# Wave 2D — military direct sites **Window:** exclusive after 2026-09-11 16:01:37 EDT through frozen cutoff 2026-09-16 19:10:34 EDT **Inclusive replay:** 2026-09-11 date-only publishers, then dedupe against Weekly Delta 2026-09-11, especially `waves/WAVE_2D_MILITARY_DIRECT_SITES.md` **Discovery rule:** official service, combatant-command, Guard/Reserve, PEO, personnel, acquisition, and operational surfaces. **Federal Register is not discovery.** **Lane:** Purse-military. Do not recensus classified ops. **Already in 1A/1C/2C — fold, do not duplicate as a new atomic** - NNSA Y-12 B61-13 CSA complete (announced 2026-09-10; stamp 2026-09-01) remains a **civilian DOE** production/acceptance object owned by 09-11 / 2C. No later Pantex assembly-complete or War-acceptance receipt was retrieved on NNSA, Pantex, or service/War pages in this sitting. - EO 14427 DPA energy delegations are 1A legal / 1C industrial. No in-window **War DPA instrument** (Title I rated order, Title III award, or allocation) was found on war.gov. Elmet (object 2) is **IBAS preferred equity**, not DPA. - EO 14426 Veterans access is 1A legal. No in-window **War/VA operating object** implementing that EO was retrieved on War or service sites. - S. 307 Prison Staff Safety Enhancement Act (signed 2026-09-16) is BOP/DOJ (1A). No War confinement overlap was retrieved. Award ≠ obligation ≠ payment ≠ delivery ≠ fielding ≠ combat effect. 403 ≠ missing. Classified/nonpublic is `classified_nonpublic`, not inactivity. Sept. 11 War contracts, posted on the standing 5 p.m. dump, sit **after** the 09-11 freeze (16:01:37 EDT) and are **this window’s objects**, not a recensus of 09-11 WAVE_2D. ## Promotion-review objects ### 1. Deputy Secretary Feinberg signed *Fostering One Strong Industrial Base* **Actor:** Deputy Secretary of War Steve Feinberg; OUSW(A&S); Cost Accounting Standards Board (proposal target); Office of Strategic Capital; IBAS **Clocks:** memorandum signed 2026-09-15. PDF posted same day. **URLs:** [War release](https://www.war.gov/News/Releases/Release/Article/4601142/deputy-secretary-of-war-directs-actions-to-foster-one-strong-industrial-base/); [memorandum PDF](https://media.defense.gov/2026/Sep/15/2003997826/-1/-1/1/FOSTERING-ONE-STRONG-INDUSTRIAL-BASE.PDF) **Disposition:** `promotion_review` Department-wide buying-rules instrument. Directs senior leaders to open competition, confine government-unique cost accounting to the work that requires it, and rely on companies’ existing GAAP/independent audits. Implements **EO 14402** (fixed-price default), not EO 14427. Carries forward the Aug 18, 2026 supplier-transparency direction so contracting officers can see through primes to suppliers and connect them to OSC loans, IBAS funds, and Department business operators. Appendix actions include: CAS Board proposal to make exemption the default; immediate use of higher FY26 NDAA cost-accounting thresholds; senior approval before bringing a new business unit under full CAS coverage; commercial determinations within 15 business days; acceptance of independent public-accounting certification in place of separate government business-system review; expanded OTAs and advance market commitments; profit policy tied to value/risk/private capital, not merely cost incurred. “No new organization or compliance framework.” Memo ≠ CAS Board rule, ≠ FAR rewrite, ≠ first commercial award under the new default. **Claim limit:** Signed memo ≠ CAS exemption in force ≠ first commercial company newly competing. Implementation clocks remain open. ### 2. War announced a $450 million IBAS redeemable preferred-equity investment in The Elmet Group (tungsten) **Actor:** OASW Industrial Base Policy; Economic Defense Unit; The Elmet Group (Coldwater, MI; Lewiston, ME; Euclid, OH; Nevada upstream) **Clocks:** announced 2026-09-14. **URL:** [War release](https://www.war.gov/News/Releases/Release/Article/4599882/department-of-war-announces-a-450-million-investment-in-the-elmet-group-to-secu/) **Disposition:** `promotion_review` IBAS redeemable preferred equity, **not** DPA Title III. Framed as securing the only U.S.