# Portfolio Evidence and Readiness Matrix **Status:** `current bounded comparison; not a scorecard` **Cutoff:** 2026-09-30 ET **Rule:** record the highest publicly supported state and the exact load/test boundary; do not turn missing evidence into a zero or failure ## Evidence ladder | Code | State | Minimum receipt | |---|---|---| | P0 | direction | signed direction or official program announcement | | P1 | scope fixed | named site, electrical boundary, mission loads, duration and performance standard | | P2 | authority and money fixed | appropriation/obligation or executed agreement with accountable owner/operator | | P3 | design and permission fixed | accepted architecture, interconnection, cyber controls and required license/authorization | | P4 | built | physical completion with material deficiencies identified or closed | | P5 | commissioned | integrated system accepted for service and delivering power | | P6 | island tested | observed no-grid start, transfer and carriage of a defined load | | P7 | endurance and recovery tested | defined load carried for the required duration and safely resynchronized/recovered | | P8 | recurring readiness | repeated exercise, maintenance, fuel, staffing and exception evidence | These are evidence states, not a single maturity score. A prototype can reach advanced technical testing without becoming a base-power service; a commissioned site can still lack public endurance evidence. ## Publicly supportable positions | Object | Public state at cutoff | Load boundary | Highest supportable installation-power state | Missing receipt that matters most | |---|---|---|---|---| | FORTRESS America | department program established | every major installation; “independent power” undefined | P0 direction | implementation constitution and covered-site list | | Army SCI energy portfolio | six conditional developer/site pairings | solicitation says installation support for at least 14 days after qualifying outage | before P2 | executed lease/PPA, finance close and site design | | Army Janus | five vendor/site pairings | site requirements not equivalent to full-base load | before P2/P3 | task award, authorization, accepted design and construction | | NWS Crane MMR | planned joint Navy/Army Janus deployment by September 2028 | critical operations; commercial ownership/operation described | P0/P1 planning direction | final commercial agreement, authorization, design, construction and accepted delivery | | Eielson microreactor | notice of intent to negotiate with Oklo | up to 5 MW for critical infrastructure | P1 proposal | final award, NRC license, construction and commissioning | | Project Pele | prototype construction/test path at INL | transportable reactor demonstration, not installation service | project-specific build/test lane | fueled criticality and published output/test result; then a separate base-service agreement | | MCAS Yuma | operational public description | backup capacity described for 100% of current and projected base requirements | P5 publicly described | current black-start, load, duration and recovery receipt | | MCAS Miramar | completed and exercised | public exercise supports mission-critical islanding; design description says up to 21 days | P6 | observed endurance/recovery evidence at the claimed load boundary | | SUBASE New London | operational microgrid | essential functions; 10.75 MW CHP plus first-right 7.4 MW fuel-cell access | P5 | current black-start/endurance result | | Fort McCoy Main Gate | operational scope-limited microgrid | gate and nearby mission-essential facilities; stated at least 14 days | P5 | observed 14-day and recovery result | | DLA Distribution Sigonella | activated tenant-facility microgrid | DLA facilities; stated up to 14 days on one fuel load | P5 | observed endurance and recovery result | ## Required portfolio fields Every future FORTRESS site row should contain: 1. installation and electrical boundary; 2. covered mission and excluded loads; 3. normal, peak and critical load; 4. generation, storage, fuel and switching architecture; 5. outage duration and replenishment assumption; 6. legal authority and financing instrument; 7. asset owner, emergency operator and site-access rights; 8. utility interconnection and island permission; 9. cyber/physical control standard; 10. construction and commissioning state; 11. black-start, transfer, island-load and recovery results; 12. exception list, maintenance clock and next recurring exercise. ## Comparison ruling The portfolio is heterogeneous by design. Full-load, critical-load, campus, gate and tenant-facility systems cannot be counted as interchangeable “independent bases.” The valid denominator is not project count; it is the number of covered installations whose defined required load has passed the required test for the required duration and remains in recurring readiness.