What does the library hold on Nuclear Regulatory Commission?
Nuclear Regulatory Commission (federal body) appears in 82 saved entries across 6 subjects and 23 source collections, dated January 19, 1975 to September 30, 2026.
Evidence through September 30, 202682 saved entries · 23 source collectionsAll companies and public bodies →Who it is, who owns it, what it owns
Banks and the dollar · Payment technology record· 8 rows
Read from records/tech.json (a master in _Workspace/Indexes/masters/).
Payment technology filings · energy · 8
Fee Schedules; Fee Recovery for Fiscal Year 2026Named in the text
June 16, 2026 · Payment technology filings · energy · row 4
The NRC finalized fixed caps on service fees to implement Section 5(a) of EO 14300, directly attacking the hourly-billing model the order condemned for throttling reactor development. The caps are framed as delivering cost predictability and accountability to license applicants.
The NRC finalized fixed caps on service fees to implement Section 5(a) of EO 14300, directly attacking the hourly-billing model the order condemned for throttling reactor development. The caps are framed as delivering cost predictability and accountability to license applicants.
Tags
fee caps; EO 14300; NEIMA; cost predictability; NRC reform
Licensing Requirements for Microreactors and Other Reactors With Comparable Risk ProfilesNamed in the text
May 1, 2026 · Payment technology filings · energy · row 11
The NRC proposed a new 10 CFR Part 57 framework for rapid, high-volume licensing of microreactors, explicitly responding to EO 14300's direction to consider regulating microreactors through general licenses. The rule would create flexible licensing pathways and reduce regulatory burden for mass-deployed small reactors.
Licensing Requirements for Microreactors and Other Reactors With Comparable Risk Profiles
Summary
The NRC proposed a new 10 CFR Part 57 framework for rapid, high-volume licensing of microreactors, explicitly responding to EO 14300's direction to consider regulating microreactors through general licenses. The rule would create flexible licensing pathways and reduce regulatory burden for mass-deployed small reactors.
Tags
microreactors; Part 57; EO 14300; general license; high-volume
Exceptions From Foreign Ownership, Control or DominationNamed in the text
April 23, 2026 · Payment technology filings · energy · row 12
The NRC proposed carving exceptions to the Atomic Energy Act's foreign-ownership bar for reactor licensees, implementing Section 301 of the ADVANCE Act of 2024. The change opens U.S. reactor projects to allied foreign capital and ownership the AEA had previously blocked.
Exceptions From Foreign Ownership, Control or Domination
Summary
The NRC proposed carving exceptions to the Atomic Energy Act's foreign-ownership bar for reactor licensees, implementing Section 301 of the ADVANCE Act of 2024. The change opens U.S. reactor projects to allied foreign capital and ownership the AEA had previously blocked.
Tags
foreign ownership; ADVANCE Act; FOCD; investment
Plotline
Energy
Subplot
Energy dominance & the nuclear revival
Record kind
official
Related instruments 1
Document number: 2026-07917 · Type: Direct final rule · Publication date: 2026-04-23 · Effective date: 2026-07-07
Related instruments 2
Document number: 2026-11363 · Type: Confirmation of effective date · Publication date: 2026-06-05 · Effective date: 2026-07-07
Maintained state note
The original document remains a proposal. Its companion direct final rule became effective July 7, 2026, confirmed June 5. Eligible utilization-facility foreign interests remain subject to NRC non-inimicality determination; production-facility restrictions remain.
Reconciliation owner
Research Packages/Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md
NRC Reviews of Reactor Designs Previously Authorized by DOE or Department of WarNamed in the text
April 2, 2026 · Payment technology filings · energy · row 14
The NRC proposed letting commercial reactor applicants directly leverage prior DOE or Department of War authorizations of demonstration reactors into NRC licensing reviews, building a bridge from the DOE pilot/test-reactor track to commercial licensing. A concrete mechanism for converting fast-tracked test reactors into licensed commercial plants.
NRC Reviews of Reactor Designs Previously Authorized by DOE or Department of War
Summary
The NRC proposed letting commercial reactor applicants directly leverage prior DOE or Department of War authorizations of demonstration reactors into NRC licensing reviews, building a bridge from the DOE pilot/test-reactor track to commercial licensing. A concrete mechanism for converting fast-tracked test reactors into licensed commercial plants.
