title: Phase VI National IT Financial and Asset Bridge
date: 2026-08-02
retrieved_through: 2026-08-02 ET
status: factual workbench lane
authority: official Federal Reserve Board, Federal Reserve Bank of Richmond, and Federal Reserve Financial Services publications
vault_status: workbench only; no live-vault, registry, manifest, or app edit
---

# Phase VI National IT Financial and Asset Bridge — 2026-08-02

## Scope, method, and claim limit

This lane extends the existing Phase V Federal Reserve financial-constitution work
through the financial, cost-accounting, capital-planning, software-asset,
shared-service, governance, procurement, and service-control layers of Richmond-hosted
National IT. It uses only publicly available official sources current or available as
of the cutoff. No request, outreach, login, participant portal, or nonpublic record was
used.

The principal accounting problem is not lack of disclosed dollars. It is that the
public dollars belong to different ledgers and perimeters:

- the Federal Reserve Bank of Richmond's audited **legal-entity** statements;
- the Board's System-wide Reserve Bank **operating and capital budgets**;
- National IT's separately presented **capital-plan** and employment subsets;
- CASPR **cost objects and allocations**;
- FAM **asset ownership and financial-accounting** rules;
- FRFS **service-control, service-level, and cost-recovery** records; and
- outside-vendor **contracts, invoices, and cash disbursements**.

Those layers must not be collapsed. In particular, Richmond's legal books are not a
National IT segment statement; a National IT capital budget is not a cash-flow
statement; a capitalized-expense credit is not capital expenditure; an inter-Bank
reimbursement is not outside revenue or vendor spend; and a software-recording Bank
need not be the developer, physical host, contracting Bank, user, or enterprise
controller.

### Status key

| Mark | Meaning |
|---|---|
| **A** | historical actual or audited balance/expense |
| **B** | approved budget, forecast, or authorization; not actual expenditure |
| **C** | current disclosed policy, governance, or operating fact |
| **D** | derived arithmetic from disclosed values; not separately reported |
| **NR** | not recovered in the reviewed public record; not a claim of nonexistence |

## Executive adjudication

1. **The 2024 System capital underrun was not a National IT capital underrun.**
   District capital was $645.5 million against a $784.4 million budget, a
   $138.9 million underrun. National IT was $131.7 million against $129.5 million,
   approximately $2.3 million over budget. Those two movements reconcile to the
   System's $136.6 million total capital underrun. This is the cleanest exact public
   bridge in the lane.

2. **The 2025 approved plan materially changed the presentation perimeter of capital
   investment.** National IT capital fell to a $60.2 million budget, down
   $71.5 million or 54.3 percent from 2024 actual, while District capital rose to an
   $882.4 million budget, up $236.9 million or 36.7 percent. National IT's share of
   total published capital moved from 24.0 percent of 2023 actual to 17.0 percent of
   2024 actual and 6.4 percent of the 2025 budget (**D**). This proves a shift in the
   published capital-plan perimeter. It does **not** prove a transfer of asset title,
   a shift from owned infrastructure to cloud expense, or actual 2025 spending.

3. **The operating-software plan moved in the opposite direction.** System-wide
   Reserve Bank software costs rose from $493.1 million actual in 2023 to
   $548.8 million actual in 2024 and a $662.2 million 2025 budget. The 2025 budget
   increase was $113.4 million, or 20.7 percent. At the same time, the
   capitalized-expense credit rose from $160.8 million actual in 2024 to a
   $206.6 million budget. These are System-wide account classifications, not National
   IT segment amounts and not vendor payments.

4. **Richmond's national-service reimbursement is large enough to reverse the visual
   meaning of its legal-entity expense statement.** Richmond reported $850 million of
   2025 operating expense after a $1.135 billion computing-and-support reimbursement
   credit in “Other.” Adding the audited credit back produces $1.985 billion of gross
   expense before that credit (**D**), of which gross “Other” is $622 million (**D**).
   The reimbursement was 57.2 percent of that reconstructed gross total (**D**) and
   exceeded the reported net total by 33.5 percent (**D**). It is an inter-Bank
   redistribution—not National IT revenue, external vendor expense, cash received,
   or a service-by-service chargeback schedule.

5. **Richmond's balance sheet does not hold the visible System software story.**
   Richmond's net capitalized software declined from $35 million to $27 million in
   2025 while the combined Reserve Banks' net software increased from $597 million to
   $646 million. Using stated amortization, the combined net-balance equation contains
   a $242 million positive residual before amortization
   (`$646m − $597m + $193m`; **D**), while Richmond's comparable residual is only
   $10 million (`$27m − $35m + $18m`; **D**). Each residual can contain additions,
   transfers, disposals, impairments, and other adjustments. Neither is gross
   additions or cash paid. The divergence is consistent with FAM's control-based
   asset-location rule and defeats any presumption that Richmond records every
   National IT or FRFS application.

