Skip to content

The world: how do the other jurisdictions do it? — saved evidence, page 57

Saved evidence through 2026-11-03. This table projects the linked graphic data; it does not refresh the underlying research.

Return to the graphic · Complete saved JSON

Rows 1101–1120 of 1549. Page 57 of 79.

Section context and qualifications
Uncertainty
  • Coverage state describes the state of this research, not a jurisdiction's crypto friendliness, adoption, legality or economic importance.
  • Digital pound: shelved vs design decision pending: 3 readings disagree — World money record (dated rows) (May 1, 2026); World money record (dated rows) (February 12, 2026); UK legal map (on-ledger overlay) (September 14, 2026). Unresolved; every reading is shown on this page.
  • JPYSC / trust-type yen stablecoin reserves in short JGBs (cap or no cap): 2 readings disagree — World money record (dated rows) (June 6, 2025); Japan money map (September 15, 2026). Unresolved; every reading is shown on this page.
  • Swift shared ledger status (three statuses plus a headline): 4 readings disagree — World money record (dated rows) (September 29, 2025); Japan money map (September 15, 2026); UK legal map (on-ledger overlay) (September 14, 2026); Swift ledger page (crypto and networks master) (October 19, 2026). Unresolved; every reading is shown on this page. Shown in full on link F.
  • International room exception: rows may keep news links. Every row's url is the single link the page showed; 163 of the 164 page cards were labelled 'Reconstructed (not an official filing)' and 1 'Saved link'. Treat row urls as source_kind news unless the host is an official body.
  • The stablecoin law cards were last built on July 28, 2026; country records are newer (October 2026).
SectionRecordSaved detailsSources and dates
The UK's on-ledger money, gilt and settlement projects (48 rows)Fnality Sterling Payment System
Badges
  • Text
    M5
Date
2026-09-14
Date label
map as of
As of
2026-09-14
Needs primary source
No
Entities
  • Name
    Fnality
Pages
Kind
platform
Maturity
M5 · limited production
Status
limited live
What has moved
Initial live payments and a central-bank-money-backed settlement representation exist.
Still with the old institution
Scale, access, liquidity, correction, failure and public transaction data remain limited.
Next record to look for
Recurring volume, wider participation and a documented failed or reversed transaction.
Disputed
None
The UK's on-ledger money, gilt and settlement projects (48 rows)Bank of England Synchronisation Lab
Badges
  • Text
    M1
Date
2026-09-14
Date label
map as of
As of
2026-09-14
Needs primary source
No
Entities
    Pages
    Kind
    program
    Maturity
    M1 · technical prototype or design work
    Status
    six-month 2026 lab
    What has moved
    Eighteen selected organisations can test prospective synchronisation-operator interactions with RT2 design.
    Still with the old institution
    The lab is non-live; RTGS remains the legal settlement ledger.
    Next record to look for
    Published lab results, selected service design, authorisation and first live transaction.
    Disputed
    None
    The UK's on-ledger money, gilt and settlement projects (48 rows)RT2 live synchronisation capability
    Badges
    • Text
      M4
    Date
    2026-09-14
    Date label
    map as of
    As of
    2026-09-14
    Needs primary source
    No
    Entities
      Pages
      Kind
      platform
      Maturity
      M4 · authorised or production-bound
      Status
      targeted for 2028
      What has moved
      The Bank has committed to live delivery and is testing the operator interface.
      Still with the old institution
      Legal cash finality remains RTGS-based; external asset-ledger title and correction remain with their governors.
      Next record to look for
      Final service rulebook, operator admission, live hours, first DvP/PvP and outage handling.
      Disputed
      None
      The UK's on-ledger money, gilt and settlement projects (48 rows)LSEG Digital Settlement House
      Badges
      • Text
        M4
      Date
      2026-09-14
      Date label
      map as of
      As of
      2026-09-14
      Needs primary source
      No
      Entities
      • Name
        LSEG
      Pages
      Kind
      platform
      Maturity
      M4 · authorised or production-bound
      Status
      launched; recurring receipt unresolved
      What has moved
      The design names deposit ownership on the DiSH ledger and notary connections to other networks.
