  "registry_id": "nssts-company-map-wave-2-2026-08-18",
  "title": "NSSTS Technology-to-Company Map — Wave 2",
  "as_of": "2026-08-18",
  "status": "active_workbench_research",
  "scope": [
    "energy systems, grid hardware, advanced fission and fusion",
    "critical-mineral processing, qualified materials and component supply chains",
    "advanced manufacturing, industrial digital twins, robotics, metrology and qualification"
  ],
  "governance": {
    "separate_from_federal_group": true,
    "vault_or_observatory_promotion_authorized": false,
    "technical_fit_and_acquisition_path_are_independent": true,
    "investment_recommendation": false
  },
  "visual_bands": [
    {
      "id": "confirmed",
      "label": "Confirmed performers and federal anchors"
    },
    {
      "id": "acquisition_near",
      "label": "Acquisition-near and strongly positioned"
    },
    {
      "id": "installed_stack",
      "label": "Installed-stack and bottleneck suppliers"
    },
    {
      "id": "blocked",
      "label": "Expired, blocked or contradicted paths"
    }
  ],
  "sources": [
    {
      "id": "w2-src-48c",
      "date": "2026-08-18",
      "issuer": "U.S. Department of Energy",
      "title": "Applicant self-disclosed 48C projects",
      "url": "https://www.energy.gov/cmei/manufacturing/applicant-self-disclosed-48c-projects",
      "source_type": "official_tax_credit_project_list",
      "limit": "Allocation or self-disclosure is not factory completion, qualification or delivery."
    },
    {
      "id": "w2-src-fitt",
      "date": "2026-06-18",
      "issuer": "U.S. Department of Energy",
      "title": "Transformer resilience and reliability project selections",
      "url": "https://www.energy.gov/oe/articles/energy-department-advances-us-electric-grid-resilience-and-reliability-new-transformer",
      "source_type": "official_project_selection",
      "limit": "Selection establishes a funded development path, not field acceptance."
    },
    {
      "id": "w2-src-eaton",
      "date": "2025-10-14",
      "issuer": "Eaton",
      "title": "Eaton begins production at expanded Texas manufacturing facility",
      "url": "https://www.eaton.com/us/en-us/company/news-insights/news-releases/2025/eaton-begins-production-at-newly-expanded-texas-manufacturing-facility.html",
      "source_type": "company_operating_record",
      "limit": "Company-reported production and first shipment; not a federal-site delivery."
    },
    {
      "id": "w2-src-prolec",
      "date": "2026-03-04",
      "issuer": "Prolec GE",
      "title": "Shreveport facility expansion completion",
      "url": "https://www.prolec.energy/news/prolec-ge-celebrates-completion-of-shreveport-facility-expansion-in-support-of-u-s-energy-transition-goals/",
      "source_type": "company_operating_record",
      "limit": "Company-reported line start and added capacity; no named federal end customer."
    },
    {
      "id": "w2-src-makeit",
      "date": "2026-01-22",
      "issuer": "U.S. Department of Energy",
      "title": "MAKE IT Prize winners",
      "url": "https://www.energy.gov/technologycommercialization/articles/doe-awards-15-million-prize-winners-domestic-clean-energy",
      "source_type": "official_prize_award",
      "limit": "Prize award does not prove full-rate manufacturing or field acceptance."
    },
    {
      "id": "w2-src-grip",
      "date": "2026-08-18",
      "issuer": "U.S. Department of Energy",
      "title": "GRIP program projects and status table",
      "url": "https://www.energy.gov/oe/grid-resilience-and-innovation-partnerships-grip-program-projects",
      "source_type": "official_status_table",
      "limit": "Selected and awarded states must remain distinct."
    },
    {
      "id": "w2-src-tfp",
      "date": "2026-08-18",
      "issuer": "U.S. Department of Energy",
      "title": "Transmission Facilitation Program selections",
      "url": "https://www.energy.gov/oe/transmission-facilitation-program-selections",
      "source_type": "official_project_selection",
      "limit": "Capacity-contract selection does not establish execution, financing or construction."
    },
    {
      "id": "w2-src-terrapower",
      "date": "2026-03-09",
      "issuer": "U.S. Department of Energy",
      "title": "NRC construction permit for TerraPower Natrium",
      "url": "https://www.energy.gov/ne/articles/nrc-issues-construction-permit-terrapowers-natrium-advanced-reactor",
      "source_type": "official_licensing_record",
      "limit": "Construction authorization is not an operating license, fuel availability or generation."
    },
    {
      "id": "w2-src-xenergy",
      "date": "2026-08-18",
      "issuer": "U.S. Department of Energy",
      "title": "X-energy and TRISO-X ARDP relationship",
      "url": "https://www.energy.gov/ne/articles/x-energys-triso-x-fuel-fabrication-facility-produce-fuel-advanced-nuclear-reactors",
      "source_type": "official_program_record",
      "limit": "Award relationship and construction activity do not prove licensed commercial fuel output."
    },
    {
      "id": "w2-src-kairos",
      "date": "2026-08-18",
      "issuer": "U.S. Nuclear Regulatory Commission",
      "title": "Kairos Hermes licensing record",
      "url": "https://www.nrc.gov/reactors/non-power/new-facility-licensing/hermes-kairos",
      "source_type": "official_licensing_record",
      "limit": "Construction permits do not establish operating authorization or criticality."
    },
    {
      "id": "w2-src-smr-select",
      "date": "2025-12-02",
      "issuer": "U.S. Department of Energy",
      "title": "TVA and Holtec Gen III+ SMR selections",
      "url": "https://www.energy.gov/articles/energy-department-selects-tva-and-holtec-advance-deployment-us-small-modular-reactors",
      "source_type": "official_project_selection",
      "limit": "Selection for funding is not construction, licensing or operation."
    },
    {
      "id": "w2-src-tva",
      "date": "2026-05-12",
      "issuer": "U.S. Department of Energy",
      "title": "NRC dockets TVA BWRX-300 construction-permit application",
      "url": "https://www.energy.gov/ne/articles/nrc-dockets-construction-permit-application-tva-small-modular-reactor",
      "source_type": "official_licensing_record",
      "limit": "Docketing begins review; it is not a permit or equipment order."
    },
    {
      "id": "w2-src-gen3",
      "date": "2026-05-29",
      "issuer": "U.S. Department of Energy",
      "title": "Gen III+ nuclear supply-chain selections",
      "url": "https://www.energy.gov/articles/energy-department-awards-94-million-american-companies-help-expedite-deployments-small",
      "source_type": "official_project_selection",
      "limit": "Selection and cost share do not prove installed or qualified capacity."
    },
    {
      "id": "w2-src-st40",
      "date": "2026-06-24",
      "issuer": "U.S. Department of Energy",
      "title": "DOE-DESNZ-Tokamak Energy ST40 partnership",
      "url": "https://www.energy.gov/science/articles/doe-partners-uks-desnz-and-tokamak-energy-ltd-accelerate-fusion-energy-development",
      "source_type": "official_partnership",
      "limit": "The facility exists; the upgrade and later outputs remain future milestones."
    },
    {
      "id": "w2-src-fusion-progress",
      "date": "2026-07-22",
      "issuer": "U.S. Department of Energy",
      "title": "Fusion Milestone Program progress and FIRE selections",
      "url": "https://www.energy.gov/articles/us-department-energy-announces-selectees-107-million-fusion-innovation-research-engine",
      "source_type": "official_program_status",
      "limit": "Program participation and selected projects do not establish pilot-plant operation."
    },
    {
      "id": "w2-src-mp",
      "date": "2026-08-06",
      "issuer": "MP Materials Corp.",
      "title": "MP Materials Q2 2026 production and qualification state",
      "url": "https://mpmaterials.com/news/mp-materials-reports-second-quarter-2026-results",
      "source_type": "company_operating_record",
      "limit": "Startup manufacture and customer qualification are not sustained commercial magnet output."
    },
    {
      "id": "w2-src-mp-dow",
      "date": "2025-07-10",
      "issuer": "U.S. Department of War",
      "title": "OSC loan agreement with MP Materials",
      "url": "https://www.war.gov/News/Releases/Release/Article/4270722/office-of-strategic-capital-announces-first-loan-through-dod-agreement-with-mp/",
      "source_type": "official_finance_instrument",
      "limit": "Loan and public-private support do not prove 10X construction or production."
    },
    {
      "id": "w2-src-dla-magnets",
      "date": "2026-05-26",
      "issuer": "U.S. Department of War",
      "title": "DLA rare-earth magnet block delivery orders",
      "url": "https://www.war.gov/News/Contracts/Contract/Article/4500905/contracts-for-may-26-2026/",
      "source_type": "official_contract_award",
      "limit": "Orders establish acquisition; completion, acceptance and recurring options remain separate."
    },
    {
      "id": "w2-src-usar",
      "date": "2026-06-03",
      "issuer": "National Institute of Standards and Technology",
      "title": "Definitive CHIPS agreement with USA Rare Earth",
      "url": "https://www.nist.gov/news-events/news/2026/06/department-commerces-chips-program-finalizes-definitive-agreement-usa-rare",
      "source_type": "official_final_agreement",
      "limit": "Final agreement does not collapse commissioned, planned and producing sites."
    },
    {
      "id": "w2-src-energyfuels",
      "date": "2026-07-29",
      "issuer": "Energy Fuels Inc.",
      "title": "Commercial-scale heavy rare-earth plant under construction",
      "url": "https://investors.energyfuels.com/2026-07-29-Commercial-Scale-Heavy-Rare-Earth-Plant-Now-Under-Construction-in-Utah",
      "source_type": "company_construction_record",
      "limit": "Construction and current NdPr capability do not prove commercial Dy/Tb shipments."
    },
    {
      "id": "w2-src-reelement",
      "date": "2026-07-13",
      "issuer": "U.S. Department of War",
      "title": "$25 million investment in ReElement Technologies",
      "url": "https://www.war.gov/News/Releases/Release/Article/4541423/department-of-war-announces-25-million-investment-with-reelement-technologies-t/",
      "source_type": "official_investment",
      "limit": "Investment funds expansion; installed capacity and qualified output remain future gates."
