# Wave 4 strict anti-bloat re-audit

**Status:** PASS — controlling promotion-gate supplement; closed Wave 4 preserved byte-identically  
**Vault/chart/canon mutation:** none

All 15 prior Wave 4 review rows were re-challenged after lane close. The official-site census and evidence ledgers remain unchanged; this supplement narrows only what may reach later human review.

| Measure | Rows |
|---|---:|
| Prior Wave 4 review queue | 15 |
| Retained after strict gate | 12 |
| Downgraded to plotline support | 3 |

## Downgraded as maintenance or same-program duplication

| Object | Title | Reason |
|---|---|---|
| `W4-EL-OBJ-001` | Puerto Rico Electric Power Authority Order No. 202-25-1E Regarding Specified Generation Resources | Demote to C: the 1E instrument is a recurring bounded successor renewal of already operative PREPA emergency authority. Preserve the exact order and reporting clock for the energy watch, but do not create a separate review unit absent dispatch, output, repair, outage, or other observed effect. |
| `W4-EL-OBJ-002` | Puerto Rico Electric Power Authority Order No. 202-25-2E Regarding Transmission and Distribution Facilities | Demote to C: the 2E instrument renews the same bounded PREPA emergency-order family. The additional 400-mile directive is worth preserving in the existing grid watch, but no completed vegetation work, repair, capacity, or customer result supports a separate review unit. |
| `W4-TT-OBJ-003` | Hybrid-electric eIPP demonstration flight along Utah's I-15 corridor | Demote to C: the Utah test is genuine operating evidence, but it is an earlier same-program demonstration leg. Preserve it as support for the later multistate eIPP milestone rather than creating a second near-duplicate Observatory item. |

## Retained review candidates

| Object | Title | Non-routine basis |
|---|---|---|
| `W4-CI-OBJ-002` | NIST Joins National Genesis Mission to Accelerate AI Innovation | Strict re-audit retained: A signed interagency operating agreement and two identified implementation sprints materially advance established AI, autonomy, and drone-production threads. |
| `W4-CI-OBJ-023` | Amended USMCA automobile U.S.-content submission procedures | Strict re-audit retained: A live Section 232-USMCA administration procedure changed deadlines and validity periods for an established tariff plotline. |
| `W4-CI-OBJ-024` | Approval of Subzone Status; Fermi, Inc.; Panhandle, Texas | Strict re-audit retained: A project-specific federal trade-zone legal state changed for an already relevant energy-compute site, while construction and operation remain explicitly unproved. |
| `W4-EL-OBJ-019` | Department of Energy Awards First Civil Nuclear Credit Payment to California Power Plant | Strict re-audit retained: DOE issued the first actual Civil Nuclear Credit payment after stated conditions were met; this is beyond selection, negotiation or award-announcement state. |
| `W4-EL-OBJ-009` | Energy Secretary Announces Cancellation of Three Proposed National Interest Electric Transmission Corridors | Strict re-audit retained: DOE closed the existing three-corridor designation process with no NIETC designated, a final decision-state falsifier rather than a proposal or amount. |
| `W4-EL-OBJ-003` | PJM Interconnection Order No. 202-26-40 regarding Eddystone Units 3 and 4 | Strict re-audit retained: A new signed federal emergency order placed Eddystone Units 3 and 4 into a bounded availability regime; dispatch and output remain unproved. |
| `W4-AG-OBJ-001` | USDA-DHS memorandum for New World screwworm border biosurveillance using UAS and AI | Strict re-audit retained: Not routine maintenance: the signed interagency instrument formalizes USDA-DHS roles and an operating UAS/AI/biosurveillance architecture on the already-established New World screwworm border-response storyline. It does not claim a deployment or outcome. |
| `W4-AG-OBJ-002` | Forest Service reassigns all fire and aviation authorities to the Deputy Chief | Strict re-audit retained: Not routine maintenance: every Forest Service fire/aviation authority under the cited manual series moved to one Deputy Chief, changing the national command and emergency-declaration state on the established wildfire-governance and administrative-reorganization storyline. |
| `W4-AG-OBJ-003` | Forest Service awards RTI contract for federal wildland-fire consolidation feasibility study | Strict re-audit retained: Not routine grant churn: an executed named contract commissions the specific federal wildland-fire separation/consolidation study and fixes a February 15, 2027 report horizon on an established wildfire-governance/reorganization storyline. The review packet is limited to the study award, not consolidation. |
| `W4-AG-OBJ-006` | Food and Nutrition Service becomes Food and Nutrition Administration and begins hub realignment | Strict re-audit retained: Not routine maintenance: the official mission area changed identity, reporting line, headquarters footprint, regional hubs, and retailer-compliance topology. It materially repairs the established government-reorganization storyline but is explicitly reservoir-new historical, not current catch-up. |
| `W4-TT-OBJ-009` | Hybrid-electric eIPP flights connected small airports with Philadelphia | Strict re-audit retained: Multistate hybrid-electric flights physically occurred under eIPP and therefore materially advance the established advanced-air-mobility plotline. |
| `W4-TT-OBJ-012` | FAA adoption of Air Force categorical exclusion for specified supersonic-flight reviews | Strict re-audit retained: FAA adopted a new environmental-review pathway for specified supersonic SFA actions at an exact issuance/publication/effect clock, advancing the established advanced-airspace legal architecture. |

## Preservation and authority boundary

Closed Wave 4 tree: 121 files; SHA-256 `e4e32408685fa14d2d2edaa7a9e1008b4291e770cd5cfda071e4f7ea52422662` before and after.

This is a controlling promotion gate only. It grants no keep, promotion, vault, chart, canon, or entity-topology authority.