6. **A cloud migration cannot be quantified from the public accounts.** Official
   budgets name Accelerate Cloud and Colocation, Common Data Platform, FRFS cloud
   migration, FedLine software, and Treasury cloud work. FAM explains when a cloud
   arrangement is a software asset versus a service contract and when implementation
   costs may be deferred. The public record does not provide application-level
   contract terms, vendor invoices, capitalized implementation balances, hosting
   terms, asset-recording Bank, or CASPR allocation drivers. The defensible result is
   “publicly named migration programs with an unrecovered financial bridge,” not
   “capital moved to cloud operating expense.”

7. **The public 2026 plan gap is real.** As of the cutoff, the Board's current Reserve
   Bank budget page still identifies the 2025 budget as current. The 2025 budget was a
   maximum authorization, later reduced in managerial implementation, and selected IT
   modernization items were reduced or eliminated. No public 2026 National IT
   operating, capital, FTE, or compensation plan was recovered.

## I. Entity and accounting boundary matrix

| Object | What the official public source establishes | What it does not establish |
|---|---|---|
| Federal Reserve Bank of Richmond | separate Reserve Bank legal entity; audited statements; hosts National IT; books computing/support reimbursement in “Other” expense | a separate National IT legal entity, segment statement, vendor ledger, or all-System software register |
| National IT / FRIT | unified national technology organization operated through Richmond; separately shown capital plan; published employment subset; provides national infrastructure/business-line technology | stand-alone audited balance sheet, income statement, cash-flow statement, asset rollforward, or complete headcount perimeter |
| FRFS | enterprise business controller for Reserve Bank financial services; defines business requirements and specifications and manages/oversees wholesale-service software development | ownership of every application asset, physical hosting, invoice payment, or legal title to infrastructure |
| ITOC | sets strategic direction/policy for national IT, approves standards/security policy, evaluates National IT | application-level asset register, vendor award authority matrix, or public allocation drivers |
| Richmond NIT Committee | Richmond-board committee reviews National IT operating/capital budgets and oversees Richmond staff and operations serving National IT | System-wide service-cost schedule or authority to change another Bank's legal books |
| CASPR | uniform cost-accounting framework for priced, reimbursable, assessed, and other central-bank services; in use since July 2021 | public current manual, cost-center dictionary, allocation-base table, recipient-Bank chargeback, or annual National IT cost report |
| FAM | controlling financial-accounting policy, including capitalization, amortization, asset ownership, and presentation | cost-accounting allocations; FAM expressly points that function to CASPR |
| Vendor/hosting provider | may supply software, cloud, colocation, network, equipment, or services under a contract with a Bank | identity, contract value, invoice-paying Bank, application mapping, and paid-to-date absent an award or ledger |

The roles can separate further under FAM Appendix D. For one application there may
be different (1) business controller, (2) controller-hosting Bank, (3) development
Bank, (4) physical hardware host or cloud provider, (5) contracting Bank,
(6) capitalizing Bank, (7) invoice-paying Bank, and (8) CASPR beneficiary. No public
source located here supplies that full eight-field row for a core payment
application.

## II. Capital-plan bridge: where the disclosed investment moved

### A. Published National IT capital sequence

| Year and clock | National IT | Districts | Total | NIT share of total (**D**) | Status |
|---|---:|---:|---:|---:|---|
| 2023 budget | $179.8m | $708.4m | $888.2m | 20.2% | **B** |
| 2023 actual | **$155.0m** | **$490.5m** | **$645.5m** | **24.0%** | **A/D** |
| 2024 budget | **$129.5m** | **$784.4m** | **$913.9m** | **14.2%** | **B** |
| 2024 forecast in December 2024 approval memo | not separately disclosed | not separately disclosed | **$911.8m** | NR | **B** |
| 2024 actual | **$131.7m** | **$645.5m** | **$777.2m** | **17.0%** | **A/D** |
| 2025 approved budget | **$60.2m** | **$882.4m** | **$942.7m** | **6.4%** | **B/D** |

Sources: [2023 annual-report budget tables D.11–D.12](https://www.federalreserve.gov/publications/2023-ar-federal-reserve-system-budgets.htm),
[2024 annual-report budget tables D.11–D.12](https://www.federalreserve.gov/publications/2024-ar-federal-reserve-system-budgets.htm),
and [2025 Reserve Bank budget approval memo](https://www.federalreserve.gov/foia/files/2025ReserveBankBudgets.pdf),
pp. 2, 6–7.

