{
  "receipt_type": "bounded_document_read_and_named-input_census",
  "created_date": "2026-09-11",
  "document": {
    "title": "Procurement Programs (P-1), Department of War Budget, Fiscal Year 2027",
    "publisher": "Office of the Under Secretary of War (Comptroller)",
    "document_date": "April 2026",
    "official_url": "https://comptroller.war.gov/Portals/45/Documents/defbudget/FY2027/FY2027_p1.pdf",
    "local_snapshot": "/private/tmp/fy2027_p1.pdf",
    "local_text_extract": "/private/tmp/fy2027_p1_p151_225.txt",
    "physical_pdf_pages": 335
  },
  "read_scope": {
    "status": "full_sequential_read_for_bounded_range",
    "physical_pages_read_one_based": "151-225 inclusive",
    "printed_exhibit_pages_observed": "146-220",
    "prior_bounded_read": "physical pp. 1-150 (batches1-2)",
    "combined_coverage_after_this_batch": "physical pp. 1-225 inclusive",
    "unread_physical_pages_one_based": "226-335",
    "method": "Text extracted from every physical page in the bounded range and reviewed sequentially, including tables."
  },
  "section_coverage": [
    {"physical_pages": "151-157", "content": "1611N Shipbuilding and Conversion, Navy: completion of amphibious and auxiliaries/craft/prior-year-program-cost detail"},
    {"physical_pages": "158-161", "content": "1612N National Sea-Based Deterrence Fund summary and detail"},
    {"physical_pages": "162-165", "content": "1613N Maritime Industrial Base Fund summary and detail"},
    {"physical_pages": "166-201", "content": "1810N Other Procurement, Navy summary and complete detail"},
    {"physical_pages": "202-219", "content": "1109N Procurement, Marine Corps summary and complete detail"},
    {"physical_pages": "220-225", "content": "Department of the Air Force summary; 3010F Aircraft Procurement, Air Force activity summary and opening combat-aircraft detail"}
  ],
  "accounting_and_status_basis": {
    "measure": "Total Obligational Authority; all tables state dollars in thousands.",
    "comparison_columns": ["FY2025 Actuals", "FY2026 Discretionary Enacted", "FY2026 P.L. 119-21 Spend Plan", "FY2026 Total", "FY2027 Discretionary Request", "FY2027 Mandatory Request", "FY2027 Total"],
    "status_boundary": "FY2027 figures are requested TOA. FY2026 enacted and P.L. 119-21 spend-plan values are separately printed comparator/resource columns and not FY2027 enacted amounts.",
    "selected_table_totals_thousands": {
      "shipbuilding_conversion_navy_fy2027_total_request": 65825017,
      "other_procurement_navy_fy2027_discretionary_request": 18866679,
      "other_procurement_navy_fy2027_mandatory_request": 50000,
      "other_procurement_navy_fy2027_total_request": 18916679,
      "procurement_marine_corps_fy2027_discretionary_request": 6288905,
      "procurement_marine_corps_fy2027_mandatory_request": 15000,
      "procurement_marine_corps_fy2027_total_request": 6303905,
      "department_air_force_fy2026_total": 74657745,
      "department_air_force_fy2027_discretionary_request": 83551842,
      "department_air_force_fy2027_mandatory_request": 17659220,
      "department_air_force_fy2027_total_request": 101211062,
      "aircraft_procurement_air_force_fy2027_total_request": 30641187
    },
    "blank_request_tables": "The FY2027 request tables for the National Sea-Based Deterrence Fund and Maritime Industrial Base Fund (physical pp. 159 and 163) contain no dollar entries. This records the exhibit as printed; it does not establish a funding outcome outside the P-1."
  },
  "named_upstream_inputs_and_references_in_read_scope": [
    {
      "name": "P.L. 119-21",
      "role_stated": "A separately labeled FY2026 spend-plan column throughout the Navy, Marine Corps, and Air Force procurement tables.",
      "locator": "physical pp. 152, 154, 156, 158, 160, 162, 164, 166 and repeated through pp. 168-225",
      "public_url_or_access": "No statutory locator or versioned spend-plan URL is provided in this P-1.",
      "read_status": "not separately reviewed in this batch",
      "reliance_classification": "legal/funding comparator label"
    }
  ],
  "source_census_limits": {
    "new_named_source_objects": "None beyond the P.L. 119-21 comparator previously identified. The P-1 preface's Next Generation Resource Management System database remains the document-level stated source from batch1, outside this range.",
    "studies_audits_strategies_models": "No separately titled study, audit, strategy, cost-estimate report, requirements document, data set, or analytic model is cited in physical pp. 151-225.",
    "labels_not_promoted_to_sources": "Named ships, aircraft, missiles, industrial-base activities, C4ISR/cyber/equipment programs, advance-procurement lines, and terms including CONOPS/TTPs are table or line-item labels. The range supplies no separately identifiable underlying document for them."
  },
  "next_queue": [
    "Read physical pp. 226-335 before claiming whole-P-1 coverage.",
    "Acquire a versioned FY2026 P.L. 119-21 spend plan before independently relying on its allocations.",
    "Locate service/component justifications if assessing cost methods, requirements, performance evidence, or rationale behind any individual P-1 line."
  ]
}
