Skip to content

The operators: which companies and networks run it, and how far along is each? — saved evidence, page 53

Saved evidence through 2026-10-26. This table projects the linked graphic data; it does not refresh the underlying research.

Return to the graphic · Complete saved JSON

Rows 939–958 of 3717. Page 53 of 194.

Section context and qualifications
Uncertainty
  • Primary sources only (Katie, 2026-10-19): official records and the actor's own documents. News, newsletters, blogs and law-firm summaries were removed on 2026-10-19; what rested on them is held in masters/_held/needs_primary_source_2026-10-19.json.
  • July deck sources carry no dates in the library; their 'date' is null unless re-verified on the web. Web sources checked on 2026-10-19 carry their publication date.
  • Technical finality, authoritative legal record and cash or redemption remedy are separate endpoints. Proposal, staff position, registration, ownership, partnership, software capability, pilot and production are different facts and clocks.
  • This is a capability-and-receipt map, not a league table, safety rating or investment view. A group can lead one surface and depend on another institution for the claim, authoritative record, cash, custody, collateral rulebook or remedy.
  • This is a functional and control comparison, not a ranking of safety, adoption, token value or investment merit. A live partner connection is not group ownership, and an approved or conditional charter is not automatically an operating service.
  • A place on this map records a bounded capability or comparison. It does not establish SEC selection, TSV qualification, a production integration, legal equivalence between models or an investment view.
  • This ledger records dated technology, deal and operating receipts. Announcements, integrations, pilots, availability, named live use and scaled use remain separate states. Company-reported activity is not independently verified volume, legal finality, token value capture or control of a third-party network.
  • The bank comparison, field guide and build-out ledger carry their own cutoffs (late September to October 3); the build-status master (October 19) is current where they differ.
  • placements.json is an index whose rows copy from their homes; its legal rows are on link E, and its countries and timeline rows belong to links H and I (not built in this wave).
  • The Major Bank Digital Transition package has no JSON registry in this workbench (README only); its comparison is read from BANK_TRANSITION_COMPARISON_2026-09-26.json.
SectionRecordSaved detailsSources and dates
All 383 connectionsWells Fargo → Wells Fargo tokenized deposits: Wells Fargo tokenized deposits
Badge
Text
Planned
Date
2026-08-04
Date kind
Date
From
Wells Fargo
To
Wells Fargo tokenized deposits
From
wells-fargo
To
bank-project-27
Type
partnership
Status
planned
Date
2026-08-04
Claim
Planned limited fall rollout, initially USD-to-GBP on a proprietary blockchain; not a completed service receipt.
Boundary
This relationship is scoped to the cited project; it does not establish a route through another system.
Operational state
planned
Needs primary source
No
Question pages
    All 383 connectionsWells Fargo → Wells Fargo / Cosmos stack: Wells Fargo / Cosmos stack
    Badge
    Text
    Planned
    Date
    2026-10-03
    Date kind
    Date
    From
    Wells Fargo
    To
    Wells Fargo / Cosmos stack
    From
    wells-fargo
    To
    bank-project-28
    Type
    partnership
    Status
    planned
    Date
    undated; retrieved 2026-09-09
    Claim
    Cosmos Labs says Wells Fargo is building its deposit engine on Cosmos. Vendor attribution; no ATOM, Cosmos Hub or SWIFT adapter established.
    Boundary
    This relationship is scoped to the cited project; it does not establish a route through another system.
    Operational state
    planned
    Needs primary source
    No
    Question pages
      All 383 connectionsStandard Chartered → Standard Chartered ↔ HSBC: Reported participant
      Badge
      Text
      Pilot test
      Date
      2026-08-19
      Date kind
      Date
      From
      Standard Chartered
      To
      Standard Chartered ↔ HSBC
      From
      standard-chartered
      To
      swift-case-sc-hsbc
      Type
      operating
      Status
      pilot test
      Date
      2026-08-19
      Claim
      Currency and corridor not disclosed; obligations matched/netted before external settlement.
      Boundary
      This relationship is scoped to the cited project; it does not establish a route through another system.