    },
    {
      "id": "w2-src-syrah",
      "date": "2026-08-18",
      "issuer": "U.S. Department of Energy",
      "title": "Syrah Vidalia active-anode-material loan",
      "url": "https://www.energy.gov/edf/syrah-vidalia",
      "source_type": "official_closed_loan",
      "limit": "Operating facility and federal capital do not prove customer-accepted recurring volumes."
    },
    {
      "id": "w2-src-thacker",
      "date": "2026-08-18",
      "issuer": "U.S. Department of Energy",
      "title": "Thacker Pass loan and borrower record",
      "url": "https://www.energy.gov/edf/thacker-pass",
      "source_type": "official_closed_loan",
      "limit": "Construction-stage finance does not establish battery-grade production."
    },
    {
      "id": "w2-src-5n",
      "date": "2026-01-29",
      "issuer": "U.S. Department of War",
      "title": "Germanium refining-capacity investment in 5N Plus",
      "url": "https://www.war.gov/News/Releases/Release/Article/4393075/department-of-war-invests-181m-to-increase-us-refining-capacity-for-germanium-m/",
      "source_type": "official_award",
      "limit": "Expansion award does not prove commissioned 20-tonne capacity."
    },
    {
      "id": "w2-src-lattice",
      "date": "2025-12-22",
      "issuer": "U.S. Department of War",
      "title": "Germanium and silicon optics investment in Lattice Materials",
      "url": "https://www.war.gov/News/Releases/Release/Article/4366365/department-of-war-invests-185-million-to-expand-germanium-and-silicon-optics-pr/",
      "source_type": "official_award",
      "limit": "Award does not prove new equipment commissioning or qualified output."
    },
    {
      "id": "w2-src-elementus",
      "date": "2025-11-20",
      "issuer": "U.S. Department of War",
      "title": "Domestic gallium demonstration award to ElementUS",
      "url": "https://www.war.gov/News/Releases/Release/Article/4338685/department-of-defense-awards-299-million-to-create-a-us-domestic-supply-of-gallium/",
      "source_type": "official_award",
      "limit": "Demonstration funding is not commercial-scale gallium production."
    },
    {
      "id": "w2-src-crucible",
      "date": "2025-12-17",
      "issuer": "National Institute of Standards and Technology",
      "title": "CHIPS award to Crucible Metals",
      "url": "https://www.nist.gov/news-events/news/2025/12/department-commerce-awards-chips-incentives-subsidiary-korea-zinc-crucible",
      "source_type": "official_final_award",
      "limit": "Award supports a planned integrated platform; commissioning remains years away."
    },
    {
      "id": "w2-src-antimony",
      "date": "2026-03-17",
      "issuer": "U.S. Department of War",
      "title": "Domestic antimony production and expansion award",
      "url": "https://www.war.gov/News/Releases/Release/Article/4421101/department-of-war-invests-27m-for-the-domestic-excavation-extraction-processing/",
      "source_type": "official_award",
      "limit": "Milestone award and existing refinery do not prove sustained domestic-mine feed."
    },
    {
      "id": "w2-src-haleu",
      "date": "2026-07-01",
      "issuer": "U.S. Department of Energy",
      "title": "HALEU enrichment services program",
      "url": "https://www.energy.gov/ne/haleu-enrichment-services",
      "source_type": "official_contract_program",
      "limit": "Task orders establish a federal path; demo production is not expanded commercial scale."
    },
    {
      "id": "w2-src-gothaam",
      "date": "2026-08-18",
      "issuer": "America Makes / NCDMM",
      "title": "GOTHAAM project-call winner",
      "url": "https://www.americamakes.us/america-makes-announces-winner-of-gothaam-project-call-worth-5-5m-in-funding/",
      "source_type": "official_institute_selection",
      "limit": "GA-ASI is the winner and named partners are team members; partner workshare is not disclosed."
    },
    {
      "id": "w2-src-jaqs",
      "date": "2026-05-19",
      "issuer": "America Makes / NCDMM",
      "title": "JAQS-SQ project-call winners",
      "url": "https://www.manufacturingusa.com/news/america-makes-announces-winners-jaqs-sq-project-call-worth-17m-funding",
      "source_type": "official_institute_selection",
      "limit": "Selection establishes a qualification project, not completed supplier approval."
    },
    {
      "id": "w2-src-afrl",
      "date": "2025-09-22",
      "issuer": "Air Force Research Laboratory",
      "title": "Active OTSB and small-business contracts portfolio",
      "url": "https://www.afrl.af.mil/Portals/90/Documents/SB/AFRL_Active_OTSB-SB_Contracts.pdf",
      "source_type": "official_contract_portfolio",
      "limit": "Portfolio is a dated snapshot; later modifications or terminations may not appear."
    },
    {
      "id": "w2-src-arm",
      "date": "2025-12-16",
      "issuer": "Advanced Robotics for Manufacturing Institute",
      "title": "ARM 25-01 selected projects",
      "url": "https://arminstitute.org/news/25-01-selections/",
      "source_type": "official_institute_selection",
      "limit": "Selected team status does not disclose final agreement or company workshare."
    },
    {
      "id": "w2-src-sedaro",
      "date": "2025-04-30",
      "issuer": "U.S. Department of War",
      "title": "Sedaro rocket-propulsion digital-twin IDIQ",
      "url": "https://www.war.gov/News/Contracts/Contract/Article/4170827/contracts-for-apr-30-2025/",
      "source_type": "official_contract_award",
      "limit": "IDIQ ceiling is not task-order revenue; only the award obligation is confirmed."
    },
    {
      "id": "w2-src-hicam",
      "date": "2026-06-22",
      "issuer": "NASA",
      "title": "HiCAM Advanced Composites Consortium",
      "url": "https://www.nasa.gov/directorates/armd/aavp/hicam/advanced-composites-consortium/",
      "source_type": "official_program_roster",
      "limit": "Membership establishes transition proximity, not a company-specific award."
    },
    {
      "id": "w2-src-qtime",
      "date": "2026-02-10",
      "issuer": "America Makes / NCDMM",
      "title": "QTIME additive-manufacturing inspection winners",
      "url": "https://www.americamakes.us/america-makes-announces-winners-of-qtime-project-call-worth-5m-in-funding/",
      "source_type": "official_institute_selection",
      "limit": "Award lead status does not establish completed NDI qualification."
    },
    {
      "id": "w2-src-smart-closed",
      "date": "2026-08-18",
      "issuer": "National Institute of Standards and Technology",
      "title": "SMART USA funding opportunity terminated",
      "url": "https://www.nist.gov/chips/r%2526d-funding-opportunities/notice-funding-opportunity-chips-manufacturing-usa-institute",
      "source_type": "official_termination_notice",
      "limit": "The institute's prior solicitation and roster are historical, not a live acquisition path."
    }
  ],
  "edges": [
    {
      "inference_id": "w2-energy-eaton-001",
      "as_of": "2026-08-18",
      "sector": "Energy systems, grid and nuclear infrastructure",
      "cet_family": [
        "advanced manufacturing and materials",
        "nuclear energy"
      ],
      "mission": "Expand resilient grid capacity for industrial and AI loads",
      "required_capability": "domestic distribution transformers, voltage regulation and field-qualified hybrid transformers",
      "federal_owner": "DOE Office of Electricity / Treasury",
      "federal_program_or_facility": "48C manufacturing allocation and FITT transformer program",
      "anticipated_instrument": "tax-credit allocation plus selected field demonstration",
      "company_legal_entity": "Eaton Corporation",
      "company_display_name": "Eaton",
      "company_role": "transformer and voltage-regulation manufacturer",
      "relationship_state": "operating_factory_and_selected_field_project",
      "visual_band": "confirmed",
      "fit_grade": 4,
      "path_grade": 4,
      "evidence_grade": "A",
      "forecast_label": "CONFIRMED",
      "supporting_signal_ids": [
        "w2-src-48c",
        "w2-src-fitt",
        "w2-src-eaton"
      ],
      "contrary_signal_ids": [],
      "inference_boundary": "Production and first shipment are confirmed; no named federal-campus delivery or accepted FITT deployment is public.",
      "missing_gate": "Public utility field acceptance and named federal or AI-site customer.",
      "upgrade_trigger": "Accepted FITT demonstration or disclosed project delivery.",
      "downgrade_trigger": "Field failure, program cancellation or production not converting to deliveries.",
      "next_recheck": "2026-10-31",
      "expiry": "2027-02-18"
    },
    {
      "inference_id": "w2-energy-siemens-002",
      "as_of": "2026-08-18",
      "sector": "Energy systems, grid and nuclear infrastructure",
      "cet_family": [
        "advanced manufacturing and materials"
      ],
      "mission": "Increase large-load interconnection capacity",
      "required_capability": "large power transformers manufactured domestically",
      "federal_owner": "Treasury / DOE",
      "federal_program_or_facility": "48C applicant project list",
      "anticipated_instrument": "allocated manufacturing tax credit",
      "company_legal_entity": "Siemens Energy, Inc.",
      "company_display_name": "Siemens Energy",
      "company_role": "large-power-transformer manufacturer",
      "relationship_state": "factory_under_construction",
      "visual_band": "acquisition_near",
      "fit_grade": 4,
      "path_grade": 4,
      "evidence_grade": "A",
      "forecast_label": "STRONG INFERENCE",
      "supporting_signal_ids": [
        "w2-src-48c"
      ],
      "contrary_signal_ids": [],
      "inference_boundary": "The federal manufacturing bridge is confirmed; Charlotte production had not begun at cutoff.",
      "missing_gate": "Factory completion, product qualification and first delivery.",
      "upgrade_trigger": "Late-2026 production start and named utility order.",
      "downgrade_trigger": "Schedule slip, certification failure or scope reduction.",
      "next_recheck": "2026-10-31",
      "expiry": "2027-02-18"
    },
    {
      "inference_id": "w2-energy-prolec-003",
      "as_of": "2026-08-18",
      "sector": "Energy systems, grid and nuclear infrastructure",
      "cet_family": [
        "advanced manufacturing and materials"
      ],