### B. Exact 2024 budget-to-actual reconciliation

| Capital perimeter | 2024 budget | 2024 actual | Variance | Interpretation |
|---|---:|---:|---:|---|
| Districts | $784.4m | $645.5m | **$(138.9)m** | district capital underrun |
| National IT | $129.5m | $131.7m | **$2.3m source-stated** | NIT slightly over budget; displayed one-decimal values subtract to $2.2m |
| **Total** | **$913.9m** | **$777.2m** | **$(136.6)m source-stated** | district underrun plus NIT overrun; displayed one-decimal values subtract to $(136.7)m |

The Board's variance fields use unrounded source values, which is why the published
$2.3 million and $(136.6) million do not equal subtraction of the displayed
one-decimal balances. The approved-budget memo's late-2024 total forecast was $911.8 million. Final actual
was $777.2 million, a further $134.6 million or 14.8 percent below that forecast
(**D**). The annual report attributes the broader 2024 capital shortfall primarily to
delays in critical System investments and identifies delays in ACC, Common Data
Platform, and FRFS cloud migration in the operating discussion. But the capital table
itself shows that National IT did not miss its separate annual capital budget. It
would therefore be mechanically wrong to assign the total capital underrun to
National IT.

### C. 2025 authorization versus implementation

The $942.7 million approved capital budget included multiyear technology, cash, and
building investments. It included ACC infrastructure and $312.4 million of projects
designated for conditional approval across technology, currency processors, markets,
Treasury Retail Investment Manager, and buildings. The $312.4 million is not a
National IT total.

The annual report later added an implementation warning: a budget is a maximum
authorization, not an obligation; certain 2025 IT modernization initiatives were not
proceeding at their originally budgeted levels; and the Banks reduced the 2025 FTE
forecast. Accordingly, no 2025 “actual” in this lane is inferred from the approved
budget.

## III. Operating software, capitalization credits, and workforce

### A. System-wide account-classification bridge

| Reserve Bank account classification | 2023 actual | 2024 actual | 2025 approved budget | 2024A→2025B |
|---|---:|---:|---:|---:|
| Salaries and other benefits | $4,230.2m | $4,321.2m | $4,670.8m | +$349.6m / +8.1% |
| Software costs | **$493.1m** | **$548.8m** | **$662.2m** | **+$113.4m / +20.7%** |
| Equipment | $250.3m | $264.0m | $278.8m | +$14.8m / +5.6% |
| Recoveries | $(233.3)m | $(242.0)m | $(245.7)m | $(3.7)m contra-expense change |
| Expenses capitalized | **$(159.2)m** | **$(160.8)m** | **$(206.6)m** | **$(45.8)m / 28.5% larger credit (D)** |
| Reported total operating expense | $5,648.3m | $5,865.4m | $6,382.5m | +$517.1m / +8.8% |
| Gross before recoveries and capitalized-expense credits (**D**) | **$6,040.8m** | **$6,268.2m** | **$6,834.8m** | **+$566.6m / +9.0%** |

The derived gross line merely adds the two disclosed contra-expense classifications
back to the reported total. It is not an audited “gross expense” caption and is not
comparable to the Richmond reimbursement add-back below without a consolidation and
elimination schedule.

“Software costs” is an operating-expense classification. “Expenses capitalized” is a
credit that removes eligible costs from current expense into asset basis. Neither is
cash paid, neither is National IT-only, and the credit can include qualifying costs
outside the software line. The figures cannot be reconciled to National IT capital
expenditures from the public tables.

### B. Published National IT/FRIT workforce and compensation

| Measure | 2023 actual | 2024 actual | 2025 approved budget | Boundary |
|---|---:|---:|---:|---|
| Published NIT/FRIT FTE row | 1,720 | 1,750 | 1,789 | 2024 annual report labels FRIT a **subset** of National IT employees; do not assume a complete organization count |
| Total Reserve Bank FTE | 20,680 | 20,840 | 21,411 | Banks plus published NIT perimeter |
| Published row share (**D**) | 8.3% | 8.4% | 8.4% | descriptive ratio, not a cost allocation |

The 2025 budget's cash-compensation appendix adds an NIT-specific planning measure:

| FRIT compensation-plan field | Amount |
|---|---:|
| December 31, 2024 “salary liability” | **$271.7721m** |
| Merit addition | $8.4249m |
| Equity adjustments | $1.0871m |
| Promotions/reclasses | $2.7177m |
| Base-salary increase | 4.5% |
| Change in variable-pay expense | $1.6523m |
| Total listed change | **$13.8820m / 5.1%** |

The memo defines “salary liability” as annualized salary expense based on salaries in
effect at December 31. It is a compensation-planning measure—not Richmond's audited
accrued-payroll liability, cash payroll, or total National IT personnel expense. The
1,789 FTE budget was subsequently reduced in managerial implementation, so it must
not be presented as current 2025 or 2026 headcount.