      Operational state
      pilot test
      Needs primary source
      No
      Question pages
        All 383 connectionsHSBC → Standard Chartered ↔ HSBC: Reported participant
        Badge
        Text
        Pilot test
        Date
        2026-08-19
        Date kind
        Date
        From
        HSBC
        To
        Standard Chartered ↔ HSBC
        From
        hsbc
        To
        swift-case-sc-hsbc
        Type
        operating
        Status
        pilot test
        Date
        2026-08-19
        Claim
        Currency and corridor not disclosed; obligations matched/netted before external settlement.
        Boundary
        This relationship is scoped to the cited project; it does not establish a route through another system.
        Operational state
        pilot test
        Needs primary source
        No
        Question pages
          All 383 connectionsStandard Chartered ↔ HSBC → Swift shared ledger: Shared-ledger coordination
          Badge
          Text
          Pilot test
          Date
          2026-08-19
          Date kind
          Date
          From
          Standard Chartered ↔ HSBC
          To
          Swift shared ledger
          From
          swift-case-sc-hsbc
          To
          swift-shared-ledger
          Type
          technical
          Status
          pilot test
          Date
          2026-08-19
          Claim
          Currency and corridor not disclosed; obligations matched/netted before external settlement.
          Boundary
          This relationship is scoped to the cited project; it does not establish a route through another system.
          Operational state
          pilot test
          Needs primary source
          No
          Question pages
            All 383 connectionsUOB → UOB ↔ HSBC · HKD: Reported participant
            Badge
            Text
            Pilot test
            Date
            2026-08-26
            Date kind
            Date
            From
            UOB
            To
            UOB ↔ HSBC · HKD
            From
            uob
            To
            swift-case-uob-hsbc
            Type
            operating
            Status
            pilot test
            Date
            2026-08-26
            Claim
            Completed HKD cross-border transactions; exact geographic endpoints not disclosed.
            Boundary
            This relationship is scoped to the cited project; it does not establish a route through another system.
            Operational state
            pilot test
            Needs primary source
            No
            Question pages
              All 383 connectionsHSBC → UOB ↔ HSBC · HKD: Reported participant
              Badge
              Text
              Pilot test
              Date
              2026-08-26
              Date kind
              Date
              From
              HSBC
              To
              UOB ↔ HSBC · HKD
              From
              hsbc
              To
              swift-case-uob-hsbc
              Type
              operating
              Status
              pilot test
              Date
              2026-08-26
              Claim
              Completed HKD cross-border transactions; exact geographic endpoints not disclosed.
              Boundary
              This relationship is scoped to the cited project; it does not establish a route through another system.
              Operational state
              pilot test
              Needs primary source
              No
              Question pages
                All 383 connectionsUOB ↔ HSBC · HKD → Swift shared ledger: Shared-ledger coordination
                Badge
                Text
                Pilot test
                Date
                2026-08-26
                Date kind
                Date
                From
                UOB ↔ HSBC · HKD
                To
                Swift shared ledger
                From
                swift-case-uob-hsbc
                To
                swift-shared-ledger
                Type
                technical
                Status
                pilot test
                Date
                2026-08-26
                Claim
                Completed HKD cross-border transactions; exact geographic endpoints not disclosed.
                Boundary
                This relationship is scoped to the cited project; it does not establish a route through another system.
                Operational state
                pilot test
                Needs primary source
                No
                Question pages
                  All 383 connectionsCiti → Citi ↔ FAB · USD: Reported participant
                  Badge
                  Text
                  Pilot test
                  Date
                  2026-09-02
                  Date kind
                  Date
                  From
                  Citi
                  To
                  Citi ↔ FAB · USD
                  From
                  citi
                  To
                  swift-case-citi-fab
                  Type
                  operating
                  Status
                  pilot test
                  Date
                  2026-09-02
                  Claim
                  Completed USD pilot; FAB separately confirms correspondent settlement completed.
                  Boundary
                  This relationship is scoped to the cited project; it does not establish a route through another system.
                  Operational state
                  pilot test
                  Needs primary source
                  No
                  Question pages
                    All 383 connectionsFirst Abu Dhabi Bank → Citi ↔ FAB · USD: Reported participant
                    Badge
                    Text
                    Pilot test
                    Date
                    2026-09-02
                    Date kind
                    Date
                    From
                    First Abu Dhabi Bank
                    To
                    Citi ↔ FAB · USD
                    From
                    fab
                    To
                    swift-case-citi-fab
                    Type
                    operating
                    Status
                    pilot test
                    Date
                    2026-09-02
                    Claim
                    Completed USD pilot; FAB separately confirms correspondent settlement completed.
