---
title: Wave 2 — National Command, Foreign Affairs, Defense and Public Intelligence
status: source-checked
artifact_role: research-wave
retrieval_cutoff: 2026-08-13 21:25:45 EDT
---

# Wave 2 — National command, foreign affairs, defense and public intelligence

## Executive result

This lane contains the largest White House gap in Grok's find-first pass. Three
new presidential instruments materially change command, tariff, acquisition or
program state. An export-control emergency continuation and a Commerce drone
export-control rule also reached public inspection. The instruments create
orders, delegations, future duties and planning gates; they do not prove that a
contract, cyber operation, shipyard, carrier redesign, import collection or
export transaction has occurred.

## P1 — material command and security state

### P1-1. The President established a federally controlled private-company cyber program

The August 12 memorandum directs the National Coordination Center to create,
manage and maintain a program authorizing vetted U.S. companies to conduct
cyber-surveillance and cyber-effects operations against foreign cyber-enabled
transnational criminal organizations. DOJ and DHS co-executive directors
oversee the program; participating companies must contract with DOJ or DHS; and
every operation package requires written approval and federal direction.

Within **60 days**, the directors must establish consensus operating procedures.
No operation may be approved unless it complies with those procedures. The
memorandum also requires a status report within **180 days** and annually,
contains a classified annex, and imposes deconfliction, legal, targeting,
incident and possible bond/escrow controls.

- **Source:** [White House presidential memorandum, August 12](https://www.whitehouse.gov/presidential-actions/2026/08/expanding-capabilities-to-combat-transnational-cyber-enabled-crime/).
- **Current state:** signed program direction and delegated approval structure.
- **Do not claim:** a participating company has been accepted, a contract has
  been awarded, operating procedures are complete, or an operation occurred.

### P1-2. The President ordered a naval/shipbuilding redesign and planning package

The August 13 memorandum directs a 60-day plan to replace the electromagnetic
aircraft launch and advanced-weapons-elevator systems with steam and hydraulic
systems for CVN-81. It sets 90- and 120-day planning/review gates for acquisition
competition, trade-deal investment, a fifth public Navy yard, a component
repair center and NAVSEA reform. It adopts a conditional “Finland Model” for up
to three ship classes and delegates 10 U.S.C. § 8679 waiver determinations; no
waiver-based contract may be made until 30 days after Congress receives the
determination.

- **Source:** [White House presidential memorandum, August 13](https://www.whitehouse.gov/presidential-actions/2026/08/rebuilding-the-united-states-navy-and-americas-shipbuilding-industrial-base/).
- **Current state:** presidential command, plan deadlines and delegated waiver
  authority.
- **Do not claim:** CVN-81 was physically redesigned, a foreign-yard waiver or
  contract exists, pledged trade-deal resources were obligated, or a fifth yard
  was selected, funded or built.

### P1-3. A section 232 UAS import-duty framework was proclaimed

The August 13 proclamation schedules additional duties beginning **September
3, 2026**: nominal rates include 100 percent for Annex I UAS/docking stations/
critical components and 25 percent for Annex II UAS, subject to product,
country, certification and other exceptions. A 25 percent rate for Annex III
components begins **February 9, 2027**. Qualifying products from named partners
are capped at 15 percent or, for the United Kingdom, 10 percent under stated
origin/certification conditions. Commerce must establish administration and
onshoring mechanisms and report on market/import conditions within 120 days.

- **Source:** [White House UAS section 232 proclamation, August 13](https://www.whitehouse.gov/presidential-actions/2026/08/adjusting-imports-of-unmanned-aircraft-systems-and-unmanned-aircraft-systems-components-into-the-united-states/).
- **Current state:** proclaimed future tariff and administrative framework.
- **Do not claim:** duties were collected by cutoff, every drone is covered at
  one rate, an importer satisfies a partner cap, or domestic production began.

### P1-4. The export-control national emergency was continued for another year

The President's August 12 notice continues the national emergency supporting
the Export Administration Regulations for one year beyond **August 17, 2026**.

