Skip to content

The operators: which companies and networks run it, and how far along is each? — saved evidence, page 52

Saved evidence through 2026-10-26. This table projects the linked graphic data; it does not refresh the underlying research.

Return to the graphic · Complete saved JSON

Rows 919–938 of 3717. Page 52 of 194.

Section context and qualifications
Uncertainty
  • Primary sources only (Katie, 2026-10-19): official records and the actor's own documents. News, newsletters, blogs and law-firm summaries were removed on 2026-10-19; what rested on them is held in masters/_held/needs_primary_source_2026-10-19.json.
  • July deck sources carry no dates in the library; their 'date' is null unless re-verified on the web. Web sources checked on 2026-10-19 carry their publication date.
  • Technical finality, authoritative legal record and cash or redemption remedy are separate endpoints. Proposal, staff position, registration, ownership, partnership, software capability, pilot and production are different facts and clocks.
  • This is a capability-and-receipt map, not a league table, safety rating or investment view. A group can lead one surface and depend on another institution for the claim, authoritative record, cash, custody, collateral rulebook or remedy.
  • This is a functional and control comparison, not a ranking of safety, adoption, token value or investment merit. A live partner connection is not group ownership, and an approved or conditional charter is not automatically an operating service.
  • A place on this map records a bounded capability or comparison. It does not establish SEC selection, TSV qualification, a production integration, legal equivalence between models or an investment view.
  • This ledger records dated technology, deal and operating receipts. Announcements, integrations, pilots, availability, named live use and scaled use remain separate states. Company-reported activity is not independently verified volume, legal finality, token value capture or control of a third-party network.
  • The bank comparison, field guide and build-out ledger carry their own cutoffs (late September to October 3); the build-status master (October 19) is current where they differ.
  • placements.json is an index whose rows copy from their homes; its legal rows are on link E, and its countries and timeline rows belong to links H and I (not built in this wave).
  • The Major Bank Digital Transition package has no JSON registry in this workbench (README only); its comparison is read from BANK_TRANSITION_COMPARISON_2026-09-26.json.
SectionRecordSaved detailsSources and dates
All 383 connectionsDBS → Kinexys Digital Payments: DBS / Kinexys
Badge
Text
Announced only
Date
2025-11-11
Date kind
Date
From
DBS
To
Kinexys Digital Payments
From
dbs
To
kinexys-digital-payments
Type
partnership
Status
announced
Date
2025-11-11
Claim
Development framework for cross-network tokenized-deposit transfers; completion not established by this announcement.
Boundary
This relationship is scoped to the cited project; it does not establish a route through another system.
Operational state
announced
Needs primary source
No
Question pages
    All 383 connectionsDBS → Partior network: DBS / Partior
    Badge
    Text
    Current operating
    Date
    2026-03-31
    Date kind
    Date
    From
    DBS
    To
    Partior network
    From
    dbs
    To
    partior-network
    Type
    partnership
    Status
    current operating
    Date
    2026-03-31
    Claim
    DBS reports board participation and material contribution to Partior activity; no quantified SWIFT route follows.
    Boundary
    This relationship is scoped to the cited project; it does not establish a route through another system.
    Operational state
    current operating
    Needs primary source
    No
    Question pages
      All 383 connectionsFirst Abu Dhabi Bank → Kinexys: FAB / Onyx programmable payments
      Badge
      Text
      Pilot test
      Date
      2024-09-24
      Date kind
      Date
      From
      First Abu Dhabi Bank
      To
      Kinexys
      From
      fab
      To
      kinexys
      Type
      partnership
      Status
      pilot test
      Date
      2024-09-24
      Claim
      Completed programmable funding pilot using time and balance triggers on JPM Coin/Onyx.
      Boundary
      This relationship is scoped to the cited project; it does not establish a route through another system.
      Operational state
      pilot test
      Needs primary source
      No
      Question pages
        All 383 connectionsFirstRand Bank Limited → Kinexys Digital Payments: FirstRand / Kinexys
        Badge
        Text
        Current operating
        Date
        2026-03-18
        Date kind
        Date
        From
        FirstRand Bank Limited
        To
        Kinexys Digital Payments
        From
        firstrand-bank
        To
        kinexys-digital-payments
        Type
        partnership
        Status
        current operating
        Date
        2026-03-18
        Claim
        Implemented intragroup USD transfers between Blockchain Deposit Accounts. Primary indexed content retrieved; direct page opening failed.