Tags
design leveraging; DOE authorization; demonstration reactors; licensing efficiency
Risk-Informed, Technology-Inclusive Regulatory Framework for Advanced Reactors (10 CFR Part 53)Named in the text
March 30, 2026 · Payment technology filings · energy · row 16
The NRC finalized 10 CFR Part 53, a new optional, technology-inclusive licensing pathway built for non-light-water advanced reactor designs, fulfilling a mandate of the Nuclear Energy Innovation and Modernization Act. It gives developers a third licensing route alongside the legacy Part 50 and Part 52 frameworks.
Risk-Informed, Technology-Inclusive Regulatory Framework for Advanced Reactors (10 CFR Part 53)
Summary
The NRC finalized 10 CFR Part 53, a new optional, technology-inclusive licensing pathway built for non-light-water advanced reactor designs, fulfilling a mandate of the Nuclear Energy Innovation and Modernization Act. It gives developers a third licensing route alongside the legacy Part 50 and Part 52 frameworks.
Tags
Part 53; NEIMA; advanced reactors; technology-inclusive; licensing
Streamlining Contested Adjudications in Licensing ProceedingsNamed in the text
March 3, 2026 · Payment technology filings · energy · row 17
The NRC proposed revising its rules of practice to compress contested hearings in licensing proceedings, responding to both the ADVANCE Act of 2024 and EO 14300. The change tightens intervention and filing windows to keep reactor licensing on the EO-mandated accelerated timeline.
Streamlining Contested Adjudications in Licensing Proceedings
Summary
The NRC proposed revising its rules of practice to compress contested hearings in licensing proceedings, responding to both the ADVANCE Act of 2024 and EO 14300. The change tightens intervention and filing windows to keep reactor licensing on the EO-mandated accelerated timeline.
Tags
adjudication; ADVANCE Act; EO 14300; hearings; licensing
Regulatory Framework for Fusion MachinesNamed in the text
February 26, 2026 · Payment technology filings · energy · row 19
The NRC proposed regulating commercial fusion machines under its existing byproduct-material framework — a lighter touch than fission licensing — with technology-inclusive requirements spanning the variety of anticipated fusion designs. The ADVANCE Act's relabeling of 'fusion reactor' to 'fusion machine' anchors the lighter posture meant to clear a path for commercial fusion.
The NRC proposed regulating commercial fusion machines under its existing byproduct-material framework — a lighter touch than fission licensing — with technology-inclusive requirements spanning the variety of anticipated fusion designs. The ADVANCE Act's relabeling of 'fusion reactor' to 'fusion machine' anchors the lighter posture meant to clear a path for commercial fusion.
Executive Order 14300 — Ordering the Reform of the Nuclear Regulatory CommissionNamed in the text
May 29, 2025 · Payment technology filings · energy · row 51
Signed May 23, 2025, this order directs a wholesale overhaul of the NRC, faulting it for licensing only a fraction of reactors since 1978 and for fee structures that throttle development. It mandates fixed fee caps, an 18-month deadline for new reactor license decisions, and a culture shift away from radiation-risk conservatism toward enabling deployment.
Executive Order 14300 — Ordering the Reform of the Nuclear Regulatory Commission
Summary
Signed May 23, 2025, this order directs a wholesale overhaul of the NRC, faulting it for licensing only a fraction of reactors since 1978 and for fee structures that throttle development. It mandates fixed fee caps, an 18-month deadline for new reactor license decisions, and a culture shift away from radiation-risk conservatism toward enabling deployment.
Tags
NRC reform; EO 14300; licensing; 18-month deadline; nuclear
Government · house repository daily discovery 119th· 2 rows
Found in Research Packages/Congressional Committee Control Plane/house_repository_daily_discovery_119th.json by the whole-library index (masters/library_index.json); each row names its home and pointer.
Daily fetches · 1
Nuclear Regulatory Commission: Oversight of Activities, Priorities, and Fiscal Year 2027 Budget.Named in the text
Undated · Daily fetches
Home: Research Packages/Congressional Committee Control Plane/house_repository_daily_discovery_119th.json › /daily_fetches/474/events/10
No https link on this row in its home.
Events · 1
Nuclear Regulatory Commission: Oversight of Activities, Priorities, and Fiscal Year 2027 Budget.Named in the text
April 22, 2026 · Events
Home: Research Packages/Congressional Committee Control Plane/house_repository_daily_discovery_119th.json › /events/951
No https link on this row in its home.