      "mission": "Expand distribution and substation capacity",
      "required_capability": "substation, pad-mount and network transformers",
      "federal_owner": "Treasury / DOE",
      "federal_program_or_facility": "48C applicant project list",
      "anticipated_instrument": "allocated manufacturing tax credit",
      "company_legal_entity": "Prolec GE USA LLC",
      "company_display_name": "Prolec GE USA",
      "company_role": "distribution-transformer manufacturer",
      "relationship_state": "operating_expanded_factory",
      "visual_band": "confirmed",
      "fit_grade": 4,
      "path_grade": 4,
      "evidence_grade": "A",
      "forecast_label": "CONFIRMED",
      "supporting_signal_ids": [
        "w2-src-48c",
        "w2-src-prolec"
      ],
      "contrary_signal_ids": [],
      "inference_boundary": "Expanded production is confirmed; a named federally bridged end customer is not.",
      "missing_gate": "Project-level customer and delivery record.",
      "upgrade_trigger": "Award or delivery into a GRIP, TFP or federal-site project.",
      "downgrade_trigger": "Underuse, customer-qualification failure or line disruption.",
      "next_recheck": "2026-10-31",
      "expiry": "2027-02-18"
    },
    {
      "inference_id": "w2-energy-gevernova-004",
      "as_of": "2026-08-18",
      "sector": "Energy systems, grid and nuclear infrastructure",
      "cet_family": [
        "advanced manufacturing and materials",
        "future computing"
      ],
      "mission": "Make the grid more controllable and resilient",
      "required_capability": "solid-state and universal-spare transformer technologies",
      "federal_owner": "DOE Office of Electricity / CESER",
      "federal_program_or_facility": "FITT transformer projects",
      "anticipated_instrument": "selected cost-shared R&D and deployment projects",
      "company_legal_entity": "GE Vernova Operations LLC",
      "company_display_name": "GE Vernova",
      "company_role": "grid-equipment developer and industrial validator",
      "relationship_state": "selected_transformer_projects",
      "visual_band": "acquisition_near",
      "fit_grade": 4,
      "path_grade": 4,
      "evidence_grade": "A",
      "forecast_label": "STRONG INFERENCE",
      "supporting_signal_ids": [
        "w2-src-fitt"
      ],
      "contrary_signal_ids": [],
      "inference_boundary": "Two selected transformer projects are real; qualification and manufacturing scale are not.",
      "missing_gate": "Full-scale utility deployment and accepted test results.",
      "upgrade_trigger": "Public commissioning and performance acceptance.",
      "downgrade_trigger": "Failed demonstration, cancellation or no scale path.",
      "next_recheck": "2026-10-31",
      "expiry": "2027-02-18"
    },
    {
      "inference_id": "w2-energy-switched-005",
      "as_of": "2026-08-18",
      "sector": "Energy systems, grid and nuclear infrastructure",
      "cet_family": [
        "AI and autonomy",
        "advanced manufacturing and materials"
      ],
      "mission": "Add distribution hosting capacity and resilience",
      "required_capability": "medium-voltage power-flow control and hybrid transformer automation",
      "federal_owner": "DOE / DoD",
      "federal_program_or_facility": "MAKE IT, GRIP and installation demonstration lanes",
      "anticipated_instrument": "prize award, selected GRIP project and planned DoD demonstration",
      "company_legal_entity": "Switched Source, LLC",
      "company_display_name": "Switched Source",
      "company_role": "grid-control equipment developer",
      "relationship_state": "prize_winner_and_selected_field_path",
      "visual_band": "acquisition_near",
      "fit_grade": 4,
      "path_grade": 4,
      "evidence_grade": "A",
      "forecast_label": "STRONG INFERENCE",
      "supporting_signal_ids": [
        "w2-src-makeit",
        "w2-src-grip"
      ],
      "contrary_signal_ids": [],
      "inference_boundary": "Multiple federal paths are confirmed, but GRIP remains selected and field acceptance is open.",
      "missing_gate": "Executed GRIP award and commissioned DoD or utility deployment.",
      "upgrade_trigger": "Accepted Fort Bliss or utility field result.",
      "downgrade_trigger": "GRIP rescission, failed demonstration or factory-ramp miss.",
      "next_recheck": "2026-10-31",
      "expiry": "2027-02-18"
    },
    {
      "inference_id": "w2-energy-southernspirit-006",
      "as_of": "2026-08-18",
      "sector": "Energy systems, grid and nuclear infrastructure",
      "cet_family": [
        "advanced manufacturing and materials"
      ],
      "mission": "Move power bidirectionally between regions",
      "required_capability": "3,000 MW-class HVDC transmission",
      "federal_owner": "DOE Office of Electricity",
      "federal_program_or_facility": "Transmission Facilitation Program",
      "anticipated_instrument": "selected capacity-contract project",
      "company_legal_entity": "Southern Spirit Transmission, LLC",
      "company_display_name": "Southern Spirit Transmission",
      "company_role": "HVDC project owner and developer",
      "relationship_state": "selected_capacity_contract",
      "visual_band": "acquisition_near",
      "fit_grade": 3,
      "path_grade": 4,
      "evidence_grade": "A",
      "forecast_label": "STRONG INFERENCE",
      "supporting_signal_ids": [
        "w2-src-tfp"
      ],
      "contrary_signal_ids": [],
      "inference_boundary": "Project-owner selection is confirmed; construction and suppliers are not.",
      "missing_gate": "Executed capacity contract, permits, finance and named converter/cable suppliers.",
      "upgrade_trigger": "Financial close and notice to proceed.",
      "downgrade_trigger": "Withdrawal, termination, permit denial or redesign.",
      "next_recheck": "2026-10-31",
      "expiry": "2027-02-18"
    },
    {
      "inference_id": "w2-energy-terrapower-007",
      "as_of": "2026-08-18",
      "sector": "Energy systems, grid and nuclear infrastructure",
      "cet_family": [
        "nuclear energy"
      ],
      "mission": "Deliver flexible firm power and industrial heat",
      "required_capability": "sodium-fast reactor with molten-salt storage",
      "federal_owner": "DOE Office of Clean Energy Demonstrations / NRC",
      "federal_program_or_facility": "Advanced Reactor Demonstration Program and Natrium licensing",
      "anticipated_instrument": "cost-share agreement plus issued construction permit",
      "company_legal_entity": "TerraPower, LLC",
      "company_display_name": "TerraPower",
      "company_role": "advanced-reactor developer and integrator",
      "relationship_state": "construction_permit_issued",
      "visual_band": "confirmed",
      "fit_grade": 4,
      "path_grade": 4,
      "evidence_grade": "A",
      "forecast_label": "CONFIRMED",
      "supporting_signal_ids": [
        "w2-src-terrapower"
      ],
      "contrary_signal_ids": [],
      "inference_boundary": "Construction authorization is confirmed; operation, fuel and generation are not.",
      "missing_gate": "Operating license, HALEU fuel, commissioning and synchronization.",
      "upgrade_trigger": "Accepted operating-license filing and major nuclear construction milestones.",
      "downgrade_trigger": "Fuel failure, financing gap, suspension or licensing reversal.",
      "next_recheck": "2026-10-31",
      "expiry": "2027-02-18"
    },
    {
      "inference_id": "w2-energy-xenergy-008",
      "as_of": "2026-08-18",
      "sector": "Energy systems, grid and nuclear infrastructure",
      "cet_family": [
        "nuclear energy",
        "advanced manufacturing and materials"
      ],
      "mission": "Build an integrated advanced-reactor and fuel pathway",
      "required_capability": "Xe-100 reactor engineering and domestic TRISO fuel production",
      "federal_owner": "DOE / NRC",
      "federal_program_or_facility": "ARDP and 48C TX-1 project",
      "anticipated_instrument": "cost-share award and manufacturing tax-credit allocation",
      "company_legal_entity": "X Energy, LLC",
      "company_display_name": "X-energy",
      "company_role": "reactor developer and fuel-platform integrator",
      "relationship_state": "active_ardp_and_fuel_factory_build",
      "visual_band": "confirmed",
      "fit_grade": 4,
      "path_grade": 4,
      "evidence_grade": "A",
      "forecast_label": "CONFIRMED",
      "supporting_signal_ids": [
        "w2-src-xenergy",
        "w2-src-48c"
      ],
      "contrary_signal_ids": [],
      "inference_boundary": "Federal support and construction activity are confirmed; licensed commercial fuel and reactor permits are not.",
      "missing_gate": "TX-1 regulatory approval, qualified output and Seadrift permit.",
      "upgrade_trigger": "Commissioned fuel line or issued reactor construction permit.",
      "downgrade_trigger": "HALEU shortage, license delay, customer withdrawal or schedule failure.",
      "next_recheck": "2026-10-31",
      "expiry": "2027-02-18"
    },
    {
      "inference_id": "w2-energy-kairos-009",
      "as_of": "2026-08-18",
      "sector": "Energy systems, grid and nuclear infrastructure",
      "cet_family": [
        "nuclear energy"
      ],
      "mission": "Test and qualify fluoride-salt-cooled reactor systems",
      "required_capability": "Hermes and Hermes 2 test-reactor construction",
      "federal_owner": "DOE / NRC",
      "federal_program_or_facility": "advanced-reactor support and non-power reactor licensing",
      "anticipated_instrument": "federal support plus issued construction permits",
      "company_legal_entity": "Kairos Power LLC",
      "company_display_name": "Kairos Power",
      "company_role": "test-reactor developer and operator",
      "relationship_state": "test_reactors_under_construction",
      "visual_band": "confirmed",
      "fit_grade": 4,
      "path_grade": 4,
      "evidence_grade": "A",
      "forecast_label": "CONFIRMED",
      "supporting_signal_ids": [
        "w2-src-kairos"
      ],
      "contrary_signal_ids": [],
      "inference_boundary": "Construction is confirmed; operating authorization, fuel loading and criticality are not.",
      "missing_gate": "Operating license and initial fuel/criticality.",
      "upgrade_trigger": "NRC operating authorization and accepted test program.",
