# Wave 3 strict re-audit — Navy, Space Force and Defense intelligence **Status:** controlling promotion-gate overlay ready for strict merge **Closed Wave 3 mutation:** none **Vault/chart/canon mutation:** none This lane independently re-challenges the 25 prior Wave 3 `promotion_review` rows owned by `fg-109`, `fg-111` and `fg-118`. It does not question the closed Wave 3 official-site census or primary-object identities. It controls only whether those rows may proceed to later human promotion review. ## Result | Class | Meaning | Rows | |---|---|---:| | A | routine/duplicate reject | 0 | | B | campaign completeness only | 7 | | C | established-plotline support only | 10 | | D | human promotion review only | 8 | Seventeen of the 25 prior D rows are downgraded. The retained queue has 8 atomic rows and the same number of unique deterministic promotion units. D still means review only; it grants no `keep`, vault note, chart, canon or new plotline authority. ## Every ruling | # | Object | Entity | Title | Prior → controlling | Ruling | |---:|---|---|---|---|---| | 1 | `W3-DS-OBJ-394` | `fg-109` | U.S. Navy and RTX Accelerate Critical Munitions Production Through Tomahawk Award | D → C | Demote to C: this is an ordinary recurring-munitions production-contract announcement. The 22.9-billion-dollar headline, press treatment and recency cannot elevate it, and the source gives no PIID, obligation, quantity, delivery or readiness result. | | 2 | `W3-DS-OBJ-431` | `fg-109` | Implementation of Revised Department of War Religious Affiliation Codes | D → D | Retain D: MARADMIN 361/26 is the operative service-level implementation leg of the already tracked Pentagon faith-code storyline, and its August 11 effective state was separately canceled by ALMAR 010/26 on August 18. That short-lived authority and reversal materially falsify any claim that the revised codes still controlled; no successor policy is inferred. | | 3 | `W3-DS-OBJ-411` | `fg-109` | Implementation Guidance for Military Equal Opportunity Reform Initiatives | D → D | Retain D: this effective-immediately Marine message changed the operative MEO reporting, anonymous-handling, ADR, dismissal and appeal rules and superseded conflicting language inside the established Pentagon/DEI reform story. It is a procedural authority change, not merely a policy announcement, and proves no complaint outcome. | | 4 | `W3-DS-OBJ-410` | `fg-109` | Implementation Guidance for Reinstatement and Reintegration of Marines Affected by COVID-19 Vaccine Mandate | D → D | Retain D: this message converted the already tracked military vaccine-mandate reinstatement policy into assigned Marine CRC tracking and record, pay and administrative-correction duties. The implementation step is specific to the established Covid-revisionism story; it does not prove any completed correction, entitlement or reinstatement count. | | 5 | `W3-DS-OBJ-396` | `fg-109` | DONRCO establishes National Security Plug and Play Consortium for rapid acquisition of advanced technologies | D → D | Retain D: the Navy created a named rapid-acquisition consortium and installed a named external manager, adding an institutional intake/control carrier to the established defense-acquisition-reform architecture. That entity change is the event; the consortium is not an OTA, solicitation, award, obligation, prototype or delivered technology. | | 6 | `W3-DS-OBJ-391` | `fg-109` | Navy Removes Bureaucratic Barriers to Accelerate 3D Printing and Accelerate Submarine Lethality | D → D | Retain D: PPD 802-8436658 changed the approval pathway and authorized immediate operational use of specified metallic additive-manufacturing substitutions while retaining SUBSAFE and Level I controls. The non-routine event is the operative authority change, not 3D-printing adjacency; no component, installation or readiness result is inferred. | | 7 | `W3-DS-OBJ-393` | `fg-109` | USS Massachusetts (SSN 798) Ready for Fleet Tasking | D → C | Demote to C: completion of shakedown and a ready-for-fleet-tasking declaration support the naval-readiness record, but this is one asset's ordinary readiness progression, not an established vessel-specific Observatory storyline, deployment, mission assignment, combat operation or observed result. | | 8 | `W3-DS-OBJ-064` | `fg-109` | Dragoon Technology LLC,* Tucson, Arizona — base contract — no PIID published; W3-CONTRACT-20260806-07-01 | D → C | Demote to C: this is an ordinary SBIR Phase II engineering and test award. UAS energetics, collaborative-autonomy language and obligated R&D funds