--- title: Wave 4 — Physical Production Systems status: source-checked artifact_role: research-wave reader_window: 2026-08-02 through 2026-08-08 ET novel_delta_boundary: 2026-08-04 17:48 ET retrieval_cutoff: 2026-08-08 11:41:26 EDT baseline: Research Packages/Federal Government Whole-Site Recertification 2026-08-01/Physical Production Systems Full-Surface Wave 2026-08-04/PHYSICAL_PRODUCTION_SYSTEMS_FULL_SURFACE_WAVE_2026-08-04.md --- # Wave 4 — Physical Production Systems - **Reader window:** August 2–8, 2026 ET - **Novel-delta boundary:** strictly after August 4, 2026 at 17:48 ET - **Retrieval cutoff:** August 8, 2026 at 11:41:26 EDT - **Scope:** USDA / APHIS / Forest Service / Rural Development as physical production; Interior / BIA / BLM / BOEM / BSEE / FWS / NPS / USGS; EPA; DOE / FERC where physically relevant; NRC - **Admission bar:** a material legal, institutional, funding, implementation, operating, physical-delivery, outcome, oversight, correction, or exact-watch object. Routine notices, grants, awards, permits, enforcement, scientific releases, and press churn were covered but rejected unless they changed one of those states. ## Baseline and clock control This is a delta against the August 4 physical-production full-surface wave. Labels below keep the clocks separate: - `NOVEL` — the controlling action or public object occurred after the boundary. - `LATE-PUBLICATION` — the underlying action predates the boundary, but the controlling public notice entered the reader window after it. - `NOVEL-PUBLIC-INSPECTION` — the document was filed for public inspection after the boundary but is scheduled for later Federal Register publication. - `COMPLETION-TIME-NR` — the official source confirms a completed state but does not expose the completion timestamp. - `BASELINE-REPLAY` — no new object is promoted; the replay only closes or preserves an inherited watch. Proposal, permit, authorization, construction, operation, and production are not interchangeable. Announced, signed/closed, obligated, advanced, spent, and physically delivered funding states also remain separate. ## Executive result **P0: 2. P1: 9. P2: 4.** The strongest physical deltas are Oklo's Groves test reactor reaching criticality and completion of the twenty-fourth Hanford single-shell-tank retrieval. The strongest authority and control deltas are DOE's Guam emergency order, three final Nuclear Fuel Cycle Consortium plans of action, Alaska hazardous-waste primacy, and Ohio mining-program revisions. DOE also reported closing a $489.4 million Puerto Rico grid loan; the public source does not establish an advance, construction start, commissioning, or operating battery capacity. The delayed/dynamic replay was outcome-changing. DOE office pages exposed both P0 objects, the loan close, and the Guam order; the current Federal Register public-inspection API exposed the three DOE plans. It also exposed EPA draft chemical-risk evaluations, FERC filings, an FWS permit notice, and an NRC meeting notice that did not clear the bar. No reached source established a newly operating mine, completed oil or gas well, new offshore production, commissioned Puerto Rico storage capacity, uranium extraction at Dewey-Burdock, or a post-boundary SPP dispatch under the inherited emergency order. ## P0 — completed physical or operating-state changes ### P0-1. Oklo's Groves isotope test reactor achieved criticality **State:** `NOVEL — COMPLETED OPERATIONAL MILESTONE`; DOE confirmation August 6 concerning the prior night. DOE reported that Oklo's Groves Isotope Test Reactor at Lockhart, Texas, successfully achieved criticality under the DOE Reactor Pilot Program. Oklo operated the experiment; DOE was the authorizer and official publisher. This is a completed physical operating milestone. - **Source:** [DOE Office of Nuclear Energy release](https://www.energy.gov/ne/articles/office-nuclear-energy-celebrates-fifth-advanced-reactor-criticality). - **Allowed claim:** the test reactor reached criticality and became the fifth DOE-authorized advanced reactor reported to do so during summer 2026. - **Do not claim:** continuous operation, electricity generation, commercial reactor approval, NRC licensing, isotope production, product delivery, or a future commercial variant. ### P0-2. Hanford completed retrieval from its twenty-fourth single-shell tank **State:** `NOVEL-PUBLICATION / COMPLETION-TIME-NR — COMPLETED PHYSICAL TRANSFER`; DOE publication August 