        Boundary
        This relationship is scoped to the cited project; it does not establish a route through another system.
        Operational state
        current operating
        Needs primary source
        No
        Question pages
          All 383 connectionsHSBC → HSBC Tokenised Deposit Service: HSBC Tokenised Deposit Service
          Badge
          Text
          Live production
          Date
          2025-10-09
          Date kind
          Date
          From
          HSBC
          To
          HSBC Tokenised Deposit Service
          From
          hsbc
          To
          bank-project-11
          Type
          partnership
          Status
          live production
          Date
          2025-10-09
          Claim
          USD Hong Kong–Singapore Ant transfers and Singapore corporate wallet transfers; an intrabank TDS service.
          Boundary
          This relationship is scoped to the cited project; it does not establish a route through another system.
          Operational state
          live production
          Needs primary source
          No
          Question pages
            All 383 connectionsHSBC → HSBC UAE TDS: HSBC UAE TDS
            Badge
            Text
            Announced only
            Date
            2026-06-22
            Date kind
            Date
            From
            HSBC
            To
            HSBC UAE TDS
            From
            hsbc
            To
            bank-project-12
            Type
            partnership
            Status
            announced
            Date
            2026-06-22
            Claim
            Service launch for eligible onboarded clients; no specific customer transaction or SWIFT corridor established.
            Boundary
            This relationship is scoped to the cited project; it does not establish a route through another system.
            Operational state
            announced
            Needs primary source
            No
            Question pages
              All 383 connectionsItaú Unibanco → Itaú / OpenAssets / ANBIMA: Itaú / OpenAssets / ANBIMA
              Badge
              Text
              Pilot test
              Date
              2026-08-11
              Date kind
              Date
              From
              Itaú Unibanco
              To
              Itaú / OpenAssets / ANBIMA
              From
              itau-unibanco
              To
              bank-project-13
              Type
              partnership
              Status
              pilot test
              Date
              2026-08-11
              Claim
              Partnership for debenture and fund lifecycle tokenization; a securities pilot, not a disclosed SWIFT deposit implementation.
              Boundary
              This relationship is scoped to the cited project; it does not establish a route through another system.
              Operational state
              pilot test
              Needs primary source
              No
              Question pages
                All 383 connectionsLloyds Bank → Canton participant validators: Lloyds / Canton gilt pilot
                Badge
                Text
                Pilot test
                Date
                2026-01
                Date kind
                Date
                From
                Lloyds Bank
                To
                Canton participant validators
                From
                lloyds-bank
                To
                canton-participant-validators
                Type
                partnership
                Status
                pilot test
                Date
                2026-01 publication; 2025-12 execution
                Claim
                Sterling tokenized deposits funded a tokenized gilt purchase from Archax; Lloyds also operated a validator.
                Boundary
                This relationship is scoped to the cited project; it does not establish a route through another system.
                Operational state
                pilot test
                Needs primary source
                No
                Question pages
                  All 383 connectionsLloyds Bank → Lloyds / Agorá: Lloyds / Agorá
                  Badge
                  Text
                  Pilot test
                  Date
                  2026-07-30
                  Date kind
                  Date
                  From
                  Lloyds Bank
                  To
                  Lloyds / Agorá
                  From
                  lloyds-bank
                  To
                  bank-project-15
                  Type
                  partnership
                  Status
                  pilot test
                  Date
                  2026-07-30
                  Claim
                  Three completed tests: CHF-to-GBP dealer/sterling settlement roles and separate CHF/EUR customer-bank transactions.
                  Boundary
                  This relationship is scoped to the cited project; it does not establish a route through another system.
