# NSSTS Wave 4 — Claim Audit and Forward Watchboard

**Evidence cutoff:** 2026-08-18  
**Status:** active workbench control record  
**Scope:** communications and networking, information management and cybersecurity, and directed energy  
**Boundary:** standalone Wave 4 research object; inclusion here does not promote any company into another package, the Federal Group, a portfolio, or a current-incumbent list

## Claim firewall

This record audits the company edges in the three Wave 4 registries. A company
may be a strong technical fit without a live federal path, and a confirmed
instrument may still be only a design, prototype, grant, pool membership or
expired historical relationship. Promotion requires the specific return object
named below. Company press releases can resolve product and corporate seams but
cannot substitute for a federal award, task, delivery, test or acceptance
record.

| Unsafe compression | Ruling |
|---|---|
| A design award means the company won production. | **False.** PTS-G design orders and Swarm 1 production awards are different objects. Viasat and Intelsat hold the named Swarm 1 production lane; design participants do not inherit it. |
| A production award means a system is deployed or accepted. | **False.** Manufacture, delivery, launch, checkout and government acceptance remain separate for PTS-G, ESS and MUOS. |
| A prototype OTA proves operational capability. | **False.** JLWS, IFPC-HEL, IFPC-HPM, Thunderdome, Sphinx and the frontier-AI OTAs confirm funded pathways, not successful operational acceptance. |
| A system installed on a platform is formally accepted or effective. | **False.** HELIOS installation and training are real; operational test, availability and fleet replication remain open. |
| A field assessment proves transition to production. | **False.** DE M-SHORAD, HELWS, PHASER and Boeing's dual-use laser retain separate assessment, transition and procurement clocks. |
| A federal grant is a procurement. | **False.** NTIA Innovation Fund grants to DISH, VIAVI and Nokia fund laboratories, test infrastructure or commercialization; they do not establish a federal network purchase. |
| A funded demonstration is an operating service. | **False.** NASA Communications Services Project agreements and the SpaceX Space Data Network prototype require delivery, service qualification and acceptance. |
| A multiple-award vehicle or IDIQ ceiling is revenue or demand. | **False.** JWCC, Oracle ESI, L3Harris radio, Navy laser and other vehicles require task orders and obligations. A ceiling is maximum authority, not spend. |
| A task order's ceiling equals its obligation. | **False.** Preserve base award, ceiling, obligated amount, options and later modifications as separate financial objects. |
| A budget prime map guarantees a future order. | **False.** Army future Unit-E radio suppliers are still to be determined; Persistent's prior manufacture does not reserve the next lot. |
| A successful component or integrated test proves a generally available service. | **False.** PExT and Layered Laser Defense tests support installed-stack evidence only; mission acceptance and recurring procurement remain open. |
| An R&D performer is a weapon producer. | **False.** SARA, Transient Plasma Systems and MaXentric are named component R&D performers until a funded system insertion and accepted integrated test appear. |
| A government-funded allied system is a direct company award. | **False.** U.S. assistance for Iron Beam does not itself resolve Rafael's contract, U.S. workshare or acceptance. |
| A corporate parent may replace the named awardee. | **False.** Exact subsidiaries, LLCs, LPs, trade names and instrument signatories remain canonical. |
| A current brand announcement resolves the legal counterparty. | **False.** HPE's DISA announcement and GE Vernova's CyTRICS collaboration remain below CONFIRMED where the exact current signatory or affiliate is unresolved. |
| A planned acquisition immediately transfers the federal award. | **False.** NetRise remains the SBIR awardee unless and until the Accenture transaction closes and the contract or novation record changes. |
| A program object names a vendor when the release names only a capability or site. | **False.** JIATF-401 pilot sites and APFIT Cybergenome/ARCHER selections are vendor-agnostic until an official source names the performer. |
| A canceled, expired or suspended object remains a live path. | **False.** JEDI was canceled, Accenture's Protective DNS order expired, and CMMC Phase II requirements are suspended. None may inflate current PATH. |