      "downgrade_trigger": "Construction halt, fuel unavailability or licensing failure.",
      "next_recheck": "2026-10-31",
      "expiry": "2027-02-18"
    },
    {
      "inference_id": "w2-energy-holtec-010",
      "as_of": "2026-08-18",
      "sector": "Energy systems, grid and nuclear infrastructure",
      "cet_family": [
        "nuclear energy"
      ],
      "mission": "Deploy repeatable light-water SMRs",
      "required_capability": "SMR-300 design, licensing and site deployment",
      "federal_owner": "DOE Office of Nuclear Energy",
      "federal_program_or_facility": "Gen III+ SMR Tier 1 selection",
      "anticipated_instrument": "selected cost-shared deployment project",
      "company_legal_entity": "Holtec Government Services, LLC",
      "company_display_name": "Holtec Government Services",
      "company_role": "SMR deployment lead",
      "relationship_state": "selected_for_smr_funding",
      "visual_band": "acquisition_near",
      "fit_grade": 4,
      "path_grade": 4,
      "evidence_grade": "A",
      "forecast_label": "STRONG INFERENCE",
      "supporting_signal_ids": [
        "w2-src-smr-select"
      ],
      "contrary_signal_ids": [],
      "inference_boundary": "Selection for up to $400 million is confirmed; award execution, permit and construction are not.",
      "missing_gate": "Executed award, NRC authorization and financing.",
      "upgrade_trigger": "Final award plus site work and long-lead orders.",
      "downgrade_trigger": "Award rescission, NRC rejection or orderbook collapse.",
      "next_recheck": "2026-10-31",
      "expiry": "2027-02-18"
    },
    {
      "inference_id": "w2-energy-gehitachi-011",
      "as_of": "2026-08-18",
      "sector": "Energy systems, grid and nuclear infrastructure",
      "cet_family": [
        "nuclear energy"
      ],
      "mission": "Create a scalable SMR fleet platform",
      "required_capability": "BWRX-300 design, licensing and supply-chain integration",
      "federal_owner": "DOE / TVA / NRC",
      "federal_program_or_facility": "Gen III+ TVA selection and Clinch River review",
      "anticipated_instrument": "selected demonstration program plus docketed license review",
      "company_legal_entity": "GE-Hitachi Nuclear Energy Americas LLC",
      "company_display_name": "GE Hitachi Nuclear Energy",
      "company_role": "SMR design-platform supplier",
      "relationship_state": "design_selected_and_license_review_open",
      "visual_band": "acquisition_near",
      "fit_grade": 4,
      "path_grade": 4,
      "evidence_grade": "A",
      "forecast_label": "STRONG INFERENCE",
      "supporting_signal_ids": [
        "w2-src-smr-select",
        "w2-src-tva"
      ],
      "contrary_signal_ids": [],
      "inference_boundary": "Platform position and license review are confirmed; permit, procurement and construction are not.",
      "missing_gate": "Construction permit and TVA equipment orders.",
      "upgrade_trigger": "Permit issuance plus long-lead procurement.",
      "downgrade_trigger": "Review failure, TVA withdrawal or design divergence.",
      "next_recheck": "2026-10-31",
      "expiry": "2027-02-18"
    },
    {
      "inference_id": "w2-energy-bwxt-012",
      "as_of": "2026-08-18",
      "sector": "Energy systems, grid and nuclear infrastructure",
      "cet_family": [
        "nuclear energy",
        "advanced manufacturing and materials"
      ],
      "mission": "Create domestic SMR heavy-component capacity",
      "required_capability": "reactor-pressure-vessel final assembly and qualified large components",
      "federal_owner": "DOE Office of Nuclear Energy",
      "federal_program_or_facility": "Gen III+ supply-chain Tier 2",
      "anticipated_instrument": "selected cost-shared equipment procurement",
      "company_legal_entity": "BWXT Nuclear Energy, Inc.",
      "company_display_name": "BWXT Nuclear Energy",
      "company_role": "nuclear-component manufacturer",
      "relationship_state": "selected_supply_chain_project",
      "visual_band": "acquisition_near",
      "fit_grade": 4,
      "path_grade": 4,
      "evidence_grade": "A",
      "forecast_label": "STRONG INFERENCE",
      "supporting_signal_ids": [
        "w2-src-gen3"
      ],
      "contrary_signal_ids": [],
      "inference_boundary": "Selection is confirmed; installed equipment, nuclear QA qualification and customer order are not.",
      "missing_gate": "Installed qualified line and named SMR order.",
      "upgrade_trigger": "Accepted production qualification and component contract.",
      "downgrade_trigger": "Negotiation failure, qualification delay or absent demand.",
      "next_recheck": "2026-10-31",
      "expiry": "2027-02-18"
    },
    {
      "inference_id": "w2-energy-tokamak-013",
      "as_of": "2026-08-18",
      "sector": "Energy systems, grid and nuclear infrastructure",
      "cet_family": [
        "nuclear energy",
        "advanced manufacturing and materials"
      ],
      "mission": "Close fusion confinement, magnet and diagnostic gaps",
      "required_capability": "upgraded operating spherical tokamak and HTS research",
      "federal_owner": "DOE Office of Science / UK DESNZ",
      "federal_program_or_facility": "ST40 tripartite partnership",
      "anticipated_instrument": "named five-year public-private partnership",
      "company_legal_entity": "Tokamak Energy Ltd.",
      "company_display_name": "Tokamak Energy",
      "company_role": "fusion-facility owner and research performer",
      "relationship_state": "named_fusion_facility_partnership",
      "visual_band": "confirmed",
      "fit_grade": 4,
      "path_grade": 4,
      "evidence_grade": "A",
      "forecast_label": "CONFIRMED",
      "supporting_signal_ids": [
        "w2-src-st40"
      ],
      "contrary_signal_ids": [],
      "inference_boundary": "The partnership and existing ST40 facility are confirmed; upgrade completion and later outputs are not.",
      "missing_gate": "Operational upgrade and validated research outputs.",
      "upgrade_trigger": "Commissioned upgrade and verified milestone results.",
      "downgrade_trigger": "Appropriation failure, progress failure or delay.",
      "next_recheck": "2026-10-31",
      "expiry": "2027-02-18"
    },
    {
      "inference_id": "w2-energy-thea-014",
      "as_of": "2026-08-18",
      "sector": "Energy systems, grid and nuclear infrastructure",
      "cet_family": [
        "nuclear energy",
        "advanced manufacturing and materials"
      ],
      "mission": "Industrialize a manufacturable stellarator architecture",
      "required_capability": "modular planar HTS magnets and pilot-plant integration",
      "federal_owner": "DOE Office of Fusion Energy Sciences",
      "federal_program_or_facility": "Milestone-Based Fusion Development Program",
      "anticipated_instrument": "executed milestone agreement with verified early result",
      "company_legal_entity": "Thea Energy Inc.",
      "company_display_name": "Thea Energy",
      "company_role": "stellarator and HTS-magnet developer",
      "relationship_state": "milestone_program_verified_result",
      "visual_band": "confirmed",
      "fit_grade": 4,
      "path_grade": 4,
      "evidence_grade": "A",
      "forecast_label": "CONFIRMED",
      "supporting_signal_ids": [
        "w2-src-fusion-progress"
      ],
      "contrary_signal_ids": [],
      "inference_boundary": "DOE-verified progress is real; an integrated fusion experiment or power plant is not.",
      "missing_gate": "Integrated Eos experiment and next verified milestone.",
      "upgrade_trigger": "DOE verification of later design or device milestone.",
      "downgrade_trigger": "Coil scale-up failure or milestone funding loss.",
      "next_recheck": "2026-10-31",
      "expiry": "2027-02-18"
    },
    {
      "inference_id": "w2-mat-mp-015",
      "as_of": "2026-08-18",
      "sector": "Critical materials and component supply chains",
      "cet_family": [
        "advanced manufacturing and materials"
      ],
      "mission": "Secure mine-to-magnet supply for motors, guidance and industrial equipment",
      "required_capability": "rare-earth separation, metal, alloy and sintered NdFeB magnet production",
      "federal_owner": "Department of War / OSC",
      "federal_program_or_facility": "MP public-private partnership and 10X support",
      "anticipated_instrument": "loan, equity, price support and demand commitment",
      "company_legal_entity": "MP Materials Corp.",
      "company_display_name": "MP Materials",
      "company_role": "integrated rare-earth and magnet platform",
      "relationship_state": "operating_upstream_and_magnet_startup",
      "visual_band": "confirmed",
      "fit_grade": 4,
      "path_grade": 4,
      "evidence_grade": "A",
      "forecast_label": "CONFIRMED",
      "supporting_signal_ids": [
        "w2-src-mp",
        "w2-src-mp-dow"
      ],
      "contrary_signal_ids": [],
      "inference_boundary": "Federal platform support and early manufacture are confirmed; full commercial magnet output and 10X commissioning are not.",
      "missing_gate": "Customer qualification, recurring shipment and 10X construction milestones.",
      "upgrade_trigger": "Qualified commercial deliveries and installed 10X equipment.",
      "downgrade_trigger": "Execution failure, qualification delay or scale miss.",
      "next_recheck": "2026-10-31",
      "expiry": "2027-02-18"
    },
    {
      "inference_id": "w2-mat-noveon-016",
      "as_of": "2026-08-18",
      "sector": "Critical materials and component supply chains",
      "cet_family": [
        "advanced manufacturing and materials"
      ],
      "mission": "Supply qualified domestic magnets",
      "required_capability": "sintered NdFeB blocks from recycled and direct feed",
      "federal_owner": "Department of War / DLA",
      "federal_program_or_facility": "five-year magnet-block contract",
      "anticipated_instrument": "firm-fixed-price delivery order",
      "company_legal_entity": "Noveon Magnetics, Inc.",
      "company_display_name": "Noveon Magnetics",
      "company_role": "commercial magnet manufacturer",
      "relationship_state": "direct_dla_delivery_order",
      "visual_band": "confirmed",
      "fit_grade": 4,
      "path_grade": 4,
      "evidence_grade": "A",
      "forecast_label": "CONFIRMED",
      "supporting_signal_ids": [
        "w2-src-dla-magnets"
