## SWIFT programme lineage and linked research

These are separate experiments and architectures. Earlier membership does not prove a 2026 ledger connection.

| Programme | Verified scope / outcome | Overlap and process significance |
|---|---|---|
| 2023 public/private blockchain interoperability | Completed experimental transfers using Chainlink abstraction/CCIP and Ethereum Sepolia. | Named banks include ANZ, BNP Paribas, BNY Mellon, Citi and Lloyds. Tests address connectivity and asset transfer, not current deposit-ledger production. [SWIFT results article](https://www.swift.com/news-events/news/successful-blockchain-experiments-unlock-potential-tokenisation). |
| March 2024 CBDC sandbox Phase 2 | 38 institutions; 750+ sandbox transactions; digital trade, FX, DvP and liquidity-saving scenarios. | Named roster overlaps ANZ, Citi, DBS, HSBC, Standard Chartered and UOB. CBDC simulation is distinct from the current commercial-bank-money model. [Official report](https://www.swift.com/sites/default/files/files/swift_cbdc_sandbox_project_results_report_phase2_final_220324.pdf), executive summary and Figure 1. |
| November 2024 UBS Asset Management / Chainlink, Project Guardian | Completed tokenized-fund subscription/redemption pilot using existing Swift payment infrastructure. | Coordinates conventional payment confirmation with fund mint/burn. UBS AM's fund role differs from UBS bank deposits. SBI Digital Markets contributed preceding subscription/redemption work. [SWIFT release](https://www.swift.com/news-events/press-releases/swift-ubs-asset-management-and-chainlink-successfully-complete-innovative-pilot-bridge-tokenized-assets-existing-payment-systems). |
| July 2025 Northern Trust / Project Acacia | Northern Trust announced a simulated carbon-credit DvP workflow under the RBA/DFCRC project. | Private asset ledger plus commercial bank account; Swift coordinates asset and cash. Later Swift overview calls the related trials completed, but the linked July bank release itself is prospective. [Northern Trust](https://www.northerntrust.com/japan/pr/2025/northern-trust-advances-tokenized-finance-innovation-in-australia-through-project-acacia). Northern Trust is not in July's 17-bank ledger cohort. |
| September 29, 2025 shared-ledger design | More than 30 financial institutions; Consensys conceptual prototype; 34 names in the published design list. | Comparing the lists gives 14 overlapping banks; Lloyds, Mashreq and UBS appear in July's initial-use list but not the earlier design list. J.P. Morgan is a design participant, not one of July's 17. Design and activation cohorts must remain separate. [SWIFT design announcement](https://www.swift.com/news-events/press-releases/swift-add-blockchain-based-ledger-its-infrastructure-stack-groundbreaking-move-accelerate-and-scale-benefits-digital-finance). |
| November 14, 2025 Citi / Swift fiat-digital PvP | Completed workflow trial using test USDC on Ethereum Sepolia, escrow and orchestration. Citi explicitly says synchronized but non-atomic. | This establishes a test USDC connection for that experiment, not USDC use in 2026 deposit payments. [Citi trial](https://www.citigroup.com/global/news/press-release/2025/citi-completes-landmark-fiat-to-digital-currency-payment-settlement-workflow-trial-with-swift). |
| Tokenized bond lifecycle trial, described in Swift's subsequent overview | BNP Paribas Securities Services and Intesa Sanpaolo acted as paying agents/custodians; SG-FORGE supplied tokenized assets and EURCV. DvP, interest and redemption were tested. | Asset servicing, stablecoin cash and messaging interoperability. Separate from BNP/HSBC's deposit payment. Swift says it submitted market-practice proposals to SMPG; submission is not adoption. Exact event day not supplied by the opened overview. [Swift overview](https://www.swift.com/news-events/news/swift-takes-bold-steps-unlock-benefits-digital-finance-global-scale). |
| March 2026 implementation / July initial use | Besu/EVM implementation, then 17 banks preparing controlled live pilots. | Swift operates shared coordination, with bank-side money/funding and external settlement responsibilities. [Implementation](https://www.swift.com/news-events/news/swifts-blockchain-based-shared-ledger-progresses-mvp-implementation), [July roster](https://www.swift.com/news-events/press-releases/swifts-blockchain-ledger-ready-use-17-banks-set-pioneer-tokenised-cross-border-payments-trusted-global-infrastructure). |
| July 2026 Agorá real-value testing — separate BIS programme | BIS reports 30 transactions across 17 scenarios, about CHF800,000 total; SIX facilitator, Kaleido technology. | Testing list overlaps BNP Paribas, BNY, Citi, Lloyds, MUFG, Standard Chartered and UBS. It combines tokenized deposits and reserves on a shared platform. Programme totals are not individual-bank performance. Header says May27 despite July body; retrieved September9. [BIS results/table](https://www.bis.org/project/agora). |

The [2023 full interoperability report](https://www.swift.com/sites/default/files/files/results_report_swift_interoperability_experiments_final_310823.pdf) is particularly useful for our legal/process comparison: its findings discuss designated depository responsibilities, privacy, liability and recourse alongside technical message handling. Technical success did not itself resolve the legal stack.

The Swift overview also links an HSBC/Ant ISO 20022 tokenized-deposit trial. The Ant target returned only its navigation shell in this pass; the overview establishes Swift's description, but no further transaction detail is admitted from that target. Embedded videos and transcripts were not reviewed. These access limits prevent a claim to have exhausted every linked release or test.