Government · Source Text Editions· 1 row
Found in Research Packages/Executive Order Source Library/Source Text Editions by the whole-library index (masters/library_index.json); each row names its home and pointer.
Notes · 1
EO 14300 — Ordering the Reform of the Nuclear Regulatory CommissionNamed in the text
Undated · Notes
Home: Research Packages/Executive Order Source Library/Source Text Editions › eo-5aa6d3a7df9569a3b22c.md
No https link on this row in its home.
Government · Names matched to research studies· 1 row
Found in Research Packages/Federal Government Movement Atlas/generated/CATALOG_ENTITY_MATCH_REVIEW.json by the whole-library index (masters/library_index.json); each row names its home and pointer.
Labels · 1
Nuclear Regulatory CommissionNamed in the text
September 11, 2026 · Labels
Home: Research Packages/Federal Government Movement Atlas/generated/CATALOG_ENTITY_MATCH_REVIEW.json › /labels/894
No https link on this row in its home.
Government · Research linked to public bodies· 9 rows
Found in Research Packages/Federal Government Movement Atlas/generated/ENTITY_ATTACHMENTS.json by the whole-library index (masters/library_index.json); each row names its home and pointer.
Attachments · 9
Fee Schedules; Fee Recovery for Fiscal Year 2026Exact name in a name field
June 16, 2026 · Attachments
Home: Research Packages/Federal Government Movement Atlas/generated/ENTITY_ATTACHMENTS.json › /attachments/163/filings/6
No https link on this row in its home.
Licensing Requirements for Microreactors and Other Reactors With Comparable Risk ProfilesExact name in a name field
May 1, 2026 · Attachments
Home: Research Packages/Federal Government Movement Atlas/generated/ENTITY_ATTACHMENTS.json › /attachments/163/filings/5
No https link on this row in its home.
Exceptions From Foreign Ownership, Control or DominationExact name in a name field
April 23, 2026 · Attachments
Home: Research Packages/Federal Government Movement Atlas/generated/ENTITY_ATTACHMENTS.json › /attachments/163/filings/4
No https link on this row in its home.
NRC Reviews of Reactor Designs Previously Authorized by DOE or Department of WarExact name in a name field
April 2, 2026 · Attachments
Home: Research Packages/Federal Government Movement Atlas/generated/ENTITY_ATTACHMENTS.json › /attachments/163/filings/3
No https link on this row in its home.
Risk-Informed, Technology-Inclusive Regulatory Framework for Advanced Reactors (10 CFR Part 53)Exact name in a name field
March 30, 2026 · Attachments
Home: Research Packages/Federal Government Movement Atlas/generated/ENTITY_ATTACHMENTS.json › /attachments/163/filings/2
No https link on this row in its home.
Streamlining Contested Adjudications in Licensing ProceedingsExact name in a name field
March 3, 2026 · Attachments
Home: Research Packages/Federal Government Movement Atlas/generated/ENTITY_ATTACHMENTS.json › /attachments/163/filings/1
No https link on this row in its home.
Regulatory Framework for Fusion MachinesExact name in a name field
February 26, 2026 · Attachments
Home: Research Packages/Federal Government Movement Atlas/generated/ENTITY_ATTACHMENTS.json › /attachments/163/filings/0
No https link on this row in its home.
Executive Order 14300 — Ordering the Reform of the Nuclear Regulatory CommissionNamed in the text
May 29, 2025 · Attachments
Home: Research Packages/Federal Government Movement Atlas/generated/ENTITY_ATTACHMENTS.json › /attachments/130/filings/8
No https link on this row in its home.
Money / Tech Machine filings — Nuclear Regulatory CommissionNamed in the text
Undated · Attachments
Home: Research Packages/Federal Government Movement Atlas/generated/ENTITY_ATTACHMENTS.json › /attachments/163
No https link on this row in its home.
Government · Public bodies and their connections· 1 row
Found in Research Packages/Federal Government Movement Atlas/generated/ENTITY_TOPOLOGY.json by the whole-library index (masters/library_index.json); each row names its home and pointer.
Nodes · 1
Nuclear Regulatory CommissionExact name in a name field
January 19, 1975 · Nodes
Home: Research Packages/Federal Government Movement Atlas/generated/ENTITY_TOPOLOGY.json › /nodes/471
No https link on this row in its home.