      ],
      "contrary_signal_ids": [],
      "inference_boundary": "The direct order and prior commercial shipments are confirmed; sustained annual output is not.",
      "missing_gate": "Delivery acceptance, option exercise and verified run rate.",
      "upgrade_trigger": "Recurring DLA orders and named accepted deliveries.",
      "downgrade_trigger": "Missed delivery, qualification failure or feedstock disruption.",
      "next_recheck": "2026-10-31",
      "expiry": "2027-02-18"
    },
    {
      "inference_id": "w2-mat-evac-017",
      "as_of": "2026-08-18",
      "sector": "Critical materials and component supply chains",
      "cet_family": [
        "advanced manufacturing and materials"
      ],
      "mission": "Supply qualified domestic magnets",
      "required_capability": "sintered NdFeB block manufacture",
      "federal_owner": "Department of War / DLA",
      "federal_program_or_facility": "DPA manufacturing award and sole-source delivery order",
      "anticipated_instrument": "award plus firm-fixed-price delivery order",
      "company_legal_entity": "eVAC Magnetics LLC",
      "company_display_name": "eVAC Magnetics",
      "company_role": "commercial magnet manufacturer",
      "relationship_state": "direct_dla_delivery_order",
      "visual_band": "confirmed",
      "fit_grade": 4,
      "path_grade": 4,
      "evidence_grade": "A",
      "forecast_label": "CONFIRMED",
      "supporting_signal_ids": [
        "w2-src-dla-magnets"
      ],
      "contrary_signal_ids": [],
      "inference_boundary": "First shipment and DLA order are confirmed; claimed 2,000-tonne run rate is not independently established.",
      "missing_gate": "Order completion, recurring orders and sustained output.",
      "upgrade_trigger": "Accepted DLA delivery and disclosed run rate.",
      "downgrade_trigger": "Production-ramp or feedstock failure.",
      "next_recheck": "2026-10-31",
      "expiry": "2027-02-18"
    },
    {
      "inference_id": "w2-mat-usar-018",
      "as_of": "2026-08-18",
      "sector": "Critical materials and component supply chains",
      "cet_family": [
        "advanced manufacturing and materials"
      ],
      "mission": "Build an integrated U.S. rare-earth platform",
      "required_capability": "mine, separation, metal/alloy and magnet capacity",
      "federal_owner": "Commerce CHIPS Program",
      "federal_program_or_facility": "definitive USA Rare Earth agreement",
      "anticipated_instrument": "final incentives agreement and senior loan commitment",
      "company_legal_entity": "USA Rare Earth, Inc.",
      "company_display_name": "USA Rare Earth",
      "company_role": "integrated rare-earth platform developer",
      "relationship_state": "final_federal_agreement_and_commissioning",
      "visual_band": "confirmed",
      "fit_grade": 4,
      "path_grade": 4,
      "evidence_grade": "A",
      "forecast_label": "CONFIRMED",
      "supporting_signal_ids": [
        "w2-src-usar"
      ],
      "contrary_signal_ids": [],
      "inference_boundary": "Final agreement and Stillwater commissioning are confirmed; run rate, Blacksburg and Round Top production are not.",
      "missing_gate": "Named customer shipment and verified run rate, then site construction.",
      "upgrade_trigger": "Recurring sales plus Blacksburg construction start.",
      "downgrade_trigger": "Ramp failure, financing breach or mine delay.",
      "next_recheck": "2026-10-31",
      "expiry": "2027-02-18"
    },
    {
      "inference_id": "w2-mat-energyfuels-019",
      "as_of": "2026-08-18",
      "sector": "Critical materials and component supply chains",
      "cet_family": [
        "advanced manufacturing and materials"
      ],
      "mission": "Expand domestic separated rare-earth oxide supply",
      "required_capability": "NdPr production and commercial-scale Dy/Tb separation",
      "federal_owner": "Department of War / OSC",
      "federal_program_or_facility": "conditional finance and operating White Mesa platform",
      "anticipated_instrument": "conditional loan plus company-funded construction",
      "company_legal_entity": "Energy Fuels Inc.",
      "company_display_name": "Energy Fuels",
      "company_role": "rare-earth oxide producer and HREE plant developer",
      "relationship_state": "operating_ndpr_and_hree_construction",
      "visual_band": "acquisition_near",
      "fit_grade": 4,
      "path_grade": 3,
      "evidence_grade": "B",
      "forecast_label": "STRONG INFERENCE",
      "supporting_signal_ids": [
        "w2-src-energyfuels"
      ],
      "contrary_signal_ids": [],
      "inference_boundary": "Live NdPr capability and HREE construction are real; commercial Dy/Tb and downstream metal/magnet conversion are not.",
      "missing_gate": "Commissioning, saleable HREE shipment and named domestic customer.",
      "upgrade_trigger": "Qualified Dy/Tb delivery to a U.S. metal or magnet producer.",
      "downgrade_trigger": "Construction delay, purity failure or absent customer.",
      "next_recheck": "2026-10-31",
      "expiry": "2027-02-18"
    },
    {
      "inference_id": "w2-mat-reelement-020",
      "as_of": "2026-08-18",
      "sector": "Critical materials and component supply chains",
      "cet_family": [
        "advanced manufacturing and materials"
      ],
      "mission": "Scale domestic separation and recycling",
      "required_capability": "high-purity rare-earth, gallium and germanium refining",
      "federal_owner": "Department of War Economic Defense Unit",
      "federal_program_or_facility": "Industrial Base Fund expansion investment",
      "anticipated_instrument": "direct federal investment",
      "company_legal_entity": "ReElement Technologies Corp.",
      "company_display_name": "ReElement Technologies",
      "company_role": "chromatographic refining and recycling platform",
      "relationship_state": "federal_capacity_expansion_investment",
      "visual_band": "confirmed",
      "fit_grade": 4,
      "path_grade": 4,
      "evidence_grade": "A",
      "forecast_label": "CONFIRMED",
      "supporting_signal_ids": [
        "w2-src-reelement"
      ],
      "contrary_signal_ids": [],
      "inference_boundary": "The expansion investment is confirmed; installed capacity, economics and qualified output are not.",
      "missing_gate": "Equipment installation and customer-qualified shipments.",
      "upgrade_trigger": "Commissioned line with measured output and named buyer.",
      "downgrade_trigger": "Scale economics, feedstock or purity failure.",
      "next_recheck": "2026-10-31",
      "expiry": "2027-02-18"
    },
    {
      "inference_id": "w2-mat-syrah-021",
      "as_of": "2026-08-18",
      "sector": "Critical materials and component supply chains",
      "cet_family": [
        "advanced manufacturing and materials"
      ],
      "mission": "Secure active-anode material for batteries",
      "required_capability": "natural-graphite active-anode material production",
      "federal_owner": "DOE Energy Dominance Financing",
      "federal_program_or_facility": "Vidalia direct loan",
      "anticipated_instrument": "closed federal loan",
      "company_legal_entity": "Syrah Technologies LLC",
      "company_display_name": "Syrah Technologies",
      "company_role": "active-anode-material facility operator",
      "relationship_state": "operating_federally_financed_facility",
      "visual_band": "confirmed",
      "fit_grade": 4,
      "path_grade": 4,
      "evidence_grade": "A",
      "forecast_label": "CONFIRMED",
      "supporting_signal_ids": [
        "w2-src-syrah"
      ],
      "contrary_signal_ids": [],
      "inference_boundary": "The facility and loan are confirmed; recurring customer-qualified sales and U.S.-mined feed are not.",
      "missing_gate": "Customer acceptance and recurring commercial volumes.",
      "upgrade_trigger": "Qualified repeat shipments and expansion financing.",
      "downgrade_trigger": "Qualification failure or Mozambique feed disruption.",
      "next_recheck": "2026-10-31",
      "expiry": "2027-02-18"
    },
    {
      "inference_id": "w2-mat-thacker-022",
      "as_of": "2026-08-18",
      "sector": "Critical materials and component supply chains",
      "cet_family": [
        "advanced manufacturing and materials"
      ],
      "mission": "Create domestic battery-grade lithium supply",
      "required_capability": "large-scale lithium carbonate mine and processing plant",
      "federal_owner": "DOE Energy Dominance Financing",
      "federal_program_or_facility": "Thacker Pass ATVM loan",
      "anticipated_instrument": "closed federal loan and major construction",
      "company_legal_entity": "Lithium Nevada Corp.",
      "company_display_name": "Lithium Nevada / Thacker Pass",
      "company_role": "lithium project owner and plant developer",
      "relationship_state": "closed_loan_and_major_construction",
      "visual_band": "confirmed",
      "fit_grade": 4,
      "path_grade": 4,
      "evidence_grade": "A",
      "forecast_label": "CONFIRMED",
      "supporting_signal_ids": [
        "w2-src-thacker"
      ],
      "contrary_signal_ids": [],
      "inference_boundary": "Finance and construction are confirmed; production and battery-grade qualification are not.",
      "missing_gate": "Mechanical completion, commissioning and customer qualification.",
      "upgrade_trigger": "First qualified battery-grade shipments.",
      "downgrade_trigger": "Cost overrun, construction delay or market-driven scope change.",
      "next_recheck": "2026-10-31",
      "expiry": "2027-02-18"
    },
    {
      "inference_id": "w2-mat-5n-023",
      "as_of": "2026-08-18",
      "sector": "Critical materials and component supply chains",
      "cet_family": [
        "semiconductors and microelectronics",
        "advanced manufacturing and materials"
      ],
      "mission": "Secure germanium for IR, sensing and semiconductor uses",
      "required_capability": "zone-refined germanium metal",
      "federal_owner": "Department of War / DPA Title III",
      "federal_program_or_facility": "germanium capacity-expansion award",
      "anticipated_instrument": "direct investment agreement",
      "company_legal_entity": "5N Plus Inc.",
      "company_display_name": "5N Plus",
      "company_role": "germanium refiner",
      "relationship_state": "dpa_capacity_expansion_award",