-owned fully integrated tungsten/molybdenum producer supporting 100+ War programs (F-35, PAC-3, Trident D5, NGI, PrSM, Virginia/Columbia). Also to establish the only independent ammonium-paratungstate facility in North America. China-share claim in the release: ~85% tungsten / ~40% molybdenum. Expected jobs language is a Department projection, not an observed hire. Investment announcement ≠ mill running ≠ APT plant complete ≠ China-share reduced. **Claim limit:** Preferred-equity announcement ≠ cash transferred ≠ processing capacity online ≠ stockpile increase. ### 3. Army awarded a $1.211 billion IDIQ for Precision Strike Missile Increment 2 Early Operational Capability **Actor:** Army Contracting Command, Redstone; Lockheed Martin, Grand Prairie **Clocks:** announced on the 2026-09-14 War contracts page. Estimated completion 2031-09-13. One bid solicited, one received. **URL:** [Contracts for Sept. 14, 2026](https://www.war.gov/News/Contracts/Contract/Article/4600826/contracts-for-sept-14-2026/) **Disposition:** `promotion_review` CPFF/FFP IDIQ for PrSM Increment 2 EOC. Work locations and funding determined with each order. Vehicle for an **early operational capability** increment, not Increment 1 fielding, not combat use, not a completed EOC unit. **Claim limit:** IDIQ ≠ first Increment 2 missile delivered ≠ EOC declared ≠ HIMARS/MLRS loadout observed. ### 4. Navy awarded MQ-25A Stingray Lot 1 low-rate initial production (three aircraft) **Actor:** NAVAIR; Unmanned Carrier Aviation PMA; Boeing, St. Louis **Clocks:** War contracts page 2026-09-14 as undefinitized FPI modification P00017 to N0001922C0048, NTE **$552,053,000**. Navy/War news story 2026-09-15 frames a **$562 million** FPI Lot 1 award. Obligated at award (contracts page): FY25 APN $100,000,000 + FY26 APN $64,428,480. Work through July 2031. Initial Lot 1 deliveries **expected 2029**. Milestone C / production-and-deployment approval was announced in May (pre-window). **URLs:** [Contracts for Sept. 14, 2026](https://www.war.gov/News/Contracts/Contract/Article/4600826/contracts-for-sept-14-2026/); [War news story](https://www.war.gov/News/News-Stories/Article/Article/4601414/navy-awards-first-production-contract-for-mq-25a-stingray/) **Disposition:** `promotion_review` First LRIP lot: three Lot 1 air vehicles plus long-lead for three Lot 2. Program of record 76 air vehicles (4 EDM + 5 SDTA); seven test aircraft currently in production. Pathfinder for carrier-based unmanned tanking. UCA ≠ aircraft delivered ≠ first trap ≠ IOC. Face-value difference between the $552.053M UCA and the $562M news-story figure is unresolved on the two official pages; the contracts page is the obligation instrument. **Claim limit:** LRIP UCA ≠ first Stingray on a carrier ≠ organic tanking demonstrated. Deliveries are a 2029 clock. ### 5. Navy awarded Castelion a first production lot of Blackbeard hypersonic All-Up Rounds **Actor:** NAWCAD Lakehurst; DON Rapid Capabilities Office / PAE(A) Aviation Rapid Capabilities Cell; Castelion Corp., Torrance / Rio Rancho **Clocks:** War contracts 2026-09-14: FFP order N6833526F1211 against BOA N6833526G0006, **$43,650,000**, FY25 WPN $44,000,000 obligated, complete September 2028. Navy press release 2026-09-15 frames a SBIR Phase III production delivery order with **total value up to $200 million**. First production lot: **444 AURs**. **URLs:** [Contracts for Sept. 14, 2026](https://www.war.gov/News/Contracts/Contract/Article/4600826/contracts-for-sept-14-2026/); [Navy press release](https://www.navy.mil/Press-Office/Press-Releases/display-pressreleases/Article/4602377/navy-awards-production-delivery-order-for-blackbeard-hypersonic-missile/) **Disposition:** `promotion_review` SBIR Phase III production of an air-launched hypersonic strike weapon for carrier-based fighters. Contracts page is the first-lot order; Navy release is a wrapping that states a higher total-value ceiling. Production lot ≠ missiles delivered ≠ fleet loadout ≠ combat use. “Affordable