| Project by project · Gates every project must pass | Accounting and regulatory-recognition gate | - Sub
- shared event, institution-specific books
- Badge
- Text
- M1 · technical prototype or design work
- Status
- institution-specific
- What has moved
- DLT can provide earlier attributable transaction evidence and shared reconciliation.
- Still with the old institution
- Each entity must classify and book the event under its own legal and accounting obligations.
- Next record to look for
- Published control framework, audit treatment, regulatory reporting and corrected-entry lifecycle.
- Legal form
- Recognition and control process, not a common ledger entity
- Authority
- Accounting standards, tax law, prudential rules and entity control frameworks
- As of
- September 14, 2026
- Links
| |
|---|
| Project by project · Gates every project must pass | Collateral title, control and encumbrance gate | - Sub
- key control is not legal control
- Badge
- Text
- M0 · concept or policy intention
- Status
- product and institution specific
- What has moved
- The conventional Bank process demonstrates that data, documentation, jurisdiction, transfer mechanics and the ability to take ownership are part of collateral readiness; the DLT policy inquiry now exposes the missing equivalent for tokens.
- Still with the old institution
- The token, underlying claim, custody entitlement and collateral interest can remain separate legal objects and records.
- Next record to look for
- An operative control or title-transfer agreement, custodian/CSD acknowledgement, reconciled encumbrance record and default enforceability opinion for a named tokenised asset.
- Legal form
- A multi-record legal-control test for title transfer, perfected security and anti-double-pledge protection
- Authority
- Asset terms, custody and collateral agreements, FCAR where applicable, property and insolvency law
- As of
- September 14, 2026
- Links
| |
|---|
| Project by project · Gates every project must pass | Collateral valuation, haircut and liquidation gate | - Sub
- transfer speed is not realisable value
- Badge
- Text
- M0 · concept or policy intention
- Status
- method and live default proof missing
- What has moved
- The current SMF and CCP baseline shows that eligibility can be re-priced by binding valuation, haircuts, add-ons and concentration rules even when the asset is unchanged.
- Still with the old institution
- The admitting institution controls price sources, fallback valuation, liquidation horizon, adjusted value and extra protection for issuer, custodian, liquidity or concentration risk.
- Next record to look for
- A published token-specific valuation hierarchy and haircut/concentration method followed by a stress or default exercise that realises the expected value.
- Legal form
- An institution-specific conversion from market value to protected lending or margin value
- Authority
- Bank/CCP/counterparty valuation, haircut, concentration and default-liquidation rules
- As of
- September 14, 2026
- Links
| |
|---|
| Project by project · Gates every project must pass | Collateral cash, reuse and return gate | - Sub
- margin credit is not spendable cash
- Badge
- Text
- M0 · concept or policy intention
- Status
- full timed route unproved
- What has moved
- The live facility map and LCH's 25% minimum-cash rule make the missing cash leg explicit: more mobile non-cash collateral does not eliminate timed sterling needs.
- Still with the old institution
- Central-bank monetisation, private repo proceeds and CCP margin credit remain different outcomes with different participants, accounts and clocks.
- Next record to look for
- A live timestamped path from token admission and adjusted value through cash or margin credit, legally permitted reuse or substitution, and completed return or default realisation.
- Legal form
- A timed liquidity test linking accepted collateral to the required money, legal entity and return obligation
- Authority
- Facility terms, CCP and repo rulebooks, settlement-account rules and collateral-return obligations
- As of
- September 14, 2026
- Links
| |
|---|
| Project by project · Gates every project must pass | Tokenised-gold legal product fork | - Sub
- one label, materially different claims
- Badge
- Text
- M0 · concept or policy intention
- Status
- open policy inquiry
- What has moved
- The FCA has opened a named policy inquiry into tokenised gold and the legal/product forms that may support UK wholesale use.
- Still with the old institution
- The token label does not decide bar allocation, beneficial ownership, trust, redemption, custody, insolvency priority, fund status or lender control.
- Next record to look for
- A product-specific legal chain from holder to identified asset or claim, with operative custody, transfer, redemption, correction, insolvency and—if claimed—collateral terms.
- Legal form
- A classification gate separating direct allocated ownership, pooled or managed fractional interests, unallocated provider claims and fund or security interests
- Authority
- Property, contract, trust, fund, custody, securities and cryptoasset law according to the product actually created
- As of
- September 14, 2026
- Links
| |
|---|
| Project by project · Gates every project must pass | Tokenised-collateral stress-transmission gate | - Sub
- faster mobility can absorb or concentrate stress
- Badge
- Text
- M0 · concept or policy intention
- Status
- evidence and design gate
- What has moved
- The research map now carries both the capacity benefit and liquidity-concentration risk of faster collateral movement. AIF evidence adds LDI collateral-call timing, strategy leverage and real-estate liquidity mismatch; gilt evidence adds dealer capacity, search and bargaining frictions.
- Still with the old institution
- Eligibility, buffers, haircuts, cross-margining, intraday timing, settlement-bank and dealer capacity, recovery and loss allocation still require route-specific proof.