      "visual_band": "confirmed",
      "fit_grade": 4,
      "path_grade": 4,
      "evidence_grade": "A",
      "forecast_label": "CONFIRMED",
      "supporting_signal_ids": [
        "w2-src-5n"
      ],
      "contrary_signal_ids": [],
      "inference_boundary": "The expansion award and incumbent capability are confirmed; sevenfold commissioned capacity is not.",
      "missing_gate": "Equipment commissioning and qualified shipments.",
      "upgrade_trigger": "Verified output above 20 tonnes per year.",
      "downgrade_trigger": "Installation delay or customer-qualification failure.",
      "next_recheck": "2026-10-31",
      "expiry": "2027-02-18"
    },
    {
      "inference_id": "w2-mat-lattice-024",
      "as_of": "2026-08-18",
      "sector": "Critical materials and component supply chains",
      "cet_family": [
        "sensing and signature management",
        "advanced manufacturing and materials"
      ],
      "mission": "Secure infrared optical components",
      "required_capability": "germanium and silicon crystal growth, recycling and optics",
      "federal_owner": "Department of War / DPA Title III",
      "federal_program_or_facility": "optics production expansion",
      "anticipated_instrument": "direct investment agreement",
      "company_legal_entity": "Lattice Materials LLC",
      "company_display_name": "Lattice Materials",
      "company_role": "crystal and IR-optics manufacturer",
      "relationship_state": "dpa_component_expansion_award",
      "visual_band": "confirmed",
      "fit_grade": 4,
      "path_grade": 4,
      "evidence_grade": "A",
      "forecast_label": "CONFIRMED",
      "supporting_signal_ids": [
        "w2-src-lattice"
      ],
      "contrary_signal_ids": [],
      "inference_boundary": "The award and incumbent component capability are confirmed; new qualified output is not.",
      "missing_gate": "Commissioned equipment and accepted components.",
      "upgrade_trigger": "Customer qualification and verified production increase.",
      "downgrade_trigger": "Expansion or qualification failure.",
      "next_recheck": "2026-10-31",
      "expiry": "2027-02-18"
    },
    {
      "inference_id": "w2-mat-elementus-025",
      "as_of": "2026-08-18",
      "sector": "Critical materials and component supply chains",
      "cet_family": [
        "semiconductors and microelectronics",
        "advanced manufacturing and materials"
      ],
      "mission": "Demonstrate domestic gallium recovery",
      "required_capability": "gallium separation from bauxite residue",
      "federal_owner": "Department of War / DPA Title III",
      "federal_program_or_facility": "domestic gallium demonstration project",
      "anticipated_instrument": "demonstration award",
      "company_legal_entity": "ElementUS Minerals, LLC",
      "company_display_name": "ElementUS Minerals",
      "company_role": "gallium demonstration-plant developer",
      "relationship_state": "federal_demonstration_award",
      "visual_band": "confirmed",
      "fit_grade": 4,
      "path_grade": 4,
      "evidence_grade": "A",
      "forecast_label": "CONFIRMED",
      "supporting_signal_ids": [
        "w2-src-elementus"
      ],
      "contrary_signal_ids": [],
      "inference_boundary": "The demonstration award is confirmed; commercial-scale gallium production is not.",
      "missing_gate": "Commissioned demo, verified yield/purity and named buyer.",
      "upgrade_trigger": "Measured output and customer qualification.",
      "downgrade_trigger": "Process-yield failure or commercial-finance gap.",
      "next_recheck": "2026-10-31",
      "expiry": "2027-02-18"
    },
    {
      "inference_id": "w2-mat-crucible-026",
      "as_of": "2026-08-18",
      "sector": "Critical materials and component supply chains",
      "cet_family": [
        "semiconductors and microelectronics",
        "advanced manufacturing and materials"
      ],
      "mission": "Build a multi-mineral refining platform",
      "required_capability": "integrated gallium, germanium, indium, antimony, copper and semiconductor-grade acid production",
      "federal_owner": "Commerce CHIPS Program",
      "federal_program_or_facility": "Project Crucible",
      "anticipated_instrument": "final direct-funding award",
      "company_legal_entity": "Crucible Metals, LLC",
      "company_display_name": "Crucible Metals",
      "company_role": "integrated critical-mineral refiner",
      "relationship_state": "final_chips_award_future_platform",
      "visual_band": "confirmed",
      "fit_grade": 4,
      "path_grade": 4,
      "evidence_grade": "A",
      "forecast_label": "CONFIRMED",
      "supporting_signal_ids": [
        "w2-src-crucible"
      ],
      "contrary_signal_ids": [],
      "inference_boundary": "Final funding is confirmed; the multi-billion-dollar facility is not built or commissioned.",
      "missing_gate": "Construction mobilization and phased line commissioning.",
      "upgrade_trigger": "EPC notice and first qualified production line.",
      "downgrade_trigger": "Financing, permitting, feedstock or schedule failure.",
      "next_recheck": "2026-10-31",
      "expiry": "2027-02-18"
    },
    {
      "inference_id": "w2-mat-antimony-027",
      "as_of": "2026-08-18",
      "sector": "Critical materials and component supply chains",
      "cet_family": [
        "advanced manufacturing and materials"
      ],
      "mission": "Secure antimony for munitions and high-temperature uses",
      "required_capability": "domestic ore concentration, refining and qualified antimony products",
      "federal_owner": "Department of War / DPA Title III / DLA",
      "federal_program_or_facility": "milestone expansion award and sales contracts",
      "anticipated_instrument": "milestone award plus direct sales contracts",
      "company_legal_entity": "United States Antimony Corporation",
      "company_display_name": "United States Antimony",
      "company_role": "antimony refiner and emerging domestic-feed producer",
      "relationship_state": "operating_refinery_and_dpa_expansion",
      "visual_band": "confirmed",
      "fit_grade": 4,
      "path_grade": 4,
      "evidence_grade": "A",
      "forecast_label": "CONFIRMED",
      "supporting_signal_ids": [
        "w2-src-antimony"
      ],
      "contrary_signal_ids": [],
      "inference_boundary": "Existing refining and the expansion award are confirmed; sustained domestic-mine feed is not.",
      "missing_gate": "Verified domestic concentrate throughput and DLA deliveries.",
      "upgrade_trigger": "Accepted deliveries sourced from domestic ore.",
      "downgrade_trigger": "Resource, assay, ramp or contract failure.",
      "next_recheck": "2026-10-31",
      "expiry": "2027-02-18"
    },
    {
      "inference_id": "w2-mat-centrus-028",
      "as_of": "2026-08-18",
      "sector": "Critical materials and component supply chains",
      "cet_family": [
        "nuclear energy",
        "advanced manufacturing and materials"
      ],
      "mission": "Supply HALEU for advanced reactors",
      "required_capability": "uranium enrichment to 19.75 percent and expanded commercial cascades",
      "federal_owner": "DOE Office of Nuclear Energy",
      "federal_program_or_facility": "HALEU Availability Program",
      "anticipated_instrument": "IDIQ task order and definitive expansion contract",
      "company_legal_entity": "American Centrifuge Operating, LLC",
      "company_display_name": "Centrus / American Centrifuge",
      "company_role": "HALEU enrichment operator",
      "relationship_state": "operating_demo_and_expansion_contract",
      "visual_band": "confirmed",
      "fit_grade": 4,
      "path_grade": 4,
      "evidence_grade": "A",
      "forecast_label": "CONFIRMED",
      "supporting_signal_ids": [
        "w2-src-haleu"
      ],
      "contrary_signal_ids": [],
      "inference_boundary": "Demonstration production and federal expansion contract are confirmed; commercial scale is not.",
      "missing_gate": "New cascade installation, NRC authorization and commercial delivery.",
      "upgrade_trigger": "Commissioned expanded capacity and non-DOE customer delivery.",
      "downgrade_trigger": "License, centrifuge-manufacturing or schedule failure.",
      "next_recheck": "2026-10-31",
      "expiry": "2027-02-18"
    },
    {
      "inference_id": "w2-mat-generalmatter-029",
      "as_of": "2026-08-18",
      "sector": "Critical materials and component supply chains",
      "cet_family": [
        "nuclear energy",
        "advanced manufacturing and materials"
      ],
      "mission": "Create a second domestic enrichment platform",
      "required_capability": "new uranium enrichment plant at Paducah",
      "federal_owner": "DOE Office of Nuclear Energy",
      "federal_program_or_facility": "HALEU Availability Program",
      "anticipated_instrument": "large federal task order and site lease",
      "company_legal_entity": "General Matter, Inc.",
      "company_display_name": "General Matter",
      "company_role": "future HALEU enrichment developer",
      "relationship_state": "federal_task_order_prelicense",
      "visual_band": "acquisition_near",
      "fit_grade": 4,
      "path_grade": 4,
      "evidence_grade": "A",
      "forecast_label": "STRONG INFERENCE",
      "supporting_signal_ids": [
        "w2-src-haleu"
      ],
      "contrary_signal_ids": [],
      "inference_boundary": "The federal path and site preparation are confirmed; license, plant and production do not exist yet.",
      "missing_gate": "Accepted NRC application, EPC and first cascade installation.",
      "upgrade_trigger": "NRC licensing milestone plus construction notice.",
      "downgrade_trigger": "Technology qualification, licensing or finance failure.",
      "next_recheck": "2026-10-31",
      "expiry": "2027-02-18"
    },
    {
      "inference_id": "w2-mfg-gaasi-030",
      "as_of": "2026-08-18",
      "sector": "Advanced manufacturing and industrial qualification",
      "cet_family": [
        "advanced manufacturing and materials"
      ],
      "mission": "Qualify scalable aerospace additive production",
      "required_capability": "7075-T73-equivalent LPBF material allowables across printer classes",
      "federal_owner": "OSW ManTech / America Makes",
      "federal_program_or_facility": "GOTHAAM project call",