mass” language is program framing, not an inventory count. **Claim limit:** First production lot ≠ 444 AURs accepted ≠ hypersonic round on an F/A-18. $43.65M order ≠ $200M ceiling exhausted. ### 6. Army exercised an $818 million AMPV production modification **Actor:** ACC Detroit Arsenal; BAE Systems Land & Armaments, York **Clocks:** announced 2026-09-14 as modification PZ0054 to W56HZV-23-C-0024. Cumulative face value **$3,298,715,424**. ECD 2030-05-31. FY25 and FY26 WTCV funds $818,355,026 obligated at award. **URL:** [Contracts for Sept. 14, 2026](https://www.war.gov/News/Contracts/Contract/Article/4600826/contracts-for-sept-14-2026/) **Disposition:** `promotion_review` Production-quantity modification on the existing Armored Multi-Purpose Vehicle contract, not a new program, not first article, not fielding of a converted formation. **Claim limit:** Modification ≠ vehicles delivered ≠ HBCT conversion complete. ### 7. Air Force completed Sentinel Pathfinder inert vertical stacking at Vandenberg **Actor:** USSF/USAF Sentinel program; AFNWC / PAE ICBM; AFTC 719th Test Squadron; Northrop Grumman **Clocks:** AFNS article 2026-09-14 (AFA conference). Four-month test campaign concluded with on-pad vertical integration of an **inert** LGM-35A. First flight-test Design Review completed in parallel. Initial flight testing **2027**; initial capability still **early 2030s**. **URL:** [AFNS](https://www.af.mil/News/Article-Display/Article/4600446/usaf-assembles-inert-sentinel-missile-moving-with-pace-toward-flight-testing/) **Disposition:** `promotion_review` Hardware/test milestone: inert stack on a test ped, not a fueled flight article, not a silo emplacement, not Minuteman replacement. Digital-to-physical transition claim is the program’s; flight test remains 2027. **Claim limit:** Inert Pathfinder stack ≠ first flight ≠ Milestone B complete ≠ silo operational. Early-2030s IOC clock is unchanged. ### 8. Hawaii Guard moved from Lowell staging into post-storm recovery on Kauai **Actor:** Hawaii National Guard Task Force Kauai; Hawaii Emergency Management Agency; Hawaii Food Bank / Eleele Baptist Church **Clocks:** 09-11 WAVE_2D owned 194 personnel on SAD as of Sep 7 and Kauai staging for Lowell. This window: food-distribution article 2026-09-15 describing **Sep 12** operations after Lowell impact; five distribution sites on Kauai; 225+ vehicles at Eleele (usual 75–125 families). Self-reported additional missions: road clearance, equipment/personnel transport, search and recovery, water distribution, emergency power. State active duty, not Title 10. **URL:** [Army / HING](https://www.army.mil/article/295380/hawaii_guardsmen_support_food_distributions_after_hurricane_lowell) **Disposition:** `promotion_review` as a **later operating clock** on the 09-11 Lala/Lowell object. Staging became impact-and-recovery. **Claim limit:** SAD food-distribution support ≠ Title 10 call-up. Vehicle count ≠ island-wide recovery complete. Barge-delay anecdote is a Guardsman’s statement, not a DOT/USCG cargo finding. ### 9. Freedom Edge 26 closed as a U.S.–ROK–Japan trilateral exercise **Actor:** USINDOPACOM / U.S. Forces Japan; ROK JCS; Japan **Clocks:** five-day exercise; **concluded 2026-09-11**. Navy/Pacific Fleet story 2026-09-14. Not owned in 09-11 WAVE_2D. Maritime, air, missile-defense, cyber, and medical events south/east of the ROK and at command posts in Japan. **URL:** [Navy](https://www.navy.mil/Press-Office/News-Stories/display-news/Article/4600169/freedom-edge-26-concludes-advancing-trilateral-readiness-across-the-indo-pacific/) **Disposition:** `promotion_review` as an in-window **exercise close** that 09-11 did not carry. Close sits on the exclusive-start calendar day; the story is later publication. **Claim limit:** Exercise close ≠ new treaty, basing, or missile-defense battery fielded. ### 10. Army awarded Olin Winchester a $788 million small-caliber ammunition IDIQ **Actor:** ACC Rock Island; Olin Winchester, Oxford, MS **Clocks:** announced on the 2026-09-11 5 p.m. contracts page (in this