## Overclaim corrections by lane

### Communications and networking

| Tempting claim | Corrected state | Promotion object |
|---|---|---|
| SpaceX is operating the Space Data Network. | A funded prototype delivery order is confirmed; accepted end-to-end service is not. | Delivered prototype, government acceptance and operational authorization by the planned end-2027 milestone. |
| Viasat and Intelsat have fielded PTS-G. | Swarm 1 production awards are confirmed; spacecraft build, launch and checkout are future. | Accepted flight hardware, successful launch and on-orbit acceptance. |
| Northrop Grumman's Enhanced PTS-P is an operational constellation. | Direct development/build contract is confirmed; launch is no earlier than FY2030. | On-orbit protected-communications demonstration and follow-on production decision. |
| Boeing's ESS/MUOS awards prove deployed capacity. | Two spacecraft-production lanes are confirmed; future satellites are not yet deployed. | Delivery, launch, on-orbit test and operational acceptance. |
| Astranis has a PTS-G production award. | Ground demonstration and design work are confirmed; it was not selected for Swarm 1 production. | Flight demonstration, waveform qualification and a new production or service order. |
| NASA CSP awardees provide recurring operational relay. | Funded demonstrations exist; SES has integrated test evidence, while Telesat and Kuiper remain build/readiness paths. | Mission-level service qualification and recurring task orders. |
| An L3Harris IDIQ establishes the full stated ceiling as sales. | Supplier position is confirmed; order conversion and platform acceptance control. | Funded delivery orders and accepted field performance at scale. |
| Persistent is the FY2026-FY2027 Unit-E supplier. | FY2025 manufacture and January 2026 production are documented; later suppliers are listed as TBD. | A named next-lot production award and accepted deliveries. |
| NTIA grant recipients are deployed federal Open RAN suppliers. | DISH, VIAVI and Nokia have grant-backed capability paths, not federal network procurements. | Completed grant milestones, qualification output and buyer deployment. |

Primary anchors: [Space Data Network](https://www.ssc.spaceforce.mil/Newsroom/Article-Display/Article/4501527/us-space-force-advances-space-data-network-backbone-for-global-warfighter-conne),
[PTS-G production awards](https://www.ssc.spaceforce.mil/Newsroom/Article-Display/Article/4512873/us-space-force-advances-satellite-communications-modernization-awards-contracts),
[PTS-G design lane](https://www.ssc.spaceforce.mil/Newsroom/Article-Display/Article/4259032/space-systems-command-continues-to-transform-acquisition-of-satcom-capabilities),
[NASA commercial communications status](https://www.nasa.gov/technology/space-comms/nasas-push-toward-commercial-space-communications-gains-momentum/),
[Army FY2027 communications procurement book](https://www.asafm.army.mil/Portals/72/Documents/BudgetMaterial/2027/Discretionary%20Budget/Procurement/Other_Procurement%20-%20BA2%20-%20Communications%20%26%20Electronics.pdf),
and [NTIA Round 1 recipients](https://www.ntia.gov/page/round-1-recipients).

### Information management and cybersecurity

| Tempting claim | Corrected state | Promotion object |
|---|---|---|
| A BPA or IDIQ award proves broad enterprise deployment. | Dell CETA and Oracle ESI establish vehicles; the Air Force Dell call is a distinct funded order, while no public Oracle task order was found. | Company-specific task, obligation, delivery and acceptance. |
| JWCC proves Microsoft or AWS received the full vehicle ceiling. | Microsoft has a protested task-order record; AWS has Olympus/JOE operating evidence. The shared ceiling is not an obligation to either vendor. | Task-level obligations and accepted workloads. |
| JEDI provides current cloud-incumbency evidence. | JEDI was canceled and replaced by JWCC. | None; use only as a contrary/historical record. |
| HPE is a confirmed exact legal counterparty for DISA DCI. | DISA announced a $931 million production OTA to “Hewlett Packard Enterprise,” but the exact signatory remains unresolved; the map therefore holds STRONG INFERENCE, not CONFIRMED. | Executed agreement, FPDS/USAspending record or federal modification naming the exact legal entity. |
| OpenAI and Google prototype awards prove accepted classified deployments. | The named 2025 prototype OTAs elapsed; a later brand-level agreement does not resolve exact signatory, task, ATO or acceptance. | Current exact-entity instrument, accepted classified deployment and authorization. |
| A CMMC demand story promotes secure-software vendors. | CMMC Phase II requirements are suspended. Red Canyon and Hunted Labs stand only on their own task/SBIR evidence. | Resumption notice plus a company-specific procurement or accepted deployment. |
| APFIT Cybergenome or ARCHER names NetRise or another vendor. | The FY2026 release names capability objects, not vendors. No attribution is permitted. | Official performer, award or task naming the exact company. |
| NetRise already became an Accenture award. | The SBIR award names NETRISE INC; Accenture announced an acquisition, but closing and novation are not established in the evidence set. | Closed transaction plus official award-transfer or new exact-entity instrument. |
| Operant Networks or GE Vernova has an accepted energy-sector deployment. | DOE selection/collaboration is confirmed; completed test, field demonstration and adopted mitigation are not. | Exact counterparty, completed test report and utility/federal acceptance. |
| Accenture is the current Protective DNS incumbent. | The historical delivery order expired 2026-07-29, and no extension or successor was located by the cutoff. This edge is **BLOCKED / CONTRADICTED**. | Public extension, bridge or successor award naming Accenture Federal Services LLC. |

