# VA FY2027 Volume 4 — batch 32 Read physical PDF pages 201–240 (official-reader P200–P239) sequentially, covering printed pages 5-6 through 6.2-17. Printed 6.1-1 is intentionally blank. The next unread page is physical 241 / reader P240 / printed 6.2-18. This batch completes the 2027 construction, lease, and NRM SCIP lists and reads the executive summary plus first SCIP-method section. The receipt separates the FY2027 request, anticipated RETF, conditional lease/NRM approvals, current workload/inventory baselines, outyear demand and cost ranges, and modeled priority scores. A listed project or score is not an appropriation, award, completion, or outcome. It inventories cited OMB guidance, laws, source datasets, governance/model inputs, and method cross-references within this page span. The later NRM statutory citation is outside this receipt's range and is recorded in batch33. No maintained file was changed. **Locator correction (2026-09-11):** local-PDF heading verification corrected the Circular A-11 threshold locator to 6.2-3, the Capital Asset Inventory table to 6.2-7, and split the workload/demand and lease-cost method to 6.2-6 and 6.2-8. The JSON `corrections` record preserves the superseded locators; the analytic-hierarchy page, 6.2-9, was already correct.