window). ECD 2031-09-10. One bid solicited, one received. Work locations and funding with each order. **URL:** [Contracts for Sept. 11, 2026](https://www.war.gov/News/Contracts/Contract/Article/4599224/contracts-for-sept-11-2026/) **Disposition:** `promotion_review` FFP / FPEPA IDIQ for 5.56mm, 7.62mm, and .50-caliber ammunition. Industrial-base production vehicle, not rounds delivered, not a new caliber, not a plant standing up. **Claim limit:** IDIQ ceiling ≠ ammunition in inventory. Orders, not the ceiling, will move money. ## Folded or clock-only (do not recensus as new actions) | Object | Owner | This delta | |---|---|---| | NNSA Y-12 B61-13 CSA complete (stamp 2026-09-01; announced 2026-09-10) | 09-11 / 2C civilian DOE | **Fold.** NNSA/Pantex sites retrieved; no later assembly-complete or War-acceptance clock. CSA ≠ Pantex assembly ≠ War acceptance ≠ deployed B61-13. | | EO 14427 DPA energy delegations | 1A / 1C | **No War DPA Title I/III instrument** in this window. Elmet is IBAS. Last retrieved War DPA Title III on war.gov remains out of window (BAE RH45 July 7). | | EO 14426 Veterans access | 1A | **No War/VA operating object** retrieved. | | S. 307 Prison Staff Safety Enhancement Act | 1A BOP/DOJ | No War confinement overlap. | | Crane MMR planned installation NLT Sep 2028 | 09-11 WAVE_2D | Fold. No later site-work/NRC clock. | | JASSM/LRASM $826M P00020; IMX-104 Nitradyn IDIQ; NGEAU FRP; MK 48 MOD 7 options; DARC Site 3 preferred location | 09-11 WAVE_2D | Fold. Sep 14 LM JASSM tooling mod ($13.2M) is grouped sustainment on the same family, not a new lot. | | Super Garuda Shield 26 (kickoff through Sep 11 live fire) | 09-03 / 09-11 WAVE_2D | **Later clock:** closing ceremony **2026-09-11**, Army article 2026-09-12. Same exercise. Do not recensus kickoff or live fire. [Army](https://www.army.mil/article/295290/super_garuda_shield_26_ends_sharpening_skills_and_cementing_multinational_partnerships) | | Phoenix Express 2026 start Sep 7 | 09-11 WAVE_2D | **Later clock:** at-sea phase began **Sep 11** from Bizerte/La Goulette. Navy story 2026-09-15. Exercise start was already owned. | | Yama Sakura 91 close; Hawaii Lala SAD count as of Sep 7; Washington wildfire close; Kilmer keel | 09-11 WAVE_2D | Fold. Hawaii **Lowell recovery** is object 8, not a recensus of the Sep 7 SAD count. | | CCA Increment 1 production contracts (June); live-fire / Creech ACE (July) | pre-window AFNS | **Naming only** this window (FQ-42 Vengeance / FQ-44 Fury, Sep 14). Production entry and live fire are prior. See grouped. | | B-52J CERP Milestone B (June 1) and RMP Milestone C / LRIP (Aug 21) | pre-window | AFNS **Sep 15 wrapping** of those earlier ADMs. Fold the decisions; do not treat the conference story as a new MS B/C. | | ACC-RI Cornerstone OTA ~$25M same-day awards at DIB Exchange | event **Aug 25–27** | Army article **2026-09-16** is later wrapping of pre-window prototype awards (5N+, Graystone, Kunin, Senra, Neya, Cybernet). Fold. | | DLA Distributed Production Wargame | event **Sep 1–3** | DLA article **2026-09-16** is later wrapping of a pre-exclusive-start tabletop. Fold the event; CRMN (FY26 NDAA) is statute, not this window’s standing-up. | | DARC Site 3 Lake Kickapoo preferred location | 09-11 WAVE_2D | Fold. | | Schiess CSO installation | 09-03 / 09-11 | Fold. Sep 16 AFA priorities speech is leadership messaging, not force-structure change. | | MARADMIN 408/26, 410/26, 411/26 | 09-11 WAVE_2D | Fold. 411/26 timestamp R 111400Z is the 09-11 object. | ## Additional in-window objects (lower rank or grouped) ### War contracts clustered — Sept. 11, 14, 15 (not each a new atomic) **Sept. 11** (in-window 5 p.m. dump): - **Boeing** $13.4B **ceiling** modification P00008 to FA8609-19-D-0007 adding FMS scope (Japan, Israel, future partners); total ceiling $19.1B from $5.7B; **no funds obligated**. Ceiling ≠ aircraft sold ≠ FMS LOA executed. - **Blue Halo** $99.8M ceiling LOBO space-systems R&D IDIQ (AFRL Kirtland); $1.70M FY26 RDT&E obligated on two task orders. - **Rolls-Royce Solutions America** $39.1M