Section context and qualifications
Uncertainty
  • A stated 14- or 21-day design capability is not an observed test; the package says an independence claim is only as strong as its load boundary, duration and operating-test record.
  • The projects have different boundaries (full base, critical load, a gate, a tenant facility), so they are not counted toward one readiness score.
  • The full saved FORTRESS source ledger is available. It lists controlling, framework and project sources with their authority, access state and limits; the signed memorandum remains under the September 30 access hold.
  • Source gap (package README): The official release links the signed memorandum, but the publisher PDF was not retrievable through the available browser, HTTP or PDF-reader paths on September 30. Search indexing exposed the memorandum text and a secondary mirror reproduced it, but this package keeps the memorandum in official_link_access_hold state. The accessible official release controls the confirmed public announcement; memorandum-only wording must be rechecked against the signed PDF before quotation.
  • Candidate primary source, not yet checked: 10 U.S.C. §2920 (https://www.govinfo.gov/link/uscode/10/2920)
SectionRecordSaved detailsSources and dates
Project by project · Operational descriptionMCAS Yuma microgrid
Sub
utility partnership
Badge
Text
Operational description
Where the public record stops
Full-load backup described
Public state
operational publicly described
Load and duration
backup capacity for 100% current/projected base requirements
Next decisive record
current exercise and readiness result
For this row’s sourcing, see the saved details, section context and linked research.
Project by project · Operational descriptionSUBASE New London microgrid
Sub
Navy plant plus first-right access to utility/private fuel-cell park
Badge
Text
Operational description
Where the public record stops
Essential functions
Public state
operational
Load and duration
essential functions; 10.75 MW CHP plus 7.4 MW fuel cells
Next decisive record
current black-start/endurance result
For this row’s sourcing, see the saved details, section context and linked research.
Project by project · Operational descriptionFort McCoy Main Gate microgrid
Sub
Army/Xcel partnership
Badge
Text
Operational description
Where the public record stops
Gate / tenant-facility scope
Public state
operational scope limited
Load and duration
gate and nearby mission-essential facilities; stated ≥14 days
Next decisive record
observed 14-day or recurring exercise result
For this row’s sourcing, see the saved details, section context and linked research.
Project by project · Operational descriptionDLA Distribution Sigonella
Sub
DLA/NAVFAC tenant-facility system
Badge
Text
Operational description
Where the public record stops
Gate / tenant-facility scope
Public state
activated scope limited
Load and duration
DLA facilities; stated up to 14 days on one fuel load
Next decisive record
observed endurance and recovery result
For this row’s sourcing, see the saved details, section context and linked research.
Project by project · Island test observedMCAS Miramar microgrid
Sub
mixed sources and third-party/system partners
Badge
Text
Island test observed
Where the public record stops
Mission-critical islanding; endurance still separate
Public state
operational and exercised
Load and duration
design description up to 21 days; observed exercise covered mission-critical operations
Next decisive record
current endurance/recovery exercise report
For this row’s sourcing, see the saved details, section context and linked research.
Project by project · Not a site: the law, plans, funding and a design goal10 U.S.C. §2920 implementation
Sub
Department/services/agencies
Badge
Text
statutory requirement
Load and duration
each installation's critical-mission energy; 99.9% minimum availability by FY2030
Next decisive record
issued standards, site baselines and compliance evidence
For this row’s sourcing, see the saved details, section context and linked research.
Project by project · Not a site: the law, plans, funding and a design goalInstallation Energy Plans
Sub
services/installations
Badge
Text
planning system
Load and duration
installation-specific mission/load/risk
Next decisive record
current plan tied to financed projects and tests
For this row’s sourcing, see the saved details, section context and linked research.
Project by project · Not a site: the law, plans, funding and a design goalERCIP
Sub
OSD/services; appropriated Defense-wide MILCON
Badge
Text
operating funding program
Load and duration
project-specific mission assurance
Next decisive record
project list, award, completion and test
For this row’s sourcing, see the saved details, section context and linked research.
Project by project · Not a site: the law, plans, funding and a design goalNext Great American Base
Sub
future model-base initiative
Badge
Text
announced design objective
Load and duration
completely off commercial grid by announcement
Next decisive record
site, authority, plan, budget, construction and operation