# VA EHR September 30, 2025 notification and $37.2B model — batch 1 No public copy of VA's asserted September 30, 2025 congressional notification, transmittal routing, attachment, or $37.2 billion cost model was recovered from existing saved material or targeted official-source searches. The only direct public statement found is the later FY2027 Volume 5 CJ, which says the figure includes $10.5 billion of obligated actual spending in 2018–2024 and uses historical costs plus projected resources for 170 sites through 2031. The recovered two-page March 28, 2025 bicameral letter asked Secretary Collins for a **detailed** estimate and schedule by September 30. GAO's December 2025 and September 2026 official testimony then says VA had supplied a notional schedule but had not supplied the updated cost estimate GAO sought; its recommendation for an updated **independent** life-cycle estimate remained open. That is not proof that the CJ's described high-level notification was never delivered. It does establish that the public record here does not support treating the $37.2 billion figure as the detailed independently validated model Congress and GAO requested. No related hearing was treated as proof of FY2027-CJ reliance. The receipt distinguishes the original request letter, the CJ's later institutional assertion, and GAO's later oversight status.