- Next record to look for
- A live or supervisory stress exercise showing calls, buffers, fails, liquidity sources, dealer and settlement-bank capacity, default resources and recovery across the tokenised route.
- Legal form
- A system-wide test of timing, margin, liquidity, dealer capacity, settlement and default resources
- Authority
- CCP and market rulebooks, prudential and FMI supervision, contracts and Bank liquidity frameworks
- As of
- September 14, 2026
- Links
| |
|---|
| Project by project · Gates every project must pass | Actor, flow and decision-geography gate | - Sub
- digital reach is not distributed control
- Badge
- Text
- M0 · concept or policy intention
- Status
- research baseline
- What has moved
- FCA research supplies a bounded actor/access baseline and a framework for separating premises geography from decision and capital-flow geography. Platform custody, branch loss, FinTech clustering and short-range financial-centre effects now identify distinct measurements rather than one adoption proxy.
- Still with the old institution
- Adoption, market concentration, flow, underwriting control and regional capital delivery remain unproved without transaction- and decision-level evidence; both regional studies are associational rather than causal.
- Next record to look for
- Regulator-grade data joining legal entity, product, custody, transaction value, customer location, decision location, approval or rejection, price, collateral, tenor and delivered funds.
- Legal form
- An evidence gate separating firm presence, customer access, custody location, transaction flow and the place where underwriting, pricing, risk and allocation decisions are made
- Authority
- FCA market evidence, firm permissions, contracts and institution-specific governance
- As of
- September 14, 2026
- Links
| |
|---|
| Project by project · Gates every project must pass | DLT failure, correction and exit gate | - Sub
- the missing maturity phase
- Badge
- Text
- M0 · concept or policy intention
- Status
- public evidence missing
- What has moved
- Frameworks allocate some prospective responsibilities and wind-down duties.
- Still with the old institution
- No reviewed UK DLT rail publicly closes the full fork, outage, default, correction, insolvency and exit cycle.
- Next record to look for
- A public handled failure with ledger correction, legal result, liquidity source and final loss allocation.
- Legal form
- Cross-institution failure constitution
- Authority
- System rules, contracts, resolution law, insolvency law and public emergency powers
- As of
- September 14, 2026
- Links
| |
|---|
| Project by project · The public institutions | UK Parliament | - Sub
- Legal authority
- Badge
- Text
- M10 · normalised infrastructure
- Status
- existing authority
- What has moved
- Parliament has enacted powers for FMI sandboxes and digital settlement assets.
- Still with the old institution
- Primary legislation and parliamentary scrutiny remain necessary for permanent constitutional change and any introduced digital pound.
- Next record to look for
- Any new primary Act or affirmative instrument making a sandbox modification permanent.
- As of
- September 14, 2026
- Links
| For this row’s sourcing, see the saved details, section context and linked research. |
|---|
| Project by project · The public institutions | RTGS / CHAPS | - Sub
- Central-bank-money anchor
- Badge
- Text
- M10 · normalised infrastructure
- Status
- existing rail
- What has moved
- RT2 supports the design of synchronised settlement against external asset ledgers.
- Still with the old institution
- Legal finality and funded sterling settlement remain on the Bank's core ledger until a new capability is operative.
- Next record to look for
- Production synchronisation messages, operating hours, access rules and completed atomic settlement.
- As of
- September 14, 2026
- Links
| For this row’s sourcing, see the saved details, section context and linked research. |
|---|
| Project by project · The public institutions | Euroclear UK & International / CREST | - Sub
- Conventional securities title and settlement
- Badge
- Text
- M10 · normalised infrastructure
- Status
- incumbent record
- What has moved
- Euroclear UK & International is a DSS participant at Gate 1 and remains a potential bridge to digital records.
- Still with the old institution
- Existing CREST title, settlement and corporate-action machinery remains authoritative for its admitted securities.
- Next record to look for
- Gate 2 approval, a named live DLT transaction, bridge rulebook and handled conversion or exit.
- As of
- September 14, 2026
- Links
| For this row’s sourcing, see the saved details, section context and linked research. |
|---|
| Project by project · The public institutions | Financial Services Compensation Scheme | - Sub
- Customer failure protection
- Badge
- Text
- M10 · normalised infrastructure
- Status
- existing conditional protection
- What has moved
- Tokenised bank deposits may preserve ordinary deposit protection when they remain qualifying deposits.
- Still with the old institution
- Protection follows the legal claim and eligibility rules, not the token label; stablecoin and custody losses have different routes.
- Next record to look for
- A public failure or compensation determination involving a tokenised claim.
- As of
- September 14, 2026
- Links
| For this row’s sourcing, see the saved details, section context and linked research. |
|---|
| Project by project · The public institutions | Pay.UK retail payment systems | - Sub
- Retail-payment continuity
- Badge
- Text
- M10 · normalised infrastructure
- Status
- legacy continuity
- What has moved
- Future infrastructure design is being asked to support multiple forms of digital money.