Primary anchors: [Thunderdome](https://disa.mil/en/About/Thunderdome),
[Dell CETA BPA](https://www.war.gov/News/Contracts/Contract/Article/4502028/contracts-for-may-27-2026/),
[Dell Air Force call](https://www.war.gov/News/Contracts/Contract/Article/4517534/contracts-for-june-15-2026/),
[JWCC awards](https://www.war.gov/News/Contracts/Contract/Article/3239197/),
[JEDI cancellation](https://www.war.gov/News/Releases/release/article/2682992/future-of-the-joint-enterprise-defense-infrastructure-cloud-contract/),
[DISA DCI announcement](https://dowcio.war.gov/In-the-News/Article/4367354/disa-awards-931-million-other-transaction-agreement-for-data-center-modernizati/),
[classified-network AI agreements](https://www.war.gov/serve-from-netstorage/News/Releases/Release/Article/4475177/classified-networks-ai-agreements/index.html),
[CMMC suspension](https://dowcio.war.gov/CMMC/),
[FY2026 APFIT selections](https://www.war.gov/News/Releases/Release/Article/4544621/department-of-war-issues-final-fy26-apfit-awards-surpassing-2-billion-milestone/),
and [Accenture Protective DNS award record](https://www.usaspending.gov/award/CONT_AWD_47QFRA21F0029_4732_47QTCK18D0036_4732).

### Directed energy

| Tempting claim | Corrected state | Promotion object |
|---|---|---|
| Both JLWS awardees already have accepted 150-kW systems. | nLIGHT DEFENSE Systems and Lockheed Martin Aculight hold parallel prototype OTAs; acceptance and 300-500-kW scaling remain open. | Accepted integrated prototype, live-target/duty-cycle results and production OTA. |
| Lockheed Martin Aculight's IFPC-HEL path is secure because the OTA exists. | The OTA is confirmed, but GAO reports delayed integration and possible non-transition. | Accepted integrated prototype, approved requirement and program-office transition. |
| HELIOS is an operationally accepted fleet capability. | Installation aboard USS Preble and training are confirmed; formal operational effectiveness, availability and second-ship replication are not public. | Operational acceptance and follow-on ship procurement. |
| Four DE M-SHORAD prototypes prove production readiness. | Delivery and assessment are confirmed; GAO says the system was not mature enough to transition and a non-Stryker configuration is under consideration. | Mature enduring configuration, user acceptance and production decision. |
| HELWS or PHASER field assessment proves current procurement. | Overseas assessment is confirmed; no current follow-on or named JIATF-401 selection was found. | Current production order or named pilot-site selection with accepted effects. |
| Epirus has transitioned IFPC-HPM. | The prototype OTA exists, but the Army remains at an invest-or-divest gate. | Explicit investment/transition decision, prototype receipt and user evidence. |
| BlueHalo LOCUST is federally accepted and operational. | The product and surviving LLC are documented, but exact customer, contract, quantity and government acceptance are absent. | Government award and accepted operational-performance record. |
| Navy laser IDIQ pool membership proves a live task. | Rolls-Royce and General Atomics have relevant lineage/pool position; the recorded minimum was $500 and no current task was found. | Funded task order and accepted weapon-relevant insertion. |
| Historical HELSI integration makes Dynetics the current prime. | Historical integration and budget lineage are real; the 2023 prototype OTA went to Lockheed Martin Aculight and current Dynetics workshare is unresolved. | Current exact-entity task, deliverable or disclosed JLWS teaming role. |
| Iron Beam assistance is a Rafael contract. | U.S. funding supports system procurement for Israel; exact recipient, workshare and acceptance remain unresolved. | MDA/DoW contract naming Rafael and U.S. co-production workshare. |
| JIATF-401 site selection names the system vendors. | The official release names operational sites, not vendors. | Official system selection or award per site. |