### C. System IT residual: allocation timing, not profit

The budget memos expose a small but important year-end cost-allocation object:

- the 2024 budget memo showed a **positive $18.0 million** 2023 forecast System IT
  residual;
- the 2025 budget memo showed a **negative $18.7 million** 2024 forecast residual;
- the footnote defines the residual as the difference between actual and budgeted IT
  service expense, held in an unallocated account until year-end.

The sign moved by $36.7 million between forecast vintages (**D**). It is not National
IT operating profit, cash, an unbilled receivable, or an unallocated final year-end
balance. The public final annual table does not preserve that residual row because the
cost is allocated at year-end. The recipient, service, cost-center, and allocation-base
schedule is **NR**.

## IV. Richmond legal-book gross-to-net bridge

### A. Audited presentation

Richmond's Note 2 says computing and System-support costs are redistributed to the
other Reserve Banks under inter-Bank service arrangements. Richmond's reimbursement
was $1.135 billion in 2025 and $1.052 billion in 2024 and is included in “Operating
expenses: Other.” The same note says major Richmond-hosted services for which costs
were not reimbursed by other Banks include the Currency Technology Office and System
Financial Planning & Management.

| Richmond legal-book measure | 2024 | 2025 | Change |
|---|---:|---:|---:|
| Reported “Other” operating expense | $(462)m | $(513)m | $(51)m |
| Add: computing/support reimbursement credit | $1,052m | $1,135m | +$83m / +7.9% |
| **Gross “Other” before that credit (D)** | **$590m** | **$622m** | **+$32m / +5.4%** |
| Reported total operating expense | $879m | $850m | $(29)m / (3.3)% |
| **Gross total before that credit (D)** | **$1,931m** | **$1,985m** | **+$54m / +2.8%** |
| Reimbursement / reconstructed gross total (**D**) | 54.5% | **57.2%** | +2.7 percentage points |

Source: [Federal Reserve Bank of Richmond 2025 audited financial statements](https://www.federalreserve.gov/aboutthefed/files/richmondfinstmt2025.pdf),
Statement of Operations p. 7; Note 2 p. 11.

### B. What the reconstruction means

The add-back recovers the scale of Richmond expense before one expressly disclosed
inter-Bank credit. It explains how reported net operating expense could decline while
underlying gross expense rose. It does not reconstruct:

- National IT-only operating expense;
- cost by recipient Bank or FRFS product;
- external payroll and vendor expense;
- cash receipts or disbursements;
- CASPR direct, indirect, support, or overhead allocations;
- inter-Bank balances before ISA settlement; or
- consolidating eliminations across all twelve Banks.

The reimbursement is a legal-book accounting entry for Richmond and an internal
redistribution for the System. Adding it to another Bank's allocated expense or to a
System consolidated total without eliminating entries would double count.

## V. Software and fixed-asset bridge

### A. Richmond legal assets versus combined Bank assets

| Measure | 2024 | 2025 | Change | Boundary |
|---|---:|---:|---:|---|
| Richmond premises/equipment, gross | $1,179m | $1,147m | $(32)m | Richmond legal entity |
| Richmond accumulated depreciation | $(700)m | $(706)m | $(6)m | balance, not annual expense |
| Richmond premises/equipment, net | $479m | $441m | $(38)m | not an NIT segment |
| Richmond depreciation expense | $76m | $89m | +$13m | includes Richmond asset perimeter |
| Richmond software, net | $35m | $27m | $(8)m | in “Other assets” |
| Richmond software amortization | $24m | $18m | $(6)m | in “Other” operating expense |
| Combined Reserve Bank software, net | $597m | $646m | +$49m | all twelve Banks combined |
| Combined software amortization | $167m | $193m | +$26m | all twelve Banks combined |
| Combined rental expense for certain operating facilities, warehouses, and data-processing centers | $21m | $21m | — | combined mixed-use caption; data-center amount not separable |

Source for Richmond: audited statements, Note 6 pp. 44–45. Combined balances:
[2025 combined Reserve Bank financial statements](https://www.federalreserve.gov/aboutthefed/files/combinedfinstmt2025.pdf),
Bank Premises, Equipment, and Software Note 7 pp. 44–46.