Government · Faca fy2025 chart reconciliation queue· 3 rows
Found in Research Packages/Government Hidden Control Surfaces 2026/FACA_FY2025_CHART_RECONCILIATION_QUEUE.json by the whole-library index (masters/library_index.json); each row names its home and pointer.
Records · 3
Nuclear Regulatory CommissionExact name in a name field
Undated · Records
Home: Research Packages/Government Hidden Control Surfaces 2026/FACA_FY2025_CHART_RECONCILIATION_QUEUE.json › /records/984/agency_anchor_review/topology_candidates/0
No https link on this row in its home.
Nuclear Regulatory CommissionExact name in a name field
Undated · Records
Home: Research Packages/Government Hidden Control Surfaces 2026/FACA_FY2025_CHART_RECONCILIATION_QUEUE.json › /records/985/agency_anchor_review/topology_candidates/0
No https link on this row in its home.
Nuclear Regulatory CommissionExact name in a name field
Undated · Records
Home: Research Packages/Government Hidden Control Surfaces 2026/FACA_FY2025_CHART_RECONCILIATION_QUEUE.json › /records/986/agency_anchor_review/topology_candidates/0
No https link on this row in its home.
Government · Ffrdc source collection census fy2025 fy2026· 1 row
Found in Research Packages/Government Hidden Control Surfaces 2026/FFRDC_MASTER_CENSUS_FY2025_FY2026.json by the whole-library index (masters/library_index.json); each row names its home and pointer.
Records · 1
Center for Nuclear Waste Regulatory AnalysesExact name in a name field
Undated · Records
Home: Research Packages/Government Hidden Control Surfaces 2026/FFRDC_MASTER_CENSUS_FY2025_FY2026.json › /records/9
No https link on this row in its home.
Government · Founding dates· 1 row
Found in Research Packages/Government Hidden Control Surfaces 2026/promotion_staging/final_owner_repairs/04 - Synthesis/Entity Theory/entity_founding_dates.json by the whole-library index (masters/library_index.json); each row names its home and pointer.
Entities · 1
Nuclear Regulatory CommissionExact name in a name field
January 19, 1975 · Entities
Home: Research Packages/Government Hidden Control Surfaces 2026/promotion_staging/final_owner_repairs/04 - Synthesis/Entity Theory/entity_founding_dates.json › /entities/221
No https link on this row in its home.
Government · LOCAL COVERAGE AUDIT.generated· 1 row
Found in Research Packages/White House Research Hub/LOCAL_COVERAGE_AUDIT.generated.json by the whole-library index (masters/library_index.json); each row names its home and pointer.
Action coverage · 1
Ordering the Reform of the Nuclear Regulatory CommissionNamed in the text
May 23, 2025 · Action coverage
Home: Research Packages/White House Research Hub/LOCAL_COVERAGE_AUDIT.generated.json › /action_coverage/71
Government · WHITE HOUSE RESEARCH INVENTORY.generated· 1 row
Found in Research Packages/White House Research Hub/WHITE_HOUSE_RESEARCH_INVENTORY.generated.json by the whole-library index (masters/library_index.json); each row names its home and pointer.
Papers · 1
Ordering the Reform of the Nuclear Regulatory CommissionNamed in the text
May 23, 2025 · Papers
Home: Research Packages/White House Research Hub/WHITE_HOUSE_RESEARCH_INVENTORY.generated.json › /papers/24/related/33
Read from eo_status.json + eo_agency_links.json (a master in _Workspace/Indexes/masters/).
Executive orders that put it to work · 5
EO 14299: Deploying Advanced Nuclear Reactor Technologies for National Securitydirected programs, site designations, and export clocks · reactors and fuel tran
May 23, 2025 · Executive orders that put it to work · row 14299
Defense through the Army must stand up a nuclear program of record and commence an Army-regulated reactor at a domestic installation by September 30, 2028. Energy must designate Department sites, authorize privately funded advanced reactors for AI and national-security loads, and release at least 20 metric tons of HALEU into a fuel bank. State must pursue 123 Agreements.
Army nuclear program of record, DOE siting, HALEU bank, and 123-agreement push
What the map says
Defense through the Army must stand up a nuclear program of record and commence an Army-regulated reactor at a domestic installation by September 30, 2028. Energy must designate Department sites, authorize privately funded advanced reactors for AI and national-security loads, and release at least 20 metric tons of HALEU into a fuel bank. State must pursue 123 Agreements. A program of record is not a reactor at criticality.