Primary anchors: [JLWS OTA awards](https://www.war.gov/News/Releases/Release/Article/4539008/department-of-war-announces-awards-86-million-joint-laser-weapon-system-agreeme/),
[GAO Army modernization assessment](https://files.gao.gov/reports/GAO-25-107491/index.html),
[HELIOS training record](https://www.navsea.navy.mil/Media/News/Article/4494885/navys-directed-energy-systems-integration-lab-to-train-sailors-on-laser-weapons/),
[Navy laser IDIQ](https://www.war.gov/News/Contracts/Contract/Article/3332066/1000/),
[ONR HPM program report](https://www.onr.navy.mil/media/document/directed-energy-weapons-dew-high-power-microwave-hpm-61-62-and-sbir-programs-fy24),
[CRS directed-energy primer](https://www.congress.gov/crs-product/IF11882),
and [JIATF-401 pilot-site announcement](https://www.war.gov/serve-from-netstorage/News/News-Stories/Article/4479463/site-selections-announced-for-directed-energy-counter-drone-program/index.html).

## Exact-entity seams

| Company path | Canonical entity ruling |
|---|---|
| SpaceX / Space Data Network | **Space Exploration Technologies Corp.** is the instrument-level entity; “SpaceX” is display shorthand only. |
| PTS-G | **Viasat, Inc.** and **Intelsat General Communications LLC** remain separate awardees; do not roll Intelsat into SES plc or another affiliate. |
| NASA commercial relay | Preserve **Telesat U.S. Services LLC**, **SES Space & Defense, Inc.**, and **Kuiper Government Solutions LLC** separately from their parents and constellations. |
| General Dynamics | **General Dynamics Information Technology, Inc.** is the Project Enigma integrator; **General Dynamics Mission Systems, Inc.** is the PWSA/Army network entity. Do not merge. |
| Dell CETA | **Dell Federal Systems, L.P.** is the BPA/call counterparty, not Dell Technologies Inc. |
| Maven | **Palantir USG, Inc.** is the named entity, not the public parent. |
| Oracle ESI | **Oracle America, Inc.** is the IDIQ awardee. |
| Classified AI | **OpenAI Public Sector LLC** and **Google Public Sector LLC** are named in the prototype records; later brand-level language cannot silently replace them. |
| DISA DCI | Hold **UNRESOLVED — announced as Hewlett Packard Enterprise; likely Hewlett Packard Enterprise Company** until the executed instrument resolves the signatory. |
| GE Vernova / CyTRICS | The selection names **GE Packaged Power, LLC d/b/a GE Vernova Advanced Research**; a brand-level collaboration update does not prove the same current counterparty. |
| NetRise | **NETRISE INC** remains the awardee while the Accenture acquisition is announced but unclosed/un-novated in this evidence set. |
| Lockheed directed energy | **Lockheed Martin Aculight Corp.** holds JLWS/IFPC-HEL prototype edges; **Lockheed Martin Corporation** is canonical for HELIOS. |
| Kord | **Kord Technologies, LLC** remains the exact prototype entity despite KBR ownership; ownership does not rewrite the instrument. |
| nLIGHT | Preserve **nLIGHT DEFENSE Systems, Inc.** from the listed parent. |
| BlueHalo | Preserve **BlueHalo, LLC** as the product entity; AeroVironment ownership does not supply the missing federal contract. |
| Raytheon | The field-assessment records resolve to **Raytheon Company**; do not substitute RTX Corporation. |
| Booz Allen | **Booz Allen Hamilton Inc.** appears in distinct Thunderdome, Navy wireless and HPM-test paths; one edge does not prove the others. |

