# Wave 1C — operations, industry, procurement, and delivery **Window:** exclusive after 2026-09-03 20:09:34 EDT through frozen cutoff 2026-09-11 16:01:37 EDT **Inclusive replay:** 2026-09-03 date-only FR/PI and date-only agency publishers, then dedupe against Weekly Delta 2026-09-03 **Lane:** Purse civilian. FR ops objects for DOE, Commerce, USDA, Interior, EPA, DOT, NASA, GSA, OPM, NSF, NRC. Direct-site hunt is `WAVE_2C_DIRECT_SITES_OPERATIONS_SECURITY.md`. **Legal writeups owned by 1A:** presidential instruments as law. This wave owns industrial/production/delivery implication only. **Do not recensus:** Genesis Mission refresh through 2026-09-09 15:40 EDT; ED Learning Agenda Playbook; Twelve Banks / SR 26-6 / SWIFT / COMEX. Award ≠ obligation ≠ payment ≠ delivery ≠ operation. A 403 is a blocked surface, not a missing source. ## Promotion-review objects ### 1. EO 14427 moved DPA energy-production authority onto Interior, independently of Energy **Actor:** President; Department of the Interior; Department of Energy; Department of Commerce; National Energy Dominance Council; National Security Council; Department of War **Clocks:** signed 2026-09-08; White House posted same day; FR publication 2026-09-11 as 2026-18739 / EO 14427 (91 FR 58007); Public Inspection 2026-09-10 11:15. No later agency implementation instrument in this window. **URL:** [White House signed instrument](https://www.whitehouse.gov/presidential-actions/2026/09/adjusting-certain-delegations-under-the-defense-production-act-e2de/); [FR 2026-18739](https://www.federalregister.gov/documents/2026/09/11/2026-18739/adjusting-certain-delegations-under-the-defense-production-act); [govinfo PDF](https://www.govinfo.gov/content/pkg/FR-2026-09-11/pdf/2026-18739.pdf) **Disposition:** `promotion_review` — industrial/production control. Cross-ref 1A for the legal writeup; do not duplicate it. The signed order amends EO 13603 (as previously amended by EO 14391, 2026-03-13). Four operative moves: | EO 13603 section | Before | After | |---|---|---| | 201(a)(2) priorities | Secretary of Energy “with respect to all forms of energy” | Interior **and** Energy “with respect to all forms of energy under their purview,” each independently | | 201(d) disputes | existing two-Secretary referral | energy disputes go first to the National Energy Dominance Council; if national-defense infrastructure or military operations, also NSC, each coordinating with War | | 202(b) production/construction | Energy alone for energy production, construction, distribution, use, and related activities | Interior **and** Energy, independently | | 203 DPA §101(c)(1)–(2) | prior single-Secretary path | Interior, Commerce, **and** Energy, each independently | Industrial implication, not legal restatement: Interior now holds independent DPA Title I priority and allocation authority over energy under its purview, and independent Title I production/construction authority. Commerce is added as an independent §101(c)(1)–(2) delegate. Publication costs are assigned to Interior. This is a control-plane change, not a rated order, allocation, plant restart, mineral award, or production receipt. **Claim limit:** Delegation is not a rated order, not a Title III investment, not a plant restart, not a mineral offtake, and not proof Interior or Energy has issued a new DPA instrument in this window. “Independently of the other” is the legal state; it is not dual-hatted joint action unless a later instrument says so. ### 2. EPA extended the 2025 RFS compliance-reporting deadline after 2025 SRE decisions **Actor:** EPA **Clocks:** operationally effective 2026-09-01 (signature/good-cause); FR effective and published 2026-09-04 as 2026-18132 (91 FR 56780); 2025 annual reports now due 2026-10-01. 