modification for Eitan power packs (FMS Israel). - **Onebrief** $20M commercial-software IDIQ (ECD later corrected on Sep 15 page to 2031-09-10). - **Northrop Grumman Radford** $19,999,798 non-standard ammunition IDIQ — **withdrawn** on the Sep 15 page (“was not actually awarded”). - **CAE USA** Royal Moroccan Air Force F-16 Block 72 trainer: announced Aug 31, **actually awarded Sep 11** (correction on Sep 14 page). FMS trainer ≠ aircraft delivered. - P-8A Virtual Maintenance Trainer Increment 3 Block 2 update (American Systems $30.6M, incl. RAAF funds); AN/SPG-62 AEGIS reflectors (GDMS $11.5M, FMS Spain/Australia); DLA B-2 hot trailing edges; Hensoldt North America radar contract date/value correction to Sep 11 / $65.5M; SOCOM Obsidian JHDTP $9.3M. Grouped. - Civil-works beach/jetty/dredge lines (Anna Maria, Columbia River North Jetty, Houston Ship Channel, Brazos Island) are USACE civil, not force structure. **Sept. 14:** - **NAMC** AGT 1500 Abrams-engine OTA, **$2.5B ceiling**, **$11,831,430** FY26 RDT&E obligated, ECD 2029-03-14. Ceiling ≠ engine upgraded on the fleet. - **Hensel Phelps** $99.05M GBSD Integrated Training Center MILCON at F.E. Warren (ECD 2029-10-15). Construction award ≠ training center in service. - **Lockheed Martin** $97.6M undefinitized MLRS recapitalization (Camden / Grand Prairie / New Boston). UCA ≠ launchers recapped. - MICC $1.051B facility-sustainment MAC (41 small-business awardees); JFL Consulting $61.6M USNO precise-time security IDIQ; Bell-Boeing ODSSHI V-22 kits $35.5M (incl. FMS Japan); Seemann Composites Virginia-class propulsor IDIQ $31.3M; NG Link-16 UH-1Y/AH-1Z ceiling increase (also restated Sep 15); DLA Boeing ICBM door launchers $16.2M. Grouped. Door launchers ≠ Sentinel fielding. **Sept. 15:** - Clark $117.8M Fort Myer UEPH barracks MILCON; Walsh $73.7M JBLM secure-operations facility (FY10 MILCON); Great Lakes Dredge civil harbor program; Akima $17.9M modification for cavalry-to-HBCT equipment induction/repair. Construction/repair ≠ barracks occupied ≠ HBCT converted. - DLA: Dove Medical $330M ECAT add; Collins Engine Nozzles J-85 nozzles $78.0M and spray bars $70.3M; Kandor coats/trousers option; Elegant Stitches AGSU shirts; Robertson V-22 tanks. Commodity/sustainment. **Sept. 16 contracts dump:** not confirmed posted/retrieved before freeze. Index is a JS shell. GlobalSecurity’s 16 Sep daily listed only the Sept. 15 dump. Treat as **unread**, not empty. ### Force posture / movement / exercises (statement ≠ movement ≠ engagement) - **JTF Southern Border / Operation Ardent Vanguard** (War story 2026-09-16): 62nd Engineer Battalion emplaced concertina/razor on Hesco in National Defense Area 2 near Fort Hancock, TX. Commander cites 14 weeks of barrier work. Reinforcement of existing NDA barriers, not a new Title 10 order and not a completed border system. [War story](https://www.war.gov/News/News-Stories/Article/Article/4602704/joint-task-force-southern-border-soldiers-innovate-to-reinforce-barriers/) - **U.S.–Germany statement of intent** on defense-industrial cooperation, signed 2026-09-15 at the Pentagon (Hegseth / Pistorius). Aligns Warfighting Acquisition System reforms with Germany’s Procurement Acceleration Act. SOI ≠ treaty, co-production line, or FMS case. German F-35A “rollout this Friday” is a German event, not a U.S. delivery. [War story](https://www.war.gov/News/News-Stories/Article/Article/4602094/hegseth-german-counterpart-agree-to-advance-defense-industrial-cooperation/); [transcript](https://www.war.gov/News/Transcripts/Transcript/Article/4602195/transcript-of-secretary-pete-hegseth-hosting-honor-cordon-and-meeting-with-germ/) - **WGS MOU Amendment Three** signed with 10 international partners (Space Force story 2026-09-12). Multilateral SATCOM MOU amendment ≠ satellite launched ≠ new partner funded. Full amendment text not retrieved. - **Southern Vanguard 26** (Peru; War/Army stories Sep 14–15): jungle training with Peru/Chile. Exercise ≠ deployment. - **Saber Junction 26** air-defense integration story Sep 13: ongoing