      Still with the old institution
      Underlying bank liability, bank insolvency, connected-asset title and public finality remain separate.
      Next record to look for
      Named production participants, completed transactions, volumes, reconciliation and default procedures.
      Disputed
      None
      The UK's on-ledger money, gilt and settlement projects (48 rows)Swift shared ledger
      Badges
      • Text
        M4
      Date
      2026-09-14
      Date label
      map as of
      As of
      2026-09-14
      Needs primary source
      No
      Entities
      • Name
        Swift shared ledger
      Pages
      Kind
      platform
      Maturity
      M4 · authorised or production-bound
      Status
      MVP ready; pilots pending
      What has moved
      Interbank commitments can be validated and synchronised on a shared ledger.
      Still with the old institution
      Settlement remains through RTGS, correspondent accounts or another agreed mechanism.
      Next record to look for
      First completed pilot, exact cash leg, finality, liquidity and correction evidence.
      Disputed
      Swift shared ledger status (three statuses plus a headline): 4 readings disagree — World money record (dated rows) (September 29, 2025); Japan money map (September 15, 2026); UK legal map (on-ledger overlay) (September 14, 2026); Swift ledger page (crypto and networks master) (October 19, 2026). Unresolved; every reading is shown on this page. Shown in full on link F.
      The UK's on-ledger money, gilt and settlement projects (48 rows)Tokenised collateral-recognition gate
      Badges
      • Text
        M1
      Date
      2026-09-14
      Date label
      map as of
      As of
      2026-09-14
      Needs primary source
      No
      Entities
        Pages
        Kind
        gate
        Maturity
        M1 · technical prototype or design work
        Status
        priority implementation work; no tokenised eligibility decision
        What has moved
        FS26/1 identifies collateral mobility as the leading near-term use case and records Bank and CCP work on tokenised equivalents of assets already eligible in conventional form. The live conventional benchmark is now explicit: claim, facility-specific eligibility, control, pre-positioning, valuation, haircut/concentration, cash capacity, reuse/return and default realisation.
        Still with the old institution
        No tokenised MMF, gold product or other token is admitted merely by the feedback statement; each stage remains a named-institution judgment. Faster transfer does not upgrade a Level B or C asset to Level A or remove a CCP cash requirement.
        Next record to look for
        A named tokenised asset admitted by the Bank or a CCP, controlled and valued under published terms, then actually pledged, margined, funded and returned or realised.
        Disputed
        None
        The UK's on-ledger money, gilt and settlement projects (48 rows)Collateral title, control and encumbrance gate
        Badges
        • Text
          M0
        Date
        2026-09-14
        Date label
        map as of
        As of
        2026-09-14
        Needs primary source
        No
        Entities
          Pages
          Kind
          gate
          Maturity
          M0 · concept or policy intention
          Status
          product and institution specific
          What has moved
          The conventional Bank process demonstrates that data, documentation, jurisdiction, transfer mechanics and the ability to take ownership are part of collateral readiness; the DLT policy inquiry now exposes the missing equivalent for tokens.
          Still with the old institution
          The token, underlying claim, custody entitlement and collateral interest can remain separate legal objects and records.
          Next record to look for
          An operative control or title-transfer agreement, custodian/CSD acknowledgement, reconciled encumbrance record and default enforceability opinion for a named tokenised asset.
          Disputed
          None
          The UK's on-ledger money, gilt and settlement projects (48 rows)Collateral valuation, haircut and liquidation gate
          Badges
          • Text
            M0
          Date
          2026-09-14
          Date label
          map as of
          As of
          2026-09-14
          Needs primary source
          No
          Entities
            Pages
            Kind
            gate
            Maturity
            M0 · concept or policy intention
            Status
            method and live default proof missing
            What has moved
            The current SMF and CCP baseline shows that eligibility can be re-priced by binding valuation, haircuts, add-ons and concentration rules even when the asset is unchanged.