support the autonomous-weapons watch but do not prove a completed test, transition, fielding or operating capability. | | 9 | `W3-DS-OBJ-126` | `fg-109` | Vertex Modernization and Sustainment LLC, Indianapolis, Indiana — base IDIQ contract — M67854-26-D-0080 | D → C | Demote to C: the Tempest row establishes an ordinary base IDIQ vehicle with no funds obligated at award. A ten-vehicle requirement and counter-UAS purpose support the defense-tech watch but do not prove a funded order, delivery, fielding or operating result. | | 10 | `W3-DS-OBJ-122` | `fg-109` | Hensel Phelps Construction Co., Honolulu, Hawaii — base contract — N62478-26-C-0001 | D → C | Demote to C: P-716 entered contract-award and initial-obligation state, but local construction defaults to support and no specific pre-campaign Red Hill project plotline was established. Award and obligation do not prove outlay, construction progress, completed treatment capacity, clean water or health effect. | | 11 | `W3-DS-OBJ-143` | `fg-109` | Integrity Technologies Corp.,* Grand Forks, North Dakota — base IDIQ contract — N00023-26-D-0028 | D → B | Demote to B: this is an ordinary multiple-award IDIQ/new-awardee record with an undefined task set, a 55-billion-dollar ceiling and only a 500-dollar minimum obligation. Ceiling, option structure, location and award form create no material established-plotline state. | | 12 | `W3-DS-OBJ-226` | `fg-109` | Textron Systems Corp., New Orleans, Louisiana — modification — N00024-23-C-2452 | D → B | Demote to B: this is a routine modification for recurring LCAC-100 production. The funded construction action does not itself establish craft completion, delivery, fleet acceptance, deployment or a specific established Observatory transition. | | 13 | `W3-DS-OBJ-232` | `fg-109` | Waterman Transport Inc., Mobile, Alabama — base contract — N3220526C1249 | D → B | Demote to B: this is one ordinary 50-day military cargo-vessel charter with a future performance start. Award, obligation and carrier identity do not prove the charter began, cargo moved, a deployment occurred or an established plotline changed. | | 14 | `W3-DS-OBJ-231` | `fg-109` | American Roll-On Roll-Off Carrier LLC, Ponte Vedra Beach, Florida — base contract — N3220526C1251 | D → B | Demote to B: this is the second separate ordinary 50-day military cargo-vessel charter, preserved as its own contract identity. It remains future-performance procurement, not proof of operation, movement, deployment or a material established-plotline transition. | | 15 | `W3-DS-OBJ-236` | `fg-109` | BAE Systems Land & Armaments L.P, Maple Grove, Minnesota — modification and option exercise — N00024-24-C-5324 | D → B | Demote to B: an option exercise for recurring MK 41 canister production is ordinary weapons procurement. Award value, the U.S./FMS funding mix and option form do not prove production, delivery, installation, readiness or a specific established-story change. | | 16 | `W3-DS-OBJ-239` | `fg-109` | Overland AI Inc.,* Seattle, Washington — base contract — N6833526C1060 | D → C | Demote to C: this is an ordinary SBIR Phase II development, integration and testing contract. Funded formation-autonomy research supports the autonomous-weapons watch but does not prove testing completion, transition, production, fielding or operational use. | | 17 | `W3-DS-OBJ-254` | `fg-109` | Agrippa Industries Inc.,* Palo Alto, California — base contract — N0001426C1315 | D → C | Demote to C: this is an ordinary R&D award for an attritable expeditionary-logistics concept. Full obligation and technical naming support the defense-tech watch but do not prove prototype completion, production, delivery, fielding or operation. | | 18 | `W3-DS-OBJ-253` | `fg-109` | Core Tech-HDCC-Kajima (CHK) LLC, Tamuning, Guam — modification and option exercise — N62742-25-C-1319 | D → B | Demote to B: this is a local construction modification for a Guam communications upgrade. The modification and partial obligation do not prove construction progress, completion, activation, network capability or a specific pre-existing project transition. | | 19 | `W3-DS-OBJ-286` | `fg-109` | Fincantieri Marine Systems North America, Chesapeake, Virginia — base IDIQ contract — N3220526D0001 | D → B | Demote to B: this is an ordinary diesel-generator service IDIQ for an existing vessel class. Its ceiling, ordering period and separately unidentified initial order are maintenance/service evidence, not delivery, repaired readiness or a material established-plotline change. | | 20 | `W3-DS-OBJ-329` | `fg-109` | Corvid