Europe exercise, not a new rotation. - **Patriot 2026** Kentucky Guard wrap (exercise was Aug 24–31): later publication of a pre-window event. Fold as exercise close already outside exclusive start. - **Operation Sunset Canopy** (351st CACOM, Sep 11, Los Alamitos): Reserve airborne demonstration. Training ≠ force-structure change. - **POW/MIA Recognition Day ceremony** advisory for **Sep 18** (after cutoff). Media advisory only. ### Personnel / recruiting / civilian workforce No in-window **RIF instrument**, civilian-workforce cut order, or recruiting-mission-change MARADMIN/DAFI was retrieved. - **NAVADMIN 213/26** (2026-09-16): authorization of Combat Action Ribbon, Strike/Flight Air Medal, and V/C/R devices for **Operation Epic Fury**. Awards-eligibility instrument for a prior named operation (Feb–Apr 2026), not a new engagement and not a strength change. Index: [MyNavy HR NAVADMIN 2026](https://www.mynavyhr.navy.mil/References/Messages/NAVADMIN-2026). Full message PDF not opened this sitting. - **NAVADMIN 211/26** FY27 STA-21 selection; **210/26** NFAAS update — routine personnel admin. - **NAVADMIN 208/26** (Sep 8, pre-exclusive-start): order to account for personnel ICO Hurricane Lowell. Accountability order, not a new activation. Fold as pre-window unless a later accountability close appears (none retrieved). - **Space Force FY27 Interservice Transfer** window **Sep 15–Oct 2**. Solicitation ≠ accessions. - **AETC “1,500-pilot goal”** (AFNS 2026-09-15): on-track FY26 undergraduate-pilot throughput under FUPT; shortfall still cited at ~2,407. Training-pipeline status, not an end-strength change and not 1,500 already winged this FY as a closed count. - **CCA popular names** FQ-42 Vengeance / FQ-44 Fury (SecAF keynote Sep 14). Naming ≠ production (June) ≠ 150 Increment 1 aircraft delivered ≠ 500 by 2032. - **MARADMIN 415/26** (R 141918Z SEP 26): updated COTS ammunition/explosives policy for Marine Corps Shooting Team (Quantico) and EOD air-show support; cancels 455/23. Policy for a narrow user set, not a Class V(W) inventory action. [Print](https://www.marines.mil/DesktopModules/ArticleCS/Print.aspx?PortalId=1&ModuleId=542&Article=4600661) - **MARADMIN 414/26** CY27 DARPA Service Chiefs Fellowship — personnel solicitation. - **MARADMIN 411/26 / 410/26**: 09-11 owned (Innovation Challenge round 2; Congressional Fellowship results). ### Space Force acquisition / organization - **Space Technology Portfolio Executive** established (ASAF/SQ announcement, AFNS/Space Force Sep 15). New PE seat to accelerate emerging space capability. Organization announcement ≠ first PE award. - **SCAR Commercial Solutions Opening strategy** (Space Force Sep 16): CSO acquisition strategy for Satellite Communications Augmentation Resource / satellite C2. Strategy ≠ awarded CSO, ≠ on-orbit capability. - CSO Schiess AFA priorities (ethos / arm / integrate) and “double in size over five years” remarks: leadership intent, not a programmed end-strength decision. ### DARPA / DIU - **DARPA D2 Sprint** (news 2026-09-14): $1M prize competition (Documentation and Decision Support) for AI medical documentation/decision support; team qualifications opened Sep 10; Industry Day Sep 22 (after cutoff for the event itself). Prize announcement ≠ tool fielded. [DARPA](https://www.darpa.mil/news/2026/darpa-sprint-d2) - DARPA events calendar: Firefox Proposers Day Sep 21; NGHCM / D2 / Surgical Industry Days Sep 22; Hubble Sep 25; APM / BEAMERS Sep 30 — all **after cutoff** or open solicitations. SBIR topics still closing Sep 23 / opening Sep 23. Solicitation ≠ award. - **DIU:** no in-window project-spotlight award retrieved (last retrieved JSDT awards were July 9 / January–June). Empty dated in-window as a news object, not inactivity. ## 2026-09-11 date-only replay (then dedupe) Reached: Sept. 11 War contracts dump (kept — 5 p.m. is after 09-11 freeze); MARADMIN 410/26 and 411/26 (fold — 09-11 owned); ceremonial 9/11 Pentagon observance (reject as ceremonial); CAE Morocco award-date correction (grouped). Super Garuda close and Freedom Edge close sit on Sep 11; SGS close is a later clock on an owned exercise, Freedom Edge close is new to this wave (object 9). 