                    Boundary
                    This relationship is scoped to the cited project; it does not establish a route through another system.
                    Operational state
                    pilot test
                    Needs primary source
                    No
                    Question pages
                      All 383 connectionsCiti ↔ FAB · USD → Swift shared ledger: Shared-ledger coordination
                      Badge
                      Text
                      Pilot test
                      Date
                      2026-09-02
                      Date kind
                      Date
                      From
                      Citi ↔ FAB · USD
                      To
                      Swift shared ledger
                      From
                      swift-case-citi-fab
                      To
                      swift-shared-ledger
                      Type
                      technical
                      Status
                      pilot test
                      Date
                      2026-09-02
                      Claim
                      Completed USD pilot; FAB separately confirms correspondent settlement completed.
                      Boundary
                      This relationship is scoped to the cited project; it does not establish a route through another system.
                      Operational state
                      pilot test
                      Needs primary source
                      No
                      Question pages
                        All 383 connectionsCiti → Citi ↔ OCBC · USD: Reported participant
                        Badge
                        Text
                        Pilot test
                        Date
                        2026-09-02
                        Date kind
                        Date
                        From
                        Citi
                        To
                        Citi ↔ OCBC · USD
                        From
                        citi
                        To
                        swift-case-citi-ocbc
                        Type
                        operating
                        Status
                        pilot test
                        Date
                        2026-09-02
                        Claim
                        Completed USD live pilots in Citi’s July–December controlled proof of concept.
                        Boundary
                        This relationship is scoped to the cited project; it does not establish a route through another system.
                        Operational state
                        pilot test
                        Needs primary source
                        No
                        Question pages
                          All 383 connectionsOCBC → Citi ↔ OCBC · USD: Reported participant
                          Badge
                          Text
                          Pilot test
                          Date
                          2026-09-02
                          Date kind
                          Date
                          From
                          OCBC
                          To
                          Citi ↔ OCBC · USD
                          From
                          ocbc
                          To
                          swift-case-citi-ocbc
                          Type
                          operating
                          Status
                          pilot test
                          Date
                          2026-09-02
                          Claim
                          Completed USD live pilots in Citi’s July–December controlled proof of concept.
                          Boundary
                          This relationship is scoped to the cited project; it does not establish a route through another system.
                          Operational state
                          pilot test
                          Needs primary source
                          No
                          Question pages
                            All 383 connectionsCiti ↔ OCBC · USD → Swift shared ledger: Shared-ledger coordination
                            Badge
                            Text
                            Pilot test
                            Date
                            2026-09-02
                            Date kind
                            Date
                            From
                            Citi ↔ OCBC · USD
                            To
                            Swift shared ledger
                            From
                            swift-case-citi-ocbc
                            To
                            swift-shared-ledger
                            Type
                            technical
                            Status
                            pilot test
                            Date
                            2026-09-02
                            Claim
                            Completed USD live pilots in Citi’s July–December controlled proof of concept.
                            Boundary
                            This relationship is scoped to the cited project; it does not establish a route through another system.
                            Operational state
                            pilot test
                            Needs primary source
                            No
                            Question pages
                              All 383 connectionsBNP Paribas → Siemens · BNP France EUR → HSBC UK GBP: Reported participant
                              Badge
                              Text
                              Pilot test
                              Date
                              2026-09-04
                              Date kind
                              Date
                              From
                              BNP Paribas
                              To
                              Siemens · BNP France EUR → HSBC UK GBP
                              From
                              bnp-paribas
                              To
                              swift-case-bnp-hsbc-siemens
                              Type
                              operating
                              Status
                              pilot test
                              Date
                              2026-09-04
                              Claim
                              Siemens used existing bank channels; the banks handled FX/funding, SWIFT coordinated obligations and external rails settled.
                              Boundary
                              This relationship is scoped to the cited project; it does not establish a route through another system.