The combined $21 million rental caption is the only audited data-processing-center
facility cost recovered in this pass, but it commingles operating facilities and
warehouses and covers all twelve Banks. It cannot be assigned to National IT,
Richmond, a named facility, a cloud provider, or a specific rail.

### B. Derived net-asset residual—not an additions schedule

The net software equation yields:

- **Combined Banks:** `$646m ending − $597m beginning + $193m amortization =
  $242m` positive non-amortization residual (**D**).
- **Richmond:** `$27m ending − $35m beginning + $18m amortization = $10m`
  positive non-amortization residual (**D**).

The residual is the net effect needed to bridge beginning and ending net assets after
stated amortization. It can include additions, inter-Bank transfers, disposals,
write-offs, impairments, placed-in-service timing, and other adjustments. The public
note does not provide gross cost, accumulated amortization, construction/work in
process by project, additions, transfers, disposals, or cash paid. It would be wrong
to label $242 million “2025 software investment” or $10 million “Richmond National IT
investment.”

### C. FAM software constitution

The January 2026 FAM and Appendix D establish these rules:

- internally developed software and implementation costs for a cloud computing
  arrangement without a license are capitalized when qualifying cost reaches
  $100,000; externally purchased software generally uses a $25,000 per-license
  threshold, subject to the asset criteria;
- preliminary-stage evaluation, training, data conversion, general administration,
  maintenance, and most postimplementation support are expensed;
- application-development coding, testing, and direct implementation can qualify for
  capitalization;
- shared capitalized software costs transfer to the books of the Bank that owns the
  software; absent a contract, control determines ownership;
- the software asset is recorded at the Bank hosting the controlling CBAF, Product
  Office, or Function Office, regardless of physical location;
- development, physical hardware hosting, contracting, and control can reside at
  different Banks or a third party;
- a cloud arrangement contains a software license only if the Bank can take possession
  without significant penalty and can feasibly host it itself or through another
  provider; otherwise the arrangement is a service contract;
- qualifying implementation cost for a no-license cloud arrangement may be deferred
  and amortized over the noncancellable hosting term plus reasonably certain renewal
  periods; and
- general software useful life is no more than five years absent approval; amortization
  begins when ready for intended use after substantial testing, not necessarily the
  production-launch date.

Sources: [FAM chapter 1](https://www.federalreserve.gov/aboutthefed/chapter-1-balance-sheet.htm)
and [Appendix D, Software](https://www.federalreserve.gov/aboutthefed/appendix-d-software.htm).

The internal Software Standard Task Description List is on a Reserve Bank FAM
SharePoint site and is not publicly accessible. Therefore, the project-stage mapping
needed to reproduce capitalization conclusions for ACC, Common Data Platform,
FedLine, Fedwire, or FedNow is **NR**.

## VI. Cost-accounting and service-control bridge

### A. FAM and CASPR are different ledgers

FAM controls the Reserve Banks' financial accounting—asset recognition,
capitalization, depreciation/amortization, expense presentation, and closing. FAM
expressly says it does not provide cost-accounting guidance; CASPR does.

CASPR replaced PACS for transactions beginning July 1, 2021 and provides a uniform
structure for priced, reimbursable, assessed, and other central-bank services. The
Board has also said CASPR changed allocations across Banks, cost centers, and business
lines. FAM chapter 6 refers to annual CASPR reports that must agree with final
year-end results.

No current public CASPR manual or annual National IT CASPR report was recovered. The
public record therefore establishes the existence and purpose of the cost ledger but
not the allocation drivers needed to reconcile:

`external cost → Richmond or another Bank's legal book → National IT cost center →
FRFS or central-bank service → beneficiary Bank/function → inter-Bank reimbursement
and year-end elimination`.

Sources: [FAM, About This Manual](https://www.federalreserve.gov/aboutthefed/financial-accounting-manual.htm),
[FAM chapter 6](https://www.federalreserve.gov/aboutthefed/chapter-6-reporting-requirements.htm),
and the [Board's 2021 CASPR implementation description](https://www.federalreserve.gov/supervisionreg/supervision-regulation-assessment-2021.htm).