5. DOE Environmental Management reported completed retrieval from Single-Shell Tank A-106. Hanford Tank Waste Operations and Closure workers transferred about 79,000 gallons of waste to a double-shell tank over a period of less than seven months. The report raises the cumulative state to about 3.5 million gallons removed from 24 single-shell tanks. - **Actor / publisher:** H2C workers performed the retrieval; DOE Environmental Management published the completion record. - **Source:** [DOE Hanford completion notice](https://www.energy.gov/em/articles/hanford-marks-24th-tank-retrieval-continuing-momentum-toward-accelerated-cleanup). - **Allowed claim:** the A-106 retrieval and transfer to continued storage were completed. - **Do not claim:** treatment, vitrification, grouting, final disposal, regulatory tank closure, available double-shell capacity, or completion of the Hanford tank-waste mission. DOE says A-103 retrieval is planned for October and that double-shell space is currently at capacity. ## P1 — material authority, institution, funding, and rule-state objects ### P1-1. DOE placed Guam emergency generation authority into effect **State:** `NOVEL — OPERATIVE EMERGENCY ORDER`; issued August 5; effective August 5 at 20:00 ET / August 6 at 10:00 Guam Standard Time. In [Order 202-26-38](https://www.energy.gov/documents/doe-order-no-202-26-38), the Secretary of Energy found a statutory emergency in the Guam Power Authority region under Federal Power Act §202(c). The order directs GPA to dispatch specified Ukudu gas-turbine units only when GPA determines they are needed for reliability; it permits additional units subject to notice and DOE disapproval, imposes daily unit-use reporting, and limits operation to reliability need and environmental conditions. The order runs through November 4 at 23:59 Guam time. - **Publisher/index:** [DOE CESER controlling order page](https://www.energy.gov/ceser/federal-power-act-section-202c-guam-power-authority-gpa-order-no-202-26-38). - **Clock separation:** order/authority August 5; operative period August 6–November 4 Guam time; each dispatch, generation interval, emission, report, repair, and reliability outcome remains separate. - **Do not claim:** a specified unit was actually dispatched, blackouts ended, the Ukudu steam-turbine repair was completed, or emissions relief was used. ### P1-2. DOE reported closing a $489.4 million Puerto Rico grid loan **State:** `NOVEL — CLOSED FINANCING / ADVANCE NR`; DOE announcement August 5. DOE's Office of Energy Dominance Financing reported closing a $489.4 million loan to Amanecer Puerto Rico LLC, a Pattern Energy subsidiary. DOE says the financing supports 220 MW of battery storage at Arecibo and Santa Isabel and a pathway for possible future dispatchable gas generation. - **Source:** [DOE financing close notice](https://www.energy.gov/edf/articles/does-office-energy-dominance-financing-closes-loan-strengthen-puerto-ricos-grid). - **Allowed claim:** DOE reported a named borrower, a closed loan amount, and intended project uses. - **Do not claim:** an obligation or disbursement date not supplied by the source, borrower receipt, contractor spend, construction start, battery installation/commissioning, 220 MW in operation, future gas generation, or realized reliability/cost savings. ### P1-3. DOE filed three final DPA Nuclear Fuel Cycle Consortium plans **State:** `NOVEL-PUBLIC-INSPECTION / PRE-BOUNDARY FINALIZATION`; notices filed August 7 at 08:45 ET for August 10 publication. DOE filed final, Secretary-approved plans of action under the Nuclear Fuel Cycle Consortium voluntary agreement for the Human Mobilization, Market-Integrated Fuel Utilization, and Material Sufficiency committees. The plans create DOE-chaired committee/subcommittee structures; require federal attendance and DOJ/FTC notice or oversight for substantive meetings; constrain the DPA §708 antitrust defense to compliant, DOE-supervised action within plan scope; and assign 60-day reports on workforce/supply-chain gaps, circular-fuel and demand-aggregation mechanisms, uranium permitting, and conversion/enrichment capacity. - **Sources:** [Human Mobilization, FR Doc. 2026-16224](https://public-inspection.federalregister.gov/2026-16224.pdf); [Market-Integrated Fuel Utilization, 2026-16225](https://public-inspection.federalregister.gov/2026-16225.pdf); [Material Sufficiency, 2026-16226](https://public-inspection.federalregister.gov/2026-16226.pdf). - **Actor / publisher:** DOE Office of Nuclear Energy filed the approved plans; the Office of the Federal Register public-inspection feed supplied the reader-window clock. - **Clock separation:** plans were finalized before the April 23 consortium meeting; DOE's documents were signed July 28, submitted for publication August 6, publicly filed August 7, and scheduled for publication August 10. Participant execution, first substantive meetings, report-start clocks, follow-on plans, funding, permits, procurement, construction, and production are unresolved. - **Do not claim:** a new appropriation, permit lane, pooled purchase, offtake contract, reactor deployment, fuel production, or antitrust immunity outside the plans' supervised conditions. ### P1-4. APHIS recognized MON 87429 maize as no longer regulated under 7 CFR part 340 **State:** `NOVEL REGULATORY RECOGNITION / PRE-BOUNDARY DECISION`; determination signed July 30; status recognized August 5. APHIS determined that Bayer/Monsanto's MON 87429 maize—engineered for dicamba, glufosinate, quizalofop, and 2,4-D resistance with tissue-specific glyphosate resistance for hybrid-seed production—is unlikely to pose an increased plant-pest risk and is no longer subject to 7 CFR part 340. - **Source:** [FR Doc. 2026-15876](https://www.federalregister.gov/d/2026-15876). - **Clock separation:** APHIS decision July 30; public recognition August 5; seed sale, herbicide labeling, planting acreage, harvest, and production remain separate. - **Do not claim:** commercial availability, an EPA pesticide approval, planting, yield, or environmental outcome. ### P1-5. EPA published six material Renewable Fuel Standard refinery-petition decisions **State:** `LATE-PUBLICATION / PRE-BOUNDARY DECISIONS`; EPA decisions August 3; notice August 5. EPA acted on six individual small-refinery-exemption petitions from four refineries for compliance years 2023 and 2024: one full exemption, two 50-percent partial exemptions, no denials, and three ineligible petitions. EPA also stated that partial disproportionate-economic-hardship findings are legally available and that, where RINs were already retired, implementation is return of RINs commensurate with the exemption rather than creation of current-vintage RINs. - **Source:** [FR Doc. 2026-15905](https://www.federalregister.gov/d/2026-15905). - **Actor / publisher:** EPA made the refinery-specific decisions; Federal Register publication supplied the reader-window notice. - **Do not claim:** confidential refinery identities, an actual RIN return, a new RIN issuance, fuel-price effects, biofuel-production changes, or a court judgment. ### P1-6. The Arctic OCS exploratory-drilling proposal entered the legal record **State:** `NOVEL — PROPOSAL PUBLICATION / BASELINE CORRECTION`; published August 6. BSEE and BOEM published RIN 1082-AA05, resolving the baseline's `FR-IDENTITY-UNRESOLVED` state. The proposal would revise Arctic OCS exploration-plan, integrated-operations-plan, blowout-preventer monitoring, source-control/containment, relief-rig access, professional-engineer certification, crane, and artificial-island provisions. - **Source:** [FR Doc. 2026-15953](https://www.federalregister.gov/d/2026-15953). - **Clock separation:** proposal publication August 6; OMB information-collection comments September 8; rule comments October 5; final rule/effective date unresolved. - **Do not claim:** a final rule, lease sale, approved exploration/development plan, APD, drilling, construction, production, or relaxed conditions at any specific operation. ### P1-7. Alaska received final hazardous-waste program authorization **State:** `NOVEL — FINAL / EFFECTIVE`; August 6. EPA granted final authorization for Alaska's hazardous-waste program to operate in lieu of the federal RCRA program for the approved scope. EPA retains HSWA authority for requirements for which Alaska is not authorized and retains jurisdiction in Indian country and areas of exclusive federal jurisdiction. - **Source:** [FR Doc. 2026-15984](https://www.federalregister.gov/d/2026-15984). - **Clock separation:** state application February 24; state-rule and memorandum changes in March/July; federal authorization effective August 6; individual permits, inspections, enforcement, waste handling, and outcomes remain separate. - **Do not claim:** complete transfer of EPA authority or any permit/enforcement result. ### P1-8. Interior finalized material revisions to Ohio's mining