--- title: Federal Data Center Claim Firewall and Watchboard status: current cutoff: 2026-08-20 artifact_role: claim-audit-and-return-watchboard --- # Federal data-center claim firewall and return watchboard ## Carry / correct / reject | Public compression | Ruling | Factual replacement | |---|---|---| | “The federal government has banned new AI data centers.” | **Reject.** | S.4214/H.R.9442 propose a moratorium but remain introduced and referred. No general federal commercial moratorium exists. | | “Congress has required data centers to pay all grid costs.” | **Reject.** | Several bills propose differing FERC/PURPA allocation regimes. They are not law. FERC/RTO/state PUC actions are a separate Wave 2 clock. | | “EO 14318 eliminated environmental review.” | **Reject.** | The order directs acceleration tools under existing statutes. Issued returns include guidance, priority review, FAST-41 coordination and NWP 39; project-level requirements remain. | | “FAST-41 approved the QTS/PORTS projects.” | **Correct.** | FAST-41 coverage supplies a coordinated public permitting timetable. It is not permit issuance or federal endorsement. | | “EPA exempted islanded data-center generators from the Clean Air Act.” | **Reject.** | EPA issued a fact-dependent Acid Rain Program interpretation only. It expressly leaves all other CAA programs untouched. | | “NWP 39 means any data center can fill wetlands.” | **Reject.** | NWP 39 expressly includes data centers but generally limits waters loss to ½ acre and requires notification, conditions and district review; other statutes still apply. | | “EPA picked Superfund sites for data centers.” | **Correct.** | EPA published guidance and a discovery mapper. Entries are candidates/data records, not site awards, remedy decisions or development approvals. | | “DOE selected four developers in July 2025.” | **Reject.** | DOE selected four federal sites for solicitations. Sponsor selection, lease and permit clocks are separate. | | “Amentum won the Savannah River lease.” | **Correct.** | Amentum was selected to enter negotiations. DOE expressly states that this is not a final lease award. | | “The Paducah power plan is approved.” | **Reject.** | DOE announced selected project partners. The power-service agreement remains subject to Kentucky PSC approval; other agreements and permits remain separate. | | “The Army awarded Fort Bliss and Dugway data-center leases.” | **Correct.** | Army made conditional selections for exclusive negotiations and says the deal is not final. | | “Portsmouth proves the full 10 GW campus is on federal land.” | **Reject.** | DOE confirms an initial 189-acre federal lease; the FAST-41 object describes a larger adjacent private-land campus. Preserve the land-perimeter split. | | “A categorical exclusion is a project permit.” | **Reject.** | A CX resolves the NEPA review route for the described agency action. It does not supply land, air, water, ESA, utility, building or operating approvals. | | “No public CEQ inventory means agencies missed EO 14318.” | **Reject.** | No public compilation was located, but the order did not require publication. Public absence does not prove non-submission or noncompliance. | | “The Ratepayer Protection Pledge is a tariff.” | **Reject.** | It is a proclamation/voluntary policy instrument. Enforceable allocation requires a statute, tariff, PUC/FERC order, contract or other operative instrument. | | “The science strategy proves a data-center legal program.” | **Reject.** | Strategy documents can route research but are not legislation, regulation, lease, permit or award. Keep them outside this legal proof chain. | ## Return-object watchboard | Watch | Current state | Exact object that promotes it | Best official surface | Failure / falsifier | |---|---|---|---|---| | Commerce/OSTP EO §3 initiative | No consolidated public instrument located. | Dated initiative document defining programs, eligibility, authority and administering offices; agency support inventory; or named award/financial instrument tied to §3. | Commerce, OSTP, Federal Register, USAspending, DOE LPO. | Another announcement that cites AI investment but identifies no federal instrument. | | CEQ ten-day CE inventory | No public compilation located. | CEQ/agency inventory, adoption notice or data-center-specific CE with authority and effective date. | CEQ, agency NEPA pages, Federal Register. | General CE guidance or a project-specific CX represented as a government-wide inventory. | | FAST-41 transparency route | Two covered projects; no EO-specific transparency posting located. | Dashboard transparency-project record, agency notification and/or Executive Director determination tied to EO §6. | Permitting Dashboard / FPISC. | Ordinary statutory covered-project posting alone. | | QTS Richmond DC5 | Covered; in progress. | Final USACE permit/denial and completion of every listed federal authorization, each with