---
title: Wave 3 Strict Re-audit — Central Institutions
status: validated-overlay
artifact_role: controlling-promotion-gate-only
audited_at: 2026-08-23
closed_wave_mutation: false
vault_chart_canon_mutation: false
---

# Wave 3 strict re-audit — central institutions

This isolated overlay re-audits the exact **19** prior Wave 3 D rows belonging
to `fg-107`, `fg-114`, and `fg-227`, in their closed relevance-ledger order.
It does not revise the official-site census, evidence objects, clocks, novelty,
or any file under `../../../waves/wave_3_defense/`.

## Exact result

| Controlling class | Rows |
|---|---:|
| A — `routine_or_duplicate_reject` | 0 |
| B — `completeness_census_only` | 5 |
| C — `plotline_support_only` | 9 |
| D — `promotion_review` | 5 |
| **Total** | 19 |

Only D enters `D_REVIEW_QUEUE.csv`; the queue has 5 rows and
5 unique retained-D units.
There are no shared retained-D units. The other 14 rows
cannot create standalone Observatory notes.

## Retained D non-routine tests

| Unit | Object | Title | Exact established plotline join | Why this is not routine |
|---|---|---|---|---|
| `W3-CI-PRU-001` | `W3-DS-OBJ-017` | Department of War Publishes Fifth Release of Unidentified Anomalous Phenomena Files on WAR.GOV/UFO | `["Disclosure"]` | Retain D — not routine: public release of the fifth declassified UAP tranche is itself the tracked disclosure/provenance transition on the established UAP storyline, changing public-record availability from four releases to five without validating the files' historical claims. |
| `W3-CI-PRU-002` | `W3-DS-OBJ-009` | Department of War Launches the Golden Dome for America Hub To Accelerate Industry Engagement, Revolutionize Homeland Missile Defense Partnerships | Technology/AI; Military | Retain D — not routine: the Department actually launched a named Golden Dome industry-engagement interface on the already established Golden Dome/defense-tech storyline. The review is limited to that operating acquisition interface and does not claim a solicitation, award, fielded shield, interception, or demonstrated capability. |
| `W3-CI-PRU-003` | `W3-DS-OBJ-004` | U.S.-Jamaica Joint Statement on Status of Forces Agreement | `["Foreign Policy","Military"]` | Retain D — not routine: the governments announced a signed SOFA, creating the governing legal instrument for temporary U.S.-force presence and mutually agreed activity in Jamaica on the established Western Hemisphere defense/Monroe storyline. No instrument text, entry-into-force clock, base, deployment, force count, or operation is inferred. |
| `W3-CI-PRU-004` | `W3-DI-OBJ-029` | DOE Information Reviews [2026-100-039] | `["Energy"]` | Retain D — not routine audit/recommendation publication: the Board-signed letter records DOE staff's cessation of the prior CUI/public-release review pathway, materially updating the already established DOE–DNFSB access and technical-report availability watch. The letter requests restoration and proves neither DOE acceptance nor resolution. |
| `W3-CI-PRU-005` | `W3-DI-OBJ-030` | Acting Chairman Summers Concludes Tenure at DNFSB | `["Politics","Energy"]` | Retain D — not routine personnel: Summers's tenure end left the charted DNFSB with one serving member and without full-Board quorum, materially changing statutory Board-action capacity on the established administrative-state/nuclear-oversight spine while delegated staff functions continued. |

The fifth UAP tranche survives because public provenance is the exact
Disclosure storyline, not because it was recent. Golden Dome survives because
its named acquisition interface actually launched on an already tracked
project, not because the Department issued a press release. The Jamaica SOFA
survives as a signed governing instrument on the established Western
Hemisphere/Monroe storyline, not as generic Military adjacency. The DNFSB
letter survives because it records a change in the clearance pathway on the
already established DOE–DNFSB access watch, not merely a recommendation. The
DNFSB tenure object survives because loss of full-Board quorum changes
statutory action capacity, not because a leader departed.

## Deliberate downgrades

- SM-3 frameworks and the three industrial-finance families remain C: no
  framework signature/award/output state or final financing/production state
  is proved. Niron's pending workbench inventory is not a live Observatory
  object and cannot elevate a conditional commitment.
- PFAS and Pacific-infrastructure OIG objects remain C; the GAO blast-health
  report remains B. Audit, advisory, and recommendation publication alone is
  not implementation or effect.
- Four ordinary contract actions remain B. Amounts, FMS funding, shared
  ceilings, option periods, and award language do not prove delivery or an
  operating transition.
- DLA Okinawa and the twenty-four-site WMS go-live remain C. Both are real
  operating evidence, but neither joins a specific established Observatory
  storyline tightly enough for a standalone note; generic Military, Energy,
  or technology adjacency fails D.

## Determinism and preservation

`build_reaudit.py` derives the exact population and order from the closed
Wave 3 ledgers and emits only this directory. `validate_reaudit.py` runs the
builder twice, proves byte-idempotence, validates controlled plotline/subplot
labels and class semantics, and fingerprints the entire closed Wave 3 tree
before and after.

Frozen source proof used by this overlay:

- closed Wave 3 files: **120**
- closed Wave 3 tree SHA-256: `b8ffb27fb6b78b1b40f7881a97bb7745ae829e36f89959138dc21c38e1be28c7`
- source primary ledger SHA-256: `eccd241f5d2dbbd8d4a3aa38db7d90c668b5188a7e08b516955fefd1f422ee1d`
- source relevance ledger SHA-256: `ebbe5dc586b440301cb172331f3d7026735b42a8a4be9fad8d5995dc043122e4`

This overlay is a review gate only. It grants no `keep`, vault promotion,
chart construction, canon change, new plotline, or implementation authority.