2025 attestation remains 2027-06-01; 2026 compliance remains 2027-03-31. Judicial-review petition window through 2026-11-03 in D.C. Circuit. **URL:** [FR 2026-18132](https://www.federalregister.gov/documents/2026/09/04/2026-18132/renewable-fuel-standard-rfs-program-extension-of-2025-compliance-reporting-deadline) **Disposition:** `promotion_review` Final rule, good-cause, no prior comment. EPA issued 34 SRE decisions for the 2025 compliance year on 2026-08-31 (EPA-420-R-26-017). The deadline moves from 2026-09-01 to 2026-10-01 for **all** obligated parties, not only small refineries, because SRE decisions affect RIN price and availability. EPA states the action cannot change 2025 renewable-fuel production or use, which has already occurred. **Claim limit:** Deadline extension is not an SRE grant, not a volume-standard change, not a RIN-price finding, and not proof any obligated party retired, sold, or bought RINs. August 31 SRE decisions are the predicate, not this rule. ### 3. FSA made Application Fast Track permanent and rewrote farm-loan delivery **Actor:** USDA Farm Service Agency **Clocks:** agency news 2026-09-03 (date-only replay; not in 09-03 1C); FR publication 2026-09-04 as 2026-18164 (91 FR 56741); **effective 2026-10-01**. **URL:** [FR 2026-18164](https://www.federalregister.gov/documents/2026/09/04/2026-18164/driving-efficiency-in-farm-loan-delivery); [FSA news](https://www.fsa.usda.gov/news-events/news/09-03-2026/usda-improves-access-credit-streamlining-modernizing-farm-loans) **Disposition:** `promotion_review` Final rule permanently implements the AFT underwriting path for qualifying direct FO/OL (not EM, youth, or servicing-tied) loans: scoring on financial benchmarks and repayment history; cash-flow budget still submitted but FSA need not verify projected income/expense; equal amortizing installments after year one; standard (not limited-resource) rates. Pilot claimed ~23% of direct customers, ~8 calendar days faster, ~58,000 staff hours/year. Other material delivery changes, also effective October 1: - Direct-loan real-estate evaluations instead of USPAP appraisals for business loans ≤ $250,000 and commercial real-estate transactions ≤ $500,000 (OMB A-129 2025 thresholds); appraisals older than 18 months usable up to 36 months with documented stable/improved markets. - Preferred Lender Program (PLP) lenders receive delegated authority to certify creditworthiness, test-for-credit, feasibility, and collateral; FSA targets 5-calendar-day action on complete delegated applications once environmental review is done. - Guaranteed-loan IT modernization: electronic application, notices, guarantees, and servicing; lender status applies to the institution, not named branches. - Direct subordinations no longer require a separate FSA cash-flow feasibility review. **Claim limit:** Permanent AFT is not a new loan, obligation, disbursement, or default-rate change. Delegated PLP authority is not a guarantee issued. Evaluation-for-appraisal is not a closed FO. October 1 is the operating clock. ### 4. FNS geographic-preference DFR clarifies, does not expand, local-food procurement **Actor:** USDA Food and Nutrition Administration **Clocks:** published 2026-09-09 as 2026-18337 (91 FR 57245); adverse comments through 2026-10-09; **effective 2026-11-09** unless withdrawn. **URL:** [FR 2026-18337](https://www.federalregister.gov/documents/2026/09/09/2026-18337/simplified-geographic-preference-procurement-in-child-nutrition-programs) **Disposition:** `promotion_review` Direct final rule restates 2024 CNP geographic-preference options as (i) local **product specification** and/or (ii) **defined scoring advantage**, with operator discretion on “local” and scoring weight. FNA states the changes “do not change the meaning of the regulations or their implementation.” NSLP text is the hub; SBP/SMP/SFSP/CACFP cross-cite. **Claim limit:** Clarification