Agencies on the map
Council on Environmental Quality; Dept of Energy; Dept of State; National Security Council
EO 14300: Ordering the Reform of the Nuclear Regulatory Commissiondirected reorganization and rule rewrite · RIF, licenses, and model change not p
May 23, 2025 · Executive orders that put it to work · row 14300
The Nuclear Regulatory Commission must reorganize, reduce force, shrink the Advisory Committee on Reactor Safeguards to its statutory minimum, and rewrite its regulations on a 9-month notice / 18-month final clock, including fixed licensing deadlines. This paper does not repeal the Atomic Energy Act. A directed reorganization is not a completed reduction in force or a new license issued.
NRC reorganization, RIF, and wholesale rule rewrite
What the map says
The Nuclear Regulatory Commission must reorganize, reduce force, shrink the Advisory Committee on Reactor Safeguards to its statutory minimum, and rewrite its regulations on a 9-month notice / 18-month final clock, including fixed licensing deadlines. This paper does not repeal the Atomic Energy Act. A directed reorganization is not a completed reduction in force or a new license issued.
Agencies on the map
Council on Environmental Quality; Nuclear Regulatory Commission
EO 14302: Reinvigorating the Nuclear Industrial Basedirected · reports, agreements, and loans not proved
May 23, 2025 · Executive orders that put it to work · row 14302
Energy holds the spent-fuel report, surplus-plutonium swap, enrichment plan, and Loan Programs Office priority. Defense, Transportation, and OMB coordinate the report. NRC is consulted on enrichment, not given a new license statute. DPA § 708 voluntary agreements are talks, not purchases. This paper does not itself license a reactor or close a loan.
Energy fuel-cycle report, DPA 708 talks, loan-office priority
What the map says
Energy holds the spent-fuel report, surplus-plutonium swap, enrichment plan, and Loan Programs Office priority. Defense, Transportation, and OMB coordinate the report. NRC is consulted on enrichment, not given a new license statute. DPA § 708 voluntary agreements are talks, not purchases. This paper does not itself license a reactor or close a loan.
Agencies on the map
Dept of Energy; Office of Science & Technology Policy; Small Business Administration
EO 14270: Zero-Based Regulatory Budgeting To Unleash American Energydirected sunset-rule insertion · CFR deletions and extensions not proved
April 9, 2025 · Executive orders that put it to work · row 14270
EPA, Energy, FERC, NRC, and named Interior and Army subcomponents must insert Conditional Sunset Dates into Covered Regulations issued under listed energy and land statutes. A sunset rule due by September 30, 2025 is not a completed Code of Federal Regulations deletion. Statutory permitting regimes are carved out.
Everything on this row (21 fields, 1 dated events, 4 sources)
Key
14270
Label
EO 14270
Eo number
14270
Title
Zero-Based Regulatory Budgeting To Unleash American Energy
Signed
2025-04-09
Fr publication date
2025-04-15
Citation
90 FR 15643
Term
second
Year
2025
Provisional
no
Status text
directed sunset-rule insertion · CFR deletions and extensions not proved
Conditional sunset dates on named energy-statute rules
What the map says
EPA, Energy, FERC, NRC, and named Interior and Army subcomponents must insert Conditional Sunset Dates into Covered Regulations issued under listed energy and land statutes. A sunset rule due by September 30, 2025 is not a completed Code of Federal Regulations deletion. Statutory permitting regimes are carved out.
EO 14251: Exclusions From Federal Labor-Management Relations Programsoperative exclusion · Defense/VA restore and Transportation orders are later Fed
March 27, 2025 · Executive orders that put it to work · row 14251
The President determines under 5 U.S.C. § 7103(b)(1) that named agencies and subdivisions have a primary intelligence, counterintelligence, investigative, or national-security function and that chapter 71 cannot be applied consistently with national security, and under 22 U.S.C. § 4103(b) the same as to named Foreign Service subdivisions. The determinations amend Executive Order 12171.
