--- title: Wave 2 — Board of Governors, FOMC overlay, FRFS operating circulars status: working artifact_role: research-wave-ledger opened: 2026-08-22 verified: 2026-08-22 slice: Wave 2 / Board-FRFS inherits: HARVEST_CONTRACT.md, WAVE_0_SLICE_A.md, WAVE_2_FED_GSES.md window: 2025-01-20 through 2026-08-22 --- # Wave 2 — Board / FOMC overlay / FRFS Board of Governors (`federalreserve.gov`), FOMC documents that live on the Board, and Federal Reserve Financial Services operating circulars (`frbservices.org`). Window B: January 20, 2025 through this sitting (2026-08-22). Keep/skip bar: `HARVEST_CONTRACT.md`. This sitting does **not** rebuild Federal Reserve Financial Constitution Phases V–VI. Those remain landed at `02 - Research/Federal Reserve Financial Constitution — Source Document.md` (evidence cutoff 2026-08-02). Harvest is the library delta: circular replacements, account-access instruments, FedNow/Fedwire gates, H.4.1 line-item architecture, gold/remittance prints, and Regulation / PSR-adjacent Board notices. A Reserve Bank is not the Board. FOMC is not a parent. FRFS is not the Board. OC 1 is not the Payment Account proposal. Rows: `generated/WAVE_2_BOARD_KEEPERS.csv`. ## Method Looked at the Wave 0 Slice A libraries first: Board publications, H.4.1 current/about/announcements, FOIA reading rooms, FOMC calendars/implementation notes, FRFS operating-circulars page, FRFS communications, service operating-hours pages, and the XML sitemap path. News used only as a locator. Chrome-UA required for `frbservices.org` (Wave 0: bare urllib 404s). No PDFs saved into this package. No master-directory edit. No entity-chart mutation. Four object clocks never collapse: publication · effective · operating. A proposal is not a circular. A circular appendix is not a live rail. A Sunday-expansion *intent* is not 24x7. `not located` is not `did not happen`. ## Ranked keepers Rank is vault-interest, not chronology. Top of the pile is circular replacement, H.4.1, account-access, FedNow/Fedwire. | Rank | Object | Why it is load-bearing | Clocks that must not collapse | |---|---|---|---| | 1 | Payment Account NPRM (PSR Policy Part IV + Account Access Guidelines) + Reg D + Reg A | Skinny/payment account moves from RFI prototype to proposed Board policy and two regulations. Tier 3 access decisions encouraged paused. Legal eligibility unchanged. | Signed/announced 2026-05-20. FR 2026-05-26. Comments closed 2026-07-27. **Not final. Not OC 1.** Reserve Banks still decide accounts. | | 2 | OC 5 retitle *Electronic Access* → *General Financial Service Provisions* (Jan 5 2026) and May 15 2026 same-library replacement | Quiet circular replacement. Common terms consolidated into OC 5 across OC 3–8. PNV appendix rides OC 5. | Effective 2026-01-05 (retitle + PNV appendix). Effective 2026-05-15 (posted successor PDF). Prior 1/5/26 PDF still linked. | | 3 | Fedwire Funds + NSS Sunday / weekday-holiday expansion | Large-value rail clock. Six-day week, hours unchanged (22h / 21.5h). Voluntary use. Not FedNow, not Fedwire Securities, not FedACH. | Board 2026-10-09. FR 2025-11-17. **Operating no earlier than 2028** (Board: 2028 or 2029). Not live this sitting. | | 4 | Payment Account RFI | Prototype that the May NPRM says it substantially follows: no IORB, no Fed credit, balance caps, no eligibility expansion. | Board 2025-12-19. FR 2025-12-23 (90 FR 60096). RFI is not the NPRM. | | 5 | Regulation J subpart C NPRM — FedNow intermediaries | Would let FedNow participants use a non-Reserve-Bank intermediary on a funds transfer (cross-border domestic leg). Aligns FedNow with Fedwire practice. | Board approved 2026-04-08. FR 2026-04-10. Comments 2026-06-09. **Proposal. Not OC 8.** | | 6 | OC 8 / FedNow Operating Procedures stack | Same-URL circular replacements: interruption/thresholds (Jun 24 2025); modernization + fraud-contact sharing (Jan 5 2026); successor OC 8 (Apr 1 2026); SOP (Apr 28 2026). | Four effective dates. SOP is not the circular. Sharing fraud contacts is not a new account class. | | 7 | ISO 20022 on Fedwire Funds | Message-format cutover of the wholesale rail. | Confirmed 2025-06-18. **Operating 2025-07-14.