry as of
- August 19, 2026
| |
|---|
| Site by site · Not publicly disclosed or not decided | QTIME performer and transition-user test locations | - Sub
- Multiple sites; exact test articles and acceptance sites not public · America Makes / NCDMM project teams
- Badge
- Text
- Not publicly disclosed or not decided
- Location
- Multiple sites; exact test articles and acceptance sites not public
- Operator
- America Makes / NCDMM project teams
- State in the registry
- funded project execution
- Capability
- Rapid nondestructive inspection and qualification of additive parts
- Program
- QTIME additive-manufacturing inspection and qualification
- What the record does not prove
- Team membership is public; the controlling test articles, equipment locations and customer acceptance sites are not.
- The orientation page's words (masters/nssts_program_rulings.json)
- QTIME: Distributed test locations unresolved (Teams known / test articles and acceptance sites not public)
- Registry as of
- August 19, 2026
| |
|---|
| Site by site · Not publicly disclosed or not decided | Space Data Network satellite, gateway and integration sites | - Sub
- Not assigned in the public award release · Space Exploration Technologies Corp.
- Badge
- Text
- Not publicly disclosed or not decided
- Location
- Not assigned in the public award release
- Operator
- Space Exploration Technologies Corp.
- State in the registry
- funded prototype build
- Capability
- Optically interconnected proliferated-LEO mesh, gateways and routing
- Program
- Space Data Network Backbone
- What the record does not prove
- Public SpaceX manufacturing locations do not prove the SDN workshare or accepted program site.
- The orientation page's words (masters/nssts_program_rulings.json)
- SDN: Satellite and gateway sites unresolved (Program release does not assign public work locations)
- Registry as of
- August 19, 2026
| |
|---|
| Site by site · Not publicly disclosed or not decided | Protected Tactical SATCOM spacecraft integration and checkout sites | - Sub
- Not resolved by the program releases · Viasat, Intelsat General and Northrop Grumman under separate instruments
- Badge
- Text
- Not publicly disclosed or not decided
- Location
- Not resolved by the program releases
- Operator
- Viasat, Intelsat General and Northrop Grumman under separate instruments
- State in the registry
- production and prototype build
- Capability
- PTS-G production spacecraft and Enhanced PTS-P prototype spacecraft
- Program
- Protected Tactical SATCOM modernization portfolio
- What the record does not prove
- The company awards are exact; manufacturing, integration, launch and government-acceptance locations are not.
- The orientation page's words (masters/nssts_program_rulings.json)
- PTS: Integration and checkout sites unresolved (Company awards exact / sites not)
- Registry as of
- August 19, 2026
| |
|---|