# IMF waiver and exception ledger

**Evidence cutoff:** 2026-07-30  
**Scope:** selected published 2025–26 program reviews used in the symmetry audit

## Reading route and consolidation note — 2026-09-07

The maintained overall ruling is [[04 - Synthesis/Cross-cuts/2026-07-30 - Who Gets Adjusted — IMF Symmetry and the Price of Access]]. This specialist retains the
five-borrower exception record; the eight-country comparison is in
[eight-country matrix](<workbench:/Research Packages/International Monetary Transition/06 - Who Gets Adjusted IMF Symmetry Audit 2026/IMF_ADJUSTMENT_BURDEN_CASE_MATRIX_2026-07-30.md>).
Instrument definitions are maintained in
[instrument map](<workbench:/Research Packages/International Monetary Transition/06 - Who Gets Adjusted IMF Symmetry Audit 2026/IMF_SURVEILLANCE_VS_CONDITIONALITY_CONTROL_MAP_2026-07-30.md>).
The evidence cutoff remains **2026-07-30**. This consolidation checked saved
research only; it did not refresh the primary sources. Financing amounts below
refer to access made available after Board completion, not independently
confirmed cash transfers. Exact country-report tables and test-date locators
were not recovered locally in this pass; specific unresolved fields are noted below.

## How to read this ledger

A missed quantitative performance criterion requires a waiver for the relevant
review or purchase. Missed indicative targets and structural benchmarks do not.
A prior action operates before approval or review completion. A target
modification changes the future test. Rephasing changes the timing of access;
extension changes the arrangement clock.

These are different institutional acts and should not be collapsed into the
word “flexibility.”

## Ledger

| Member | Recorded miss or pending action | Instrument | IMF-recorded response | Finance/review result | What the record establishes |
|---|---|---|---|---|---|
| **Argentina** | End-December 2025 NIR-accumulation QPC missed | QPC | Waiver requested and approved; corrective measures; future criteria modified, including a lower interim reserve path | Second review completed; about US$1 billion made immediately available | A substantial reserve shortfall can be waived when the Board accepts corrective action and the program remains judged viable |
| **Egypt** | End-September IT and end-December NIR QPC missed; end-June primary-balance QPC missed; end-June central-bank-lending QPC missed before later correction; tax-package SB missed | Mixed QPCs, IT, SB | Waiver, corrective actions, a missed tax SB converted into a prior action, PCs modified, access rephased, arrangement extended | Combined reviews completed; about US$2.3 billion made available | Condition type controls procedure: QPC misses require waiver; IT/SB misses are handled through overall assessment, corrective action, or conversion into a prior action |
| **Pakistan** | Health/education spending IT missed at one test; FBR-revenue IT missed repeatedly; power-arrears IT missed at end-March; some SBs delayed or not met | ITs and SBs | No waiver required for those misses; two prior actions imposed/completed for the review—fuel-price alignment and tax collection/expenditure savings | Third review completed after prior actions | A miss can be real and published without triggering a waiver when the commitment is an IT or SB |
| **Ghana** | All end-June 2025 QPCs and ITs met; some complex structural reforms delayed | SBs plus prior actions | Three prior actions completed; monetary-policy consultation clause modified; program extended | Fifth review completed; about US$385 million access | Passing quantitative tests does not remove conditional leverage; prior actions can still be required before review completion |
| **Sri Lanka** | Continuous PC on external-payment arrears not observed after a small payment incident; continuous import-restrictions PC also not observed; end-December 2025 QPCs met | Continuous PCs | Waiver for external arrears on the stated basis of minor nonobservance and corrective action; prior actions restored fuel/electricity cost recovery; future PCs modified; exact disposition of the separate import-restrictions PC miss unresolved here | Combined reviews completed; about US$695 million made available | The official record distinguishes a minor technical breach from the politically material prior actions required to reach the Board |

## Case details

### Argentina — waiver plus target revision

The [2026 country
report](https://www.elibrary.imf.org/view/journals/002/2026/105/article-A001-en.xml)
records the authorities' request for a waiver of the NIR QPC and for modification
of program targets. The [Board
release](https://www.imf.org/en/news/articles/2026/05/21/pr26165-argentina-imf-completes-2nd-rev-of-extended-arr-under-eff-concludes-2026-aiv-consultation)
says corrective measures were implemented and made about US$1 billion
available.

**Boundary:** the public record supports a disclosed and Board-approved
exception. It does not establish the counterfactual—whether a similarly sized
miss by another borrower would receive the same response.