            Still with the old institution
            The admitting institution controls price sources, fallback valuation, liquidation horizon, adjusted value and extra protection for issuer, custodian, liquidity or concentration risk.
            Next record to look for
            A published token-specific valuation hierarchy and haircut/concentration method followed by a stress or default exercise that realises the expected value.
            Disputed
            None
            The UK's on-ledger money, gilt and settlement projects (48 rows)Collateral cash, reuse and return gate
            Badges
            • Text
              M0
            Date
            2026-09-14
            Date label
            map as of
            As of
            2026-09-14
            Needs primary source
            No
            Entities
              Pages
              Kind
              gate
              Maturity
              M0 · concept or policy intention
              Status
              full timed route unproved
              What has moved
              The live facility map and LCH's 25% minimum-cash rule make the missing cash leg explicit: more mobile non-cash collateral does not eliminate timed sterling needs.
              Still with the old institution
              Central-bank monetisation, private repo proceeds and CCP margin credit remain different outcomes with different participants, accounts and clocks.
              Next record to look for
              A live timestamped path from token admission and adjusted value through cash or margin credit, legally permitted reuse or substitution, and completed return or default realisation.
              Disputed
              None
              The UK's on-ledger money, gilt and settlement projects (48 rows)Tokenised-gold legal product fork
              Badges
              • Text
                M0
              Date
              2026-09-14
              Date label
              map as of
              As of
              2026-09-14
              Needs primary source
              No
              Entities
                Pages
                Kind
                gate
                Maturity
                M0 · concept or policy intention
                Status
                open policy inquiry
                What has moved
                The FCA has opened a named policy inquiry into tokenised gold and the legal/product forms that may support UK wholesale use.
                Still with the old institution
                The token label does not decide bar allocation, beneficial ownership, trust, redemption, custody, insolvency priority, fund status or lender control.
                Next record to look for
                A product-specific legal chain from holder to identified asset or claim, with operative custody, transfer, redemption, correction, insolvency and—if claimed—collateral terms.
                Disputed
                None
                The UK's on-ledger money, gilt and settlement projects (48 rows)Tokenised-collateral stress-transmission gate
                Badges
                • Text
                  M0
                Date
                2026-09-14
                Date label
                map as of
                As of
                2026-09-14
                Needs primary source
                No
                Entities
                  Pages
                  Kind
                  gate
                  Maturity
                  M0 · concept or policy intention
                  Status
                  evidence and design gate
                  What has moved
                  The research map now carries both the capacity benefit and liquidity-concentration risk of faster collateral movement. AIF evidence adds LDI collateral-call timing, strategy leverage and real-estate liquidity mismatch; gilt evidence adds dealer capacity, search and bargaining frictions.
                  Still with the old institution
                  Eligibility, buffers, haircuts, cross-margining, intraday timing, settlement-bank and dealer capacity, recovery and loss allocation still require route-specific proof.
                  Next record to look for
                  A live or supervisory stress exercise showing calls, buffers, fails, liquidity sources, dealer and settlement-bank capacity, default resources and recovery across the tokenised route.
                  Disputed
                  None
                  The UK's on-ledger money, gilt and settlement projects (48 rows)Actor, flow and decision-geography gate
                  Badges
                  • Text
                    M0
                  Date
                  2026-09-14
                  Date label
                  map as of
                  As of
                  2026-09-14
                  Needs primary source
                  No
                  Entities
                    Pages
                    Kind
                    gate
                    Maturity
                    M0 · concept or policy intention
                    Status
                    research baseline
                    What has moved
                    FCA research supplies a bounded actor/access baseline and a framework for separating premises geography from decision and capital-flow geography. Platform custody, branch loss, FinTech clustering and short-range financial-centre effects now identify distinct measurements rather than one adoption proxy.