### B. FRFS/National IT service-control split

The 2025 Fedwire Securities PFMI disclosure supplies a current operating split:

- FRFS defines wholesale-service business requirements and specifications and
  manages/oversees software development;
- National IT runs the technology infrastructure and provides wholesale-service
  hosting environments;
- ITOC sets System IT strategy, national standards, and security policy and evaluates
  National IT;
- RBOPS has oversight responsibility;
- National IT provides periodic SLA measures; FRFS combines them with processing
  timeliness and accuracy metrics for Payments Committee reporting;
- National IT coordinates capacity planning across distributed server, data-center,
  network, access-solution, and storage assets; and
- National IT administers the SAFR security program through Richmond while FRFS is
  responsible for service compliance.

Source: [2025 Fedwire Securities PFMI disclosure](https://www.frbservices.org/binaries/content/assets/crsocms/financial-services/securities/securities-service-disclosure.pdf),
pp. 33–34 and 82–84.

This proves distributed operational assets and joint control processes. It does not
identify each facility, legal asset holder, cloud provider, capacity unit, SLA
penalty, chargeback rate, or service-cost allocation.

## VII. Governance, procurement, cloud, and vendor findings

### A. Governance recovered below the “about” page

The Richmond National IT Committee charter, dated February 19, 2021, provides for
coordination with ITOC, review and approval of annual National IT operating and
capital budgets before Richmond board approval, quarterly reporting on performance,
risks, audit, security, and controls, and oversight of Richmond staff performing
National IT services. The current public roster as of the cutoff lists Barbara
Humpton as chair, with Robert Blue, Halsey Cook, Jennifer LaClair, and ex-officio
member Lisa Lawson.

Sources: [Richmond governance page](https://www.richmondfed.org/about_us/our_governance/charters_memberships)
and [National IT Committee charter](https://www.richmondfed.org/-/media/RichmondFedOrg/about_us/our_governance/charters_memberships/pdf/it.pdf).

The charter proves Richmond-board budget and control oversight. It does not convert
National IT into a subsidiary or make the Richmond directors the enterprise business
controllers of FRFS.

### B. Procurement and named-vendor limit

Richmond's National Procurement Office says it develops and executes national
contracts for certain goods and services and supports National IT. Its representative
procurement list includes computers, network equipment, servers, and software and
identifies Ariba as a sourcing and contract-management platform. Those pages are a
procurement-function and category map, not an award ledger.

Sources: [Richmond procurement functions](https://www.richmondfed.org/about_us/doing_business_with_the_bank/procurement_functions/)
and [products and services purchased](https://www.richmondfed.org/about_us/doing_business_with_the_bank/products_and_services_purchased/).

No official Richmond, Board, or FRFS source reviewed here publishes a complete
National IT vendor, cloud-provider, colocation-provider, contract-value, invoice, or
paid-to-date schedule. Official Board procurement disclosures that name Board
platforms cannot automatically be assigned to National IT or a Reserve Bank payment
rail. A vendor's own description of its relationship may corroborate use but is not
an official Federal Reserve award or payment amount and is outside this official-only
claim lane.

### C. What the cloud evidence actually supports

Official budgets name delays and investment in:

- Accelerate Cloud and Colocation;
- Common Data Platform;
- FRFS cloud migration;
- Treasury legacy-application cloud migration;
- FedLine software and connectivity; and
- local IT resources supporting national initiatives.

This establishes program direction and budget rationale. It does not disclose:

- public versus private cloud;
- provider or region;
- contract term and renewal assumptions;
- transferable license determination;
- capitalized implementation balance;
- annual hosting expense;
- exit or data-egress obligation;
- asset-recording Bank;
- invoice-paying Bank; or
- application-level resilience concentration.

The capital-budget decline and software-expense increase are therefore **signals to
audit**, not a quantified accounting reclassification.