      "anticipated_instrument": "selected $5.5 million project",
      "company_legal_entity": "General Atomics Aeronautical Systems, Inc.",
      "company_display_name": "GA-ASI",
      "company_role": "qualification prime and aerospace integrator",
      "relationship_state": "official_project_winner",
      "visual_band": "confirmed",
      "fit_grade": 4,
      "path_grade": 4,
      "evidence_grade": "A",
      "forecast_label": "CONFIRMED",
      "supporting_signal_ids": [
        "w2-src-gothaam"
      ],
      "contrary_signal_ids": [],
      "inference_boundary": "GA-ASI's winner role is confirmed; named partner workshare and qualified production are not.",
      "missing_gate": "Project abstract, allowables, qualification plan and accepted output.",
      "upgrade_trigger": "Published workshare and validated cross-machine allowables.",
      "downgrade_trigger": "Project termination or inability to reach comparable properties.",
      "next_recheck": "2026-10-31",
      "expiry": "2027-02-18"
    },
    {
      "inference_id": "w2-mfg-3dsystems-031",
      "as_of": "2026-08-18",
      "sector": "Advanced manufacturing and industrial qualification",
      "cet_family": [
        "advanced manufacturing and materials"
      ],
      "mission": "Expand the qualified defense additive supplier base",
      "required_capability": "process-control documentation, training and audit readiness",
      "federal_owner": "OSW ManTech / America Makes",
      "federal_program_or_facility": "JAQS-SQ",
      "anticipated_instrument": "official selected project",
      "company_legal_entity": "3D Systems Corporation",
      "company_display_name": "3D Systems",
      "company_role": "additive-platform qualification performer",
      "relationship_state": "official_qualification_project_winner",
      "visual_band": "confirmed",
      "fit_grade": 4,
      "path_grade": 4,
      "evidence_grade": "A",
      "forecast_label": "CONFIRMED",
      "supporting_signal_ids": [
        "w2-src-jaqs"
      ],
      "contrary_signal_ids": [],
      "inference_boundary": "The project selection is confirmed; supplier approval and sustained qualified production are not.",
      "missing_gate": "Accepted process controls and qualified production release.",
      "upgrade_trigger": "DoD customer qualification and repeat orders.",
      "downgrade_trigger": "Audit failure or lack of transition.",
      "next_recheck": "2026-10-31",
      "expiry": "2027-02-18"
    },
    {
      "inference_id": "w2-mfg-velo3d-032",
      "as_of": "2026-08-18",
      "sector": "Advanced manufacturing and industrial qualification",
      "cet_family": [
        "advanced manufacturing and materials"
      ],
      "mission": "Expand the qualified defense additive supplier base",
      "required_capability": "process control plus complex-part inspection readiness",
      "federal_owner": "OSW ManTech / America Makes",
      "federal_program_or_facility": "JAQS-SQ and prior institute projects",
      "anticipated_instrument": "official selected project",
      "company_legal_entity": "Velo3D, Inc.",
      "company_display_name": "Velo3D",
      "company_role": "metal-additive platform and repeat-path performer",
      "relationship_state": "official_qualification_project_winner",
      "visual_band": "confirmed",
      "fit_grade": 4,
      "path_grade": 4,
      "evidence_grade": "A",
      "forecast_label": "CONFIRMED",
      "supporting_signal_ids": [
        "w2-src-jaqs"
      ],
      "contrary_signal_ids": [],
      "inference_boundary": "Selection and repeat institute path are confirmed; production qualification is not.",
      "missing_gate": "Accepted process controls and named defense part qualification.",
      "upgrade_trigger": "Customer qualification and recurring production order.",
      "downgrade_trigger": "Financial distress, audit failure or transition loss.",
      "next_recheck": "2026-10-31",
      "expiry": "2027-02-18"
    },
    {
      "inference_id": "w2-mfg-divergent-033",
      "as_of": "2026-08-18",
      "sector": "Advanced manufacturing and industrial qualification",
      "cet_family": [
        "advanced manufacturing and materials"
      ],
      "mission": "Expand the qualified defense additive supplier base",
      "required_capability": "integrated digital production-system controls",
      "federal_owner": "OSW ManTech / America Makes",
      "federal_program_or_facility": "JAQS-SQ",
      "anticipated_instrument": "official selected project",
      "company_legal_entity": "Divergent Technologies, Inc.",
      "company_display_name": "Divergent",
      "company_role": "integrated additive-factory performer",
      "relationship_state": "official_qualification_project_winner",
      "visual_band": "confirmed",
      "fit_grade": 4,
      "path_grade": 4,
      "evidence_grade": "A",
      "forecast_label": "CONFIRMED",
      "supporting_signal_ids": [
        "w2-src-jaqs"
      ],
      "contrary_signal_ids": [],
      "inference_boundary": "Selection is confirmed; workshare and government supplier approval are not.",
      "missing_gate": "Accepted controls and production transition.",
      "upgrade_trigger": "Qualified defense production release.",
      "downgrade_trigger": "Audit, data-rights or transition failure.",
      "next_recheck": "2026-10-31",
      "expiry": "2027-02-18"
    },
    {
      "inference_id": "w2-mfg-gkn-034",
      "as_of": "2026-08-18",
      "sector": "Advanced manufacturing and industrial qualification",
      "cet_family": [
        "advanced manufacturing and materials"
      ],
      "mission": "Scale additive titanium for critical airframes",
      "required_capability": "large qualified Ti additive structures",
      "federal_owner": "Air Force Research Laboratory",
      "federal_program_or_facility": "Materials and Manufacturing Directorate contract",
      "anticipated_instrument": "direct R&D contract FA239425CB017",
      "company_legal_entity": "GKN Aerospace GTC, LLC",
      "company_display_name": "GKN Aerospace GTC",
      "company_role": "airframe additive-manufacturing performer",
      "relationship_state": "active_afrl_contract",
      "visual_band": "confirmed",
      "fit_grade": 4,
      "path_grade": 4,
      "evidence_grade": "A",
      "forecast_label": "CONFIRMED",
      "supporting_signal_ids": [
        "w2-src-afrl"
      ],
      "contrary_signal_ids": [],
      "inference_boundary": "The $8.39 million contract is confirmed in a dated portfolio; delivered qualified structures are not.",
      "missing_gate": "Accepted contract milestones and airframe transition.",
      "upgrade_trigger": "Qualified demonstration article and program adoption.",
      "downgrade_trigger": "Modification, termination or technical failure.",
      "next_recheck": "2026-10-31",
      "expiry": "2027-02-18"
    },
    {
      "inference_id": "w2-mfg-graymatter-035",
      "as_of": "2026-08-18",
      "sector": "Advanced manufacturing and industrial qualification",
      "cet_family": [
        "AI and autonomy",
        "advanced manufacturing and materials"
      ],
      "mission": "Automate high-mix aerospace inspection and correction",
      "required_capability": "robotic metrology linked to a digital twin",
      "federal_owner": "Air Force Research Laboratory / ARM Institute",
      "federal_program_or_facility": "canopy inspection contract and ARM 25-01 selection",
      "anticipated_instrument": "direct contract plus selected institute team",
      "company_legal_entity": "GrayMatter Robotics Inc.",
      "company_display_name": "GrayMatter Robotics",
      "company_role": "robotic inspection and correction integrator",
      "relationship_state": "active_contract_and_selected_team",
      "visual_band": "confirmed",
      "fit_grade": 4,
      "path_grade": 4,
      "evidence_grade": "A",
      "forecast_label": "CONFIRMED",
      "supporting_signal_ids": [
        "w2-src-afrl",
        "w2-src-arm"
      ],
      "contrary_signal_ids": [],
      "inference_boundary": "The AFRL contract and selected ARM team are confirmed; final ARM workshare and production adoption are not.",
      "missing_gate": "Accepted inspection performance and transition user.",
      "upgrade_trigger": "Fielded inspection cell with measured acceptance results.",
      "downgrade_trigger": "Contract termination, accuracy failure or no transition.",
      "next_recheck": "2026-10-31",
      "expiry": "2027-02-18"
    },
    {
      "inference_id": "w2-mfg-titan-036",
      "as_of": "2026-08-18",
      "sector": "Advanced manufacturing and industrial qualification",
      "cet_family": [
        "AI and autonomy",
        "advanced manufacturing and materials"
      ],
      "mission": "Create an agile autonomous factory floor",
      "required_capability": "robotic process planning and adaptive manufacturing",
      "federal_owner": "Air Force Research Laboratory",
      "federal_program_or_facility": "Agile Factory Floor and autonomous planning efforts",
      "anticipated_instrument": "active direct R&D contracts",
      "company_legal_entity": "Titan Robotics, Inc.",
      "company_display_name": "Titan Robotics",
      "company_role": "factory-automation and process-planning performer",
      "relationship_state": "active_afrl_contracts",
      "visual_band": "confirmed",
      "fit_grade": 4,
      "path_grade": 4,
      "evidence_grade": "A",
      "forecast_label": "CONFIRMED",
      "supporting_signal_ids": [
        "w2-src-afrl"
      ],
      "contrary_signal_ids": [],
      "inference_boundary": "Active contracts are confirmed from the portfolio; accepted deployment is not.",
      "missing_gate": "Completion evidence and transition to an operating factory.",
      "upgrade_trigger": "Accepted autonomous planning workflow in production.",
      "downgrade_trigger": "Contract modification, termination or transition failure.",
      "next_recheck": "2026-10-31",
      "expiry": "2027-02-18"
    },
    {
      "inference_id": "w2-mfg-sedaro-037",
      "as_of": "2026-08-18",
      "sector": "Advanced manufacturing and industrial qualification",
      "cet_family": [
        "future computing",
        "advanced manufacturing and materials"
      ],
      "mission": "Make propulsion design collaborative and traceable",