                    Still with the old institution
                    Adoption, market concentration, flow, underwriting control and regional capital delivery remain unproved without transaction- and decision-level evidence; both regional studies are associational rather than causal.
                    Next record to look for
                    Regulator-grade data joining legal entity, product, custody, transaction value, customer location, decision location, approval or rejection, price, collateral, tenor and delivered funds.
                    Disputed
                    None
                    The UK's on-ledger money, gilt and settlement projects (48 rows)Legal finality and record-precedence gate
                    Badges
                    • Text
                      M4
                    Date
                    2026-09-14
                    Date label
                    map as of
                    As of
                    2026-09-14
                    Needs primary source
                    No
                    Entities
                      Pages
                      Kind
                      gate
                      Maturity
                      M4 · authorised or production-bound
                      Status
                      object-specific
                      What has moved
                      The DSS can temporarily modify law for bounded digital FMI activity.
                      Still with the old institution
                      Every asset and money leg still needs a governing rule for precedence, finality and unwind.
                      Next record to look for
                      Transaction documents and a tested mismatch, insolvency or correction event.
                      Disputed
                      None
                      The UK's on-ledger money, gilt and settlement projects (48 rows)Accounting and regulatory-recognition gate
                      Badges
                      • Text
                        M1
                      Date
                      2026-09-14
                      Date label
                      map as of
                      As of
                      2026-09-14
                      Needs primary source
                      No
                      Entities
                        Pages
                        Kind
                        gate
                        Maturity
                        M1 · technical prototype or design work
                        Status
                        institution-specific
                        What has moved
                        DLT can provide earlier attributable transaction evidence and shared reconciliation.
                        Still with the old institution
                        Each entity must classify and book the event under its own legal and accounting obligations.
                        Next record to look for
                        Published control framework, audit treatment, regulatory reporting and corrected-entry lifecycle.
                        Disputed
                        None
                        The UK's on-ledger money, gilt and settlement projects (48 rows)DLT failure, correction and exit gate
                        Badges
                        • Text
                          M0
                        Date
                        2026-09-14
                        Date label
                        map as of
                        As of
                        2026-09-14
                        Needs primary source
                        No
                        Entities
                          Pages
                          Kind
                          gate
                          Maturity
                          M0 · concept or policy intention
                          Status
                          public evidence missing
                          What has moved
                          Frameworks allocate some prospective responsibilities and wind-down duties.
                          Still with the old institution
                          No reviewed UK DLT rail publicly closes the full fork, outage, default, correction, insolvency and exit cycle.
                          Next record to look for
                          A public handled failure with ledger correction, legal result, liquidity source and final loss allocation.
                          Disputed
                          None
                          The UK's on-ledger money, gilt and settlement projects (48 rows)Conditional territorial monetary handoff
                          Badges
                          • Text
                            S0
                          Date
                          2026-09-14
                          Date label
                          map as of
                          As of
                          2026-09-14
                          Needs primary source
                          No
                          Entities
                            Pages
                            Kind
                            scenario
                            Maturity
                            S0 · scenario-only analytical gate
                            Status
                            scenario only
                            What has moved
                            Nothing operative; the node identifies the minimum handoff questions.
                            Still with the old institution
                            Current UK and devolved legal, fiscal, monetary, settlement and resolution arrangements remain in force.
                            Next record to look for
                            A lawful mandate plus executed schedules for claims, records, settlement, supervision, continuity, correction and loss.
                            Disputed
                            None
                            The UK's on-ledger money, gilt and settlement projects (48 rows)UK Parliament
                            Badges
                            • Text
                              M10
                            • Text
                              No source link in the home
                            Date
                            2026-09-14
                            Date label
                            map as of
                            As of
                            2026-09-14
                            Source note
                            Public body graded on the map; no source list on the row
                            Needs primary source
                            No
                            Entities
                              Pages
                              Kind
                              public institution
                              Maturity
                              M10 · normalised infrastructure
                              Status
                              existing authority
                              What has moved
                              Parliament has enacted powers for FMI sandboxes and digital settlement assets.