** OC 6 Feb 18 2025 is the pre-modernization circular in the same window. | | 8 | FedNow network limit $1M/$2.5M → $10M | Customer credit / returns and LMT caps. Participants may set lower. | Operating 2025-11-12. Limit is not 24x7 (FedNow already 24x7x365). | | 9 | FedGlobal ACH (Mexico/Panama) + Foreign/Canadian Check sunset | Cross-border remittance rail removal, not a FedNow substitute. | Announced 2025-11-25. Forward ACH through 2026-11-20. Forward checks through 2026-12-04. Returns continue under OC 3/4. | | 10 | Combined 2025 Bank statements + H.4.1 remittance/gold print | Remittance still a deferred asset on the H.4.1 line. Gold stock still $11,041 million. No new H.4.1 **line** in the window. | Statements page last update 2026-04-22. H.4.1 current 2026-08-20 (Wed 2026-08-19). Do not rebuild Phase V–VI. | ## Board of Governors (`fg-305`) Root holds. No `robots.txt` / `sitemap.xml` (both 404 HTML; Wave 0). HTML sitemap `/sitemap.htm`. Publications hub last update **2026-08-19**. FOIA reading room last update **2026-08-07**. ### Account access (the gate) **Before the window:** 2022 Account Access Guidelines (three-tier review). Master accounts under OC 1 (effective **2023-09-01**, **not replaced** this sitting). | Object | Publication | Effective / operating | State after | Claim limit | |---|---|---|---|---| | RFI on a Payment Account prototype | 2025-12-19 Board; 2025-12-23 FR (90 FR 60096) | comment 45 days after FR | Prototype: no interest, no Fed credit, balance caps, streamlined review. Barr dissented on the RFI. | RFI is not a product. Does not change legal eligibility. | | NPRM: PSR Policy new Part IV + Account Access Guidelines | 2026-05-20 Board (attachment corrected same day); 2026-05-26 FR (2026-10375) | comments 60 days → **2026-07-27 closed** | Substantially similar to the RFI. Closing-balance limit tied to expected activity; maximum raised vs RFI. One account per institution (master **or** payment). Prefunded services only: Fedwire Funds, FedNow, NSS, Fedwire Securities **free of payment**. **Not FedACH.** Temporary **Tier 3 pause** encouraged until policy is finished (Board suggested on or before 2026-12-31). | **Proposal.** Not a circular. Not a master-account right. Reserve Banks still decide. Pause is encouragement, not a published OC 1 amendment. | | Proposed Payment Account Standard Terms PDF | 2026-05-20 | rides the NPRM | Board's posted terms sheet | Terms sheet is not OC 1 and is not a live account. | | Regulation D NPRM | FR 2026-10377, 2026-05-26 | comments 2026-07-27 | Would treat Payment Account balances as **not** reserve balances earning IORB | Proposal. | | Regulation A NPRM | FR 2026-10376, 2026-05-26 | comments 2026-07-27 | Payment Account holder **not eligible** for discount-window credit | Proposal. | Master Account and Services Database (requests-for-access) last update **2026-06-26**. Body is JS-gated this sitting; rows were **not enumerated**. Restoration note on the page still says some institutions were restored to the database on **2025-03-28**. Do not invent a Kraken/Board row from this publisher — Kraken's limited account is a **Kansas City** object (other Wave 2 sitting). ### H.4.1 — line items, gold, remittance Current release **2026-08-20** (Wednesday **2026-08-19**). About page last update still **2015-06-04**. Announcements feed in-window is almost entirely (a) quarterly **MS Facilities 2020 LLC** allowance footnotes and (b) DDP/FRED architecture. **No new or removed H.4.1 statistical line was located in the window.