Technologies LLC, Mooresville, North Carolina — base IDIQ contract — M67854-26-D-1008 | D → C | Demote to C: this base IDIQ creates a weapon-sled procurement vehicle but obligates no funds at award. NMESIS and autonomy adjacency support the defense-tech watch; no task order, assembly, delivery, integration, fielding or operation is proved. | | 21 | `W3-DS-OBJ-466` | `fg-111` | U.S. Space Force and Japan successfully launch U.S. sovereign space domain awareness payload aboard QZS-7 satellite | D → D | Retain D: the second and final U.S. sovereign space-domain-awareness payload physically launched aboard Japan's QZS-7 and was assigned to Mission Delta 2 operations. This is an actual bilateral implementation/launch state, not an award or future milestone; checkout, acceptance, availability, data quality and mission effect remain unproved. | | 22 | `W3-IC-OBJ-007` | `fg-118` | Dr. L. Roger Mason Jr. sworn in as NRO's twentieth Director | D → D | Retain D under the leadership exception: the pre-campaign record tracked Mason's nomination and confirmation, while his August 17 oath changed the named operating control of the NRO and activated delegated Secretary-of-War and DNI authorities. Assumption of this tracked command-and-control office is the event; no policy or classified operation is inferred. | | 23 | `W3-IC-OBJ-003` | `fg-118` | Operational Radar Commercial Augmentation contract — Capella Space Corp | D → C | Demote to C: pre-campaign coverage already held the aggregate NRO radar-augmentation release; this row newly resolves one recipient identity only. A company-specific award with no value, obligation, tasking, imagery delivery, target or operating result supports the commercial-ISR record but is not a standalone state change. | | 24 | `W3-IC-OBJ-006` | `fg-118` | Operational Commercial Radio Frequency Capabilities Augmentation contract — HawkEye 360 | D → C | Demote to C: this is a company-specific NRO commercial-RF contract vehicle. The word operational and uncapped scaling language cannot elevate it without a disclosed obligation, task order, data delivery, mission adoption, collection target or operating use. | | 25 | `W3-IC-OBJ-002` | `fg-118` | Active Threats to Siemens S7 Series Programmable Logic Controllers | D → D | Retain D under the advisory exception: the five-agency instrument itself states an active-threat assessment for Siemens S7 industrial controllers, materially changing the established physical-infrastructure threat watch. The finding, not publication prestige or agency adjacency, clears the gate; no named compromise, consequence, remediation, enforcement or classified collection is inferred. | ## Narrative packets do not merge atomic identities The following are synthesis groupings only. Every retained D row keeps its own primary-object identity and unique queue unit: 1. **Marine operative-policy packet:** `W3-DS-OBJ-431`, `W3-DS-OBJ-411` and `W3-DS-OBJ-410`. The separate cancellation object for MARADMIN 361/26 remains a supporting Wave 3 identity; it is not cloned here. 2. **Navy acquisition-control packet:** `W3-DS-OBJ-396` and `W3-DS-OBJ-391`. Entity/pathway changes are separated from any future award, printed component, installation or readiness outcome. 3. **Space/intelligence control packet:** `W3-DS-OBJ-466` and `W3-IC-OBJ-007`. Physical launch and command assumption remain separate legal/operating objects. 4. **Critical-infrastructure threat packet:** `W3-IC-OBJ-002` stands alone because the multiagency finding itself, not advisory publication as a routine form, is the claimed watch-state change. ## Anti-inflation rulings - Tomahawk, LCAC, MK 41 and related production rows do not clear D merely because they concern weapons or carry large values. - Base contracts, IDIQs, options, charters, local construction, service support, SBIR/R&D awards and company-specific NRO awards remain B or C. - Award is not obligation unless stated; neither is construction, delivery, fielding, operation or observed effect. A contract ceiling is not use. - The two cargo charters and all NRO recipient/vehicle rows retain singular object identity even though routine families may be grouped at synthesis. ## Deterministic proof Run `python3 build_reaudit.py` and then `python3 validate_reaudit.py` from this directory. `VALIDATION_RECEIPT.json` records the closed source hashes, before/after Wave 3 tree fingerprint, exact 25-row ordered join, D-only queue, canonical label checks and byte-idempotent builder result. Contract: `../../WAVE_3_REAUDIT_CONTRACT.md` Audit date: `2026-08-23`