# Wave 3 strict anti-bloat re-audit contract

**Input:** the 64 `promotion_review` rows in the closed Wave 3 relevance ledger  
**Output role:** controlling promotion-gate overlay only  
**Closed Wave 3 mutation:** forbidden  
**Vault/chart/canon mutation:** forbidden

## Purpose

Wave 3's official-site and object census remains valid. This second pass answers a narrower question: which of its 64 previously queued records are genuinely interesting to an already established Freedom 250 plotline, rather than merely new, official, large, military, or adjacent?

The prior Wave 3 queue is not trusted as an intake decision until every one of its 64 rows clears this contract.

## Hard gate

A row may remain `promotion_review` only when all of the following are true:

1. It joins to an exact established plotline, and normally to the most specific established subplot available. Generic `Military`, `Technology/AI`, `Energy`, or publisher adjacency is not enough by itself.
2. It materially changes a legal, adjudicative, entity, authority, delegation, funding, implementation, operating, watch, falsifier, provenance, or chartable-date state that the Observatory is already tracking.
3. The change is non-routine in Observatory terms. Recency, dollar amount, contract ceiling, award format, press-release treatment, senior-official quotation, or location alone cannot satisfy materiality.
4. Novelty survives the pre-campaign reservoir. Same-campaign discovery is evidence, not the dedup floor.
5. The exact actor, instrument or operating object, before/after state, and independent clock are preserved without converting a proposal, selection, conditional commitment, option, IDIQ ceiling, R&D vehicle, recommendation, or target into completed execution.

## Default rulings

- Ordinary base contracts, modifications, option exercises, IDIQ vehicles, charters, local construction, recurring weapons production, service support, research awards, and company-specific actions default to `plotline_support_only` or `completeness_census_only`.
- A contract may remain D only when the contract itself is the material tracked transition: for example, a non-routine new control architecture, a specifically established project moving into funded implementation, an actual go-live/fielded state, or a decisive falsifier. Amount alone cannot elevate it.
- Conditional loan commitments and selections do not become disbursement, production, delivery, or operation. They require a specific established project/plotline and a material legal-financing state to remain D.
- Audits, GAO/OIG reports, advisories, and recommendations default to C. They remain D only when the finding itself is a material established watch/falsifier, not merely because deficiencies or recommendations were published.
- Personnel changes default to B. A leadership assumption may remain D only for an already tracked command/control entity where the assumption itself changes named authority and operating control.
- Proposals, draft guidance, event notices, publication releases, and future milestones remain C or B unless the publication/provenance act is itself the exact established storyline.
- Multiple carrier rows about one story remain separate legal/object identities but may be joined into one review packet. Routine families should be grouped at synthesis rather than promoted atomically.

## Required output

The re-audit must produce:

1. an exact 64-row ordered join to the prior D set;
2. the prior class and the controlling new class for every row;
3. exact established plotline/subplot labels for retained D rows;
4. a concise reason that states why each retained D is not routine;
5. a D-only controlling review queue;
6. deterministic validation proving that the closed Wave 3 tree remained byte-identical; and
7. a count of downgraded rows and review units.

No retained row grants `keep`, vault promotion, chart construction, canon change, or new-plotline authority.