regulatory program **State:** `NOVEL PUBLICATION / FUTURE-EFFECTIVE`; published August 7; effective September 8. Interior's Office of Surface Mining Reclamation and Enforcement partially approved two Ohio SMCRA amendments, including alternative-bonding and full-cost performance-security changes, and removed a longstanding federal program condition after its solvency review. The rule also addresses permitting, valid existing rights, remining, blasting, and topsoil provisions. - **Source:** [FR Doc. 2026-16136](https://www.federalregister.gov/d/2026-16136). - **Clock separation:** final publication August 7; legal effect September 8; individual mine bonds, permits, forfeitures, reclamation, extraction, and production remain separate. - **Do not claim:** the rule was effective in the reader window or that any mine opened, produced, closed, or completed reclamation. ### P1-9. NRC published the Dewey-Burdock uranium license-renewal action **State:** `LATE-PUBLICATION / PRE-BOUNDARY LICENSE ACTION`; license June 18; notice August 7. NRC published notice that it renewed Source and Materials License SUA-1600 for the Dewey-Burdock uranium in-situ recovery project in South Dakota. The renewed license authorizes possession/use of source and byproduct material and operation subject to license conditions. - **Source:** [FR Doc. 2026-16132](https://www.federalregister.gov/d/2026-16132). - **Clock separation:** NRC issuance June 18; legal public notice August 7; construction, wellfield work, operation, uranium recovery, shipment, and production remain separate. - **Do not claim:** the project is constructed, operating, extracting uranium, or producing saleable material. ## P2 — bounded plan, proposal, hearing, and implementation watches ### P2-1. DOE Indian Energy fixed measurable program targets, not delivered projects **State:** `NOVEL — STRATEGIC PLAN`; release August 5. DOE's Office of Indian Energy released a plan targeting, by 2030, more than $2 billion in cumulative energy-cost savings, 100 MW of new generation, and 450 Tribe-led energy and infrastructure projects, alongside electricity-access, workforce, resource-development, and process goals. - **Source:** [DOE Indian Energy plan release](https://www.energy.gov/indianenergy/articles/doe-office-indian-energy-releases-strategic-plan). - **Claim limit:** a control-plan and measurement target, not new authority, appropriation, grant, obligation, installed capacity, project completion, savings, or transfer of Tribal/federal jurisdiction. ### P2-2. EPA proposed reissuing the Cook Inlet offshore exploration general permit **State:** `NOVEL — DRAFT PERMIT / COMMENT CLOCK`; August 7. EPA opened comment through September 21 on proposed reissuance of NPDES General Permit AKG51000 for specified discharges from oil and gas exploration facilities in federal waters of Cook Inlet. - **Source:** [FR Doc. 2026-16089](https://www.federalregister.gov/d/2026-16089). - **Claim limit:** draft general-permit terms and a public record; not a final permit, facility coverage, discharge authorization, drilling, production, or environmental outcome. ### P2-3. NRC announced first use of its modernized advanced-reactor mandatory-hearing process **State:** `NOVEL — PROCESS IMPLEMENTATION ANNOUNCED`; August 5. NRC scheduled August 13 as the first use of its modernized mandatory-hearing framework, during review of TVA's proposed Clinch River BWRX-300 construction permit. NRC says the framework moves public visibility earlier in its safety/environmental reviews while it targets construction-permit decisions within 18 months. - **Source:** [NRC Release 26-075](https://www.nrc.gov/sites/default/files/cdn/doc-collection-news/2026/26-075.pdf). - **Claim limit:** a scheduled hearing-process implementation, not a completed hearing, construction permit, site work, reactor operation, or 300 MW of generation. An operating-license application would still be separate. ### P2-4. SPP West customers sought, but did not obtain, an Order 881 implementation deferral **State:** `LATE-PUBLICATION / PENDING MOTION`; motion July 24; notice August 6. SPP West customers asked FERC to move the effective date for SPP dynamic-line-rating tariff revisions from September 1, 2026 to April 1, 2027, citing software-testing delays. Answers are due August 14 at 17:00 ET. - **Source:** [FR Doc. 2026-16061](https://www.federalregister.gov/d/2026-16061). - **Claim limit:** a pending request and exact