Everything on this row (21 fields, 1 dated events, 5 sources)
Key
14251
Label
EO 14251
Eo number
14251
Title
Exclusions From Federal Labor-Management Relations Programs
Signed
2025-03-27
Fr publication date
2025-04-03
Citation
90 FR 14553
Term
second
Year
2025
Provisional
no
Status text
operative exclusion · Defense/VA restore and Transportation orders are later Federal Register gates · 14343 later amends the list
Chapter-71 national-security exclusions; not a firing
What the map says
The President determines under 5 U.S.C. § 7103(b)(1) that named agencies and subdivisions have a primary intelligence, counterintelligence, investigative, or national-security function and that chapter 71 cannot be applied consistently with national security, and under 22 U.S.C. § 4103(b) the same as to named Foreign Service subdivisions. The determinations amend Executive Order 12171. They exclude units from the labor-management program. They do not fire anyone. Defense and Veterans Affairs hold a 15-day Federal Register restore clock. Transportation holds a further-exclusion delegation. EO 14343 is a later sibling, not a flattening.
Agencies on the map
Dept of Transportation; Federal Labor Relations Authority
Hearing on the Nominations of Lee Beaman to be a Member of the Board of Directors of the Tennessee Valley Authority and Douglas Weaver to be a Member of the Nuclear Regulatory CommissionNamed in the text
Hearing on the Nominations of Ho Nieh to be a Member of the Nuclear Regulatory Commission and Douglas Troutman to be Assistant Administrator for Toxic Substances of the Environmental Protection AgencyNamed in the text
Hearing on the Nominations of Usha-Maria Turner to be Assistant Administrator of the Environmental Protection Agency for the Office of International and Tribal Affairs and David A. Wright to be a Member of the Nuclear Regulatory CommissionNamed in the text
Across the library · 2026-08-22 Founding dates· 1 row
Found in Research Packages/Federal Government Full Freshness Sweep 2026-08-22/source_snapshots/2026-08-22__entity_founding_dates.json by the whole-library index (masters/library_index.json); each row names its home and pointer.
Entities · 1
Nuclear Regulatory CommissionExact name in a name field
January 19, 1975 · Entities
Home: Research Packages/Federal Government Full Freshness Sweep 2026-08-22/source_snapshots/2026-08-22__entity_founding_dates.json › /entities/221
No https link on this row in its home.
Across the library · 2026-08-22 federal-register-2026-08-21-onward· 14 rows
Found in Research Packages/Federal Government Full Freshness Sweep 2026-08-22/source_snapshots/2026-08-22__federal-register-2026-08-21-onward.json by the whole-library index (masters/library_index.json); each row names its home and pointer.
Results · 14
Arizona Public Service Company; Palo Verde Nuclear Generating Station, Units 1, 2, and 3; Indirect Transfer of Control of LicensesNamed in the text
August 24, 2026 · Results
Home: Research Packages/Federal Government Full Freshness Sweep 2026-08-22/source_snapshots/2026-08-22__federal-register-2026-08-21-onward.json › /results/13
Duke Energy Progress, LLC; Brunswick Steam Electric Plant, Units 1 and 2, Shearon Harris Nuclear Power Plant, Unit 1, H.B. Robinson Steam Electric Plant, Unit 2, H.B. Robinson Steam Electric Plant, Unit 2 Independent Spent Fuel Storage Installation; Consideration of Approval of Transfer of LicensesNamed in the text
August 21, 2026 · Results
Home: Research Packages/Federal Government Full Freshness Sweep 2026-08-22/source_snapshots/2026-08-22__federal-register-2026-08-21-onward.json › /results/103
Draft NUREG: Training Review Criteria and ProceduresNamed in the text
August 21, 2026 · Results
Home: Research Packages/Federal Government Full Freshness Sweep 2026-08-22/source_snapshots/2026-08-22__federal-register-2026-08-21-onward.json › /results/118
Draft Regulatory Guide: Assessing Public Health Risk Associated With Chemical Hazards of Licensed MaterialNamed in the text
August 21, 2026 · Results
Home: Research Packages/Federal Government Full Freshness Sweep 2026-08-22/source_snapshots/2026-08-22__federal-register-2026-08-21-onward.json › /results/155
Draft Interim Staff Guidance: Evaluations of Risk Assessments for Risk-Informed Decision-Making for Regulatory ApplicationsNamed in the text
August 21, 2026 · Results
Home: Research Packages/Federal Government Full Freshness Sweep 2026-08-22/source_snapshots/2026-08-22__federal-register-2026-08-21-onward.json › /results/156