- **Source:** [FR public-inspection Doc. 2026-16748](https://www.federalregister.gov/public-inspection/2026-16748/export-control-regulations-continuation-of-national-emergency-notice-of-august-12-2026).
- **Clock:** signed August 12; special public inspection August 13 at 2:00 p.m.
  ET; scheduled publication August 14.
- **Claim limit:** continuation of the pre-existing emergency, not a new export
  denial, license decision or shipment interdiction.

### P1-5. Commerce moved a drone-export-control final rule to public inspection

BIS's final rule removes the wind-gust criterion, raises the controlled
endurance threshold from 30 minutes to three hours for specified unmanned
aircraft, removes associated national-security controls for some software and
technology below that threshold, and clarifies military-UAV/end-use boundaries.
Military end-use/end-user controls remain.

- **Source:** [FR public-inspection Doc. 2026-16628](https://www.federalregister.gov/public-inspection/2026-16628/streamlining-export-controls-for-drone-exports).
- **Clock:** public inspection August 13 at 8:45 a.m. ET; scheduled publication
  August 14; the final text expressly states **August 13** as its effective date.
  That legal-effect clock does not establish a completed export.
- **Do not claim:** all drone exports were deregulated or a license, export or
  delivery occurred.

### P1-6. OMB rescinded the government-device TikTok prohibition memo

OMB Memorandum M-26-17, dated August 10, rescinds M-23-13 after DOJ's Office of
Legal Counsel concluded in July that TikTok was no longer a “covered
application” under the governing statute. The operative OMB memo states that
TikTok may be used on government devices.

- **Source:** [OMB M-26-17](https://www.whitehouse.gov/wp-content/uploads/2026/08/M-26-17-Rescission-of-M-23-13.pdf).
- **Clock separation:** July OLC legal antecedent; August 10 OMB control-memo
  rescission.
- **Do not claim:** every agency installed the app, every cybersecurity policy
  was repealed, or use is mandatory. Agency/device implementation remains a
  later operating question.

## P2 — defense/human-capital and application state

### P2-1. Defense announced a three-year gamete-preservation reimbursement demonstration

The Defense Department's notice begins the demonstration September 14 for
three years. It provides annual reimbursement ceilings of $500 for sperm and
$10,000 for oocyte cryopreservation/storage for qualifying members under
specified order, hazard-pay or separation conditions.

- **Source:** [FR Doc. 2026-16533](https://www.federalregister.gov/documents/2026/08/13/2026-16533/demonstration-project-on-reimbursement-for-the-cryopreservation-and-storage-of-certain).
- **Current state:** published future demonstration authority and eligibility
  design, not a reimbursed claim or paid benefit.

### P2-2. NRC received Orano's Project IKE enrichment-facility application

The NRC published receipt of Orano Enrichment USA's application for a
centrifuge enrichment facility in Oak Ridge/Roane County, Tennessee, including
enrichment up to 8 weight percent U-235 and possible re-enrichment of depleted
tails. The notice opens the hearing/petition path and gives a September 21
security-plan clock.

- **Source:** [FR Doc. 2026-16372](https://www.federalregister.gov/documents/2026/08/12/2026-16372/orano-enrichment-usa-llc-project-ike-enrichment-facility-notice-of-receipt-of-application-for).
- **Claim limit:** application receipt, not a license, construction start,
  enrichment operation, produced material or delivery.

## Covered and rejected

Routine export-license denials/notices, defense acquisition information
collections, ordinary military advisory meetings, arms-sales notices already
in the baseline, and ceremonial/release material without a new controlling
object were screened and rejected. OFAC's August 7 designation is retained in
Wave 1 to keep its financial-control and digital-asset-address evidence atomic.

## Bounded gaps

- The classified annex to the cyber memorandum and nonpublic intelligence,
  targeting and operational records are **NR by design**.
- No contract-award, procurement, obligation, shipyard, production, customs
  collection, export shipment or operational cyber census was performed.
- White House instruments were checked through the fixed 21:25:45 EDT cutoff;
  later page updates are outside this package.