implementation falsifier. FERC had not granted the deferral, so the tariff/effective state did not change in this wave. ## Baseline replay and inherited-watch adjudication - **Arctic OCS NPRM:** repaired above from unresolved identity to published proposal, docket/comment clocks fixed. - **DOE SPP Order 202-26-37A:** the [live DOE order page](https://www.energy.gov/ceser/federal-power-act-section-202c-southwest-power-pool-inc-spp-order-no-202-26-37) still exposes only the August 3 extension through August 10. No successor, added exhibit, or post-boundary dispatch record was visible at cutoff. - **NASS August 3 Crop Progress:** the calendar now marks the report published, closing the baseline access gap. It is routine observational data and was not promoted. - **APHIS Mexico NWS / Douglas port:** the August 24 contingent port clock remains future; no reached source established an earlier opening or a new physical animal-entry state. - **RUS PART Energy / Gulf LNG / EPA Oklahoma SIP:** the baseline program-window, export-deadline, and effective-rule states remain; no new obligation, advance, construction, export, or permit/outcome object cleared the bar. ## Clock ledger | Object | Controlling state in this wave | Next distinct clock | |---|---|---| | Groves test reactor | criticality achieved | sustained operation; experiment result; isotope/commercial production | | Hanford A-106 | retrieval/transfer complete | A-103 start; treatment/disposal; tank closure | | Guam 202-26-38 | authority operative | actual dispatch/report; repair; November 4 expiry/successor | | Puerto Rico loan | closed | obligation/advance record; construction; commissioning; operation | | Nuclear-fuel DPA plans | public inspection; publication scheduled | participant execution; first supervised meeting; 60-day deliverables; follow-on action | | MON 87429 | part 340 status recognized | EPA labels; seed sale/planting/harvest | | RFS exemptions | EPA decisions publicly noticed | refinery-specific RIN return; judicial review; market outcome | | Arctic drilling | proposed rule | comments; final/effective rule; project approvals and drilling | | Alaska RCRA | state authorization effective | permit/enforcement/implementation evidence | | Ohio mining | final rule published | September 8 effect; individual bonds/permits/production | | Dewey-Burdock | renewed license publicly noticed | construction/operation/recovery evidence | | Cook Inlet | draft permit | September 21 comments; final permit/facility coverage | | Order 881 motion | deferral requested | August 14 answers; FERC order; actual tariff implementation | ## Bounded whole-site coverage manifest ### Legal and delayed-publication spine - Screened the complete official Federal Register daily issues for [August 5](https://www.govinfo.gov/content/pkg/FR-2026-08-05/pdf/FR-2026-08-05.pdf), [August 6](https://www.govinfo.gov/content/pkg/FR-2026-08-06/pdf/FR-2026-08-06.pdf), and [August 7](https://www.govinfo.gov/content/pkg/FR-2026-08-07/pdf/FR-2026-08-07.pdf) across rules, proposed rules, and notices for all scoped agency-name variants. - Replayed the official [current public-inspection API](https://www.federalregister.gov/api/v1/public-inspection-documents/current.json) at the end of research: 80 documents total, 12 in scope. The special-filing feed was also checked after its August 7 16:15 ET NRC addition. ### Agency and component surfaces | Lane | Surfaces reached | Result | |---|---|---| | USDA / APHIS / Forest Service / RD | USDA and component current/news pages, APHIS regulatory notices, NASS publication calendar, RD current investments, Federal Register | MON 87429 admitted; delayed Crop Progress gap closed; routine data, proposed animal/plant rules, timber and announced-only funding rejected | | Interior family | BLM current releases and lease/timber notices; BIA, BOEM/BSEE, FWS, NPS, USGS current/legal surfaces; Federal Register | Arctic, Alaska, Ohio admitted; BLM offers/scoping, FWS permits and component churn rejected | | EPA | Federal Register rules/notices, current public inspection, chemical-risk, RFS, RCRA, permit and pesticide lanes | RFS, Alaska and Cook Inlet retained; draft TSCA risk evaluations and routine product/legal objects rejected | | DOE | Central and office news; CESER §202(c) order pages; Nuclear Energy, Environmental Management, Indian Energy and Energy Dominance Financing; Federal Register/public inspection | two P0s, Guam, loan, DPA plans and Indian