** That is the line-item finding. Do not promote a weekly print. | Line (Aug 19 2026 Wednesday) | Print | Reading | |---|---:|---| | Gold stock / gold certificate account | $11,041 / $11,037 million | Statutory $42.22/oz. Unchanged. Not a gold-policy act. | | SDR certificate account | $15,200 million | Unchanged in-window. | | Central bank liquidity swaps | $123 million | Aggregate. No counterparty. Weekly-delta Aug 21 already watched this print. | | Earnings remittances due to U.S. Treasury (Table 6) | **−$232,955 million** systemwide | Deferred asset. Negative is not a remittance. Phase V already has the 2025 constitution. | | Other liabilities and capital (Table 1) | −$176,478 million | Includes the remittance liability. Do not collapse into surplus. | DDP “Build Your Package” removal is scheduled the week of **2026-11-09** (announced 2026-07-16). Architecture, not a balance-sheet line. Skip as a harvest object; note as watch. Combined 2025 audited Bank statements remain posted (`combinedfinstmt2025.pdf` and the twelve Bank PDFs). Library page last update **2026-04-22**. KPMG opinions dated **2026-03-12** were already used in Phase V. **Recertify the landing; do not rebuild allocations, ISA, National IT, or reserve-interest bridges.** FAM January 2026 is still the posted manual (page last update **2026-01-02**). Already in Phase V. ### Leash personnel (Board publisher) Kevin Warsh took the oath as Board Chair and member **2026-05-22**; FOMC selected him Chair the same day. Nominated 2026-03-04; Senate confirmed member 2026-05-12 and Chair 2026-05-13. Powell remains a Governor (term to 2028); chair term ended 2026-05-22. FOIA room now files **Chairman Warsh's calendar** (May and June 2026 PDFs) and archives Powell's. Lisa Cook remains a Governor and issued a **support** statement on the Payment Account proposal (2026-05-20). Cook-removal litigation is a Wave 1 / Judicial Money object, not this library. ### Regulation / PSR-adjacent Board notices Kept: Payment Account PSR Policy Part IV; Account Access Guidelines; Regulation A; Regulation D; Regulation J subpart C (FedNow intermediaries). 2026 priced-service/PSAF notice (90 FR 57052, 2025-12-09) already sits in Phase V § 3.3 (FedNow outside mature-service recovery). Skip routine SR letters, CCAR Q&As, and CPI reprints. FOIA room additions in-window that hit the bar: Warsh calendar; MPR transmittal July 2026; Bowman–Tlaib letter 2026-06-25. Skip merger-application reading-room dumps. ## FOMC overlay (Board publisher; `fg-306`) Documents live on the Board. Implementation of OMOs is NY Markets/SOMA — out of this sitting except where the **Board implementation note** itself changes a facility. **Skipped:** every regularly scheduled 2025–26 statement, SEP, minutes, and press conference, including the August 19 2026 minutes of the July 28–29 meeting. The August 22 2025 longer-run-goals update and the January 28 2026 reaffirmation are strategy text, not a facility or account-access gate. **Kept:** December 10 2025 implementation note. Effective **2025-12-11**: IORB 3.65 percent; primary credit 3.75 percent; standing overnight repo 3.75 percent; ON RRP 3.5 percent with $160 billion per-counterparty limit; **T-bill (and ≤3-year Treasury) reserve-management purchases** to maintain ample reserves; agency principal reinvested into bills. Companion NY Desk statements (SRF full-allotment / RMP) are NY Markets objects; this sitting keeps the **Board/FOMC note** as the overlay instrument. Do not collapse the note into a 2026 rate cycle. July 29 2026 FOMC press-conference capture already exists in the Fed, Clearing and Treasury package. Not re-harvested. FOMC FOIA reading room path recertified. No new FOMC FOIA object located that changes a facility. ## FRFS — operating circulars (`fg-307` and covered rails) Library: `https://www.frbservices.org/resources/rules-regulations/operating-circulars.html`. Redlines stay posted ~six months. There is still **no OC 11**. ### Same-URL / successor replacements in the window | Circular | Governs | Window delta | Effective | |---|---|---|---| | **OC 1** | Master account / account relationships | **Unchanged.** Posted PDF still 09/01/23. | — | | OC 2 | Cash | Unchanged (01/04/16; CSMOP 03/01/19). | — | | **OC 3** | Check | Modernization replacement. Prior 10/28/24 still posted. | **2026-01-05** | | **OC 4** | FedACH | Same modernization. | **2026-01-05** | | **OC 5** | **Retitled** *General Financial Service Provisions* (was *Electronic Access*). Systemwide terms + electronic access + security. **Appendix E: Payee Name Verification.