                  Operational state
                  pilot test
                  Needs primary source
                  No
                  Question pages
                    All 383 connectionsMashreq → Mashreq blockchain trade finance: Mashreq blockchain trade finance
                    Badge
                    Text
                    Announced only
                    Date
                    2026-10-03
                    Date kind
                    Date
                    From
                    Mashreq
                    To
                    Mashreq blockchain trade finance
                    From
                    mashreq
                    To
                    bank-project-16
                    Type
                    partnership
                    Status
                    announced
                    Date
                    2026 Q1
                    Claim
                    Reports implementing blockchain trade-finance solutions; no named tokenized-money network or SWIFT adapter.
                    Boundary
                    This relationship is scoped to the cited project; it does not establish a route through another system.
                    Operational state
                    announced
                    Needs primary source
                    No
                    Question pages
                      All 383 connectionsMUFG Bank → MUFG / Agorá: MUFG / Agorá
                      Badge
                      Text
                      Pilot test
                      Date
                      2026-07
                      Date kind
                      Date
                      From
                      MUFG Bank
                      To
                      MUFG / Agorá
                      From
                      mufg-bank
                      To
                      bank-project-17
                      Type
                      partnership
                      Status
                      pilot test
                      Date
                      2026-07 event; September 9 retrieval
                      Claim
                      BIS lists MUFG in real-value testing; programme-wide counts and amounts are not MUFG-specific.
                      Boundary
                      This relationship is scoped to the cited project; it does not establish a route through another system.
                      Operational state
                      pilot test
                      Needs primary source
                      No
                      Question pages
                        All 383 connectionsMUFG Bank → MUFG / Mizuho / SMBC stablecoin plan: MUFG / Mizuho / SMBC stablecoin plan
                        Badge
                        Text
                        Planned
                        Date
                        2026-06-10
                        Date kind
                        Date
                        From
                        MUFG Bank
                        To
                        MUFG / Mizuho / SMBC stablecoin plan
                        From
                        mufg-bank
                        To
                        bank-project-18
                        Type
                        partnership
                        Status
                        planned
                        Date
                        2026-06-10
                        Claim
                        Joint council and trust-structure planning, targeting FY2026 commercial transactions; no issuance completion established.
                        Boundary
                        This relationship is scoped to the cited project; it does not establish a route through another system.
                        Operational state
                        planned
                        Needs primary source
                        No
                        Question pages
                          All 383 connectionsOCBC → OCBC / Ant Whale: OCBC / Ant Whale
                          Badge
                          Text
                          Announced only
                          Date
                          2024-11-06
                          Date kind
                          Date
                          From
                          OCBC
                          To
                          OCBC / Ant Whale
                          From
                          ocbc
                          To
                          bank-project-19
                          Type
                          partnership
                          Status
                          announced
                          Date
                          2024-11-06
                          Claim
                          MoU to explore tokenized-deposit treasury payments; no completed transaction established by this release.
                          Boundary
                          This relationship is scoped to the cited project; it does not establish a route through another system.
                          Operational state
                          announced
                          Needs primary source
                          No
                          Question pages
                            All 383 connectionsOCBC → OCBC / MAS SGD Testnet: OCBC / MAS SGD Testnet
                            Badge
                            Text
                            Pilot test
                            Date
                            2026-10-03
                            Date kind
                            Date
                            From
                            OCBC
                            To
                            OCBC / MAS SGD Testnet
                            From
                            ocbc
                            To
                            bank-project-20
                            Type
                            partnership
                            Status
                            pilot test
                            Date
                            2025 showcase
                            Claim
                            UOB reports live testnet interbank wCBDC payments with DBS and OCBC; separate from SWIFT.
                            Boundary
                            This relationship is scoped to the cited project; it does not establish a route through another system.
                            Operational state
                            pilot test
                            Needs primary source
                            No
                            Question pages
                              All 383 connectionsStandard Chartered → Standard Chartered / Ant deposits: Standard Chartered / Ant deposits
                              Badge
                              Text
                              Live production
                              Date
                              2025-12-18
                              Date kind
                              Date
                              From
                              Standard Chartered
                              To
                              Standard Chartered / Ant deposits
                              From
                              standard-chartered
                              To
                              bank-project-21
                              Type
                              partnership
                              Status
                              live production
                              Date
                              2025-12-18
                              Claim
                              Tokenized account-balance solution in Singapore and Hong Kong currencies; no basis to assign Whale to the SWIFT pilot.