                              Operational state
                              pilot test
                              Needs primary source
                              No
                              Question pages
                                All 383 connectionsHSBC → Siemens · BNP France EUR → HSBC UK GBP: Reported participant
                                Badge
                                Text
                                Pilot test
                                Date
                                2026-09-04
                                Date kind
                                Date
                                From
                                HSBC
                                To
                                Siemens · BNP France EUR → HSBC UK GBP
                                From
                                hsbc
                                To
                                swift-case-bnp-hsbc-siemens
                                Type
                                operating
                                Status
                                pilot test
                                Date
                                2026-09-04
                                Claim
                                Siemens used existing bank channels; the banks handled FX/funding, SWIFT coordinated obligations and external rails settled.
                                Boundary
                                This relationship is scoped to the cited project; it does not establish a route through another system.
                                Operational state
                                pilot test
                                Needs primary source
                                No
                                Question pages
                                  All 383 connectionsSiemens · BNP France EUR → HSBC UK GBP → Swift shared ledger: Shared-ledger coordination
                                  Badge
                                  Text
                                  Pilot test
                                  Date
                                  2026-09-04
                                  Date kind
                                  Date
                                  From
                                  Siemens · BNP France EUR → HSBC UK GBP
                                  To
                                  Swift shared ledger
                                  From
                                  swift-case-bnp-hsbc-siemens
                                  To
                                  swift-shared-ledger
                                  Type
                                  technical
                                  Status
                                  pilot test
                                  Date
                                  2026-09-04
                                  Claim
                                  Siemens used existing bank channels; the banks handled FX/funding, SWIFT coordinated obligations and external rails settled.
                                  Boundary
                                  This relationship is scoped to the cited project; it does not establish a route through another system.
                                  Operational state
                                  pilot test
                                  Needs primary source
                                  No
                                  Question pages
                                    All 383 connectionsDBS → DBS Singapore → Citi New York · USD: Reported participant
                                    Badge
                                    Text
                                    Pilot test
                                    Date
                                    2026-09-07
                                    Date kind
                                    Date
                                    From
                                    DBS
                                    To
                                    DBS Singapore → Citi New York · USD
                                    From
                                    dbs
                                    To
                                    swift-case-dbs-citi
                                    Type
                                    operating
                                    Status
                                    pilot test
                                    Date
                                    2026-09-07
                                    Claim
                                    Weekend USD payment completed in minutes; external settlement timestamp not disclosed.
                                    Boundary
                                    This relationship is scoped to the cited project; it does not establish a route through another system.
                                    Operational state
                                    pilot test
                                    Needs primary source
                                    No
                                    Question pages
                                      All 383 connectionsCiti → DBS Singapore → Citi New York · USD: Reported participant
                                      Badge
                                      Text
                                      Pilot test
                                      Date
                                      2026-09-07
                                      Date kind
                                      Date
                                      From
                                      Citi
                                      To
                                      DBS Singapore → Citi New York · USD
                                      From
                                      citi
                                      To
                                      swift-case-dbs-citi
                                      Type
                                      operating
                                      Status
                                      pilot test
                                      Date
                                      2026-09-07
                                      Claim
                                      Weekend USD payment completed in minutes; external settlement timestamp not disclosed.
                                      Boundary
                                      This relationship is scoped to the cited project; it does not establish a route through another system.
                                      Operational state
                                      pilot test
                                      Needs primary source
                                      No
                                      Question pages
                                        All 383 connectionsDBS Singapore → Citi New York · USD → Swift shared ledger: Shared-ledger coordination
                                        Badge
                                        Text
                                        Pilot test
                                        Date
                                        2026-09-07
                                        Date kind
                                        Date
                                        From
                                        DBS Singapore → Citi New York · USD
                                        To
                                        Swift shared ledger
                                        From
                                        swift-case-dbs-citi
                                        To
                                        swift-shared-ledger
                                        Type
                                        technical
                                        Status
                                        pilot test
                                        Date
                                        2026-09-07
                                        Claim
                                        Weekend USD payment completed in minutes; external settlement timestamp not disclosed.
                                        Boundary
                                        This relationship is scoped to the cited project; it does not establish a route through another system.
                                        Operational state
                                        pilot test
                                        Needs primary source
                                        No
                                        Question pages