is not a new local-food mandate, not a purchase, not a farm-to-school volume, and not a change in unprocessed-product definition. Adverse-comment withdrawal remains open through October 9. ### 5. Forest Service extended the 2001 Roadless Rule rescission comment clock **Actor:** USDA Forest Service; Deputy Secretary Vaden **Clocks:** original NPRM 2026-08-20 (91 FR 53827); this extension published 2026-09-11 as 2026-18648 (91 FR 57841); comments now due **2026-10-06** (was 2026-09-21). Docket FS-2025-0001 / RIN 0596-AD66. **URL:** [FR 2026-18648](https://www.federalregister.gov/documents/2026/09/11/2026-18648/special-areas-roadless-area-conservation) **Disposition:** `promotion_review` as a clock move on an already-open NPRM; the underlying rescission remains proposal. The NPRM would rescind the 2001 Roadless Area Conservation Rule by removing and reserving 36 CFR part 294 subpart B. This document only adds 15 comment days. No final rule, no road, no timber sale, no mineral access. **Claim limit:** Comment-period extension is not a rescission, not a road authorization, and not a change in the 2001 rule’s present legal force. ### 6. DOE opened the EO 14421 bulk-power implementation RFI **Actor:** DOE CESER (Andrew McClure signed 2026-09-04) **Clocks:** signed 2026-09-04; FR 2026-09-09 as 2026-18370 (91 FR 57322); comments through **2026-10-09**; webinar 2026-09-16 15:00–16:00 EDT. EO 14421 120-day implementation-rules clock ~2026-12-24; 180-day FAR-recommendation clock ~2027-02-22 (already named in 09-03). **URL:** [FR 2026-18370](https://www.federalregister.gov/documents/2026/09/09/2026-18370/securing-the-united-states-bulk-power-system); [CESER webinar notice](https://www.energy.gov/ceser/articles/ceser-holds-industry-engagement-webinar-covering-recent-bulk-power-system-executive) **Disposition:** `promotion_review` as the first public implementation step of already-owned EO 14421. Do not recensus the EO. RFI asks for equipment/transaction scope, Covered Foreign Entity tracing, existing-equipment mitigation, licensing/prequalification, domestic manufacturing and FAR preference, and cost. Explicitly **not** a proposed rule, order, license, or country/vendor determination. No vendor ban, no disconnection, no FAR rewrite in this object. **Claim limit:** Information request is not a prohibition, not a named-vendor finding, not equipment removal, and not FAR text. ### 7. BLM proposed a 60-day NPR-A production-site permit path **Actor:** Interior / BLM **Clocks:** published 2026-09-08 as 2026-18261 (91 FR 57091); comments through **2026-11-09**; PRA comments to OMB through 2026-10-08. Supporting draft EIS chapters dated 2026-09-02. **URL:** [FR 2026-18261](https://www.federalregister.gov/documents/2026/09/08/2026-18261/national-petroleum-reserve-in-alaska-production-site-development) **Disposition:** `promotion_review` Proposed new 43 CFR subpart 3139: qualifying production sites within 25 miles of existing permanent oil and gas infrastructure would get a consolidated APD/ROW review against pre-defined pad/road/pipeline/spill/operating conditions, with a stated **60-day decision window**, tiered to a rulemaking EIS rather than a new project EIS. Petition from Alaska Oil and Gas Association 2026-05-12. This is proposal plus draft NEPA, not an APD, pad, or barrel. **Claim limit:** NPRM is not a permit, not Willow or GMT authorization, not first oil, and not a change in the 2025 IAP’s present force. ### 8. DOE financially closed a loan of up to $1.9 billion to restart Duane Arnold **Actor:** DOE Office of Energy Dominance Financing; NextEra Energy **Clocks:** financial close announced 2026-09-08. Restart remains pending NRC licensing. Stated 615 MW; ~1,500 construction jobs / 450 operations jobs are agency claims, not observed. **URL:** [DOE