# Access Holds and Bounded Negatives The lane is substantively closed through **2026-08-23 10:21:17.132404 EDT** with next lawful cursor **2026-08-23 10:21:17.132404 EDT exclusive for exact-time sources; replay 2026-08-23 00:00:00 EDT inclusive for date-only or batch-posted sources before advancing**. Close-replay transport states are blocked=1, reached=90. A block or challenge is transport evidence, not a substantive negative; current native objects were separately reviewed. ## Bounds by publisher family - **DOE/NNSA:** DOE collection pages, office news, section 202(c), funding, directives, NEPA, OIG, FOIA and Federal Register surfaces were all checked. The DOE agency API's 110 rows include 100 FERC rows; exact attribution leaves 10 non-FERC DOE rows. A press release does not replace its legal, award or environmental instrument. - **Laboratories:** LANL (23), LLNL (3), PNNL (84), INL (6), SRNL (3) and ORNL (96) sitemap candidates were screened. Lastmod is discovery only. Sandia, Argonne and other lab publishers may challenge deterministic clients. Lab and contractor pages do not become DOE actions by adjacency. Government-issued legal and oversight overlays were checked at DOE/Federal Register/GAO; their absence from a contractor publisher is not a no-government-action finding. - **Argonne:** current official news pages were reachable through rendered/searchable official surfaces while curl can be challenged; the public-index result stays `dynamic_bounded`. - **Brookhaven:** the dated newsroom exposed no post-floor item before the native boundary. That is an `empty_hunt`, not no lab activity. - **FERC:** the official API enumerated exactly 100 Aug. 4-Aug. 21 documents across fourteen dates. Ninety-six routine notices remain census-only. eLibrary and decision-index dynamics prevent a claim about nonpublic or later-filed docket material. - **EIA:** six Today in Energy articles, the Aug. 11 STEO and three What's New releases were enumerated. They are analyses, forecasts and data releases, not policy or observed future outcomes. - **PMA aggregate:** the four publishers were checked separately. WAPA exposed no post-floor newsroom item; BPA's Q3 forecast, SEPA's proposed-rate state and SWPA's projected daily schedule were not collapsed. Forecasts, proposals and schedules are not final rates or actual generation. - **Nuclear Waste Fund:** the current OSCM page still exposes FY2025/CY2025 material and no post-floor fund object. This does not establish current Treasury balances, receipts, litigation state or unpublished contract action. ## Global bound No public-site sweep proves absence of classified, nonpublic, contractor-held, unlinked, not-yet-cleared, dynamically generated or later-posted records. Selection, negotiation, award, obligation, construction, commissioning and operation remain separate states. Date-only and batch-posted sources require replay of the full close date before advancing.