## Adverse and contrary-state ledger

| Object | Current adverse state | Map effect | Reversal evidence |
|---|---|---|---|
| JEDI | Canceled and replaced by JWCC. | Historical only; cannot raise Microsoft or AWS current PATH. | None for JEDI; use current JWCC task evidence. |
| CISA Protective DNS / Accenture | Delivery order expired 2026-07-29; successor unresolved. | `BLOCKED / CONTRADICTED`; Accenture is not treated as current incumbent. | Extension, bridge or successor award naming Accenture Federal Services LLC. |
| CMMC Phase II | Requirements suspended at cutoff. | Cannot be used as an active demand or contracting bridge for ReForged, Hunted Labs or NetRise. | Official resumption/effective-date record. |
| FY2026 APFIT Cybergenome / ARCHER | Capability selections do not name vendors. | Vendor attribution prohibited; no company edge or score promotion. | Official performer and exact award/task. |
| JIATF-401 directed-energy pilot sites | Sites named; vendors not named. | No HELWS, PHASER, Epirus, BlueHalo, Boeing or other vendor inherits selection. | Site-specific system selection or award. |
| Lockheed Martin Aculight IFPC-HEL | Integration delayed; possible non-transition. | Confirm the OTA, not a production path or successful prototype. | Accepted prototype and program-office transition. |
| Kord DE M-SHORAD | Four prototypes assessed; maturity insufficient for transition. | No enduring production inference. | Approved mature configuration and production decision. |
| Epirus IFPC-HPM | Senior-leader invest-or-divest gate. | Confirmed prototype path with material blocker. | Explicit investment and transition decision. |
| PTS-G design participants | Design lane completed; Swarm 1 production went to Viasat and Intelsat. | Astranis/Boeing/Northrop design evidence cannot imply Swarm 1 production. | New tranche award naming the company. |
| NASA CSP demonstrations | Service demos and integrated tests do not equal recurring operations. | Preserve prototype/installed-stack bands; no accepted-service promotion. | Recurring operational task order and mission acceptance. |
| Persistent Unit-E | Future supplier listed as TBD. | Prior production is not guaranteed continuation. | Named FY2026/FY2027 lot award. |
| Navy solid-state laser IDIQ | Pool membership; $500 minimum; no current tasks located for the inferred component companies. | Ceiling and pool position cannot be counted as backlog or live production. | Funded task and accepted delivery. |
| OpenAI / Google frontier-AI prototypes | Prototype periods elapsed; later agreement is brand-level. | Strong inference only for current classified path. | Exact-entity current instrument, ATO and accepted deployment. |
| HPE DISA DCI | Exact signatory unresolved. | Strong inference, not CONFIRMED. | Executed instrument or official award record naming entity. |
| NetRise acquisition | Accenture transaction announced; closing/novation absent. | Keep SBIR edge with NETRISE INC; do not transfer. | Closing plus novation or new award. |

## High-value dated recheck gates

| Recheck by | Watch object | Upgrade trigger | Downgrade trigger |
|---|---|---|---|
| **2026-08-28 to 2026-08-31** | Hunted Labs Phase II | Completion record, accepted secure-pipeline artifact or Phase III transition. | Expiry without transition, failed integration or award closeout. |
| **2026-09-30** | CISA Protective DNS successor | Current extension, bridge or successor naming the exact entity. | Rival successor, service retirement or continued absence of active award. |
| **2026-10-18** | Persistent Unit-E; Navy wireless; DISH and VIAVI grants | Next production lot; definitized/accepted installations; completed grant milestones and qualification output. | Supplier replacement, scope reduction, delayed installation or missed grant milestone. |
| **2026-10-27** | Sphinx ESS Mission Planning Phase 3 | Accepted integrated application, cyber/user acceptance and production or sustainment award. | Prototype rejection, ATO delay or architecture replacement. |
| **2026-10-31** | HPE DCI; OpenAI/Google classified AI; NetRise; Simspace | Exact entity/task, obligation, authorization and accepted deployment. | Entity conflict, elapsed vehicle with no successor, failed acceptance or acquisition/novation break. |
| **2026-10-31** | JLWS; IFPC-HEL/HPM; DE M-SHORAD; BlueHalo; Dynetics; Rafael | Accepted prototype, explicit transition/production decision, current task or exact procurement. | Test failure, divestment, no government object or continued workshare ambiguity. |
| **2026-11-17 to 2026-11-18** | GDMS PWSA; SpaceX SDN; Viasat; SES; Kratos | Accepted integration milestones, prototype/service acceptance, operational orders or accepted infrastructure. | Interoperability failure, schedule slip, service non-transition or scope loss. |
| **2026-11-28 to 2026-11-30** | GDIT Enigma; Thunderdome; HELIOS; Boeing dual-use; Rolls-Royce | Enterprise/operational acceptance, follow-on production or funded task. | Prototype-only closeout, reliability failure or no replication/task. |
| **2026-12-09 to 2026-12-18** | Intelsat PTS-G; Nokia; Boeing ESS/MUOS; Astranis; Telesat; Kuiper; L3Harris | Accepted hardware, launch/checkout, completed grant/demo, or recurring service/order conversion. | Build/launch slip, missed demo, low order conversion or qualification failure. |
| **2026-12-31** | Oracle ESI; AWS Olympus/JOE; Maven; Echelon; PQC companies; DOE OT; SARA/TPS/MaXentric | Funded task, accepted operational use, Phase III/system insertion or completed demonstration. | No task/transition, failed security/performance gate or closeout. |
| **2027-02-15** | Northrop Grumman Enhanced PTS-P | Flight-integration milestone and retained build path toward FY2030 demonstration. | Prototype schedule failure or follow-on loss. |
| **2027-03-31 to 2027-06-30** | DIGNARI ICAM; Forward Edge AI; GE/CyTRICS; HPM follow-on recompete | Renewed call/task, accepted PQC or OT result, exact counterparty, or follow-on award. | Option lapse, no transition, adverse test or recompete loss. |

