# Portfolio Evidence and Readiness Matrix

**Status:** `current bounded comparison; not a scorecard`
**Cutoff:** 2026-09-30 ET
**Rule:** record the highest publicly supported state and the exact load/test boundary; do not turn missing evidence into a zero or failure

## Evidence ladder

| Code | State | Minimum receipt |
|---|---|---|
| P0 | direction | signed direction or official program announcement |
| P1 | scope fixed | named site, electrical boundary, mission loads, duration and performance standard |
| P2 | authority and money fixed | appropriation/obligation or executed agreement with accountable owner/operator |
| P3 | design and permission fixed | accepted architecture, interconnection, cyber controls and required license/authorization |
| P4 | built | physical completion with material deficiencies identified or closed |
| P5 | commissioned | integrated system accepted for service and delivering power |
| P6 | island tested | observed no-grid start, transfer and carriage of a defined load |
| P7 | endurance and recovery tested | defined load carried for the required duration and safely resynchronized/recovered |
| P8 | recurring readiness | repeated exercise, maintenance, fuel, staffing and exception evidence |

These are evidence states, not a single maturity score. A prototype can reach advanced technical testing without becoming a base-power service; a commissioned site can still lack public endurance evidence.

## Publicly supportable positions

| Object | Public state at cutoff | Load boundary | Highest supportable installation-power state | Missing receipt that matters most |
|---|---|---|---|---|
| FORTRESS America | department program established | every major installation; “independent power” undefined | P0 direction | implementation constitution and covered-site list |
| Army SCI energy portfolio | six conditional developer/site pairings | solicitation says installation support for at least 14 days after qualifying outage | before P2 | executed lease/PPA, finance close and site design |
| Army Janus | five vendor/site pairings | site requirements not equivalent to full-base load | before P2/P3 | task award, authorization, accepted design and construction |
| NWS Crane MMR | planned joint Navy/Army Janus deployment by September 2028 | critical operations; commercial ownership/operation described | P0/P1 planning direction | final commercial agreement, authorization, design, construction and accepted delivery |
| Eielson microreactor | notice of intent to negotiate with Oklo | up to 5 MW for critical infrastructure | P1 proposal | final award, NRC license, construction and commissioning |
| Project Pele | prototype construction/test path at INL | transportable reactor demonstration, not installation service | project-specific build/test lane | fueled criticality and published output/test result; then a separate base-service agreement |
| MCAS Yuma | operational public description | backup capacity described for 100% of current and projected base requirements | P5 publicly described | current black-start, load, duration and recovery receipt |
| MCAS Miramar | completed and exercised | public exercise supports mission-critical islanding; design description says up to 21 days | P6 | observed endurance/recovery evidence at the claimed load boundary |
| SUBASE New London | operational microgrid | essential functions; 10.75 MW CHP plus first-right 7.4 MW fuel-cell access | P5 | current black-start/endurance result |
| Fort McCoy Main Gate | operational scope-limited microgrid | gate and nearby mission-essential facilities; stated at least 14 days | P5 | observed 14-day and recovery result |
| DLA Distribution Sigonella | activated tenant-facility microgrid | DLA facilities; stated up to 14 days on one fuel load | P5 | observed endurance and recovery result |

## Required portfolio fields

Every future FORTRESS site row should contain:

1. installation and electrical boundary;
2. covered mission and excluded loads;
3. normal, peak and critical load;
4. generation, storage, fuel and switching architecture;
5. outage duration and replenishment assumption;
6. legal authority and financing instrument;
7. asset owner, emergency operator and site-access rights;
8. utility interconnection and island permission;
9. cyber/physical control standard;
10. construction and commissioning state;
11. black-start, transfer, island-load and recovery results;
12. exception list, maintenance clock and next recurring exercise.

## Comparison ruling

The portfolio is heterogeneous by design. Full-load, critical-load, campus, gate and tenant-facility systems cannot be counted as interchangeable “independent bases.” The valid denominator is not project count; it is the number of covered installations whose defined required load has passed the required test for the required duration and remains in recurring readiness.