close](https://www.energy.gov/articles/energy-department-closes-19-billion-loan-restart-duane-arnold-nuclear-plant) **Disposition:** `promotion_review` State ladder: **financial close** of a loan of **up to** $1.9 billion. Not a disbursement schedule, not NRC restart authorization, not criticality, not megawatt-hours. DOE says this is the third nuclear-restart financing and the fourth concurrent conditional-commitment/close under the administration. Those counts are agency narrative, not independently recensus’d here. **Claim limit:** Close ≠ drawdown ≠ construction complete ≠ NRC authorization ≠ operation. Ceiling is not current outstanding. ### 9. DOE selected four Mine of the Future testbed projects for $73 million **Actor:** DOE CMEI / Advanced Mining and Mineral Processing Technologies Office **Clocks:** announced 2026-09-09. Selections for **award negotiations**, not executed awards. **URL:** [DOE mining selections](https://www.energy.gov/articles/does-office-critical-minerals-and-energy-innovation-announces-73-million-advance-domestic) **Disposition:** `promotion_review` Named selectees: Innovative Wireless Technologies (VA/WV/CO); University of Arizona (Sahuarita, AZ); University of Missouri (Rolla); SMU (Navasota, TX synthetic mine). Not Genesis Mission. Not a mine, not production, not a critical-mineral offtake. **Claim limit:** Selection for negotiation is not obligation, outlay, constructed testbed, or mineral output. ### 10. Census proposed new residence criteria and a short-form demographic-question bar **Actor:** Commerce / Census Bureau **Clocks:** published 2026-09-10 as 2026-18481 (91 FR 57524); comments through **2026-10-13**. Independent of any later 2030 operational plan. **URL:** [FR 2026-18481](https://www.federalregister.gov/documents/2026/09/10/2026-18481/decennial-census-of-the-population-of-americans-proposed-residence-criteria-and-proposed-regulations) **Disposition:** `promotion_review` as census-delivery design. Cross-ref 1A for constitutional/apportionment law; this wave owns the operating questionnaire/residence-machine implication. Two independent proposed CFR parts: (1) residence criteria that would count LPRs in the apportionment base and exclude illegal aliens and aliens whose status is less durable than LPR, with a defined census-enumeration period January 3–April 1 and possible use of administrative records and/or a legal-status question; (2) a bar on race, ethnicity, and sexual-orientation questions on the short-form / enumeration questionnaires, while leaving ACS and administrative-record intake unrestricted. Proposal only. **Claim limit:** NPRM is not 2030 enumeration, not an apportionment tabulation, not a questionnaire in the field, and not a finding that any State’s count has changed. ### 11. FCC closed the Covered-List component-part loophole (ops effect only) **Actor:** FCC (adopted 2026-07-22; released 2026-07-23; FR 2026-09-11) **Clocks:** FR 2026-18535 (91 FR 57798); **effective 2026-10-13**; online-marketplace FCC-ID display 2027-03-01 (physical access/title) and 2027-06-01 (third-party listings). Legal/national-security writeup is 1A’s. **URL:** [FR 2026-18535](https://www.federalregister.gov/documents/2026/09/11/2026-18535/protecting-against-national-security-threats-to-the-communications-supply-chain-through-the) **Disposition:** `promotion_review` for **authorization-gate / marketing-ops effect only**. Do not duplicate 1A’s legal analysis. Ops effect retrieved: new equipment-authorization applications on/after October 13 cannot include a Covered-List producer’s **logic-bearing hardware component** if the finished device would have been barred had that entity made the whole device. Prospective only; pending applications exempt unless later amended to add/change such a component. Covered-List entities must recertify any change; they may