Advisory Committee on the Medical Uses of Isotopes: Meeting NoticeNamed in the text
August 21, 2026 · Results
Home: Research Packages/Federal Government Full Freshness Sweep 2026-08-22/source_snapshots/2026-08-22__federal-register-2026-08-21-onward.json › /results/90
Nuclear Regulatory CommissionExact name in a name field
Undated · Results
Home: Research Packages/Federal Government Full Freshness Sweep 2026-08-22/source_snapshots/2026-08-22__federal-register-2026-08-21-onward.json › /results/103/agencies/0
Nuclear Regulatory CommissionExact name in a name field
Undated · Results
Home: Research Packages/Federal Government Full Freshness Sweep 2026-08-22/source_snapshots/2026-08-22__federal-register-2026-08-21-onward.json › /results/105/agencies/0
Nuclear Regulatory CommissionExact name in a name field
Undated · Results
Home: Research Packages/Federal Government Full Freshness Sweep 2026-08-22/source_snapshots/2026-08-22__federal-register-2026-08-21-onward.json › /results/118/agencies/0
Nuclear Regulatory CommissionExact name in a name field
Undated · Results
Home: Research Packages/Federal Government Full Freshness Sweep 2026-08-22/source_snapshots/2026-08-22__federal-register-2026-08-21-onward.json › /results/13/agencies/0
Nuclear Regulatory CommissionExact name in a name field
Undated · Results
Home: Research Packages/Federal Government Full Freshness Sweep 2026-08-22/source_snapshots/2026-08-22__federal-register-2026-08-21-onward.json › /results/155/agencies/0
Nuclear Regulatory CommissionExact name in a name field
Undated · Results
Home: Research Packages/Federal Government Full Freshness Sweep 2026-08-22/source_snapshots/2026-08-22__federal-register-2026-08-21-onward.json › /results/156/agencies/0
Nuclear Regulatory CommissionExact name in a name field
Undated · Results
Home: Research Packages/Federal Government Full Freshness Sweep 2026-08-22/source_snapshots/2026-08-22__federal-register-2026-08-21-onward.json › /results/85/agencies/0
Nuclear Regulatory CommissionExact name in a name field
Undated · Results
Home: Research Packages/Federal Government Full Freshness Sweep 2026-08-22/source_snapshots/2026-08-22__federal-register-2026-08-21-onward.json › /results/90/agencies/0
Across the library · 2026-08-22 public-inspection-current· 1 row
Found in Research Packages/Federal Government Full Freshness Sweep 2026-08-22/source_snapshots/2026-08-22__public-inspection-current.json by the whole-library index (masters/library_index.json); each row names its home and pointer.
Results · 1
Nuclear Regulatory CommissionExact name in a name field
Undated · Results
Home: Research Packages/Federal Government Full Freshness Sweep 2026-08-22/source_snapshots/2026-08-22__public-inspection-current.json › /results/75/agencies/0
Across the library · Federal Register publications 2026-09-04 to 2026-09-11· 7 rows
Found in Research Packages/Federal Government Weekly Delta 2026-09-11/generated/FR_PUBLICATION_CENSUS_2026-09-04_TO_2026-09-11.json by the whole-library index (masters/library_index.json); each row names its home and pointer.
Documents · 7
Information Collection: NRC Form 212, Qualifications Investigation Professional, Technical, and Administrative PositionsExact name in a name field
September 11, 2026 · Documents
Home: Research Packages/Federal Government Weekly Delta 2026-09-11/generated/FR_PUBLICATION_CENSUS_2026-09-04_TO_2026-09-11.json › /documents/476
Virginia Electric and Power Company, (Doing Business as Dominion Energy Virginia); North Anna Site; Early Site Permit Renewal ApplicationExact name in a name field
September 11, 2026 · Documents
Home: Research Packages/Federal Government Weekly Delta 2026-09-11/generated/FR_PUBLICATION_CENSUS_2026-09-04_TO_2026-09-11.json › /documents/508
Application for Amendment to Facility Operating License Involving Proposed No Significant Hazards Consideration Determination and Containing Sensitive Unclassified Non-Safeguards Information and Order Imposing Procedures for Access to Sensitive Unclassified Non-Safeguards InformationExact name in a name field
September 8, 2026 · Documents
Home: Research Packages/Federal Government Weekly Delta 2026-09-11/generated/FR_PUBLICATION_CENSUS_2026-09-04_TO_2026-09-11.json › /documents/125
Across the library · Federal Register publications 2026-09-11 to 2026-09-16· 7 rows
Found in Research Packages/Federal Government Weekly Delta 2026-09-16/generated/FR_PUBLICATION_CENSUS_2026-09-11_TO_2026-09-16.json by the whole-library index (masters/library_index.json); each row names its home and pointer.