09-11 WAVE_2D already owned Crane MMR, JASSM/LRASM P00020, Nitradyn IMX-104, NGEAU FRP, MK 48 options, DARC Site 3, Hawaii SAD/Lowell staging, Washington wildfire close, SGS live fire, YS91 close, Phoenix Express start, Kilmer keel. Those are not new atomics. ## 09-11 hole retry (Sept. 3 / 4 / 8 dedicated contract pages; af.mil; dla.mil) **Dedicated War contract pages for Sept. 3, 4, and 8:** still **unread as official HTML** from this host. The contracts index remains a JS shell (“simulated response” / Load More). Curl to war.gov/defense.gov article URLs returns **Akamai 403**. `open_page` retrieved Sept. 11/14/15 in full; it did not land dedicated Sept. 3/4/8 slugs. Secondary snippets quoting the Sept. 4 dump (not a substitute for the official page) name: - **Huntington Ingalls / Newport News** $336,112,000 cost-only UCA for CVN 82 (USS *William J. Clinton*) long-lead materials; FY26 SCN obligated; ECD March 2039; 10 U.S.C. 3204. HII’s own release is **2026-09-11**. Advance procurement ≠ keel ≠ construction start (HII cites planning for a 2027 keel as program talk, not this award’s completion). Because the official Sept. 4 page was a 09-11 unread hole, record the object as **hole-retry recovered from secondary/company text, official page still unread**. - **MDA** Northrop Grumman Chandler ~$508.5M follow-on IRBM/ICBM target flight-test support (HQ0855-26-C-E001) — secondary snippet only. - **DLA** Pentaq Manufacturing ~$763M IDIQ for physical fitness gear — secondary snippet only. - Griffon Outlaw remains the Sep 4 announcement / Sep 8 actual award already corrected on the 09-11 Sep 10 page. Do not promote CVN 82 / MDA targets / Pentaq as this-window atomics until the official Sept. 4 page is read. They are 09-11-window awards that this sitting still cannot certify from war.gov HTML. **af.mil:** curl/Akamai 403 from this host on some flagship URLs; **reached** this sitting via search, print handlers, and `open_page` (Sentinel Pathfinder, CCA naming, AETC 1,500, B-52 wrapping, AFA keynotes). A 403 on one path is not inactivity. **dla.mil:** curl 403 from this host on some paths; **reached** this sitting via search (Industry Collider Day Sep 9 event / Sep 16 story; Risk-to-Readiness logistics summit Sep 9–10 / Sep 11 story; Distributed Production Wargame Sep 1–3 / Sep 16 wrapping). No distinct in-window DLA **production/finance** object beyond War-contracts commodity lines. ## Bounded negatives - No public **War DPA** Title I/III instrument after exclusive start. - No public **B61-13** Pantex assembly-complete or War-acceptance receipt. - No public **IOC / fielding** claim that is not an exercise, experiment, naming, or test-stack (Sentinel Pathfinder is inert; MQ-25/Blackbeard/PrSM Inc 2 are production vehicles; CCA names are names). - No **Title 10 Guard/Reserve call-up** instrument. Hawaii Lowell recovery remains **state active duty**. - No in-window War implementing instrument for EO 14427 or EO 14426. - No census of SAM.gov, FPDS, USAspending, classified OTAs, or every PEO. ## Surfaces | Surface | Status | Note | |---|---|---| | war.gov Contracts Sept. 11 | **reached** | Full text via `open_page`. In-window 5 p.m. dump. | | war.gov Contracts Sept. 14 | **reached** | Full text via `open_page` (Army through DHA). | | war.gov Contracts Sept. 15 | **reached** | Full text via `open_page`. Includes Onebrief ECD correction and NG Radford withdrawal. | | war.gov Contracts Sept. 16 | **unread / not confirmed posted** | Index JS shell; no dedicated page retrieved before freeze. Not treated as empty. | | war.gov Contracts Sept. 3, 4, 8 | **unread as dedicated pages** | 09-11 hole **not closed**. Curl 403; index JS. Secondary snippets only for Sept. 4. | | war.gov Releases | **reached** | Elmet IBAS; Feinberg memo; 9/11 ceremonial fold | | war.gov News Stories / Transcripts | **reached (selected)** | MQ-25 story; Germany SOI; JTF-SB barriers; 9/11 observance | | army.mil news | **reached** | SGS close; Hawaii Lowell recovery; Southern Vanguard; ACC-RI wrapping; Sunset Canopy | | navy.mil Press Releases / News Stories | **reached** | Blackbeard production; Freedom Edge close; Phoenix Express at-sea; MQ-25 wrapping | | marines.mil News | **reached (thin)** | No distinct in-window operational atomic beyond MARADMINS | | marines.mil MARADMINS | **reached** | 415/26, 414/26 in-window; 410/26–411/26 fold | | af.mil News | **reached via search/print/open_page**; curl 403 on some flagship URLs | Sentinel Pathfinder; CCA names; AETC 1,500; B-52 wrapping. 