not use SDoC or ordinary permissive-change. Online marketplaces that list + fulfill are “marketing.” Not a recall, not a rip-and-replace, not an import seizure. **Claim limit:** Authorization-gate change is not equipment removal, not a Covered List addition, not software/firmware prohibition, and not proof any named device was denied. ## Folded or clock-only (do not recensus as new actions) | Object | Owner | This delta | |---|---|---| | Genesis GridFM 2.0 (Sep 1), OPAL preprint (Sep 8), SBIR pitch deadline (Sep 10 14:00 ET), fellowship input (Sep 3 / event Sep 24) | `genesis-mission` cutoff 2026-09-09 15:40 EDT | **Fold.** No formal IOC receipt. No new official DOE/lab Genesis object after that cutoff was retrieved (GEMS prize Sep 10 is ordinary HGEO, not Genesis). | | DOE §202(c) PJM Order 202-26-41 through 23:59 ET Sep 8; Carolinas through Sep 8; Stanton through Nov 30 | 09-03 weekly | **Verify later clock only.** PJM and Carolinas expired in-window; no public dispatch/EEA3 receipt. Stanton still live. No **new** 202(c) order after 09-03 was found. | | TransAlta Centralia Order 202-26-28 through 2026-09-12; Craig Order 202-26-31 through 2026-09-26 | pre-window orders | Carry expirations. Not new weekly orders. | | NRC in-situ recovery monitoring / decommissioning-timeliness NPRM FR 2026-18504 (2026-09-10) | 09-03 WAVE_2C already had the Sep 1 NRC news release | **Fold** as publication clock of the same proposal. | | GSA FY2028–2034 capital-project transmittal (Sep 3); FAA $481M AIG (Sep 3); DOE energy-employment report (Sep 3) | 09-03 WAVE_2C | Fold. | | OPM RIF-appeals transfer for notices on/after Sep 2 | 09-03 WAVE_2A / direct-site merge | **No new clock.** Live page still states the Sep 2 transfer, 30-day appeal after effective date, eFile default. Sep 2 CHCO memo “Final Regulations on Reduction in Force” is the same object. | | USDA Ranchers First Aug 31 package | 09-03 WAVE_2C | Fold the Aug 31 package. Sep 4 presidential EOs and USDA “additional four actions” are new (objects 12–13 below / 2C). | ## Additional in-window objects (lower rank or grouped) ### 12. Ranchers / livestock presidential instruments — industrial implication only **Actor:** President; USDA; Interior **Clocks:** both signed 2026-09-04; FR 2026-09-10 as 2026-18571 (EO 14425) and 2026-18567 (EO 14424). 90-day reports ~2026-12-03; livestock 60-day enforcement/access reports ~2026-11-03. **URLs:** [EO 14425 ranchers](https://www.whitehouse.gov/presidential-actions/2026/09/supporting-americas-ranchers/); [EO 14424 livestock](https://www.whitehouse.gov/presidential-actions/2026/09/promoting-fair-competition-in-livestock-markets-and-expanding-market-access-for-american-meat-producers/) **Disposition:** `promotion_review` for **production/market-access implication**; 1A owns the legal writeup. EO 14425: 90-day interagency policy review; Interior wolf delist/downlist determination and lethal-removal/compensation handbook review; USDA/USTR 90-day mandatory-COOL authority/economic review. EO 14424: expanded Packers & Stockyards enforcement (60-day report); CIS/State MPI/Talmadge-Aiken outreach; FSIS inspection-reporting trim; **SPUR guaranteed-loan program** for small/regional beef processors. None of these is a loan, a delisting, a COOL rule, or a packer case. ### 13. EPA/Army WOTUS supplemental proposal **Actor:** EPA; Army Corps **Clocks:** signed EPA 2026-09-03 / Army 2026-09-02; announced 2026-09-04; FR publication 2026-09-09; comments through **2026-10-09**. **URL:** [EPA WOTUS page](https://www.epa.gov/wotus/updated-definition-waters-united-states); [news release](https://www.epa.gov/newsreleases/epa-and-army-seek-additional-input-proposed-waters-us-definition-while-advancing) **Disposition:** `admit_lower_rank` / `promotion_review` as a comment-clock on the still-open 2025 WOTUS