** | Jan 5 retitle + PNV appendix; **May 15 2026 successor PDF** (summary, reference table, prior 1/5/26 version still linked). | **2026-01-05** then **2026-05-15** | | **OC 6** | Fedwire Funds (+ Reg J subpart B) | 02/18/25 version in-window (ISO run-up); then 01/05/26 modernization (redline from 02/18/25). | **2025-02-18**; **2026-01-05** | | **OC 7** | Fedwire Securities | Modernization. Redline from 05/01/24. | **2026-01-05** | | **OC 8** | FedNow (+ Reg J subpart C) | 06/24/25 interruption/thresholds/appendix D; 01/05/26 modernization + fraud-contact sharing; **04/01/26 successor**. SOP **04/28/26** (redline from 02/13/26). | **2025-06-24**; **2026-01-05**; **2026-04-01**; SOP **2026-04-28** | | OC 9 | Treasury investments / public-funds collateral | Unchanged (07/25/13). | — | | OC 10 | Discount-window lending | Appendix 5 correspondent-agreement amendments posted **2025-06-26**. Circular body still 08/28/23. | Appendix 5 **2025-06-26** | | OC 12 | NSS | Unchanged (03/08/21). Sunday expansion, when it operates, will need a later OC 12/hours object. **Not located** as a 2025–26 circular replacement. | — | December 8 2025 FRFS communication is the locator for the January 5 2026 phase: simplified language, standardized terms, **common terms moved into OC 5**, OC 5 PNV appendix “expected to become available in 2026,” OC 8 fraud-contact sharing. PNV service page now tells customers to contact a relationship manager and points at a FedLine Home guide — treat PNV as **offered**, not as proof of volume. ### FedNow / Fedwire operating clocks (not 24x7 for Fedwire) | Rail | Operating state this sitting | Window delta | |---|---|---| | **FedNow** | Already **24x7x365** (OC 8). LMT hours 7 p.m.–7 a.m. ET weekdays; 24 hours weekends/holidays. | Limit $10 million (2025-11-12). Intermediaries **proposed** (Reg J). SOP/OC 8 replacements above. | | **Fedwire Funds** | Funds-transfer day 9 p.m. ET preceding calendar day → 7 p.m. ET (**22 hours**). Closed Saturdays, Sundays, listed holidays. Sunday 9 p.m. open is the **Monday** business day, not a Sunday operating day. | ISO 20022 **2025-07-14**. Sunday/holiday **intent** for 2028–29. OC 6 replacements. | | **NSS** | 21.5 hours; same holiday set. | Same Sunday/holiday intent. OC 12 not yet replaced. | | **Fedwire Securities** | Closed weekends/holidays. **Not** in the Sunday expansion. | OC 7 modernization only. | ### Cross-border / remittance (FRFS, not H.4.1 gold) FedGlobal ACH to Mexico and Panama and Foreign/Canadian Check Services: discontinuation announced **2025-11-25**; forward work through late 2026. FRFS says volumes collapsed. Return items continue under OC 3/4. This is a rail sunset, not a Regulation J final, and not a gold-stock movement. ## What was skipped (one-line) Routine FOMC minutes/statements/SEPs; weekly H.4.1 reprints and MSLP allowance footnotes; DDP/FRED charting partnership; 2026 fee schedules as such; Fed360/security-obligation reminders; ACAP Phase 2 pause (Fedwire Securities testing); Reporting Central UI enhancements; generic Waller/Bowman/Logan speeches except as locators for the Payment Account; staff WPs; Beige Book; supervision-manual reprints unless a new transmittal named a live account gate (**none located**). ## Not located - OC 1 replacement that would implement the Payment Account. - OC 12 replacement for Sunday NSS. - Final rule on Payment Accounts, Regulation A/D, or Regulation J intermediaries. - Named H.4.1 swap counterparty. - Gold-certificate or gold-stock line-item change. - Board FOIA production that is the Payment Account comment corpus (corpus already inventoried 2026-08-15 in Fed, Clearing and Treasury). - Live PNV volume or go-live dated press distinct from the OC 5 appendix and the service page. ## Existing coverage (do not steal) - Phases V–VI / vault Federal Reserve Financial Constitution (2025 statements, FAM, remittance, National IT, reserve-interest model). - `FEDERAL_RESERVE_RESTRUCTURING_TIMELINE.md` already dates the RFI, the May 20 NPRM, and the July 27 comment close. - Payment Account comment-corpus inventory and constitutional synthesis (2026-08-15). - Weekly-delta 2026-08-21 H.4.1/SWPT watch enrichment ($123 million swaps). - Independent-agency officer removal map owns *Cook*; this sitting only records Warsh as the live Chair publisher. A keeper is not a vault landing.