# GSA FY2027 CJ: GAO-IG appendix and USDA FCRF evidence chain ## Read receipt I rendered and read the complete GAO-IG Act appendix in GSA’s official FY2027 Congressional Justification, PDF pages 342–396. It is dated March 24, 2026. The appendix contains: the statutory overview (342–344); GAO recommendation status (345–352); OIG recommendation status (353–383); the 2024 OIG semiannual reconciliation (384–394); and acronyms (395–396). The source PDF was rendered because its appendix table text was not reliably extractable. OCR aided transcription, but it did not reliably expose every tiny recommendation-number cell. The JSON inventory names those rows `id_unreadable` and gives the exact page, rather than guessing a number. The appendix is prior oversight/status material compiled for the FY2027 CJ: it is dated March 24, 2026, before the April 3 public submission. It says the GAO-IG Act requires qualifying open GAO/OIG recommendations, implementation timelines/explanations, and reconciliation with OIG/GAO reporting. The CJ does not identify it as an analytical model or causal input used to formulate a FY2027 account request. ## Material findings for the budget record - The GAO table includes **GAO-14-648**, which asks GSA and DHS to develop DHS headquarters consolidation cost and schedule estimates that conform to leading practices and include an **independent evaluation**. GAO lists it as partially addressed. This is a concrete example of oversight seeking independent estimate review, but it concerns DHS headquarters, not the USDA proposal. - **GAO-24-105485** remains partly open on explaining GSA’s deferred-maintenance-and-repair changes and is implementing a request for a funded, time-bounded backlog-reduction plan. GSA’s FCRF request therefore sits beside, rather than resolves, a continuing GAO transparency/control issue. - The OIG table contains current PBS work on water quality, building/child-care safety, roof fall protection, battery storage, ESPC oversight, CMc contracting, indoor firing ranges, and a $13.7 million invalid task order. These are oversight findings/statuses, not inputs cited by the FY2027 FCRF proposal. - The reconciliation table preserves important disagreement: for **A150132P4R17001** (Pensacola courthouse), OIG asked for options analysis including appraisals, financial costs, and historically grounded schedules; GSA recorded implementation of a management decision while disagreeing with the recommendation. It is relevant institutional context for assessing the difference between a project assertion and a published independent model, but it is not evidence about Agriculture South. ## USDA consolidation / disposal project The CJ calls the project the **Jamie L. Whitten Federal Building and Sidney R. Yates Federal Building Consolidation and the Agriculture South Federal Building Disposal Project**. It proposes to consolidate USDA from Agriculture South into Whitten/Yates and dispose of Agriculture South. The CJ gives a **$375,112,500** total up-front amount, a **$25,112,500** first installment of 15, and a one-time **$112,500** (0.03%) FCRF administrative fee. On FBF-52 (PDF 73–74 in the accessible CJ), GSA specifically asserts that Agriculture South disposal will eliminate **over $1 billion** in delinquent-maintenance liabilities and **$15.2 million** in annual O&M costs, while delivering a substantial space reduction. The reviewed CJ discloses general FBF selection factors such as customer/master plans, building condition/security/functionality/occupancy, utilization, lease avoidance/ROI, and risk/return. It does **not** publish a project-specific independent appraisal or appraisal review, benefit-cost analysis, ROI/DCF model, lease-avoidance calculation, operating-cost baseline, engineering estimate, condition assessment, utilization study, or USDA occupancy/move plan for this project. A bounded search of the official GSA CJ routes, GSA historic-building material, and targeted official-domain results did not locate one. That is a missing-reference queue, not a conclusion that internal or non-public records do not exist. ## Source locators - [GSA FY2027 Congressional Justification, 508 PDF](https://www.gsa.gov/system/files/GSA%20FY%202027%20Congressional%20Justification-508.pdf): GAO-IG appendix, PDF 342–396; FBF, PDF 21–85; FCRF, PDF 260–267. - [GSA FY2027 Congressional Justification, accessible PDF](https://origin-www.gsa.gov/system/files/GSA%20FY%202027%20Congressional%20Justification.pdf): project detail at FBF-52 (PDF 74–75). - [GSA Jamie L. Whitten Federal Building page](https://www.gsa.gov/real-estate/explore-historic-buildings/find-a-historic-federal-building/jamie-l-whitten-federal-building-washington-dc): building historical context only; no project cost/benefit model. The machine-readable recommendation-level inventory, locators, statuses, and missing-reference queue are in `GAO_IG_APPENDIX_AND_USDA_SOURCE_CHAIN.json`.