## VIII. Claim audit

| Claim | Adjudication | Reason |
|---|---|---|
| “National IT cut capital spending by 54.3 percent in 2025.” | **Reject as stated** | $60.2m is an approved budget compared with 2024 actual; later implementation reductions occurred and 2025 actual is NR |
| “The Fed shifted technology investment from National IT to the District Banks.” | **Supported only as published budget perimeter** | separate NIT capital fell while District capital rose; asset ownership, program transfer, and actual spend are not disclosed |
| “The shift proves a move from owned data centers to cloud subscriptions.” | **Not established** | programs are named, but contract, expense, asset, and cash bridges are absent |
| “Richmond spent $1.135bn on National IT vendors in 2025.” | **False** | amount is inter-Bank reimbursement for computing/support costs and includes no vendor allocation |
| “Richmond's 2025 operating costs were only $850m.” | **Incomplete** | audited net presentation includes $1.135bn reimbursement credit; gross before that one credit is $1.985bn derived |
| “Richmond owns all National IT software.” | **False as a rule; application result NR** | FAM assigns assets by control and controller-hosting Bank, regardless of development or physical host |
| “The $206.6m expenses-capitalized line is the 2025 NIT capital budget.” | **False** | System-wide contra-expense classification versus separate $60.2m NIT capital authorization |
| “The $242m software residual is additions.” | **False** | derived residual includes all non-amortization changes and is not a cash or gross-additions schedule |
| “System IT residual is National IT profit.” | **False** | forecast allocation variance held unallocated until year-end |
| “Fedwire infrastructure is all physically in Richmond.” | **False** | current PFMI disclosure expressly describes distributed server, data-center, network, access, and storage assets |
| “No public financial evidence exists below a budget total.” | **False** | Richmond reimbursement, compensation plan, contra-expense classification, residual allocation object, asset balances, amortization, and exact capital variance are public |

## IX. Hard public gaps and next exact public triggers

### A. Hard gaps after the whole-site official sweep

1. Current public CASPR manual, cost-object hierarchy, driver dictionary, and annual
   National IT CASPR report.
2. National IT operating expense by payroll, software license, cloud/hosting,
   colocation, telecommunications, hardware maintenance, contractor, depreciation,
   and overhead.
3. Recipient-Bank and FRFS service chargeback schedule reconciling Richmond's
   $1.135 billion reimbursement.
4. Application-level register containing controller, controller-hosting Bank,
   developer, physical host/provider, contracting Bank, capitalizing Bank,
   invoice-paying Bank, beneficiaries, and CASPR cost object.
5. National IT gross fixed-asset and software rollforwards: beginning cost, WIP,
   additions, transfers, placed-in-service dates, disposals, impairments, accumulated
   depreciation/amortization, and ending cost.
6. National IT vendor and contract ledger with legal payee, award, modifications,
   invoices, cash paid, term, renewal, exit rights, and cloud region.
7. 2025 actual National IT capital, operating, compensation, and FTE results.
8. Approved 2026 Reserve Bank/National IT operating and capital budget.
9. Internal SLA targets, service-credit mechanics, and application-level capacity
   cost.
10. Cash-flow statement or disbursement ledger linking capital authorizations and
    asset additions to cash paid.

### B. Public triggers that can close them without outreach

| Trigger | Exact update it would enable |
|---|---|
| Board posts 2026 Reserve Bank budget | refresh operating, FTE, compensation, capital, conditional approval, and residual clocks |
| 2025 annual-report budget tables appear | replace 2025 budget with actual account-classification, NIT capital, and FTE results |
| 2026/2027 Richmond audited statement | update reimbursement, gross-to-net bridge, software, premises, depreciation, and amortization |
| new Fedwire/FedNow PFMI disclosure | update service controller, host, SLA, capacity, and security roles |
| public CASPR manual/report appears | convert cost-accounting existence into reproducible allocation bridge |
| Richmond NPO posts award/contract data | begin named National IT vendor and cash/commitment ledger |
| official application/cloud inventory appears | resolve controller-host-provider-contracting-capitalizing roles |

## X. Merge-ready financial spine

The correct compact addition to the Federal Reserve Financial Constitution is:

> National IT is financially visible but not publicly consolidated as a segment. In
> 2024 it slightly exceeded its separate $129.5 million capital budget while District
> capital produced the System's $136.6 million total capital underrun. The 2025
> approved plan then reduced National IT capital to $60.2 million while increasing
> District capital to $882.4 million and System-wide software operating cost to a
> $662.2 million budget. That proves a change in published budget perimeter, not a
> completed transfer of assets or a quantified move to cloud expense. Richmond's
> audited books separately contain a $1.135 billion inter-Bank computing/support
> reimbursement credit; adding it back produces $1.985 billion of gross legal-book
> operating expense before that credit, but not a National IT segment or vendor-spend
> total. FAM assigns software assets by control rather than physical location, while
> CASPR governs service-cost allocations. The public record therefore exposes the
> legal-book, budget, asset, and service-control layers but still lacks the CASPR,
> application, vendor, and cash bridges required to merge them dollar for dollar.