date. | FAST-41 dashboard; USACE Norfolk District. | Treating timetable progress as approval. | | PORTS Technology Campus | Covered; in progress. | Completed federal authorizations plus exact final land, water, ESA and permit objects. | FAST-41 dashboard; USACE; FWS; DOE. | Groundbreaking or lease announcement represented as federal permitting completion. | | Savannah River / Amentum | Selection for negotiations. | Executed phased lease and authoritative terms, followed separately by permits and construction notice. | NNSA, SAM.gov, site NEPA/security records. | Repetition of selection announcement. | | Paducah / Brookfield–NextEra | Sponsor selections; PSC condition outstanding in DOE release. | Executed lease(s); Kentucky PSC final order on power service; interconnection/service agreements; named permits. | DOE; Kentucky PSC; utilities; MISO/FERC where applicable. | Investment/partnership announcement without dispositive instruments. | | INL and Oak Ridge | Solicitation stage in reviewed public record. | Official selection decision and executed lease, separately dated. | DOE site offices; SAM.gov. | Applicant statement without agency disposition. | | Army Fort Bliss / Dugway | Conditional selection / negotiations. | Executed 10 U.S.C. 2667 lease and final environmental/realty authorizations. | Army; installations; SAM.gov; NEPA notices. | Projected IOC or exclusive negotiation treated as lease execution. | | Air Force eight-site solicitations | Solicitation; Arnold no-proposal. | Installation-specific final selection/award and executed lease. | AFCEC opportunities; SAM.gov; base releases. | One base's nonresponse generalized to all installations. | | Townsite BLM right-of-way | Approved decision; appeal period shown. | Final effective ROW instrument after appeal/administrative disposition, exact acreage and later permits. | BLM ePlanning and lands/realty record. | Announcement alone treated as unappealable or operating. | | EPA Brownfield/Superfund implementation | Guidance/mapper, no authoritative EO designation list located. | Site-specific EPA/state/Tribal remedy/suitability/land-use and permit records; any official EO list. | EPA Superfund/Brownfields; state/Tribal programs. | Mapper point represented as approval. | | ESA programmatic consultation | No posted EO-specific document located. | Initiation letter plus completed FWS/NOAA programmatic consultation/BiOp, action area, duration and covered activities. | FWS ECOS; NOAA; agency NEPA/ESA records. | DOE site selection or NWP coverage represented as ESA completion. | | EPA CWA implementation | No EO-specific final/proposed data-center effluent rule located. | Proposed/final rule, NPDES general permit or project permit with exact effective state. | EPA, Federal Register, authorized state agencies. | WRAP 2.0 policy work represented as a permit standard. | | EPA NSR construction proposal | Proposal; comments closed June 29, 2026. | Final Federal Register rule, effective date and any litigation/stay. | Federal Register; EPA air rule pages. | Reliance on proposed text. | | Direct federal bills | Introduced/referred only. | Committee report/markup, chamber passage, presentment or enacted Public Law text. | Congress.gov; GovInfo; committees. | Hearing, cosponsor, press release or nonbinding resolution represented as law. | | FY2026 NDAA §321 Navy pilot | Enacted; initiation due Dec. 18, 2026. | Navy initiation instrument; site selection; report within 30 days; later project approvals. | Navy/DOD; congressional reports; Federal Register if used. | Enacted direction represented as reactor/data-center approval. | | FY2026 NDAA §1531 DOD roadmap | Enacted; first specified update Mar. 1, 2027. | Updated roadmap with installation-specific estimates. | DOD CIO/CTO; congressional submission surfaces. | Data-center announcement represented as statutory report completion. | ## Five-clock project grammar For every named project, record these fields independently: 1. **proposal/solicitation** — an agency or sponsor invites/offers development; 2. **selection/agreement** — the agency chooses a counterparty or signs a legal instrument, with negotiations and final execution kept separate; 3. **authorization** — land, environmental, utility, rate and building objects; 4. **construction/commissioning** — physical work and testing; and 5. **commercial or initial operation** — the named facility actually serves load under the required agreements. No earlier clock inherits a later verb. ## Wave 2 bridge — deliberately not adjudicated here The next federal-regulatory wave should start from FERC RM26-4 and the June 18, 2026 section 206 proceedings involving six RTO/ISO large-load tariff regimes, then descend into the exact tariffs, filings, intervention records and orders. It should join state PUC large-load tariffs and named project service approvals without importing the voluntary Ratepayer Protection Pledge as law.