Documents · 7
Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving no Significant Hazards ConsiderationsExact name in a name field
September 15, 2026 · Documents
Home: Research Packages/Federal Government Weekly Delta 2026-09-16/generated/FR_PUBLICATION_CENSUS_2026-09-11_TO_2026-09-16.json › /documents/271
Virginia Electric and Power Company, (Doing Business as Dominion Energy Virginia); North Anna Site; Early Site Permit Renewal ApplicationExact name in a name field
September 11, 2026 · Documents
Home: Research Packages/Federal Government Weekly Delta 2026-09-16/generated/FR_PUBLICATION_CENSUS_2026-09-11_TO_2026-09-16.json › /documents/4
Across the library · Physical Production Systems Full-Surface Wave 2026-08-04· 1 row
Found in Research Packages/Federal Government Whole-Site Recertification 2026-08-01/Physical Production Systems Full-Surface Wave 2026-08-04 by the whole-library index (masters/library_index.json); each row names its home and pointer.
Notes · 1
Physical Production Systems Full-Surface Wave — 2026-08-04Exact name in a name field
August 4, 2026 · Notes
Home: Research Packages/Federal Government Whole-Site Recertification 2026-08-01/Physical Production Systems Full-Surface Wave 2026-08-04 › PHYSICAL_PRODUCTION_SYSTEMS_FULL_SURFACE_WAVE_2026-08-04.md
No https link on this row in its home.
Official records and research notes · Official Records· 5 rows
Found in vault:02 - Research/Official Records by the whole-library index (masters/library_index.json); each row names its home and pointer.
Official Records notes · 5
SMR, LLC; Palisades SMR, LLC; Pioneer Units 1 and 2; ExemptionNamed in the text
August 28, 2026 · Official Records notes
Home: vault:02 - Research/Official Records › Official filings/2026-08-28-0000 - NRC Pioneer Units 1 and 2 pre-LWA excavation-wall exemption.md
RESEARCH DESK CATALOG.json · Studies in the Research Desk Catalog
Conflicts (both readings)· 0
No conflict about this entity is recorded in the masters.
What is uncertain· 3
76 of the 82 rows name Nuclear Regulatory Commission without carrying its shared id (40 by an exact name field, 36 named in the text); each such row is labelled, and a row that only mentions the name may be about something else it does.
This body has no shared entity id yet; its page id is its federal-tree id, and its names come from the tree by fixed rules.
68 rows come from the whole-library index (built 2026-10-25): each shows its title, date, link and the place it lives (home and pointer); open the home to read the row in full.
Sources and data
Rows are read at build time from the masters in Workbench _Workspace/Indexes/masters/ and the package registries named on each section; nothing is copied into this page.
Every other home in the library (every package registry and note, the Research Desk Catalog, Official Records, executive-order notes, source folders and essays) is read through masters/library_index.json, built nightly by build_library_index.py.
Shared ids: masters/entities/entities.json and crosswalk.json; federal tree: masters/federal_entities.json; open questions: RESEARCH RETURN LEDGER.json.
Matched by shared id first, then by exact legal name or alias in a name field, then by the exact name in a row's title or summary; never by a fuzzy guess.
Earlier record links retain their original identity. Unproved successors remain dated history.
This saved link has a verified current record. Open the record.
This saved link has a verified current record. Open the record.
Saved historical record. Retained from release 94b2c7301a00. Its original dates and identity limits remain; no current successor is asserted.
Exceptions From Foreign Ownership, Control or DominationNamed in the text
April 23, 2026 · Payment technology filings · energy · row 12
The NRC proposed carving exceptions to the Atomic Energy Act's foreign-ownership bar for reactor licensees, implementing Section 301 of the ADVANCE Act of 2024. The change opens U.S. reactor projects to allied foreign capital and ownership the AEA had previously blocked.
Exceptions From Foreign Ownership, Control or Domination
Summary
The NRC proposed carving exceptions to the Atomic Energy Act's foreign-ownership bar for reactor licensees, implementing Section 301 of the ADVANCE Act of 2024. The change opens U.S. reactor projects to allied foreign capital and ownership the AEA had previously blocked.