## Leading indicators and required source surfaces

### Communications and networking

High-value objects are production modifications, accepted spacecraft or
terminals, successful launch and checkout, operational service task orders,
waveform/security qualification, site acceptance, and documented IDIQ order
conversion. Design rosters, maximum ceilings, constellation plans and grants
remain discovery evidence unless the later object is explicit.

Monitor [Space Systems Command](https://www.ssc.spaceforce.mil/Newsroom/),
[Department of War contract releases](https://www.war.gov/News/Contracts/),
[NASA Communications Services Project](https://www.nasa.gov/communicating-with-missions/communications-services-project/),
[NASA Near Space Network awards](https://www.nasa.gov/news-release/nasa-selects-four-commercial-companies-to-support-near-space-network/),
Army procurement books and [NTIA Innovation Fund awards](https://www.ntia.gov/page/round-1-recipients).

### Information management and cybersecurity

High-value objects are task orders, obligations, accepted migration waves,
production deployment, ATO/authorization, operating metrics, SBIR Phase III or
novation, exact legal counterparties and current option periods. Vehicle access,
brand agreements, listings, policy demand and suspended controls cannot replace
these objects.

Monitor [DISA](https://disa.mil/),
[DoW CIO](https://dowcio.war.gov/),
[USAspending](https://www.usaspending.gov/),
[SBIR awards](https://www.sbir.gov/awards),
[DOE CESER](https://www.energy.gov/ceser),
GAO bid-protest decisions and exact contract modifications.

### Directed energy

High-value objects are accepted integrated prototypes, quantified target effects,
beam quality and duty cycle, thermal/power performance, electromagnetic safety,
operational availability, user assessment, approved requirements, program-office
transition, production instruments and accepted lots. Lab components, corporate
fielding claims, IDIQ pools and vendor-neutral pilot sites remain below those
gates.

Monitor [GAO defense acquisition reports](https://www.gao.gov/),
[Army acquisition releases](https://www.army.mil/),
[NAVSEA](https://www.navsea.navy.mil/),
[ONR](https://www.onr.navy.mil/),
[AFRL](https://www.afrl.af.mil/),
DoW contract releases and JIATF-401 vendor selections.

## Recheck cadence

- **Immediate through 2026-09-30:** Hunted Labs expiry/transition, Protective
  DNS successor, APFIT performer attribution and any JIATF-401 vendor selections.
- **Monthly:** current DoW modifications and task orders, SSC production and
  demonstration milestones, DISA operating/authorization records, directed-energy
  test and transition releases, and CMMC status.
- **Quarterly:** NASA commercial-relay milestones, NTIA grant deliverables,
  SBIR Phase III/novation records, PQC migration evidence, DOE OT demonstrations,
  production deliveries and accepted field performance.
- **On every award, grant or deployment headline:** resolve the exact legal
  entity; separate design from production, prototype from operation, grant from
  procurement, vehicle from task, ceiling from obligation, and installation from
  acceptance before any score or visual-band promotion.
- **On every expiration, cancellation, suspension, recompete or acquisition:**
  preserve both clocks, attach the contrary signal and reopen current-incumbent
  status only when a new official object warrants it.

