# FY2027 C-1: first 75 physical PDF pages This bounded receipt covers physical PDF pages 0–74 of the 450-page official [FY2027 Construction Programs (C-1)](https://comptroller.war.gov/Portals/45/Documents/defbudget/FY2027/FY2027_c1.pdf). The document is the April 2026 Comptroller exhibit. Pages 75–449, including individual project material, remain unread. C-1 is distinct from the other Defense exhibits because it prints **authorization**, **Budget Authority**, and **Total Obligational Authority** as separate fields. Its FY2027 request should not be treated as appropriated or enacted. The FY2027 funding overview is $29.086 billion ($26.401 billion discretionary plus $2.685 billion mandatory reconciliation), while the later authorization/BA/TOA summary prints $31.250 billion. These are separate accounting presentations. The mandatory request is $2.685 billion: $217 million for an OTH-radar project, $190 million unspecified minor MILCON, and $2.278 billion family housing. The published narrative gives policy rationale but cites no supporting study, model, condition survey, or engineering estimate. The only named legal/input reference in the read scope is P.L. 119-21 §20013 and its described FY2026 MILCON spend-plan update, neither of which was read here. Host-country project lists, geographic totals, and construction categories are recorded as allocation/authorization lists rather than evidence studies. Exact accounting, locators, and the project-justification queue are in [DEFENSE_FY2027_C1_P0_P74_RECEIPT.json](DEFENSE_FY2027_C1_P0_P74_RECEIPT.json).