### Egypt — layered flexibility

The [2026 country
report](https://www.imf.org/-/media/files/publications/cr/2026/english/1egyea2026001.pdf)
records:

- a missed end-December NIR QPC due to a lack of central-bank FX purchases;
- a missed end-June primary-balance QPC linked to divestment shortfalls;
- a missed central-bank-lending QPC followed by corrective action and later
  observance;
- a missed tax-package structural benchmark converted into a prior action;
- modification of performance criteria, rephasing of access, and extension.

The prior action required Cabinet approval of a tax package agreed with IMF
staff and designed to raise 1% of GDP in FY2026/27.

**Boundary:** “waiver” is only one part of this program response. The controlling
record also changes the future clock and elevates a missed structural measure
into a pre-Board requirement.

**Exact-source gaps:** the saved end-September IT is not named in the ledger
row, and the years for the September, December and June tests are not given
here. The relevant report table and test-date locators were not recovered in
this pass; the dates should not be inferred solely from the report year.

### Pakistan — no waiver because the misses were trackers or benchmarks

The [2026 country
report](https://www.imf.org/-/media/files/publications/cr/2026/english/1pakea2026001.pdf)
reports:

- health-and-education spending of PRs 591 billion against a PRs 600 billion
  indicative floor at one test, later followed by observance at the next
  reported test;
- repeated shortfalls in the FBR net-revenue indicative target;
- PRs 420 billion in power-sector payment arrears against a PRs 400 billion
  indicative ceiling at end-March;
- two completed prior actions: full fuel-price alignment with international
  prices, and tax collection with expenditure savings. The saved notes
  associate PRs 322 billion with the measure; whether it is tax collection
  alone or a combined total needs report-table verification.

No waiver was needed for the IT misses. This follows the IMF's general rule,
not a Pakistan-specific exemption.

**Exact-source gaps:** the saved summaries do not identify the health/education
miss and later-observance test dates, the year of the end-March power-arrears
test, or the exact QPC test behind the companion matrix's original “end-June”
wording. That wording is retained there as a dated discrepancy, not a verified
clock. The lead and specialist summaries also leave ambiguous whether PRs 322
billion refers to tax collection alone or tax collection plus expenditure
savings; the original report table must resolve the allocation.

### Ghana — prior action despite met QPCs

The [2025 country
report](https://www.imf.org/en/publications/cr/issues/2025/12/22/ghana-fifth-review-under-the-arrangement-under-the-extended-credit-facility-requests-for-572753)
states that every end-June performance criterion and indicative target was met.
The review still required an audit of 2024 payables, taxpayer-registry and
ledger cleansing, and submission to Parliament of a 2026 budget aligned with
program objectives.

This is important for burden analysis: leverage is not limited to penalizing a
miss. A prior action can be used to establish the policy basis for the next
review even after satisfactory numerical performance.

### Sri Lanka — minor waiver, material prior actions

The [2026 country
report](https://www.imf.org/-/media/files/publications/cr/2026/english/1lkaea2026001.pdf)
records a waiver request for a minor nonobservance of the continuous
external-arrears PC and corrective actions. The [Board
release](https://www.imf.org/en/news/articles/2026/05/27/pr26172-sri-lanka-imf-completes-combined-5th-and-6th-reviews-under-eff)
records that the prior actions on fuel and electricity cost-recovery pricing
were met before about US$695 million became available. The saved review also
records a separate continuous import-restrictions PC miss, but the exact
waiver or other disposition for that criterion is unresolved here; do not
extend the identified external-arrears waiver to it by inference.

The same report places the temporary subsidy package on budget, limits combined
subsidies and Aswesuma support to LKR100 billion, targets the electricity
subsidy to household use below 180 kWh (plus specified low-use non-residential
segments), and requires phaseout when the cap is reached or by end-September 2026. These are the dated design conditions recorded at the July 30 cutoff;
the Board's acceptance of the design does not establish later implementation
or actual subsidy phaseout.

## Cross-case interpretation and remaining comparison

The maintained synthesis and interpretation of these cases belong to
[[04 - Synthesis/Cross-cuts/2026-07-30 - Who Gets Adjusted — IMF Symmetry and the Price of Access]]. The ledger preserves the case evidence for disclosed waiver
grounds, future target revisions, prior-action leverage and the different
conditionality status of social commitments. A waiver concerns present
nonobservance; modification, rephasing and extension change distinct future
conditions or clocks. None alone establishes favoritism.

The original July 30 proposal for a stronger comparison remains open: code all
waivers, modifications and prior actions in a defined cohort of comparable
arrangements using the IMF's MONA database and underlying Board papers, and
compare the public granularity of waiver justifications. The five cases here
do not establish a population-wide or causal favoritism finding.