                              Boundary
                              This relationship is scoped to the cited project; it does not establish a route through another system.
                              Operational state
                              live production
                              Needs primary source
                              No
                              Question pages
                                All 383 connectionsStandard Chartered → Partior network: Standard Chartered / Partior
                                Badge
                                Text
                                Live production
                                Date
                                2024-05-15
                                Date kind
                                Date
                                From
                                Standard Chartered
                                To
                                Partior network
                                From
                                standard-chartered
                                To
                                partior-network
                                Type
                                partnership
                                Status
                                live production
                                Date
                                2024-05-15 publication; May 13–14 execution
                                Claim
                                Completed EUR Hong Kong–Singapore transactions for Siemens and iFAST on Partior.
                                Boundary
                                This relationship is scoped to the cited project; it does not establish a route through another system.
                                Operational state
                                live production
                                Needs primary source
                                No
                                Question pages
                                  All 383 connectionsUBS → UBS Digital Cash: UBS Digital Cash
                                  Badge
                                  Text
                                  Pilot test
                                  Date
                                  2024-11-07
                                  Date kind
                                  Date
                                  From
                                  UBS
                                  To
                                  UBS Digital Cash
                                  From
                                  ubs
                                  To
                                  bank-project-23
                                  Type
                                  partnership
                                  Status
                                  pilot test
                                  Date
                                  2024-11-07
                                  Claim
                                  Completed domestic and cross-border private-chain pilot in USD, CHF, EUR and CNY; Autoneum named.
                                  Boundary
                                  This relationship is scoped to the cited project; it does not establish a route through another system.
                                  Operational state
                                  pilot test
                                  Needs primary source
                                  No
                                  Question pages
                                    All 383 connectionsUBS → UBS / Ant Whale: UBS / Ant Whale
                                    Badge
                                    Text
                                    Announced only
                                    Date
                                    2025-11-17
                                    Date kind
                                    Date
                                    From
                                    UBS
                                    To
                                    UBS / Ant Whale
                                    From
                                    ubs
                                    To
                                    bank-project-24
                                    Type
                                    partnership
                                    Status
                                    announced
                                    Date
                                    2025-11-17
                                    Claim
                                    MoU to explore Digital Cash and Whale treasury integration; no completed transaction in the release.
                                    Boundary
                                    This relationship is scoped to the cited project; it does not establish a route through another system.
                                    Operational state
                                    announced
                                    Needs primary source
                                    No
                                    Question pages
                                      All 383 connectionsUBS → Chainlink financial-market infrastructure integrations: UBS AM / SWIFT / Chainlink
                                      Badge
                                      Text
                                      Pilot test
                                      Date
                                      2024-11-05
                                      Date kind
                                      Date
                                      From
                                      UBS
                                      To
                                      Chainlink financial-market infrastructure integrations
                                      From
                                      ubs
                                      To
                                      chainlink-fmi
                                      Type
                                      partnership
                                      Status
                                      pilot test
                                      Date
                                      2024-11-05
                                      Claim
                                      Completed tokenized-fund subscription/redemption workflow with conventional payment legs; distinct from SWIFT’s deposit ledger.
                                      Boundary
                                      This relationship is scoped to the cited project; it does not establish a route through another system.
                                      Operational state
                                      pilot test
                                      Needs primary source
                                      No
                                      Question pages
                                        All 383 connectionsUOB → UOB / MAS SGD Testnet: UOB / MAS SGD Testnet
                                        Badge
                                        Text
                                        Pilot test
                                        Date
                                        2026-10-03
                                        Date kind
                                        Date
                                        From
                                        UOB
                                        To
                                        UOB / MAS SGD Testnet
                                        From
                                        uob
                                        To
                                        bank-project-26
                                        Type
                                        partnership
                                        Status
                                        pilot test
                                        Date
                                        2025 showcase
                                        Claim
                                        Completed testnet interbank wCBDC payments with DBS and OCBC, plus a separate repo use case.
                                        Boundary
                                        This relationship is scoped to the cited project; it does not establish a route through another system.
                                        Operational state
                                        pilot test
                                        Needs primary source
                                        No
                                        Question pages