plan retained; announced/future initiatives rejected or routed | | FERC | Published and public-inspection legal objects; tariff/application/blanket-authorization lanes | Order 881 motion retained as a watch; routine combined filings, applications, settlement and authorization requests rejected | | NRC | 2026 releases, Federal Register notices, public inspection, August 7 event-notification report, licensing/hearing objects | Dewey and Clinch River process retained; routine/pre-boundary events and application/hearing notices rejected or watched | This is bounded whole-site coverage of roots, indexes, publications, dockets/notices, plans, funding/loan pages, orders, operating reports, and access gaps. It is not a claim that every endpoint, record, transaction, or dynamic database row was inspected. ## Covered and rejected as routine, premature, or out of lane - APHIS coffee-import and National Poultry Improvement Plan proposals: proposal/comment state only; no import authorization or final disease-control standard. - BLM's two Idaho timber-sale offers and New Mexico/Oklahoma February 2027 oil-and-gas lease scoping: offer/scoping, not award, harvest, lease issuance, drilling, delivery, or production. - USDA RD announced water investments in Mississippi, Choctaw Nation, and Oklahoma without a controlling instrument/project identifier, obligation, advance, or spend record; retained as an exact funding-record watch, not an admitted funding event. - EPA pesticide cancellation/tolerance objects and o-/p-dichlorobenzene draft TSCA risk evaluations: routine product controls or draft assessment; the latter becomes material only at final risk determination or risk-management action. - FERC combined filings, blanket-authorization requests, hydro settlement, water-quality timing application, and same-day procedural notices: routine applications/enforcement/procedure absent a changed physical state. - NRC Eden and Belews Creek hearings, North Anna early-site-permit renewal notice, Crownpoint board creation, and routine licensing notices: application/hearing state, not permit issuance, construction, operation, or production. The Dewey renewal was retained because the underlying authorization state had already changed. - NRC Event 58397: an August 5 60-day notification of a June 8 invalid emergency-diesel start at Susquehanna; Unit 1 remained at 100-percent power and the event was non-emergency. It is a lagged routine report, not a new operating delta. - DOE/IAEA ATLAS maritime-nuclear launch and industry day: future August 25–27 events, not a deployed institution, vessel, reactor, or floating power plant. - DOE PROSPECT: an August 7 notice of intent for **up to** $100 million in critical-minerals workforce support, not a funding opportunity, selection, award, obligation, or payment. It is routed to Waves 2/5 rather than duplicated here. ## Source-access gaps and bounded negatives - EPA's newsroom search/RSS did not return a usable final replay; Federal Register, public inspection, and program-specific legal surfaces supplied the controlling legal backbone. No negative is asserted for inaccessible press-only content. - FERC's news surface returned a Cloudflare challenge and eLibrary was not exhaustively enumerated. Published/public-inspection filings were covered, but no whole-eLibrary negative is claimed. - USDA's central press index returned an access-denied page during the final replay; previously reached USDA/RD/NASS surfaces and the full legal index were used. Forest Service's national current page also returned 403. - DOI's central press route did not resolve cleanly; component pages and the legal spine were used. BOEM/BSEE and several component indexes are dynamically rendered, so absence from a reached page is not proof of absence from every component database. - No exhaustive USAspending, SAM.gov, FPDS, individual grant-payment, state-permit, NRC ADAMS, oil/gas production, harvest, mining-output, or environmental-monitoring transaction census was performed. ## Delayed/dynamic-source replay result The final replay was **materially positive**, not a clean negative: 1. DOE's dynamic office pages exposed the Groves criticality, Hanford completion, Guam operative order, Puerto Rico loan close, and Indian Energy plan. 2. The Federal Register current feed exposed three DOE DPA plans filed August 7 for August 10 publication. The same feed's other scoped documents were bounded and rejected: FERC applications/combined filings/settlement, an FWS permit notice, EPA draft TSCA evaluations, and an NRC meeting notice. 