Freedom 250 · Foreign relations and world money · United Kingdom
Compares the recorded stages of UK money, securities and settlement initiatives.
Of 15 UK on-ledger money, gilt and settlement projects on the UK map (as of September 14, 2026), the furthest along is the Tokenised authorised-fund register at M7 (authoritative-record integration); 1 at M5 (limited production); 10 at M4 (authorised or production-bound); 2 at M1 (technical prototype or design work); 1 at M0 (concept or policy intention). The least advanced: HSBC–LSEG DSD link, Digital pound design phase, Bank of England Synchronisation Lab. No project has reached M8 or above (liquidity integration, proven failure and exit, normal infrastructure).
Evidence through September 14, 202679 saved rows. Read every row with its sources and dates · Download the complete data.
The first 8 rows appear below. Follow the complete table for all remaining rows.
| Section | Record | Saved details | Sources and dates |
|---|---|---|---|
| The maturity scale, M0 to M10 | 1 |
| For this row’s sourcing, see the saved details, section context and linked research. |
| The maturity scale, M0 to M10 | 2 |
| For this row’s sourcing, see the saved details, section context and linked research. |
| The maturity scale, M0 to M10 | 3 |
| For this row’s sourcing, see the saved details, section context and linked research. |
| The maturity scale, M0 to M10 | 4 |
| For this row’s sourcing, see the saved details, section context and linked research. |
| The maturity scale, M0 to M10 | 5 |
| For this row’s sourcing, see the saved details, section context and linked research. |
| The maturity scale, M0 to M10 | 6 |
| For this row’s sourcing, see the saved details, section context and linked research. |
| The maturity scale, M0 to M10 | 7 |
| For this row’s sourcing, see the saved details, section context and linked research. |
| The maturity scale, M0 to M10 | 8 |
| For this row’s sourcing, see the saved details, section context and linked research. |
Read the UK DLT transition study →
full research · Read the document’s own evidence dates. Graphic evidence: 2026-09-14.