## XI. Official source ledger

1. [Federal Reserve Bank of Richmond, 2025 audited financial statements](https://www.federalreserve.gov/aboutthefed/files/richmondfinstmt2025.pdf) — Statement of Operations p. 7; inter-Bank reimbursement Note 2 p. 11; premises/equipment/software Note 6 pp. 44–45.
2. [Combined Federal Reserve Banks, 2025 audited financial statements](https://www.federalreserve.gov/aboutthefed/files/combinedfinstmt2025.pdf) — combined software balance and amortization.
3. [2024 Annual Report, Federal Reserve System Budgets](https://www.federalreserve.gov/publications/2024-ar-federal-reserve-system-budgets.htm) — 2024 actual and 2025 budget account classifications, FTE, capital, implementation box, and conditional approvals.
4. [2023 Annual Report, Federal Reserve System Budgets](https://www.federalreserve.gov/publications/2023-ar-federal-reserve-system-budgets.htm) — 2023 actual and 2024 budget account classifications, FTE, and capital.
5. [2025 Reserve Bank Budget approval memo](https://www.federalreserve.gov/foia/files/2025ReserveBankBudgets.pdf) — approval clock, forecast, System IT residual, program rationales, FTE, and FRIT compensation plan.
6. [Federal Reserve Bank Budgets current page](https://www.federalreserve.gov/foia/budgets.htm) and [archive](https://www.federalreserve.gov/foia/federal-reserve-bank-budgets.htm) — public 2026 budget gap at cutoff.
7. [Financial Accounting Manual, About This Manual](https://www.federalreserve.gov/aboutthefed/financial-accounting-manual.htm) — FAM/CASPR boundary.
8. [FAM chapter 1](https://www.federalreserve.gov/aboutthefed/chapter-1-balance-sheet.htm) and [Appendix D, Software](https://www.federalreserve.gov/aboutthefed/appendix-d-software.htm) — capitalization, cloud, control, ownership, useful life, and amortization.
9. [FAM chapter 6](https://www.federalreserve.gov/aboutthefed/chapter-6-reporting-requirements.htm) — year-end agreement to annual CASPR reports.
10. [Board 2021 supervision assessment](https://www.federalreserve.gov/supervisionreg/supervision-regulation-assessment-2021.htm) — CASPR adoption and allocation-change warning.
11. [2025 Fedwire Securities PFMI disclosure](https://www.frbservices.org/binaries/content/assets/crsocms/financial-services/securities/securities-service-disclosure.pdf) — FRFS/National IT governance, SLA reporting, distributed infrastructure, capacity, and security.
12. [Richmond governance page](https://www.richmondfed.org/about_us/our_governance/charters_memberships) and [National IT Committee charter](https://www.richmondfed.org/-/media/RichmondFedOrg/about_us/our_governance/charters_memberships/pdf/it.pdf) — current committee roster and chartered budget/control oversight.
13. [Richmond National Procurement Office](https://www.richmondfed.org/about_us/doing_business_with_the_bank/procurement_functions/) and [products/services purchased](https://www.richmondfed.org/about_us/doing_business_with_the_bank/products_and_services_purchased/) — procurement role and categories, not award ledger.
14. [Governor Waller, “Modernizing Reserve Bank Operations,” April 21, 2026](https://www.federalreserve.gov/newsevents/speech/waller20260421a.htm) — official institutional history of national infrastructure centralization; not a financial disclosure or operative reorganization instrument.

## XII. Existing-corpus merge map

This lane should merge into, not replace:

- `PHASE_V_TWELVE_BANK_BALANCE_SHEET_EARNINGS_AND_CAPITAL_DEEP_DIVE_2026-08-01.md` for the twelve-Bank audited statement perimeter;
- `PHASE_V_SHARED_SERVICES_ELIMINATIONS_AND_REPORTING_PERIMETERS_2026-08-01.md` for eliminations and reimbursement presentation;
- `PUBLIC_ONLY_FRFS_NATIONAL_IT_FINANCE_TECH_LAYER_SWEEP_2026-08-01.md` for FRFS operating, billing, ISA, and service-role topology;
- `FEDERAL_RESERVE_SYSTEM_ENTITY_TRANSACTION_AND_SOFTWARE_MAP.md` for the full entity/transaction/software constitution; and
- `FED_PAYMENT_STACK_CONTROL_FINALITY_AND_COST_AUDIT_2026-07-25.md` for product-control, finality, and cost-recovery separation.

Merge rule: retain this lane's 2024 capital reconciliation, 2025 budget-perimeter
adjudication, FRIT compensation plan, System IT residual, Richmond gross-to-net
bridge, derived software residual, FAM/CASPR split, and 2026 public-budget gap. Do not
promote a cloud-expense migration, National IT segment total, vendor payment, or
application ownership result without the missing bridge records.