3. The SPP order page showed no post-baseline successor or dispatch evidence; NASS closed the delayed Crop Progress publication gap without producing an admissible control change. No later material scoped object was located after those admissions through the exact cutoff. That negative is bounded by the access gaps above. ## Exact watches and falsifiers | Trigger | Watch | Promotion/correction test | |---|---|---| | August 10 | SPP Order 202-26-37A expiry/successor | new order changes authority; dispatch/report evidence changes physical state | | August 10 | DPA plan Federal Register publication | replace public-inspection clock; then identify participant execution and first supervised substantive meetings before starting 60-day clocks | | August 13 | Clinch River mandatory hearing | completed hearing/process evidence only; construction permit remains a separate Commission action | | August 14 17:00 ET | Order 881 motion answers | FERC grant/denial controls September 1 versus April 1 implementation state | | August 24 | APHIS Douglas port | operative reopening/entry evidence required; contingent date alone is insufficient | | September 8 | Ohio mining rule; Arctic information-collection comments | verify Ohio legal effect; comments do not make Arctic proposal final | | September 17 / September 29 | Belews Creek / Eden hearings | hearing record only; permits and construction remain separate | | September 21 | Cook Inlet draft general-permit comments | final permit and facility coverage required before authorization claim | | October 5 | Arctic OCS and APHIS proposal comments | final rules required; comments do not authorize imports or drilling | | October | Hanford A-103 retrieval plan | actual retrieval start, transferred volume and capacity; schedule is not completion | | November 4 Guam time | Order 202-26-38 expiry/successor | renew, supersede, expire; separately retrieve daily dispatch/use reports | | first Puerto Rico loan transaction record | Amanecer financing | obligation/advance/borrower receipt; then construction, commissioning and operating MW | | first Groves operating/output record | test-reactor state | sustained operation and actual isotope/output record; criticality alone is not production | | Dewey-Burdock field record | uranium project | construction/wellfield/operation/recovery evidence; license alone is not production | | 2030 reporting | Indian Energy plan | measured installed MW, projects and cost savings; targets are not outcomes | ## Cross-wave routing - BIS's recoverable-critical-minerals DPAS allocation, the Section 232 derivative-article proposal, the polysilicon proclamation, the White House mining finance/project package, and broader industrial-enablement objects are already routed between Waves 2 and 5. This wave does not duplicate them. - DOE PROSPECT is likewise routed to the industrial/critical-minerals lane because the reached object is a notice of intent, not an obligation or physical delivery. - The DOE Nuclear Fuel Cycle Consortium plans remain here only as the nuclear physical-production institutional/control layer. They do not duplicate any named mine, processor, loan, allocation, or Section 232 object. ## Promotion recommendations 1. Promote the Groves and Hanford objects as completed physical-state deltas with the explicit production/treatment limits above. 2. Promote the Guam order as operative emergency authority, never as proof of actual dispatch or restored reliability. 3. Promote the Puerto Rico loan only at the **closed financing** clock; maintain separate obligation/advance, construction, commissioning, and operation watches. 4. Promote the APHIS, Alaska and Ohio legal-state changes. Carry the Arctic proposal as a correction-bearing rulemaking watch rather than as operative drilling policy. 5. Retain the three DPA plans as one source-bearing institutional-control object; promote further only when publication, participant execution, meeting, deliverable, funding, contracting, permitting, or physical actions advance. 6. Keep the Cook Inlet draft permit, Clinch River hearing process, Order 881 motion and Indian Energy targets in the watch/workbench layer. ## Retrieval cutoff Research and delayed replay stopped at **2026-08-08 11:41:26 EDT**. No vault, registry, app, README, manifest, or other wave file was edited by this wave.