rewrite. SNPRM adds alternatives for “perennial,” “relatively permanent,” and “continuous surface connection.” It does not finalize Sackett implementation and does not change present CWA jurisdiction. ### Other grouped FR ops (not individually promoted) - **NHTSA FMVSS 213/213a/213b** child-restraint final rule 2026-18380 (2026-09-09): school-bus CRS exemption from 213a if labeled. Product-standard change, not a recall or injury finding. - **FHWA National Network** Syracuse I-81 viaduct de-designation 2026-18548 (2026-09-11): route designation, not construction. - **DOT org-terminology** technical correction 2026-18560 (2026-09-11): names/authorities, not a program go-live. - **EPA NPDES definition NPRM** 2026-18134 (2026-09-04); **Wisconsin CCR permit-program NPRM** 2026-18552 (2026-09-11). - **GSA FY2027 CONUS per diem** notice 2026-18439 (2026-09-10), effective 2026-10-01; **FMR Bulletin B-51 rescission** 2026-18617 (2026-09-11). Reimbursement/reporting hygiene, not a property disposal. - **NASA PRA notices** (NVMS; SBIR ProSAMS). Paperwork, not awards. - **NSF information-collection notice.** Not an award. - **Commerce ITA** AD/CVD administrative reviews and sunset revocations; **NOAA** in-season fishery closures/quota transfers. Routine trade/fishery administration unless a later wave needs a named product. - **Census** cessation of Annual Survey of State Government Tax Collections 2026-18449 (2026-09-10): data-series stop, not the decennial object above. - **FAA** airspace and airworthiness directives: grouped as routine aviation maintenance of the NAS. ## 2026-09-03 date-only replay (then dedupe) FR 2026-09-03 1C-adjacent objects already in the 09-03 package (MSPB penalty rule, HHS EUA declaration, Form PF extension, etc.) stay folded. Newly retrieved on the 09-03 date that 09-03 1C did **not** carry: FSA farm-loan news (object 3). NRC spent-fuel cask Holtec HI-STORM amendment FR 2026-18107 (2026-09-03) is a cask-certificate amendment, grouped routine unless 2C finds an operating change. ## Bounded negatives No exhaustive pass of SAM.gov, USAspending, FPDS, every DOE loan ledger, every FSA county office, invoices, construction milestones, NRC restart dockets, or classified DPA orders. No new public DOE §202(c) order after 09-03 was located. No formal Genesis IOC receipt. No OPM RIF-appeals first-decision clock. ## Coverage receipt (FR ops backbone) | Family | Status | Promotion-review | Fold / clock-only | Routine/reject | |---|---|---:|---:|---:| | Presidential industrial (DPA, ranchers, livestock) | reached | 2 (DPA + ranchers/livestock implication) | 0 | Labor Day ceremonial to 1A | | DOE / FERC FR | reached; FERC notices routine | 2 (bulk-power RFI; mining $73M is 2C-primary) | 1 (EO 14421 publication already 09-03) | FERC combined filings | | USDA / FSA / FNS / FS | reached | 3 | 1 (Ranchers First Aug 31) | AMS/NASS/FSIS notices | | Interior / BLM / FWS | reached | 1 (NPR-A) | 0 | ESA not-warranted findings; NPS | | EPA | reached | 2 (RFS; WOTUS SNPRM) | 0 | Indiana ozone SIP; NPDES NPRM grouped | | DOT / FAA / NHTSA / FHWA | reached | 0 in 1C (eVTOL/SPACE are 2C) | 1 (AIG $481M) | ADs, airspace, hazmat penalty | | Commerce / Census / ITA / NIST / NOAA | reached | 1 (Census NPRM) | 0 | ITA AD/CVD; NOAA in-season | | NASA / NSF / NRC / GSA FR | reached | 0 at FR (NASA Space Academy is 2C) | 1 (NRC ISR publication) | PRA, per diem, cask amendment | | FCC | rule retrieved | 1 ops-effect only | — | — | | OPM | no in-window FR | 0 | 1 (RIF appeals) | — | **Closed:** yes for the 1C FR-ops census of named MUST objects and in-window rules/proposed rules for the listed agencies, subject to the blocked USDA department newsroom (FSA component reached) and the absence of a CESER emergency-order index page (individual order pages reached). Direct sites continue in Wave 2C.