403 ≠ inactivity. | | spaceforce.mil News | **reached (index/search)** | WGS Amendment Three; Space Technology PE; SCAR CSO strategy; IST window; Schiess AFA remarks. Some guessed article slugs 404’d. | | nationalguard.mil News | **reached (index/search)** | Hawaii Lowell later clock taken from army.mil; Patriot 26 is pre-window wrap | | darpa.mil/news | **reached** | D2 Sprint announcement; remaining items are open events/SBIR clocks | | diu.mil | **reached; empty dated in-window news** | Last retrieved awards July 9 | | dla.mil News | **reached via search**; curl 403 on some paths | Wrapping of pre-window wargame/summit; no distinct production object | | nnsa.energy.gov / pantex.energy.gov | **reached** | No post-CSA B61-13 later clock. Pantex homepage is people/9-11 features. | | mynavyhr.navy.mil NAVADMIN index | **reached (index)** | 213/26 titled; full PDF unread | | SAM.gov / FPDS / USAspending | **not recensus’d** | Bounded negative | | Classified / nonpublic ops | **classified_nonpublic** | Not inactivity | ## Coverage receipt | Publisher family | Status | Missed (new) | Enrichment / clock | Routine/reject | |---|---|---:|---:|---:| | War contracts (business-day $7.5M+) | mixed: Sep 11/14/15 reached; Sep 16 unread; Sep 3/4/8 dedicated pages still unread | 4 promoted production/industrial (PrSM Inc 2; MQ-25 LRIP; Blackbeard lot; Olin ammo) | AMPV mod promoted; NAMC/GBSD ITC/MLRS UCA grouped; NG Radford withdrawn | civil-works; clothing; ECAT add-ons | | War releases / news | reached | 2 (Feinberg memo; Elmet IBAS) | Germany SOI; JTF-SB barriers | ceremonial 9/11; POW/MIA advisory for Sep 18 | | Army flagship | reached | 1 (HI Lowell recovery clock) | SGS close; Southern Vanguard | ACC-RI Aug wrapping; Sunset Canopy | | Navy press + numbered fleets | reached | 2 (Blackbeard wrapping as production lot; Freedom Edge close) | Phoenix Express at-sea | CNO/AFA adjacent | | Marines news + MARADMINS | reached | 0 | 1 (415/26 COTS A&E policy) | fellowship/challenge | | Air Force flagship | reached this sitting via search/print | 1 (Sentinel Pathfinder stack) | CCA names; AETC 1,500 | B-52 MS wrapping; AFA keynotes | | Space Force flagship | reached (index) | 0 promoted | WGS Amd 3; Space Tech PE; SCAR CSO strategy | Schiess speech; IST window | | National Guard | reached | 0 new atomics (HI is later clock) | Lowell recovery | Patriot 26 pre-window | | DARPA / DIU | reached | 0 | D2 prize announcement | open SBIR/event clocks | | DLA news | reached via search | 0 | 0 | pre-window wargame wrapping | | NNSA / Pantex | reached | 0 | 0 | CSA fold; no Pantex later clock | | Award systems | not enumerated | — | — | bounded | **Closed:** **no** for a complete business-day contracts series (unread dedicated pages still: Sept. 3, 4, 8; Sept. 16 dump not confirmed). **Yes** for the named service newsrooms actually retrieved (Army, Navy press, Marines MARADMINS, Air Force via search/print, Space Force index, Guard index, War releases, DARPA news, NNSA). Named unread or blocked publishers: **dedicated War contract pages for Sept. 3/4/8**, **Sept. 16 contracts if posted**, **NAVADMIN 213/26 full PDF**, **WGS Amendment Three full text**, **Feinberg appendix beyond the release HTML** (PDF URL retrieved, full appendix not line-read). Those are tool-path or scope bounds, not inactivity findings. This is public-surface research, not a census of every contract, PEO, COCOM action, field outcome, or classified operation.