      "required_capability": "cloud-native rocket-propulsion digital twins",
      "federal_owner": "Air Force Test Center / AFRL",
      "federal_program_or_facility": "Rocket Propulsion digital-twin IDIQ",
      "anticipated_instrument": "competitive IDIQ FA9300-25-D-6000",
      "company_legal_entity": "Sedaro Corp.",
      "company_display_name": "Sedaro",
      "company_role": "cloud-native propulsion digital-twin platform",
      "relationship_state": "active_idiq_vehicle",
      "visual_band": "confirmed",
      "fit_grade": 4,
      "path_grade": 4,
      "evidence_grade": "A",
      "forecast_label": "CONFIRMED",
      "supporting_signal_ids": [
        "w2-src-sedaro"
      ],
      "contrary_signal_ids": [],
      "inference_boundary": "The $20 million ceiling vehicle is confirmed; ceiling value is not revenue and task-order scale is open.",
      "missing_gate": "Task orders, obligations and accepted operational use.",
      "upgrade_trigger": "Material task-order flow and named program use.",
      "downgrade_trigger": "No task orders, platform rejection or cancellation.",
      "next_recheck": "2026-10-31",
      "expiry": "2027-02-18"
    },
    {
      "inference_id": "w2-mfg-convergent-038",
      "as_of": "2026-08-18",
      "sector": "Advanced manufacturing and industrial qualification",
      "cet_family": [
        "advanced manufacturing and materials"
      ],
      "mission": "Control and qualify composite cure processes",
      "required_capability": "in-process sensing and composite manufacturing simulation",
      "federal_owner": "Air Force Research Laboratory / NASA",
      "federal_program_or_facility": "AFRL cure-management contract and HiCAM consortium",
      "anticipated_instrument": "direct R&D contract plus transition consortium",
      "company_legal_entity": "Convergent Manufacturing Technologies US Inc.",
      "company_display_name": "Convergent Manufacturing Technologies",
      "company_role": "composite-process sensing and simulation specialist",
      "relationship_state": "active_contract_and_transition_ecosystem",
      "visual_band": "confirmed",
      "fit_grade": 4,
      "path_grade": 4,
      "evidence_grade": "A",
      "forecast_label": "CONFIRMED",
      "supporting_signal_ids": [
        "w2-src-afrl",
        "w2-src-hicam"
      ],
      "contrary_signal_ids": [],
      "inference_boundary": "The contract and consortium position are confirmed; airworthiness acceptance and production adoption are not.",
      "missing_gate": "Accepted cure-control result and qualified manufacturing process.",
      "upgrade_trigger": "Customer certification artifact or production transition.",
      "downgrade_trigger": "Sensor reliability or qualification failure.",
      "next_recheck": "2026-10-31",
      "expiry": "2027-02-18"
    },
    {
      "inference_id": "w2-mfg-spirit-039",
      "as_of": "2026-08-18",
      "sector": "Advanced manufacturing and industrial qualification",
      "cet_family": [
        "advanced manufacturing and materials"
      ],
      "mission": "Demonstrate high-rate unitized composite structures",
      "required_capability": "bonded aerostructure manufacturing and qualification",
      "federal_owner": "Air Force Research Laboratory / NASA",
      "federal_program_or_facility": "bonded-unitized-composites contract and HiCAM",
      "anticipated_instrument": "direct R&D contract plus transition consortium",
      "company_legal_entity": "Spirit AeroSystems, Inc.",
      "company_display_name": "Spirit AeroSystems",
      "company_role": "composite-aerostructure manufacturer",
      "relationship_state": "active_contract_and_hicam_member",
      "visual_band": "confirmed",
      "fit_grade": 4,
      "path_grade": 4,
      "evidence_grade": "A",
      "forecast_label": "CONFIRMED",
      "supporting_signal_ids": [
        "w2-src-afrl",
        "w2-src-hicam"
      ],
      "contrary_signal_ids": [],
      "inference_boundary": "The $23.81 million contract and HiCAM position are confirmed; qualified production adoption is not.",
      "missing_gate": "Accepted structural demonstration and production decision.",
      "upgrade_trigger": "Flight or production article acceptance.",
      "downgrade_trigger": "Program cancellation, integration disruption or qualification failure.",
      "next_recheck": "2026-10-31",
      "expiry": "2027-02-18"
    },
    {
      "inference_id": "w2-mfg-hill-040",
      "as_of": "2026-08-18",
      "sector": "Advanced manufacturing and industrial qualification",
      "cet_family": [
        "sensing and signature management",
        "advanced manufacturing and materials"
      ],
      "mission": "Create airworthiness-grade NDE evidence",
      "required_capability": "inspection of cold-worked fastener holes in aerospace alloys",
      "federal_owner": "Air Force Research Laboratory",
      "federal_program_or_facility": "Materials and Manufacturing Directorate contract",
      "anticipated_instrument": "direct R&D contract FA239425CB032",
      "company_legal_entity": "Hill Engineering, LLC",
      "company_display_name": "Hill Engineering",
      "company_role": "NDE and structural-integrity specialist",
      "relationship_state": "active_afrl_contract",
      "visual_band": "confirmed",
      "fit_grade": 4,
      "path_grade": 4,
      "evidence_grade": "A",
      "forecast_label": "CONFIRMED",
      "supporting_signal_ids": [
        "w2-src-afrl"
      ],
      "contrary_signal_ids": [],
      "inference_boundary": "The contract is confirmed; accepted inspection method and fleet adoption are not.",
      "missing_gate": "Validated method and transition into maintenance or production.",
      "upgrade_trigger": "Airworthiness authority acceptance.",
      "downgrade_trigger": "Accuracy, repeatability or transition failure.",
      "next_recheck": "2026-10-31",
      "expiry": "2027-02-18"
    },
    {
      "inference_id": "w2-mfg-bluequartz-041",
      "as_of": "2026-08-18",
      "sector": "Advanced manufacturing and industrial qualification",
      "cet_family": [
        "advanced manufacturing and materials",
        "future computing"
      ],
      "mission": "Make materials characterization reproducible",
      "required_capability": "reliable microtexture quantification software for titanium",
      "federal_owner": "Air Force Research Laboratory",
      "federal_program_or_facility": "Materials and Manufacturing Directorate contract",
      "anticipated_instrument": "direct R&D contract FA239425CB033",
      "company_legal_entity": "BlueQuartz Software, LLC",
      "company_display_name": "BlueQuartz Software",
      "company_role": "materials-characterization software specialist",
      "relationship_state": "active_afrl_contract",
      "visual_band": "confirmed",
      "fit_grade": 3,
      "path_grade": 4,
      "evidence_grade": "A",
      "forecast_label": "CONFIRMED",
      "supporting_signal_ids": [
        "w2-src-afrl"
      ],
      "contrary_signal_ids": [],
      "inference_boundary": "The contract is confirmed; certification authority acceptance and broader deployment are not.",
      "missing_gate": "Validated reliability and program use.",
      "upgrade_trigger": "Adopted characterization workflow in a qualification record.",
      "downgrade_trigger": "Software reliability or acceptance failure.",
      "next_recheck": "2026-10-31",
      "expiry": "2027-02-18"
    },
    {
      "inference_id": "w2-mfg-honeywell-042",
      "as_of": "2026-08-18",
      "sector": "Advanced manufacturing and industrial qualification",
      "cet_family": [
        "sensing and signature management",
        "advanced manufacturing and materials"
      ],
      "mission": "Inspect large and complex additive parts rapidly",
      "required_capability": "near-commercial non-destructive inspection",
      "federal_owner": "OSW ManTech / America Makes",
      "federal_program_or_facility": "QTIME project call",
      "anticipated_instrument": "official award-lead selection",
      "company_legal_entity": "Honeywell International Inc.",
      "company_display_name": "Honeywell",
      "company_role": "additive NDI project lead",
      "relationship_state": "official_qtime_award_lead",
      "visual_band": "confirmed",
      "fit_grade": 4,
      "path_grade": 4,
      "evidence_grade": "A",
      "forecast_label": "CONFIRMED",
      "supporting_signal_ids": [
        "w2-src-qtime"
      ],
      "contrary_signal_ids": [],
      "inference_boundary": "Award-lead status is confirmed; completed rapid NDI qualification is not.",
      "missing_gate": "Accepted inspection system and transition to DoD, FAA or NASA use.",
      "upgrade_trigger": "Qualified part inspection and production adoption.",
      "downgrade_trigger": "Performance or transition failure.",
      "next_recheck": "2026-10-31",
      "expiry": "2027-02-18"
    },
    {
      "inference_id": "w2-mfg-northrop-043",
      "as_of": "2026-08-18",
      "sector": "Advanced manufacturing and industrial qualification",
      "cet_family": [
        "sensing and signature management",
        "advanced manufacturing and materials"
      ],
      "mission": "Inspect large and complex additive parts rapidly",
      "required_capability": "near-commercial non-destructive inspection",
      "federal_owner": "OSW ManTech / America Makes",
      "federal_program_or_facility": "QTIME project call",
      "anticipated_instrument": "official award-lead selection",
      "company_legal_entity": "Northrop Grumman Systems Corporation",
      "company_display_name": "Northrop Grumman Systems",
      "company_role": "additive NDI project lead and end-user integrator",
      "relationship_state": "official_qtime_award_lead",
      "visual_band": "confirmed",
      "fit_grade": 4,
      "path_grade": 4,
      "evidence_grade": "A",
      "forecast_label": "CONFIRMED",
      "supporting_signal_ids": [
        "w2-src-qtime"
      ],
      "contrary_signal_ids": [],
      "inference_boundary": "Award-lead status is confirmed; completed rapid NDI qualification is not.",
      "missing_gate": "Accepted inspection system and program transition.",
      "upgrade_trigger": "Qualified part inspection used in production.",
      "downgrade_trigger": "Performance, data-rights or transition failure.",
      "next_recheck": "2026-10-31",
      "expiry": "2027-02-18"
    }
  ]
}