- Still with the old institution
- Faster Payments, Bacs and cheque clearing continue while the future infrastructure is designed.
- Next record to look for
- The future-infrastructure blueprint, Delivery Company mandate and migration plan.
- As of
- September 14, 2026
- Links
| For this row’s sourcing, see the saved details, section context and linked research. |
|---|
| Project by project · The public institutions | UK judicial systems | - Sub
- Dispute and insolvency consequence
- Badge
- Text
- M10 · normalised infrastructure
- Status
- existing legal forum
- What has moved
- Digital assets can be objects of property rights, and DLT records can carry legally relevant evidence.
- Still with the old institution
- Priority, insolvency, mistake, fraud, trust and remedy questions remain matters of law and adjudication.
- Next record to look for
- Contested UK cases testing DLT title, ledger divergence, smart-contract correction or intermediary failure.
- As of
- September 14, 2026
- Links
| For this row’s sourcing, see the saved details, section context and linked research. |
|---|
| Project by project · The public institutions | Bank of England | - Sub
- Public settlement and systemic supervision
- Badge
- Text
- M5 · limited production
- Status
- existing plus production-bound
- What has moved
- The Bank supervises relevant FMIs, operates RTGS/RT2, runs synchronisation work and has an omnibus-backed live settlement-system case.
- Still with the old institution
- Reserve accounts, liquidity, systemic supervision and crisis authority remain Bank functions.
- Next record to look for
- A live RT2 synchronisation transaction, tokenised collateral use in Bank operations, and a documented DLT failure response.
- As of
- September 14, 2026
- Links
| For this row’s sourcing, see the saved details, section context and linked research. |
|---|
| Project by project · The public institutions | HM Treasury | - Sub
- Policy, issuance and designation
- Badge
- Text
- M4 · authorised or production-bound
- Status
- delivery phase
- What has moved
- Treasury has established the DSS, selected the DIGIT route and holds systemic-recognition powers.
- Still with the old institution
- Treasury still sets policy and legal perimeter; a platform does not issue sovereign authority to itself.
- Next record to look for
- DIGIT closing documents, first issuance, any systemic stablecoin recognition order, and permanent-law changes after sandbox evidence.
- As of
- September 14, 2026
- Links
| For this row’s sourcing, see the saved details, section context and linked research. |
|---|
| Project by project · The public institutions | Financial Conduct Authority | - Sub
- Conduct, custody and market perimeter
- Badge
- Text
- M4 · authorised or production-bound
- Status
- rules made; main perimeter future-effective; FS26/1 implementation work
- What has moved
- FCA rules permit DLT fund registers and define future cryptoasset requirements; FS26/1 confirms that regulated firms remain accountable when technology or DeFi providers supply infrastructure and that CASS 6 is the interim RSIC custody route.
- Still with the old institution
- Authorisation, conduct, market integrity, custody, recourse and consumer-protection judgments remain with the FCA and the regulated legal person; outsourcing does not transfer them to code or a provider.
- Next record to look for
- Authorised issuers and custodians, effective-regime operation from 25 October 2027, the planned H1 2027 custody consultation, and product-specific recourse and failure evidence.
- As of
- September 14, 2026
- Links
| For this row’s sourcing, see the saved details, section context and linked research. |
|---|
| Project by project · The public institutions | Prudential Regulation Authority | - Sub
- Prudential recognition
- Badge
- Text
- M4 · authorised or production-bound
- Status
- supervisory expectation
- What has moved
- Prudential expectations expressly address tokenised assets, stablecoins and innovations in deposits.
- Still with the old institution
- Capital, liquidity, operational resilience and risk-management recognition stay institution-specific.
- Next record to look for
- Public supervisory or stress evidence for a material tokenised exposure and its treatment in resolution.
- As of
- September 14, 2026
- Links
| For this row’s sourcing, see the saved details, section context and linked research. |
|---|
| Project by project · The public institutions | Payment Systems Regulator | - Sub
- Payment-system economic regulation
- Badge
- Text
- M4 · authorised or production-bound
- Status
- designation-dependent
- What has moved
- The statutory perimeter can reach designated payment systems transferring stablecoins.
- Still with the old institution
- Its role depends on Treasury designation and does not replace FCA or Bank objectives.
- Next record to look for
- A designation order covering a stablecoin payment system and the resulting access or competition rules.
- As of
- September 14, 2026
- Links
| For this row’s sourcing, see the saved details, section context and linked research. |
|---|
| Project by project · The public institutions | UK Debt Management Office | - Sub
- Sovereign debt execution
- Badge
- Text
- M4 · authorised or production-bound
- Status
- production-bound
- What has moved
- The DMO and Treasury jointly manage the experimental digital-gilt issuance.
- Still with the old institution
- DIGIT remains separate from the main financing remit and does not replace conventional gilt operations.
- Next record to look for
- Final terms, issue size, investor allocation, settlement asset and first completed transaction.
- As of
- September 14, 2026
- Links
| For this row’s sourcing, see the saved details, section context and linked research. |
|---|