                              Still with the old institution
                              Primary legislation and parliamentary scrutiny remain necessary for permanent constitutional change and any introduced digital pound.
                              Next record to look for
                              Any new primary Act or affirmative instrument making a sandbox modification permanent.
                              Disputed
                              None
                              For this row’s sourcing, see the saved details, section context and linked research.
                              The UK's on-ledger money, gilt and settlement projects (48 rows)HM Treasury
                              Badges
                              • Text
                                M4
                              • Text
                                No source link in the home
                              Date
                              2026-09-14
                              Date label
                              map as of
                              As of
                              2026-09-14
                              Source note
                              Public body graded on the map; no source list on the row
                              Needs primary source
                              No
                              Entities
                                Pages
                                Kind
                                public institution
                                Maturity
                                M4 · authorised or production-bound
                                Status
                                delivery phase
                                What has moved
                                Treasury has established the DSS, selected the DIGIT route and holds systemic-recognition powers.
                                Still with the old institution
                                Treasury still sets policy and legal perimeter; a platform does not issue sovereign authority to itself.
                                Next record to look for
                                DIGIT closing documents, first issuance, any systemic stablecoin recognition order, and permanent-law changes after sandbox evidence.
                                Disputed
                                None
                                For this row’s sourcing, see the saved details, section context and linked research.
                                The UK's on-ledger money, gilt and settlement projects (48 rows)Bank of England
                                Badges
                                • Text
                                  M5
                                • Text
                                  No source link in the home
                                Date
                                2026-09-14
                                Date label
                                map as of
                                As of
                                2026-09-14
                                Source note
                                Public body graded on the map; no source list on the row
                                Needs primary source
                                No
                                Entities
                                  Pages
                                  Kind
                                  public institution
                                  Maturity
                                  M5 · limited production
                                  Status
                                  existing plus production-bound
                                  What has moved
                                  The Bank supervises relevant FMIs, operates RTGS/RT2, runs synchronisation work and has an omnibus-backed live settlement-system case.
                                  Still with the old institution
                                  Reserve accounts, liquidity, systemic supervision and crisis authority remain Bank functions.
                                  Next record to look for
                                  A live RT2 synchronisation transaction, tokenised collateral use in Bank operations, and a documented DLT failure response.
                                  Disputed
                                  None
                                  For this row’s sourcing, see the saved details, section context and linked research.
                                  The UK's on-ledger money, gilt and settlement projects (48 rows)Financial Conduct Authority
                                  Badges
                                  • Text
                                    M4
                                  • Text
                                    No source link in the home
                                  Date
                                  2026-09-14
                                  Date label
                                  map as of
                                  As of
                                  2026-09-14
                                  Source note
                                  Public body graded on the map; no source list on the row
                                  Needs primary source
                                  No
                                  Entities
                                    Pages
                                    Kind
                                    public institution
                                    Maturity
                                    M4 · authorised or production-bound
                                    Status
                                    rules made; main perimeter future-effective; FS26/1 implementation work
                                    What has moved
                                    FCA rules permit DLT fund registers and define future cryptoasset requirements; FS26/1 confirms that regulated firms remain accountable when technology or DeFi providers supply infrastructure and that CASS 6 is the interim RSIC custody route.
                                    Still with the old institution
                                    Authorisation, conduct, market integrity, custody, recourse and consumer-protection judgments remain with the FCA and the regulated legal person; outsourcing does not transfer them to code or a provider.
                                    Next record to look for
                                    Authorised issuers and custodians, effective-regime operation from 25 October 2027, the planned H1 2027 custody consultation, and product-specific recourse and failure evidence.
                                    Disputed
                                    None
                                    For this row’s sourcing, see the saved details, section context and linked research.